CN207324925U - A kind of traffic bridge cement block breaker - Google Patents

A kind of traffic bridge cement block breaker Download PDF

Info

Publication number
CN207324925U
CN207324925U CN201720612855.9U CN201720612855U CN207324925U CN 207324925 U CN207324925 U CN 207324925U CN 201720612855 U CN201720612855 U CN 201720612855U CN 207324925 U CN207324925 U CN 207324925U
Authority
CN
China
Prior art keywords
slide
sliding block
bolted connection
plate
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720612855.9U
Other languages
Chinese (zh)
Inventor
万畅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhong Gang construction group Co., Ltd
Original Assignee
Quanzhou Tea Fire Trading Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Quanzhou Tea Fire Trading Co Ltd filed Critical Quanzhou Tea Fire Trading Co Ltd
Priority to CN201720612855.9U priority Critical patent/CN207324925U/en
Application granted granted Critical
Publication of CN207324925U publication Critical patent/CN207324925U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

It the utility model is related to a kind of breaker, more particularly to a kind of traffic bridge cement block breaker.The technical problem to be solved by the present invention is to provide it is a kind of it is time saving and energy saving, labor intensity is small, and in shattering process, dust can be purged, into without influencing surrounding environment, do not make the traffic bridge cement block breaker of people's clothes dirty also.In order to solve the above-mentioned technical problem, the utility model provides such a traffic bridge cement block breaker, includes bottom plate, support plate, top plate, bracing wire, pulley, the first slide, first sliding block etc.;Bottom plate crown center is provided with the first slide by bolted connection, and for the first slide in being horizontally disposed with, the first slide is equipped with the first sliding block coordinated with it, and the first sliding block is slidably matched with the first slide.It is small that the utility model has reached time saving and energy saving, labor intensity, in shattering process, dust can be purged, into without influencing surrounding environment, not make the effect of people's clothes dirty also.

Description

A kind of traffic bridge cement block breaker
Technical field
It the utility model is related to a kind of breaker, more particularly to a kind of traffic bridge cement block breaker.
Background technology
Bridge, refers generally to be erected in rivers,lakes and seas, the structures for making traffic etc. smoothly to pass through.It is modern to adapt to The transportation industry of high speed development, bridge be also extended to across mountain stream, unfavorable geology or meet other traffic needs and set up make Current more easily building.Bridge is generally made of superstructure, substructure, bearing and attached structure, top knot Structure is also known as bridge span structure, is across the primary structure of obstacle;Substructure includes abutment, bridge pier and basis;Bearing is spanning knot The load transfer device that the supporting place of structure and bridge pier or abutment is set;Attached structure then refer to transition slab at bridge head, truncated cone banking, shore protection, Training works etc..
In the construction of traffic bridge, it can all use and arrive cement, and cement places easily caking for a long time, and before use It is time-consuming and laborious, work is strong when being required for crushing cement block, and then easy to use, and manually cement block being crushed Degree is big, during broken, it may appear that a large amount of dusts, and then surrounding environment is influenced, while can also make the clothes of people dirty, because This there is an urgent need for research and development it is a kind of it is time saving and energy saving, labor intensity is small, in shattering process, dust can be purged, into without influencing week Collarette border, does not make the traffic bridge cement block breaker of people's clothes dirty also.
Utility model content
(1)Technical problems to be solved
It is time-consuming and laborious, labor intensity is big when the utility model manually crushes cement block to overcome, broken During, it may appear that a large amount of dusts, and then the shortcomings that influence surrounding environment, the technical problem to be solved by the present invention is to provide It is a kind of it is time saving and energy saving, labor intensity is small, in shattering process, dust can be purged, into without influencing surrounding environment, also not Make the traffic bridge cement block breaker of people's clothes dirty.
(2)Technical solution
In order to solve the above-mentioned technical problem, the utility model provides such a traffic bridge and crushes dress with cement block Put, include bottom plate, support plate, top plate, bracing wire, pulley, the first slide, the first sliding block, the first spring, broken frame, crushing shell, drive Dynamic device and lifting gear, bottom plate crown center are provided with the first slide by bolted connection, and the first slide is in level Set, the first slide is equipped with the first sliding block coordinated with it, and the first sliding block is slidably matched with the first slide, the first sliding block of left side The first spring is connected between left surface in left surface lower part and the first slide, the first slider top is by bolted connection Broken frame is installed, the left and right sides is all provided with support plate by bolted connection at the top of bottom plate, and support plate is left to be symmetrical arranged Collateral plate right flank is equipped with lifting gear, and crushing shell is connected with the lifting part of lifting gear, and crushing shell is located in broken frame, Both sides are all provided with pulley to right side support plate left surface by bolted connection up and down, and pulley is is symmetrical arranged, at the top of support plate Driving device is installed by bolted connection, the driving part of driving device is contacted with the rolling member of lifting gear, Bracing wire is connected with the driving part of driving device, bracing wire tail end connects around two pulleys and right side the first sliding block right flank middle part Connect.
Preferably, driving device includes the first motor, gear, rack, the second slide, the second sliding block and wedge block, top Second slide is installed by bolted connection, in being horizontally disposed with, the second slide is equipped with the second slide among plate bottom The second sliding block coordinated with it, the second sliding block are slidably matched with the second slide, and the second slider bottom is by bolted connection Wedge block is installed, wedge block inclined-plane is contacted with lifting gear, is installed by bolted connection in the middle part of wedge block left surface There is rack, rack is in being horizontally disposed with, and wedge block right flank is connected with bracing wire, and top plate bottom left is pacified by bolted connection Equipped with the first motor, gear is connected with by shaft coupling on the output shaft of the first motor, gear is located on front side of the first motor, gear Above rack, wheel and rack engagement.
Preferably, lifting gear includes transverse slat, motion bar, contact roller, fixed baffle and second spring, left side support plate Right flank top is provided with transverse slat by bolted connection, and first through hole is provided with the right side of transverse slat, is equipped with and lives in first through hole Lever, motion bar bottom are connected with crushing shell crown center by bolted connection, and motion bar top is bolted Mode contact roller is installed, contact roller and wedge block contact of incline plane, motion bar top is pacified by bolted connection Equipped with fixed baffle, second spring is connected between fixed baffle bottom and transverse slat top, second spring is sleeved on motion bar.
Preferably, dust-extraction unit has been further included, dust-extraction unit includes compression cylinder, fixing sleeve, outlet pipe, first unidirectional Valve, nozzle, water inlet pipe, the second check valve, water tank, filler pipe, piston and cylinder, the side that transverse slat bottom left is bolted Formula is provided with compression cylinder, and compression cylinder is located at broken frame left, and compression cylinder left upper portion is connected with water inlet pipe, water inlet pipe and compression cylinder Interior connection, water inlet pipe are equipped with the second check valve, and left side support plate left surface top is provided with water tank by bolted connection, Filler pipe is connected with the left of tank top, filler pipe in water tank with connecting, and water inlet pipe tail end is in the middle part of support plate and on the right side of water tank Lower part connects, and for water inlet pipe with being connected in water tank, broken frame left side top is provided with fixing sleeve by bolted connection, fixed Outlet pipe is equipped with set, outlet pipe is equipped with the first check valve, and outlet pipe wherein one end is connected with compression cylinder right upper portion, water outlet Pipe in compression cylinder with connecting, and the outlet pipe other end is provided with nozzle by bolted connection, and nozzle is connected with outlet pipe, spray Head is located above broken frame, piston is equipped with compression cylinder, in being horizontally disposed with, piston compresses piston with being slidably matched in compression cylinder The second through hole is provided among cylinder bottom portion, bolted mode is passed on left at the top of bottom plate cylinder is installed, cylinder is in set vertically Put, the telescopic rod of cylinder among the second through hole and piston base by connecting.
Preferably, the first travel switch and the second travel switch have been further included, the second slide bottom right is connected by screw The mode connect is provided with the first travel switch, and the first travel switch is located at the second sliding block right, and the second slide bottom left passes through The mode of screw connection is provided with the second travel switch, and the second travel switch be located at the second sliding block left, the second travel switch with First travel switch has circuit to be connected with the first motor.
Preferably, the material of bottom plate is Q235 steel.
Operation principle:Operating personnel pour into cement block in broken frame first, start driving device, the driving of driving device The lifting part of component driving lifting gear moves up and down, and the lifting part of lifting gear is moved up and down to drive and moved down on crushing shell Dynamic, crushing shell, which moves up and down, crushes cement block, meanwhile, because of the effect of the first spring, driving device is also drawn by bracing wire Dynamic first sliding block moves left and right, and the first sliding block moves left and right the broken frame of drive and moves left and right, and broken frame is moved left and right to cement block Rocked, and then crushing shell is more fully crushed to cement block.After the completion of cement block crushes, driving dress is closed Put, you can take out the cement block crushed.
Because driving device includes the first motor, gear, rack, the second slide, the second sliding block and wedge block, top plate bottom Second slide is installed by bolted connection, the second slide is in being horizontally disposed with, and the second slide is equipped with and it among portion The second sliding block coordinated, the second sliding block are slidably matched with the second slide, and the second slider bottom is installed by bolted connection There is wedge block, wedge block inclined-plane is contacted with lifting gear, is installed by bolted connection in the middle part of wedge block left surface with teeth Bar, rack is in being horizontally disposed with, and wedge block right flank is connected with bracing wire, and top plate bottom left is provided with by bolted connection First motor, is connected with gear on the output shaft of the first motor by shaft coupling, and gear is located on front side of the first motor, and gear is located at Above rack, wheel and rack engagement, when cement block is located in broken frame, operating personnel start the first motor positive and negative alternate and turn Dynamic, the first motor positive and negative alternate rotation driven gear positive and negative alternate rotates, and gear positive and negative alternate rotates band carry-over bar and moves left and right, Rack, which moves left and right, drives wedge block to move left and right, and the second slide play the guiding role with the second sliding block, and wedge block moves left and right drive The lifting part of dynamic lifting gear moves up and down, and then the lifting part of lifting gear drives crushing shell to move up and down to cement block Crushed, meanwhile, wedge block pulls the first sliding block to move left and right by bracing wire, and then drives broken frame to move left and right to make to crush Plate more fully crushes cement block.After the completion of cement block crushes, the first motor is closed.
Because lifting gear includes transverse slat, motion bar, contact roller, fixed baffle and second spring, left side support plate is right Side surface upper part is provided with transverse slat by bolted connection, and first through hole is provided with the right side of transverse slat, activity is equipped with first through hole Bar, motion bar bottom are connected with crushing shell crown center by bolted connection, and motion bar top is bolted Mode is provided with contact roller, contact roller and wedge block contact of incline plane, and motion bar top is installed by bolted connection Have a fixed baffle, at the top of fixed baffle bottom and transverse slat between be connected with second spring, second spring is sleeved on motion bar, when the When one motor positive and negative alternate rotates, wedge block moves left and right, and then when contact roller and the rolling of wedge block contact of incline plane, because of second The effect of spring, contact roller drive motion bar to move up and down, and motion bar, which moves up and down, drives crushing shell to move up and down, and then broken Slashings, which moves up and down, crushes cement block.
Because having further included dust-extraction unit, dust-extraction unit includes compression cylinder, fixing sleeve, outlet pipe, the first check valve, spray Head, water inlet pipe, the second check valve, water tank, filler pipe, piston and cylinder, transverse slat bottom left are pacified by bolted connection Equipped with compression cylinder, compression cylinder is located at broken frame left, and compression cylinder left upper portion is connected with water inlet pipe, and water inlet pipe in compression cylinder with connecting Logical, water inlet pipe is equipped with the second check valve, and left side support plate left surface top is provided with water tank, water tank by bolted connection Top left side is connected with filler pipe, and filler pipe in water tank with connecting, and water inlet pipe tail end is through support plate middle part and water tank lower right side Connection, connects in water inlet pipe and water tank, crushes frame left side top and is provided with fixing sleeve by bolted connection, in fixing sleeve Equipped with outlet pipe, outlet pipe is equipped with the first check valve, and outlet pipe wherein one end is connected with compression cylinder right upper portion, outlet pipe with Connection, the outlet pipe other end are provided with nozzle by bolted connection in compression cylinder, and nozzle is connected with outlet pipe, nozzle position Above broken frame, piston is equipped with compression cylinder, piston is in being horizontally disposed with, and piston in compression cylinder with being slidably matched, compression cylinder bottom The second through hole is provided among portion, bolted mode is passed on left at the top of bottom plate cylinder is installed, cylinder is in be vertically arranged, gas The telescopic rod of cylinder among the second through hole and piston base by connecting, and water is poured into water tank by operating personnel by filler pipe first Interior, while crushing shell is crushing cement block, the telescopic rod that operating personnel start cylinder moves up and down, and cylinder is stretched Contracting bar moves up and down band piston and moves up and down, and when piston moves down, the water in water tank is pumped into by piston by water inlet pipe In compression cylinder, when piston moves up, the water in compression cylinder is pushed into outlet pipe by piston, and then the water in outlet pipe passes through Nozzle sprays, and the dust that water occurs when being sprayed on cement block to crushing is purged, at the same time, moreover it is possible to cement block is preferably broken It is broken.After the completion of cement block crushes, cylinder is closed.In this way, when being crushed to cement block, dust appearance pair can be prevented The influence of surrounding environment.
Because having further included the first travel switch and the second travel switch, what the second slide bottom right was connected by screw Mode is provided with the first travel switch, and the first travel switch is located at the second sliding block right, and the second slide bottom left passes through screw The mode of connection is provided with the second travel switch, and the second travel switch is located at the second sliding block left, the second travel switch and first Travel switch has circuit to be connected with the first motor, and when cement block is when broken, the first motor positive and negative alternate rotates, and then when second When sliding block moves right, the second sliding block and the first stroke switch contact, the first motor rotate forward, and then the second sliding block is moved to the left, Second sliding block is moved to the left to be contacted with the second travel switch, the first motor reversal, and then the second sliding block moves right.In this way, nothing Need operating personnel to start the first motor positive and negative alternate to rotate, it is time saving and energy saving.
Because the material of bottom plate is Q235 steel, the load-bearing capacity of Q235 steel is strong, acidproof corrosion-resistant, adds the use of bottom plate Service life.
(3)Beneficial effect
It is small that the utility model has reached time saving and energy saving, labor intensity, and in shattering process, dust can be purged, into Without influencing surrounding environment, the effect of people's clothes is not made dirty also.
Brief description of the drawings
Fig. 1 is the first main structure diagram of the utility model.
Fig. 2 is second of main structure diagram of the utility model.
Fig. 3 is the third main structure diagram of the utility model.
Mark in attached drawing for:1- bottom plates, 2- support plates, 3- top plates, 4- bracing wires, 5- pulleys, the first slides of 6-, 7- first are slided Block, the first springs of 8-, 9- crush frame, 10- crushing shells, 11- driving devices, the first motors of 111-, 112- gears, 113- racks, The second slides of 114-, the second sliding blocks of 115-, 116- wedge blocks, 12- lifting gears, 121- transverse slats, 122- first through hole, 123- live Lever, 124- contact rollers, 125- fixed baffles, 126- second springs, 13- dust-extraction units, 131- compression cylinders, 132- are fixed Set, 133- outlet pipes, the first check valves of 134-, 135- nozzles, 136- water inlet pipes, the second check valves of 137-, 138- water tanks, 139- Filler pipe, 1310- pistons, the second through holes of 1311-, 1312- cylinders, the first travel switches of 14-, the second travel switches of 15-.
Embodiment
The utility model is further described with reference to the accompanying drawings and examples.
Embodiment 1
A kind of traffic bridge cement block breaker, as shown in Figs. 1-3, includes bottom plate 1, support plate 2, top plate 3, bracing wire 4th, pulley 5, the first slide 6, the first sliding block 7, the first spring 8, broken frame 9, crushing shell 10, driving device 11 and lifting gear 12,1 crown center of bottom plate is provided with the first slide 6 by bolted connection, and the first slide 6 is in horizontally disposed, the first cunning Rail 6 is equipped with the first sliding block 7 coordinated with it, and the first sliding block 7 is slidably matched with the first slide 6,7 left surface of the first sliding block of left side The first spring 8 is connected with lower part and the first slide 6 between left surface, the top of the first sliding block 7 is pacified by bolted connection Equipped with broken frame 9, the top of bottom plate 1 left and right sides is all provided with support plate 2 by bolted connection, and support plate 2 is to be symmetrical arranged, Support plate 2 right flank in left side is equipped with lifting gear 12, and crushing shell 10, crushing shell 10 are connected with the lifting part of lifting gear 12 In in broken frame 9, both sides are all provided with pulley 5 to 2 left surface of right side support plate by bolted connection up and down, and pulley 5 is pair Claim to set, the top of support plate 2 is provided with driving device 11, the driving part of driving device 11 and lifting by bolted connection The rolling member contact of device 12, is connected with bracing wire 4 on the driving part of driving device 11,4 tail end of bracing wire around two pulleys 5 with 7 right flank middle part of the first sliding block of right side connects.
Embodiment 2
A kind of traffic bridge cement block breaker, as shown in Figs. 1-3, includes bottom plate 1, support plate 2, top plate 3, bracing wire 4th, pulley 5, the first slide 6, the first sliding block 7, the first spring 8, broken frame 9, crushing shell 10, driving device 11 and lifting gear 12,1 crown center of bottom plate is provided with the first slide 6 by bolted connection, and the first slide 6 is in horizontally disposed, the first cunning Rail 6 is equipped with the first sliding block 7 coordinated with it, and the first sliding block 7 is slidably matched with the first slide 6,7 left surface of the first sliding block of left side The first spring 8 is connected with lower part and the first slide 6 between left surface, the top of the first sliding block 7 is pacified by bolted connection Equipped with broken frame 9, the top of bottom plate 1 left and right sides is all provided with support plate 2 by bolted connection, and support plate 2 is to be symmetrical arranged, Support plate 2 right flank in left side is equipped with lifting gear 12, and crushing shell 10, crushing shell 10 are connected with the lifting part of lifting gear 12 In in broken frame 9, both sides are all provided with pulley 5 to 2 left surface of right side support plate by bolted connection up and down, and pulley 5 is pair Claim to set, the top of support plate 2 is provided with driving device 11, the driving part of driving device 11 and lifting by bolted connection The rolling member contact of device 12, is connected with bracing wire 4 on the driving part of driving device 11,4 tail end of bracing wire around two pulleys 5 with 7 right flank middle part of the first sliding block of right side connects.
Driving device 11 includes the first motor 111, gear 112, rack 113, the second slide 114,115 and of the second sliding block Wedge block 116, the second slide 114 is provided among 3 bottom of top plate, the second slide 114 is in level by bolted connection Setting, the second slide 114 is equipped with the second sliding block 115 coordinated with it, and the second sliding block 115 is slidably matched with the second slide 114, Second sliding block, 115 bottom is provided with wedge block 116 by bolted connection, and 116 inclined-plane of wedge block connects with lifting gear 12 Touch, rack 113 is installed by bolted connection, rack 113 is in horizontally disposed, wedge shape in the middle part of 116 left surface of wedge block 116 right flank of block is connected with bracing wire 4, and 3 bottom left of top plate is provided with the first motor 111 by bolted connection, and first Gear 112 is connected with by shaft coupling on the output shaft of motor 111, gear 112 is located at the front side of the first motor 111, gear 112 Above rack 113, gear 112 is engaged with rack 113.
Embodiment 3
A kind of traffic bridge cement block breaker, as shown in Figs. 1-3, includes bottom plate 1, support plate 2, top plate 3, bracing wire 4th, pulley 5, the first slide 6, the first sliding block 7, the first spring 8, broken frame 9, crushing shell 10, driving device 11 and lifting gear 12,1 crown center of bottom plate is provided with the first slide 6 by bolted connection, and the first slide 6 is in horizontally disposed, the first cunning Rail 6 is equipped with the first sliding block 7 coordinated with it, and the first sliding block 7 is slidably matched with the first slide 6,7 left surface of the first sliding block of left side The first spring 8 is connected with lower part and the first slide 6 between left surface, the top of the first sliding block 7 is pacified by bolted connection Equipped with broken frame 9, the top of bottom plate 1 left and right sides is all provided with support plate 2 by bolted connection, and support plate 2 is to be symmetrical arranged, Support plate 2 right flank in left side is equipped with lifting gear 12, and crushing shell 10, crushing shell 10 are connected with the lifting part of lifting gear 12 In in broken frame 9, both sides are all provided with pulley 5 to 2 left surface of right side support plate by bolted connection up and down, and pulley 5 is pair Claim to set, the top of support plate 2 is provided with driving device 11, the driving part of driving device 11 and lifting by bolted connection The rolling member contact of device 12, is connected with bracing wire 4 on the driving part of driving device 11,4 tail end of bracing wire around two pulleys 5 with 7 right flank middle part of the first sliding block of right side connects.
Driving device 11 includes the first motor 111, gear 112, rack 113, the second slide 114,115 and of the second sliding block Wedge block 116, the second slide 114 is provided among 3 bottom of top plate, the second slide 114 is in level by bolted connection Setting, the second slide 114 is equipped with the second sliding block 115 coordinated with it, and the second sliding block 115 is slidably matched with the second slide 114, Second sliding block, 115 bottom is provided with wedge block 116 by bolted connection, and 116 inclined-plane of wedge block connects with lifting gear 12 Touch, rack 113 is installed by bolted connection, rack 113 is in horizontally disposed, wedge shape in the middle part of 116 left surface of wedge block 116 right flank of block is connected with bracing wire 4, and 3 bottom left of top plate is provided with the first motor 111 by bolted connection, and first Gear 112 is connected with by shaft coupling on the output shaft of motor 111, gear 112 is located at the front side of the first motor 111, gear 112 Above rack 113, gear 112 is engaged with rack 113.
Lifting gear 12 includes transverse slat 121, motion bar 123, contact roller 124, fixed baffle 125 and second spring 126, support plate 2 right flank top in left side is provided with transverse slat 121 by bolted connection, and it is logical that the right side of transverse slat 121 is provided with first Hole 122, first through hole 122 is interior to be equipped with motion bar 123, and 123 bottom of motion bar is pushed up with crushing shell 10 by bolted connection Connection among portion, 123 top of motion bar are provided with contact roller 124, contact roller 124 and wedge shape by bolted connection 116 contact of incline plane of block, 123 top of motion bar are provided with fixed baffle 125,125 bottom of fixed baffle by bolted connection Second spring 126 is connected between portion and the top of transverse slat 121, second spring 126 is sleeved on motion bar 123.
Embodiment 4
A kind of traffic bridge cement block breaker, as shown in Figs. 1-3, includes bottom plate 1, support plate 2, top plate 3, bracing wire 4th, pulley 5, the first slide 6, the first sliding block 7, the first spring 8, broken frame 9, crushing shell 10, driving device 11 and lifting gear 12,1 crown center of bottom plate is provided with the first slide 6 by bolted connection, and the first slide 6 is in horizontally disposed, the first cunning Rail 6 is equipped with the first sliding block 7 coordinated with it, and the first sliding block 7 is slidably matched with the first slide 6,7 left surface of the first sliding block of left side The first spring 8 is connected with lower part and the first slide 6 between left surface, the top of the first sliding block 7 is pacified by bolted connection Equipped with broken frame 9, the top of bottom plate 1 left and right sides is all provided with support plate 2 by bolted connection, and support plate 2 is to be symmetrical arranged, Support plate 2 right flank in left side is equipped with lifting gear 12, and crushing shell 10, crushing shell 10 are connected with the lifting part of lifting gear 12 In in broken frame 9, both sides are all provided with pulley 5 to 2 left surface of right side support plate by bolted connection up and down, and pulley 5 is pair Claim to set, the top of support plate 2 is provided with driving device 11, the driving part of driving device 11 and lifting by bolted connection The rolling member contact of device 12, is connected with bracing wire 4 on the driving part of driving device 11,4 tail end of bracing wire around two pulleys 5 with 7 right flank middle part of the first sliding block of right side connects.
Driving device 11 includes the first motor 111, gear 112, rack 113, the second slide 114,115 and of the second sliding block Wedge block 116, the second slide 114 is provided among 3 bottom of top plate, the second slide 114 is in level by bolted connection Setting, the second slide 114 is equipped with the second sliding block 115 coordinated with it, and the second sliding block 115 is slidably matched with the second slide 114, Second sliding block, 115 bottom is provided with wedge block 116 by bolted connection, and 116 inclined-plane of wedge block connects with lifting gear 12 Touch, rack 113 is installed by bolted connection, rack 113 is in horizontally disposed, wedge shape in the middle part of 116 left surface of wedge block 116 right flank of block is connected with bracing wire 4, and 3 bottom left of top plate is provided with the first motor 111 by bolted connection, and first Gear 112 is connected with by shaft coupling on the output shaft of motor 111, gear 112 is located at the front side of the first motor 111, gear 112 Above rack 113, gear 112 is engaged with rack 113.
Lifting gear 12 includes transverse slat 121, motion bar 123, contact roller 124, fixed baffle 125 and second spring 126, support plate 2 right flank top in left side is provided with transverse slat 121 by bolted connection, and it is logical that the right side of transverse slat 121 is provided with first Hole 122, first through hole 122 is interior to be equipped with motion bar 123, and 123 bottom of motion bar is pushed up with crushing shell 10 by bolted connection Connection among portion, 123 top of motion bar are provided with contact roller 124, contact roller 124 and wedge shape by bolted connection 116 contact of incline plane of block, 123 top of motion bar are provided with fixed baffle 125,125 bottom of fixed baffle by bolted connection Second spring 126 is connected between portion and the top of transverse slat 121, second spring 126 is sleeved on motion bar 123.
Dust-extraction unit 13 is further included, dust-extraction unit 13 includes compression cylinder 131, fixing sleeve 132, outlet pipe 133, first Check valve 134, nozzle 135, water inlet pipe 136, the second check valve 137, water tank 138, filler pipe 139, piston 1310 and cylinder 1312,121 bottom left of transverse slat is provided with compression cylinder 131 by bolted connection, and it is left that compression cylinder 131 is located at broken frame 9 Side, 131 left upper portion of compression cylinder are connected with water inlet pipe 136, and water inlet pipe 136 is set with being connected in compression cylinder 131 on water inlet pipe 136 There is the second check valve 137, support plate 2 left surface top in left side is provided with water tank 138 by bolted connection, and water tank 138 pushes up Filler pipe 139 is connected with the left of portion, filler pipe 139 in water tank 138 with connecting, and 136 tail end of water inlet pipe is through the middle part of support plate 2 and water 138 lower right side of case connects, and water inlet pipe 136 crushes 9 left side top of frame by bolted connection with being connected in water tank 138 Fixing sleeve 132 is installed, is equipped with outlet pipe 133 in fixing sleeve 132, outlet pipe 133 is equipped with the first check valve 134, outlet pipe 133 wherein one end are connected with 131 right upper portion of compression cylinder, and outlet pipe 133 in compression cylinder 131 with connecting, 133 other end of outlet pipe Nozzle 135 is installed by bolted connection, nozzle 135 is connected with outlet pipe 133, and nozzle 135 is located on broken frame 9 Side, is equipped with piston 1310 in compression cylinder 131, piston 1310 in being horizontally disposed with, piston 1310 with being slidably matched in compression cylinder 131, The second through hole 1311 is provided among 131 bottom of compression cylinder, 1 top left side of bottom plate is provided with cylinder by bolted connection 1312, cylinder 1312 is in being vertically arranged, and the telescopic rod of cylinder 1312 is by the second through hole 1311 with connecting among 1310 bottom of piston Connect.
The first travel switch 14 and the second travel switch 15 are further included, 114 bottom right of the second slide is connected by screw The mode connect is provided with the first travel switch 14, and the first travel switch 14 is located at 115 right of the second sliding block, 114 bottom of the second slide The mode that portion passes on left screw connection is provided with the second travel switch 15, and it is left that the second travel switch 15 is located at the second sliding block 115 Side, the second travel switch 15 and the first travel switch 14 have circuit to be connected with the first motor 111.
The material of bottom plate 1 is Q235 steel.
Operation principle:Operating personnel pour into cement block in broken frame 9 first, start driving device 11, driving device 11 The lifting part of driving part driving lifting gear 12 move up and down, it is broken that the lifting part of lifting gear 12 moves up and down drive Slashings 10 moves up and down, and crushing shell 10, which moves up and down, crushes cement block, meanwhile, because of the effect of the first spring 8, driving dress Put 11 also pulls the first sliding block 7 to move left and right by bracing wire 4, and the first sliding block 7 moves left and right the broken frame 9 of drive and moves left and right, and breaks Broken frame 9, which moves left and right, rocks cement block, and then crushing shell 10 is more fully crushed to cement block.Work as cement block After the completion of broken, driving device 11 is closed, you can take out the cement block crushed.
Because driving device 11 includes the first motor 111, gear 112, rack 113, the second slide 114, the second sliding block 115 and wedge block 116, the second slide 114 is installed by bolted connection among 3 bottom of top plate, the second slide 114 is in Horizontally disposed, the second slide 114 is equipped with the second sliding block 115 coordinated with it, and the second sliding block 115 is slided with the second slide 114 Coordinate, 115 bottom of the second sliding block is provided with wedge block 116,116 inclined-plane of wedge block and lifting gear by bolted connection 12 contacts, 116 left surface of wedge block middle part are provided with rack 113 by bolted connection, and rack 113 is in be horizontally disposed with, 116 right flank of wedge block is connected with bracing wire 4, and 3 bottom left of top plate is provided with the first motor 111 by bolted connection, Gear 112 is connected with by shaft coupling on the output shaft of first motor 111, gear 112 is located at the front side of the first motor 111, gear 112 engage positioned at the top of rack 113, gear 112 with rack 113, and when cement block is located in broken frame 9, operating personnel start First motor, 111 positive and negative alternate rotates, and 111 positive and negative alternate rotation driven gear of the first motor, 112 positive and negative alternate rotates, gear 112 positive and negative alternates rotate band carry-over bar 113 and move left and right, and rack 113, which moves left and right, drives wedge block 116 to move left and right, and second Slide 114 play the guiding role with the second sliding block 115, and wedge block 116 is moved left and right above and below the lifting part of driving lifting gear 12 It is mobile, and then the lifting part drive crushing shell 10 of lifting gear 12 moves up and down and cement block is crushed, meanwhile, wedge block 116 pull the first sliding block 7 to move left and right by bracing wire 4, and then driving broken frame 9 to move left and right makes crushing shell 10 more fully right Cement block is crushed.After the completion of cement block crushes, the first motor 111 is closed.
Because lifting gear 12 includes transverse slat 121, motion bar 123, contact roller 124,125 and second bullet of fixed baffle Spring 126,2 right flank top of left side support plate are provided with transverse slat 121 by bolted connection, and the right side of transverse slat 121 is provided with first Through hole 122, is equipped with motion bar 123 in first through hole 122,123 bottom of motion bar by bolted connection with crushing shell 10 Crown center connects, and 123 top of motion bar is provided with contact roller 124, contact roller 124 and wedge by bolted connection 116 contact of incline plane of shape block, 123 top of motion bar are provided with fixed baffle 125, fixed baffle 125 by bolted connection Second spring 126 is connected between bottom and the top of transverse slat 121, second spring 126 is sleeved on motion bar 123, when the first motor When 111 positive and negative alternates rotate, wedge block 116 moves left and right, and then when contact roller 124 and the rolling of 116 contact of incline plane of wedge block, Because of the effect of second spring 126, contact roller 124 drives motion bar 123 to move up and down, and it is broken that motion bar 123 moves up and down drive Slashings 10 moves up and down, and then crushing shell 10 moves up and down and cement block is crushed.
Because having further included dust-extraction unit 13, dust-extraction unit 13 include compression cylinder 131, fixing sleeve 132, outlet pipe 133, First check valve 134, nozzle 135, water inlet pipe 136, the second check valve 137, water tank 138, filler pipe 139, piston 1310 are gentle Cylinder 1312,121 bottom left of transverse slat are provided with compression cylinder 131 by bolted connection, and compression cylinder 131 is located at broken frame 9 Left, 131 left upper portion of compression cylinder are connected with water inlet pipe 136, and water inlet pipe 136 in compression cylinder 131 with connecting, on water inlet pipe 136 Equipped with the second check valve 137, support plate 2 left surface top in left side is provided with water tank 138, water tank 138 by bolted connection Top left side is connected with filler pipe 139, filler pipe 139 with connect in water tank 138,136 tail end of water inlet pipe through the middle part of support plate 2 and 138 lower right side of water tank connects, and water inlet pipe 136 crushes the side that 9 left side top of frame is bolted with being connected in water tank 138 Formula is provided with fixing sleeve 132, is equipped with outlet pipe 133 in fixing sleeve 132, outlet pipe 133 is equipped with the first check valve 134, water outlet The wherein one end of pipe 133 is connected with 131 right upper portion of compression cylinder, and for outlet pipe 133 with being connected in compression cylinder 131, outlet pipe 133 is another End is provided with nozzle 135 by bolted connection, and nozzle 135 is connected with outlet pipe 133, and nozzle 135 is located on broken frame 9 Side, is equipped with piston 1310 in compression cylinder 131, piston 1310 in being horizontally disposed with, piston 1310 with being slidably matched in compression cylinder 131, The second through hole 1311 is provided among 131 bottom of compression cylinder, 1 top left side of bottom plate is provided with cylinder by bolted connection 1312, cylinder 1312 is in being vertically arranged, and the telescopic rod of cylinder 1312 is by the second through hole 1311 with connecting among 1310 bottom of piston Connect, operating personnel are poured into water in water tank 138 by filler pipe 139 first, when crushing shell 10 cement block is carried out it is broken Meanwhile the telescopic rod of operating personnel's startup cylinder 1312 moves up and down, the telescopic rod of cylinder 1312 moves up and down band piston 1310 move up and down, and when piston 1310 moves down, the water in water tank 138 is pumped into pressure by piston 1310 by water inlet pipe 136 In contracting cylinder 131, when piston 1310 moves up, the water in compression cylinder 131 is pushed into outlet pipe 133 by piston 1310, and then Water in outlet pipe 133 is sprayed by nozzle 135, and the dust that water occurs when being sprayed on cement block to crushing is purged, meanwhile, Cement block can also be made preferably to be broken.After the completion of cement block crushes, cylinder 1312 is closed.In this way, to cement block When carrying out broken, it can prevent dust from the influence to surrounding environment occur.
Because having further included the first travel switch 14 and the second travel switch 15,114 bottom right of the second slide passes through spiral shell The mode of nail connection is provided with the first travel switch 14, and the first travel switch 14 is located at 115 right of the second sliding block, the second slide The mode that 114 bottom lefts are connected by screw is provided with the second travel switch 15, and the second travel switch 15 is located at the second sliding block 115 lefts, the second travel switch 15 and the first travel switch 14 have circuit to be connected with the first motor 111, when cement block is broken When, 111 positive and negative alternate of the first motor rotates, and then when the second sliding block 115 moves right, the second sliding block 115 and the first stroke The contact of switch 14, the first motor 111 rotates forward, and then the second sliding block 115 is moved to the left, and the second sliding block 115 is moved to the left and second Travel switch 15 contacts, and the first motor 111 inverts, and then the second sliding block 115 moves right.In this way, start without operating personnel First motor, 111 positive and negative alternate rotates, time saving and energy saving.
Because the material of bottom plate 1 is Q235 steel, the load-bearing capacity of Q235 steel is strong, acidproof corrosion-resistant, adds making for bottom plate 1 Use the service life.
Embodiment described above only expresses the preferred embodiment of the utility model, its description is more specific and detailed, But it should not be interpreted as limiting the scope of the present invention.It should be pointed out that for the common of this area For technical staff, without departing from the inventive concept of the premise, some deformations can also be made, improves and substitutes, these are all Belong to the scope of protection of the utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.

Claims (6)

1. a kind of traffic bridge cement block breaker, it is characterised in that include bottom plate(1), support plate(2), top plate(3)、 Bracing wire(4), pulley(5), the first slide(6), the first sliding block(7), the first spring(8), broken frame(9), crushing shell(10), driving Device(11)And lifting gear(12), bottom plate(1)Crown center is provided with the first slide by bolted connection(6), the One slide(6)In horizontally disposed, the first slide(6)It is equipped with the first sliding block coordinated with it(7), the first sliding block(7)With first Slide(6)It is slidably matched, the first sliding block of left side(7)Left surface lower part and the first slide(6)First is connected between interior left surface Spring(8), the first sliding block(7)Top is provided with broken frame by bolted connection(9), bottom plate(1)At left and right sides of top Support plate is all installed by bolted connection(2), support plate(2)To be symmetrical arranged, left side support plate(2)Right flank is equipped with lifting Device(12), lifting gear(12)Lifting part on be connected with crushing shell(10), crushing shell(10)Positioned at broken frame(9)It is interior, Right side support plate(2)Left surface is all provided with pulley in both sides by bolted connection up and down(5), pulley(5)To be symmetrical arranged, Support plate(2)Top is provided with driving device by bolted connection(11), driving device(11)Driving part and lifting Device(12)Rolling member contact, driving device(11)Driving part on be connected with bracing wire(4), bracing wire(4)Tail end bypasses Two pulleys(5)With the first sliding block of right side(7)Right flank middle part connects.
A kind of 2. traffic bridge cement block breaker according to claim 1, it is characterised in that driving device(11) Include the first motor(111), gear(112), rack(113), the second slide(114), the second sliding block(115)And wedge block (116), top plate(3)Second slide is installed by bolted connection among bottom(114), the second slide(114)In water It is flat to set, the second slide(114)It is equipped with the second sliding block coordinated with it(115), the second sliding block(115)With the second slide (114)It is slidably matched, the second sliding block(115)Bottom is provided with wedge block by bolted connection(116), wedge block (116)Inclined-plane and lifting gear(12)Contact, wedge block(116)Rack is installed by bolted connection in the middle part of left surface (113), rack(113)In horizontally disposed, wedge block(116)Right flank and bracing wire(4)Connection, top plate(3)Bottom left passes through Bolted mode is provided with the first motor(111), the first motor(111)Output shaft on gear is connected with by shaft coupling (112), gear(112)Positioned at the first motor(111)Front side, gear(112)Positioned at rack(113)Top, gear(112)With tooth Bar(113)Engagement.
A kind of 3. traffic bridge cement block breaker according to claim 2, it is characterised in that lifting gear(12) Include transverse slat(121), motion bar(123), contact roller(124), fixed baffle(125)And second spring(126), left side branch Plate(2)Right flank top is provided with transverse slat by bolted connection(121), transverse slat(121)Right side is provided with first through hole (122), first through hole(122)It is interior to be equipped with motion bar(123), motion bar(123)Bottom is by bolted connection with crushing Plate(10)Crown center connects, motion bar(123)Top is provided with contact roller by bolted connection(124), contact Roller(124)With wedge block(116)Contact of incline plane, motion bar(123)Top is provided with fixed gear by bolted connection Plate(125), fixed baffle(125)Bottom and transverse slat(121)Second spring is connected between top(126), second spring(126) It is sleeved on motion bar(123)On.
4. a kind of traffic bridge cement block breaker according to claim 3, it is characterised in that further included dedusting Device(13), dust-extraction unit(13)Include compression cylinder(131), fixing sleeve(132), outlet pipe(133), the first check valve (134), nozzle(135), water inlet pipe(136), the second check valve(137), water tank(138), filler pipe(139), piston(1310) And cylinder(1312), transverse slat(121)Bottom left is provided with compression cylinder by bolted connection(131), compression cylinder(131) Positioned at broken frame(9)Left, compression cylinder(131)Left upper portion is connected with water inlet pipe(136), water inlet pipe(136)With compression cylinder (131)Interior connection, water inlet pipe(136)It is equipped with the second check valve(137), left side support plate(2)Left surface top is connected by bolt The mode connect is provided with water tank(138), water tank(138)Top left side is connected with filler pipe(139), filler pipe(139)With water tank (138)Interior connection, water inlet pipe(136)Tail end runs through support plate(2)Middle part and water tank(138)Lower right side connects, water inlet pipe(136) With water tank(138)Interior connection, crushes frame(9)Left side top is provided with fixing sleeve by bolted connection(132), fixing sleeve (132)It is interior to be equipped with outlet pipe(133), outlet pipe(133)It is equipped with the first check valve(134), outlet pipe(133)Wherein one end with Compression cylinder(131)Right upper portion connects, outlet pipe(133)With compression cylinder(131)Interior connection, outlet pipe(133)The other end passes through Bolted mode is provided with nozzle(135), nozzle(135)With outlet pipe(133)Connection, nozzle(135)Positioned at broken frame (9)Top, compression cylinder(131)It is interior to be equipped with piston(1310), piston(1310)In horizontally disposed, piston(1310)With compression cylinder (131)Inside it is slidably matched, compression cylinder(131)The second through hole is provided among bottom(1311), bottom plate(1)Top left side passes through bolt The mode of connection is provided with cylinder(1312), cylinder(1312)In being vertically arranged, cylinder(1312)Telescopic rod it is logical by second Hole(1311)With piston(1310)Connection among bottom.
5. a kind of traffic bridge cement block breaker according to claim 4, it is characterised in that further included first Travel switch(14)With the second travel switch(15), the second slide(114)The mode that bottom right is connected by screw is provided with First travel switch(14), the first travel switch(14)Positioned at the second sliding block(115)Right, the second slide(114)Bottom left The mode being connected by screw is provided with the second travel switch(15), the second travel switch(15)Positioned at the second sliding block(115)It is left Side, the second travel switch(15)With the first travel switch(14)With the first motor(111)There is circuit connection.
A kind of 6. traffic bridge cement block breaker according to claim 5, it is characterised in that bottom plate(1)Material Matter is Q235 steel.
CN201720612855.9U 2017-05-30 2017-05-30 A kind of traffic bridge cement block breaker Expired - Fee Related CN207324925U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720612855.9U CN207324925U (en) 2017-05-30 2017-05-30 A kind of traffic bridge cement block breaker

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720612855.9U CN207324925U (en) 2017-05-30 2017-05-30 A kind of traffic bridge cement block breaker

Publications (1)

Publication Number Publication Date
CN207324925U true CN207324925U (en) 2018-05-08

Family

ID=62425810

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720612855.9U Expired - Fee Related CN207324925U (en) 2017-05-30 2017-05-30 A kind of traffic bridge cement block breaker

Country Status (1)

Country Link
CN (1) CN207324925U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108940489A (en) * 2018-06-20 2018-12-07 姜玉欣 A kind of mine coal high-efficiency crushing device
CN109162214A (en) * 2018-10-29 2019-01-08 郭弘 A kind of method of bridge strengthening
CN109162215A (en) * 2018-10-29 2019-01-08 郭弘 A kind of bridge strengthening equipment
CN109185615A (en) * 2018-08-29 2019-01-11 九方安达工程技术集团有限责任公司 Ultrasonic detector test device
CN109201258A (en) * 2018-08-28 2019-01-15 李彦 A kind of aloe mud making apparatus for moisturizing hand lotion
CN110064472A (en) * 2019-04-25 2019-07-30 钟志刚 A kind of quick shredding mechanism of food plastic rubbish
CN110124771A (en) * 2019-04-24 2019-08-16 翁宇彬 A kind of finishing plastic garbage high-efficient treatment device
CN110614177A (en) * 2019-09-19 2019-12-27 马鞍山中千环保科技有限公司 A spraying painting device for steel surface
CN111729716A (en) * 2020-06-03 2020-10-02 淮北辰威科技有限公司 Fodder reducing mechanism

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108940489A (en) * 2018-06-20 2018-12-07 姜玉欣 A kind of mine coal high-efficiency crushing device
CN108940489B (en) * 2018-06-20 2020-08-07 准格尔旗永智煤炭有限公司 High-efficient breaker of mine coal
CN109201258A (en) * 2018-08-28 2019-01-15 李彦 A kind of aloe mud making apparatus for moisturizing hand lotion
CN109185615A (en) * 2018-08-29 2019-01-11 九方安达工程技术集团有限责任公司 Ultrasonic detector test device
CN109185615B (en) * 2018-08-29 2020-07-31 九方安达工程技术集团有限责任公司 Ultrasonic detector testing arrangement
CN109162214A (en) * 2018-10-29 2019-01-08 郭弘 A kind of method of bridge strengthening
CN109162215A (en) * 2018-10-29 2019-01-08 郭弘 A kind of bridge strengthening equipment
CN109162214B (en) * 2018-10-29 2020-06-02 南昌公路桥梁工程有限公司 Bridge reinforcing method
CN110124771A (en) * 2019-04-24 2019-08-16 翁宇彬 A kind of finishing plastic garbage high-efficient treatment device
CN110064472A (en) * 2019-04-25 2019-07-30 钟志刚 A kind of quick shredding mechanism of food plastic rubbish
CN110614177A (en) * 2019-09-19 2019-12-27 马鞍山中千环保科技有限公司 A spraying painting device for steel surface
CN111729716A (en) * 2020-06-03 2020-10-02 淮北辰威科技有限公司 Fodder reducing mechanism

Similar Documents

Publication Publication Date Title
CN207324925U (en) A kind of traffic bridge cement block breaker
CN107127005A (en) A kind of traffic bridge cement block breaker
CN107127171A (en) A kind of traffic bridge roadblock device for high-efficiency cleaning
CN206315847U (en) A kind of bulk stone breaker for building
CN107138393A (en) A kind of bridge sand screening plant
CN107476193B (en) A kind of bridge construction pours device with clump
CN206635699U (en) A kind of bridge guard rail high-efficiency washing device
CN107185824A (en) A kind of bridge construction sand rapid screening equipment
CN106955773A (en) A kind of construction waste break process equipment
CN107042457A (en) A kind of reinforced bar rust cleaning equipment for bridge construction
CN104986300A (en) Cleaning boat for garbage on water surface
CN107511440A (en) A kind of pile foundation reinforcing bar cutter device
CN205850949U (en) A kind of useless brick quick crashing device for building
CN107282571A (en) A kind of Municipal Engineering Construction dress efficient cleaning equipment of Sand Bucket
CN207071519U (en) A kind of bridge sand screening plant
CN107225624A (en) A kind of bridge construction sawing apparatus
CN107042186A (en) A kind of bridge railing production pipe mopping device
CN108035285A (en) A kind of bridge expanssion joint cleaning plant
CN207071557U (en) A kind of traffic bridge roadblock device for high-efficiency cleaning
CN107186594A (en) Reinforcing bar Rapid rust cleaning device is used in a kind of energy-saving bridge pier cast
CN207891729U (en) A kind of bridge discharge structure
CN202764031U (en) Moveable wet sprayed concrete mixing station
CN107253687B (en) Solar energy photovoltaic panel installation, which is promoted, faces upward rocker
CN107456790A (en) It is a kind of to be filtered dry equipment for the quick of rare earth recovery
CN108252567A (en) A kind of bridge road temporary construction guardrail

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190927

Address after: The 224700 Jianhu people's Road No. 1 in Jiangsu Province

Patentee after: Zhong Gang construction group Co., Ltd

Address before: No. 29, Dahongpu Stone Carving City, Luoyang Town, Hui'an County, Quanzhou City, Fujian Province, 362100

Patentee before: Quanzhou tea fire Trading Co. Ltd.

Effective date of registration: 20190927

Address after: The 224700 Jianhu people's Road No. 1 in Jiangsu Province

Patentee after: Zhong Gang construction group Co., Ltd

Address before: No. 29, Dahongpu Stone Carving City, Luoyang Town, Hui'an County, Quanzhou City, Fujian Province, 362100

Patentee before: Quanzhou tea fire Trading Co. Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180508

Termination date: 20200530