CN205875069U - High efficiency device that sweeps away snow for bridge - Google Patents

High efficiency device that sweeps away snow for bridge Download PDF

Info

Publication number
CN205875069U
CN205875069U CN201620344264.3U CN201620344264U CN205875069U CN 205875069 U CN205875069 U CN 205875069U CN 201620344264 U CN201620344264 U CN 201620344264U CN 205875069 U CN205875069 U CN 205875069U
Authority
CN
China
Prior art keywords
cylinder
motor
bridge
casing
fixed plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620344264.3U
Other languages
Chinese (zh)
Inventor
李刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingyang Huanyu Industry Co., Ltd.
Original Assignee
李刚
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 李刚 filed Critical 李刚
Priority to CN201620344264.3U priority Critical patent/CN205875069U/en
Application granted granted Critical
Publication of CN205875069U publication Critical patent/CN205875069U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a device that sweeps away snow especially relates to a high efficiency device that sweeps away snow for bridge. The to -be -solved technical problem of the utility model is to provide a high efficiency device that sweeps away snow for bridge that sweep away snow efficient, the effect of sweeping away snow is good, intensity of labour is little. In order to solve the technical problem, the utility model provides a such high efficiency device that sweeps away snow for bridge, including cleaning device, the shallow, and a support, cylinder I and cylinder II, be equipped with the support in the shallow, the support left side is equipped with cylinder I, I left side in the cylinder is equipped with cylinder II, II bottoms in the cylinder are equipped with cleaning device, cleaning device is including fixed plate I, a slide rail, the slider, the rack, motor I, the gear, fixed plate II, motor II and broken wheel, the symmetry is equipped with motor I and slide rail around the fixed plate I, motor I is established in the slide rail left side, I below in the motor is equipped with the gear, be equipped with the slider on the slide rail, the slider left side is equipped with the rack. The utility model discloses the effect that the deicing is efficient, the deicing effect is good, intensity of labour is little has been reached.

Description

A kind of efficient snow removal equipment of bridge
Technical field
This utility model relates to a kind of snow removal equipment, particularly relates to a kind of efficient snow removal equipment of bridge.
Background technology
Bridge, refers generally to be erected in rivers,lakes and seas, makes the structures that traffic etc. can pass through smoothly.For adapting to the transportation industry of Modern High-Speed development, bridge be also extended to cross over mountain stream, unfavorable geology or meet other traffic needs and set up make the building more easily of passing through.Bridge is typically made up of superstructure, substructure, bearing and attached structure, and superstructure, also known as bridge span structure, is across the primary structure of obstacle;Substructure includes abutment, bridge pier and basis;Bearing is the load transfer device set by the supporting of bridge span structure and bridge pier or abutment;Attached structure then refers to transition slab at bridge head, truncated cone banking, shore protection, training works etc..
Water in nature, has gaseous state, solid-state and three kinds of states of liquid.The liquid of normal temperature and pressure we term it water, the water of gaseous state is referred to as ice in steam, the water of solid-state.
In winter, temperature lower ground district, easily with sleety weather, especially freezes on bridge, and the bridge after icing affects traffic, it has not been convenient to people walk, and even results in serious vehicle accident, and the snow removed on bridge the most in time is extremely important.
There is the shortcoming that efficiency is low, poor effect of sweeping away snow, labor intensity are big of sweeping away snow in existing bridge snow removal equipment, therefore needs a kind of efficient snow removal equipment of bridge that efficiency is high, effect of sweeping away snow is good, labor intensity is little that sweeps away snow of research and development badly.
Utility model content
(1) to solve the technical problem that
This utility model is in order to overcome existing bridge snow removal equipment to there is the shortcoming that efficiency is low, poor effect of sweeping away snow, labor intensity are big of sweeping away snow, and the technical problems to be solved in the utility model is to provide a kind of efficient snow removal equipment of bridge that efficiency is high, effect of sweeping away snow is good, labor intensity is little that sweeps away snow.
(2) technical scheme
In order to solve above-mentioned technical problem, this utility model provides the efficient snow removal equipment of such a bridge, include cleaning plant, go-cart, support, cylinder I and cylinder II, go-cart is provided with support, cylinder I it is provided with on the left of support, cylinder II it is provided with on the left of cylinder I, it is provided with cleaning plant bottom cylinder II, cleaning plant includes fixed plate I, slide rail, slide block, tooth bar, motor I, gear, fixed plate II, motor II and broken wheel, it is arranged with motor I and slide rail before and after fixed plate I, motor I is located on the left of slide rail, it is provided with gear below motor I, slide rail is provided with slide block, tooth bar it is provided with on the left of slide block, rack and pinion engages, tooth bar is provided with fixed plate II, fixed plate II is provided with motor II, broken wheel it is provided with below motor II.
Preferably, also include flute profile steel plate and hydraulic cylinder, on the left of frame bottom, be provided with hydraulic cylinder, bottom hydraulic cylinder, be provided with flute profile steel plate.
Preferably, also include casing, air inlet pipe, air pump, heating wire, housing, electrically-controlled valve and escape pipe, casing top is provided with air pump, air pump is provided with air inlet pipe, air inlet pipe passes casing top, and casing inner bottom part is provided with housing, is provided with heating wire in housing, casing lower left is provided with escape pipe, and escape pipe is provided with electrically-controlled valve.
nullOperation principle: when people need to clear away the snow on bridge floor,First shift go-cart onto destination,Start cylinder I to extend,Cylinder I band dynamic air cylinder II is moved to the left,Drive cleaning plant is moved to the left,After device for clearance is moved to the left a certain distance,Close cylinder II,Start cylinder II to extend,Cylinder II drives cleaning plant to move down,After device for clearance is moved down into suitable distance,Close cylinder II,Start motor II to rotate,Motor II drives broken wheel to rotate,Start motor I alternately to rotate and reverse,Motor I driven gear alternately rotates and reverse,Gear driven tooth bar moves forward and backward,Fixed plate II is driven to move forward and backward,Drive motor II moves forward and backward,Drive broken wheel movable,Thus the snow block on bridge floor is crushed by broken wheel,And shift the snow block after broken onto bridge floor both sides,Treat that the snow on bridge floor has been cleared up,And after crushing wheel reset,Close motor I and motor II,Start cylinder II to shorten,Device for clearance resets,Close cylinder II,Start cylinder I to extend,Device for clearance resets,Close cylinder I,Finally by go-cart forced back.
Because also including flute profile steel plate and hydraulic cylinder, hydraulic cylinder it is provided with on the left of frame bottom, flute profile steel plate it is provided with bottom hydraulic cylinder, so when running into bigger snow block, starting hydraulic cylinder and alternately extend shortening, hydraulic cylinder drives flute profile steel plate to move up and down, thus the most harder snow block is crushed by flute profile steel plate, after the most harder snow block crushing, and after the reset of flute profile steel plate, close hydraulic cylinder.
Because also including casing, air inlet pipe, air pump, heating wire, housing, electrically-controlled valve and escape pipe, casing top is provided with air pump, air pump is provided with air inlet pipe, air inlet pipe passes casing top, casing inner bottom part is provided with housing, heating wire it is provided with in housing, casing lower left is provided with escape pipe, escape pipe is provided with electrically-controlled valve, so when running into the most harder snow block, booster air pump, air pump by the cold air of outside by air inlet tube pump in casing, start electric-heating-wire-heating, housing is made to heat, thus heat to the cold air in casing, after the cold air in casing heats, close air pump and heating wire, open electrically-controlled valve, in casing, the hot-air after heating is sprayed onto on snow block, thus melt snow block, after snow block melts, close electrically-controlled valve.
(3) beneficial effect
This utility model has reached the effect that deicing efficiency is high, deicing effect is good, labor intensity is little.
Accompanying drawing explanation
Fig. 1 is the first main TV structure schematic diagram of the present utility model.
Fig. 2 is the plan structure schematic diagram of this utility model cleaning plant.
Fig. 3 is the second of the present utility model main TV structure schematic diagram.
Fig. 4 is the third main TV structure schematic diagram of the present utility model.
Being labeled as in accompanying drawing: 1-cleaning plant, 2-go-cart, 3-support, 4-cylinder I, 5-cylinder II, 6-fixed plate I, 7-slide rail, 8-slide block, 9-tooth bar, 10-motor I, 11-gear, 12-fixed plate II, 13-motor II, the broken wheel of 14-, 15-flute profile steel plate, 16-hydraulic cylinder, 17-casing, 18-air inlet pipe, 19-air pump, 20-heating wire, 21-housing, 22-electrically-controlled valve, 23-escape pipe.
Detailed description of the invention
With embodiment, this utility model is further described below in conjunction with the accompanying drawings.
Embodiment 1
nullA kind of efficient snow removal equipment of bridge,As Figure 1-4,Include cleaning plant 1、Go-cart 2、Support 3、Cylinder I 4 and cylinder II 5,Go-cart 2 is provided with support 3,Cylinder I 4 it is provided with on the left of support 3,Cylinder II 5 it is provided with on the left of cylinder I 4,Cleaning plant 1 it is provided with bottom cylinder II 5,Cleaning plant 1 includes fixed plate I 6、Slide rail 7、Slide block 8、Tooth bar 9、Motor I 10、Gear 11、Fixed plate II 12、Motor II 13 and broken wheel 14,It is arranged with motor I 10 and slide rail 7 before and after fixed plate I 6,Motor I 10 is located on the left of slide rail 7,Gear 11 it is provided with below motor I 10,Slide rail 7 is provided with slide block 8,Tooth bar 9 it is provided with on the left of slide block 8,Tooth bar 9 engages with gear 11,Tooth bar 9 is provided with fixed plate II 12,Fixed plate II 12 is provided with motor II 13,Broken wheel 14 it is provided with below motor II 13.
Also including flute profile steel plate 15 and hydraulic cylinder 16, support 3 bottom left is provided with hydraulic cylinder 16, is provided with flute profile steel plate 15 bottom hydraulic cylinder 16.
Also include casing 17, air inlet pipe 18, air pump 19, heating wire 20, housing 21, electrically-controlled valve 22 and escape pipe 23, casing 17 top is provided with air pump 19, air pump 19 is provided with air inlet pipe 18, air inlet pipe 18 is through casing 17 top, casing 17 inner bottom part is provided with housing 21, being provided with heating wire 20 in housing 21, casing 17 lower left is provided with escape pipe 23, and escape pipe 23 is provided with electrically-controlled valve 22.
nullOperation principle: when people need to clear away the snow on bridge floor,First shift go-cart 2 onto destination,Start cylinder I 4 elongation,Cylinder I 4 band dynamic air cylinder II 5 is moved to the left,Cleaning plant 1 is driven to be moved to the left,After device 1 for clearance is moved to the left a certain distance,Close cylinder II 5,Start cylinder II 5 elongation,Cylinder II 5 drives cleaning plant 1 to move down,After device 1 for clearance is moved down into suitable distance,Close cylinder II 5,Start motor II 13 to rotate,Motor II 13 drives the rotation of broken wheel 14,Start motor I 10 alternately to rotate and reverse,Motor I 10 driven gear 11 alternately rotates and reverse,Gear 11 band carry-over bar 9 moves forward and backward,Fixed plate II 12 is driven to move forward and backward,Drive motor II 13 moves forward and backward,Broken wheel 14 is driven to move forward and backward,Thus crush wheel 14 and the snow block on bridge floor is crushed,And shift the snow block after broken onto bridge floor both sides,Treat that the snow on bridge floor has been cleared up,And after the reset of broken wheel 14,Close motor I 10 and motor II 13,Start cylinder II 5 to shorten,Device 1 for clearance resets,Close cylinder II 5,Start cylinder I 4 elongation,Device 1 for clearance resets,Close cylinder I 4,Finally by go-cart 2 forced back.
Because also including flute profile steel plate 15 and hydraulic cylinder 16, support 3 bottom left is provided with hydraulic cylinder 16, flute profile steel plate 15 it is provided with bottom hydraulic cylinder 16, so when running into bigger snow block, starting hydraulic cylinder 16 and alternately extend shortening, hydraulic cylinder 16 drives flute profile steel plate 15 to move up and down, thus the most harder snow block is crushed by flute profile steel plate 15, after the most harder snow block crushing, and after flute profile steel plate 15 reset, close hydraulic cylinder 16.
nullBecause also including casing 17、Air inlet pipe 18、Air pump 19、Heating wire 20、Housing 21、Electrically-controlled valve 22 and escape pipe 23,Casing 17 top is provided with air pump 19,Air pump 19 is provided with air inlet pipe 18,Air inlet pipe 18 is through casing 17 top,Casing 17 inner bottom part is provided with housing 21,Heating wire 20 it is provided with in housing 21,Casing 17 lower left is provided with escape pipe 23,Escape pipe 23 is provided with electrically-controlled valve 22,So when running into the most harder snow block,Booster air pump 19,Air pump 19 by the cold air of outside by air inlet pipe 18 pump in casing 17,Start heating wire 20 to heat,Housing 21 is made to heat,Thus heat to the cold air in casing 17,After the cold air in casing 17 heats,Close air pump 19 and heating wire 20,Open electrically-controlled valve 22,In casing 17, the hot-air after heating is sprayed onto on snow block,Thus melt snow block,After snow block melts,Close electrically-controlled valve 22.
Embodiment described above only have expressed preferred implementation of the present utility model, and it describes more concrete and detailed, but therefore can not be interpreted as the restriction to this utility model the scope of the claims.It should be pointed out that, for the person of ordinary skill of the art, without departing from the inventive concept of the premise, it is also possible to making some deformation, improve and substitute, these broadly fall into protection domain of the present utility model.Therefore, the protection domain of this utility model patent should be as the criterion with claims.

Claims (3)

  1. null1. the efficient snow removal equipment of bridge,It is characterized in that,Include cleaning plant (1)、Go-cart (2)、Support (3)、Cylinder I (4) and cylinder II (5),Go-cart (2) is provided with support (3),Support (3) left side is provided with cylinder I (4),Cylinder I (4) left side is provided with cylinder II (5),Cylinder II (5) bottom is provided with cleaning plant (1),Cleaning plant (1) includes fixed plate I (6)、Slide rail (7)、Slide block (8)、Tooth bar (9)、Motor I (10)、Gear (11)、Fixed plate II (12)、Motor II (13) and broken wheel (14),It is arranged with motor I (10) and slide rail (7) before and after fixed plate I (6),Motor I (10) is located at slide rail (7) left side,Motor I (10) lower section is provided with gear (11),Slide rail (7) is provided with slide block (8),Slide block (8) left side is provided with tooth bar (9),Tooth bar (9) engages with gear (11),Tooth bar (9) is provided with fixed plate II (12),Fixed plate II (12) is provided with motor II (13),Motor II (13) lower section is provided with broken wheel (14).
  2. A kind of efficient snow removal equipment of bridge the most according to claim 1, it is characterized in that, also including flute profile steel plate (15) and hydraulic cylinder (16), support (3) bottom left is provided with hydraulic cylinder (16), and hydraulic cylinder (16) bottom is provided with flute profile steel plate (15).
  3. A kind of efficient snow removal equipment of bridge the most according to claim 1, it is characterized in that, also include casing (17), air inlet pipe (18), air pump (19), heating wire (20), housing (21), electrically-controlled valve (22) and escape pipe (23), casing (17) top is provided with air pump (19), air pump (19) is provided with air inlet pipe (18), air inlet pipe (18) passes casing (17) top, casing (17) inner bottom part is provided with housing (21), heating wire (20) it is provided with in housing (21), casing (17) lower left is provided with escape pipe (23), escape pipe (23) is provided with electrically-controlled valve (22).
CN201620344264.3U 2016-04-23 2016-04-23 High efficiency device that sweeps away snow for bridge Expired - Fee Related CN205875069U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620344264.3U CN205875069U (en) 2016-04-23 2016-04-23 High efficiency device that sweeps away snow for bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620344264.3U CN205875069U (en) 2016-04-23 2016-04-23 High efficiency device that sweeps away snow for bridge

Publications (1)

Publication Number Publication Date
CN205875069U true CN205875069U (en) 2017-01-11

Family

ID=57688082

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620344264.3U Expired - Fee Related CN205875069U (en) 2016-04-23 2016-04-23 High efficiency device that sweeps away snow for bridge

Country Status (1)

Country Link
CN (1) CN205875069U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106948307A (en) * 2017-01-20 2017-07-14 镇江鹏飞光伏技术有限公司 Vehicle-mounted high temperature deicing machine
CN107975008A (en) * 2017-12-18 2018-05-01 沈梦佳 A kind of clear snow equipment with ice-breaking
CN107975007A (en) * 2017-12-18 2018-05-01 沈梦佳 A kind of new have the function of the clear snow equipment of ice-breaking
CN108080358A (en) * 2018-01-29 2018-05-29 宋森 A kind of open air switch board snow-removing device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106948307A (en) * 2017-01-20 2017-07-14 镇江鹏飞光伏技术有限公司 Vehicle-mounted high temperature deicing machine
CN107975008A (en) * 2017-12-18 2018-05-01 沈梦佳 A kind of clear snow equipment with ice-breaking
CN107975007A (en) * 2017-12-18 2018-05-01 沈梦佳 A kind of new have the function of the clear snow equipment of ice-breaking
CN107975007B (en) * 2017-12-18 2019-01-15 许陈菲 A kind of clear snow equipment with ice-breaking function
CN107975008B (en) * 2017-12-18 2019-02-05 南通薇星纺织科技有限公司 A kind of clear snow equipment with ice-breaking function
CN108080358A (en) * 2018-01-29 2018-05-29 宋森 A kind of open air switch board snow-removing device

Similar Documents

Publication Publication Date Title
CN205875069U (en) High efficiency device that sweeps away snow for bridge
CN107409845A (en) A kind of greenhouse irrigated using sleet is reclaimed
CN207324925U (en) A kind of traffic bridge cement block breaker
US5904321A (en) Deicing fluid recovery system especially adapted for aircraft deicing apparatus
CN107127005A (en) A kind of traffic bridge cement block breaker
CN104314036B (en) Liquefied gas heated type snow removing deicing vehicle
CN201901839U (en) Movable bridge
CN206866179U (en) A kind of greenhouse irrigated using sleet is reclaimed
CN108035285A (en) A kind of bridge expanssion joint cleaning plant
CN205804265U (en) A kind of bridge rapid deicing apparatus
CN107217639A (en) A kind of municipal works avenge device with road deicing
CN205742056U (en) A kind of bridge snow-removing device
CN203075708U (en) Anti-icing device of sedimentation tank
CN205711731U (en) A kind of anti-freeze collection drainage system
CN218291640U (en) Bridge detection and maintenance device
CN109736194A (en) A kind of anti-fall ice production apparatus of intelligence suitable for overpass discharge outlet
CN205975351U (en) Water drainage tank for bridge
CN206873385U (en) A kind of efficient deicing sweeper
CN205822111U (en) A kind of efficient deicer of bridge
CN209669696U (en) A kind of anti-fall ice production apparatus of intelligence suitable for overpass discharge outlet
CN109914184A (en) A kind of road surface anti-icing dust-extraction unit and method automatically
CN205711944U (en) A kind of efficient deicer of highway
CN205777166U (en) A kind of one-storey house roof, rural area device for melting snow
CN205822112U (en) A kind of efficient deicer of bridge
CN109024151B (en) Highway maintenance method

Legal Events

Date Code Title Description
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170608

Address after: 730020 Gansu Province Chengguan District of Lanzhou City Yantan geese Longxing road building 19 floor

Patentee after: Man Hongxi

Address before: Yanchi County, Wuzhong City in the Ningxia Hui Autonomous Region 751500 liberation Street No. 108

Patentee before: Li Gang

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170714

Address after: 730020 Gansu Province Chengguan District of Lanzhou City Yantan geese Longxing road building 19 floor

Patentee after: Qingyang Huanyu Industry Co., Ltd.

Address before: 730020 Gansu Province Chengguan District of Lanzhou City Yantan geese Longxing road building 19 floor

Patentee before: Man Hongxi

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170111

Termination date: 20180423