CN207324925U - A kind of traffic bridge cement block breaker - Google Patents
A kind of traffic bridge cement block breaker Download PDFInfo
- Publication number
- CN207324925U CN207324925U CN201720612855.9U CN201720612855U CN207324925U CN 207324925 U CN207324925 U CN 207324925U CN 201720612855 U CN201720612855 U CN 201720612855U CN 207324925 U CN207324925 U CN 207324925U
- Authority
- CN
- China
- Prior art keywords
- slide
- sliding block
- bolted connection
- plate
- block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000004568 cement Substances 0.000 title claims abstract description 58
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances data:image/svg+xml;base64,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 data:image/svg+xml;base64,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 O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 80
- 238000007906 compression Methods 0.000 claims description 53
- 239000000945 filler Substances 0.000 claims description 18
- 238000000605 extraction Methods 0.000 claims description 10
- 238000005096 rolling process Methods 0.000 claims description 8
- 229910000831 Steel Inorganic materials 0.000 claims description 7
- 230000001808 coupling Effects 0.000 claims description 7
- 238000010168 coupling process Methods 0.000 claims description 7
- 238000005859 coupling reaction Methods 0.000 claims description 7
- 239000010959 steel Substances 0.000 claims description 7
- 239000000463 material Substances 0.000 claims description 5
- 239000000428 dust Substances 0.000 abstract description 9
- 230000000694 effects Effects 0.000 abstract description 8
- 238000000034 method Methods 0.000 abstract description 5
- 238000010586 diagram Methods 0.000 description 3
- 239000007921 spray Substances 0.000 description 3
- 238000005260 corrosion Methods 0.000 description 2
- 210000000282 Nails Anatomy 0.000 description 1
- 241001080929 Zeugopterus punctatus Species 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000002441 reversible Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 238000004642 transportation engineering Methods 0.000 description 1
Abstract
It the utility model is related to a kind of breaker, more particularly to a kind of traffic bridge cement block breaker.The technical problem to be solved by the present invention is to provide it is a kind of it is time saving and energy saving, labor intensity is small, and in shattering process, dust can be purged, into without influencing surrounding environment, do not make the traffic bridge cement block breaker of people's clothes dirty also.In order to solve the above-mentioned technical problem, the utility model provides such a traffic bridge cement block breaker, includes bottom plate, support plate, top plate, bracing wire, pulley, the first slide, first sliding block etc.;Bottom plate crown center is provided with the first slide by bolted connection, and for the first slide in being horizontally disposed with, the first slide is equipped with the first sliding block coordinated with it, and the first sliding block is slidably matched with the first slide.It is small that the utility model has reached time saving and energy saving, labor intensity, in shattering process, dust can be purged, into without influencing surrounding environment, not make the effect of people's clothes dirty also.
Description
Technical field
It the utility model is related to a kind of breaker, more particularly to a kind of traffic bridge cement block breaker.
Background technology
Bridge, refers generally to be erected in rivers,lakes and seas, the structures for making traffic etc. smoothly to pass through.It is modern to adapt to
The transportation industry of high speed development, bridge be also extended to across mountain stream, unfavorable geology or meet other traffic needs and set up make
Current more easily building.Bridge is generally made of superstructure, substructure, bearing and attached structure, top knot
Structure is also known as bridge span structure, is across the primary structure of obstacle;Substructure includes abutment, bridge pier and basis;Bearing is spanning knot
The load transfer device that the supporting place of structure and bridge pier or abutment is set;Attached structure then refer to transition slab at bridge head, truncated cone banking, shore protection,
Training works etc..
In the construction of traffic bridge, it can all use and arrive cement, and cement places easily caking for a long time, and before use
It is time-consuming and laborious, work is strong when being required for crushing cement block, and then easy to use, and manually cement block being crushed
Degree is big, during broken, it may appear that a large amount of dusts, and then surrounding environment is influenced, while can also make the clothes of people dirty, because
This there is an urgent need for research and development it is a kind of it is time saving and energy saving, labor intensity is small, in shattering process, dust can be purged, into without influencing week
Collarette border, does not make the traffic bridge cement block breaker of people's clothes dirty also.
Utility model content
(1)Technical problems to be solved
It is time-consuming and laborious, labor intensity is big when the utility model manually crushes cement block to overcome, broken
During, it may appear that a large amount of dusts, and then the shortcomings that influence surrounding environment, the technical problem to be solved by the present invention is to provide
It is a kind of it is time saving and energy saving, labor intensity is small, in shattering process, dust can be purged, into without influencing surrounding environment, also not
Make the traffic bridge cement block breaker of people's clothes dirty.
(2)Technical solution
In order to solve the above-mentioned technical problem, the utility model provides such a traffic bridge and crushes dress with cement block
Put, include bottom plate, support plate, top plate, bracing wire, pulley, the first slide, the first sliding block, the first spring, broken frame, crushing shell, drive
Dynamic device and lifting gear, bottom plate crown center are provided with the first slide by bolted connection, and the first slide is in level
Set, the first slide is equipped with the first sliding block coordinated with it, and the first sliding block is slidably matched with the first slide, the first sliding block of left side
The first spring is connected between left surface in left surface lower part and the first slide, the first slider top is by bolted connection
Broken frame is installed, the left and right sides is all provided with support plate by bolted connection at the top of bottom plate, and support plate is left to be symmetrical arranged
Collateral plate right flank is equipped with lifting gear, and crushing shell is connected with the lifting part of lifting gear, and crushing shell is located in broken frame,
Both sides are all provided with pulley to right side support plate left surface by bolted connection up and down, and pulley is is symmetrical arranged, at the top of support plate
Driving device is installed by bolted connection, the driving part of driving device is contacted with the rolling member of lifting gear,
Bracing wire is connected with the driving part of driving device, bracing wire tail end connects around two pulleys and right side the first sliding block right flank middle part
Connect.
Preferably, driving device includes the first motor, gear, rack, the second slide, the second sliding block and wedge block, top
Second slide is installed by bolted connection, in being horizontally disposed with, the second slide is equipped with the second slide among plate bottom
The second sliding block coordinated with it, the second sliding block are slidably matched with the second slide, and the second slider bottom is by bolted connection
Wedge block is installed, wedge block inclined-plane is contacted with lifting gear, is installed by bolted connection in the middle part of wedge block left surface
There is rack, rack is in being horizontally disposed with, and wedge block right flank is connected with bracing wire, and top plate bottom left is pacified by bolted connection
Equipped with the first motor, gear is connected with by shaft coupling on the output shaft of the first motor, gear is located on front side of the first motor, gear
Above rack, wheel and rack engagement.
Preferably, lifting gear includes transverse slat, motion bar, contact roller, fixed baffle and second spring, left side support plate
Right flank top is provided with transverse slat by bolted connection, and first through hole is provided with the right side of transverse slat, is equipped with and lives in first through hole
Lever, motion bar bottom are connected with crushing shell crown center by bolted connection, and motion bar top is bolted
Mode contact roller is installed, contact roller and wedge block contact of incline plane, motion bar top is pacified by bolted connection
Equipped with fixed baffle, second spring is connected between fixed baffle bottom and transverse slat top, second spring is sleeved on motion bar.
Preferably, dust-extraction unit has been further included, dust-extraction unit includes compression cylinder, fixing sleeve, outlet pipe, first unidirectional
Valve, nozzle, water inlet pipe, the second check valve, water tank, filler pipe, piston and cylinder, the side that transverse slat bottom left is bolted
Formula is provided with compression cylinder, and compression cylinder is located at broken frame left, and compression cylinder left upper portion is connected with water inlet pipe, water inlet pipe and compression cylinder
Interior connection, water inlet pipe are equipped with the second check valve, and left side support plate left surface top is provided with water tank by bolted connection,
Filler pipe is connected with the left of tank top, filler pipe in water tank with connecting, and water inlet pipe tail end is in the middle part of support plate and on the right side of water tank
Lower part connects, and for water inlet pipe with being connected in water tank, broken frame left side top is provided with fixing sleeve by bolted connection, fixed
Outlet pipe is equipped with set, outlet pipe is equipped with the first check valve, and outlet pipe wherein one end is connected with compression cylinder right upper portion, water outlet
Pipe in compression cylinder with connecting, and the outlet pipe other end is provided with nozzle by bolted connection, and nozzle is connected with outlet pipe, spray
Head is located above broken frame, piston is equipped with compression cylinder, in being horizontally disposed with, piston compresses piston with being slidably matched in compression cylinder
The second through hole is provided among cylinder bottom portion, bolted mode is passed on left at the top of bottom plate cylinder is installed, cylinder is in set vertically
Put, the telescopic rod of cylinder among the second through hole and piston base by connecting.
Preferably, the first travel switch and the second travel switch have been further included, the second slide bottom right is connected by screw
The mode connect is provided with the first travel switch, and the first travel switch is located at the second sliding block right, and the second slide bottom left passes through
The mode of screw connection is provided with the second travel switch, and the second travel switch be located at the second sliding block left, the second travel switch with
First travel switch has circuit to be connected with the first motor.
Preferably, the material of bottom plate is Q235 steel.
Operation principle:Operating personnel pour into cement block in broken frame first, start driving device, the driving of driving device
The lifting part of component driving lifting gear moves up and down, and the lifting part of lifting gear is moved up and down to drive and moved down on crushing shell
Dynamic, crushing shell, which moves up and down, crushes cement block, meanwhile, because of the effect of the first spring, driving device is also drawn by bracing wire
Dynamic first sliding block moves left and right, and the first sliding block moves left and right the broken frame of drive and moves left and right, and broken frame is moved left and right to cement block
Rocked, and then crushing shell is more fully crushed to cement block.After the completion of cement block crushes, driving dress is closed
Put, you can take out the cement block crushed.
Because driving device includes the first motor, gear, rack, the second slide, the second sliding block and wedge block, top plate bottom
Second slide is installed by bolted connection, the second slide is in being horizontally disposed with, and the second slide is equipped with and it among portion
The second sliding block coordinated, the second sliding block are slidably matched with the second slide, and the second slider bottom is installed by bolted connection
There is wedge block, wedge block inclined-plane is contacted with lifting gear, is installed by bolted connection in the middle part of wedge block left surface with teeth
Bar, rack is in being horizontally disposed with, and wedge block right flank is connected with bracing wire, and top plate bottom left is provided with by bolted connection
First motor, is connected with gear on the output shaft of the first motor by shaft coupling, and gear is located on front side of the first motor, and gear is located at
Above rack, wheel and rack engagement, when cement block is located in broken frame, operating personnel start the first motor positive and negative alternate and turn
Dynamic, the first motor positive and negative alternate rotation driven gear positive and negative alternate rotates, and gear positive and negative alternate rotates band carry-over bar and moves left and right,
Rack, which moves left and right, drives wedge block to move left and right, and the second slide play the guiding role with the second sliding block, and wedge block moves left and right drive
The lifting part of dynamic lifting gear moves up and down, and then the lifting part of lifting gear drives crushing shell to move up and down to cement block
Crushed, meanwhile, wedge block pulls the first sliding block to move left and right by bracing wire, and then drives broken frame to move left and right to make to crush
Plate more fully crushes cement block.After the completion of cement block crushes, the first motor is closed.
Because lifting gear includes transverse slat, motion bar, contact roller, fixed baffle and second spring, left side support plate is right
Side surface upper part is provided with transverse slat by bolted connection, and first through hole is provided with the right side of transverse slat, activity is equipped with first through hole
Bar, motion bar bottom are connected with crushing shell crown center by bolted connection, and motion bar top is bolted
Mode is provided with contact roller, contact roller and wedge block contact of incline plane, and motion bar top is installed by bolted connection
Have a fixed baffle, at the top of fixed baffle bottom and transverse slat between be connected with second spring, second spring is sleeved on motion bar, when the
When one motor positive and negative alternate rotates, wedge block moves left and right, and then when contact roller and the rolling of wedge block contact of incline plane, because of second
The effect of spring, contact roller drive motion bar to move up and down, and motion bar, which moves up and down, drives crushing shell to move up and down, and then broken
Slashings, which moves up and down, crushes cement block.
Because having further included dust-extraction unit, dust-extraction unit includes compression cylinder, fixing sleeve, outlet pipe, the first check valve, spray
Head, water inlet pipe, the second check valve, water tank, filler pipe, piston and cylinder, transverse slat bottom left are pacified by bolted connection
Equipped with compression cylinder, compression cylinder is located at broken frame left, and compression cylinder left upper portion is connected with water inlet pipe, and water inlet pipe in compression cylinder with connecting
Logical, water inlet pipe is equipped with the second check valve, and left side support plate left surface top is provided with water tank, water tank by bolted connection
Top left side is connected with filler pipe, and filler pipe in water tank with connecting, and water inlet pipe tail end is through support plate middle part and water tank lower right side
Connection, connects in water inlet pipe and water tank, crushes frame left side top and is provided with fixing sleeve by bolted connection, in fixing sleeve
Equipped with outlet pipe, outlet pipe is equipped with the first check valve, and outlet pipe wherein one end is connected with compression cylinder right upper portion, outlet pipe with
Connection, the outlet pipe other end are provided with nozzle by bolted connection in compression cylinder, and nozzle is connected with outlet pipe, nozzle position
Above broken frame, piston is equipped with compression cylinder, piston is in being horizontally disposed with, and piston in compression cylinder with being slidably matched, compression cylinder bottom
The second through hole is provided among portion, bolted mode is passed on left at the top of bottom plate cylinder is installed, cylinder is in be vertically arranged, gas
The telescopic rod of cylinder among the second through hole and piston base by connecting, and water is poured into water tank by operating personnel by filler pipe first
Interior, while crushing shell is crushing cement block, the telescopic rod that operating personnel start cylinder moves up and down, and cylinder is stretched
Contracting bar moves up and down band piston and moves up and down, and when piston moves down, the water in water tank is pumped into by piston by water inlet pipe
In compression cylinder, when piston moves up, the water in compression cylinder is pushed into outlet pipe by piston, and then the water in outlet pipe passes through
Nozzle sprays, and the dust that water occurs when being sprayed on cement block to crushing is purged, at the same time, moreover it is possible to cement block is preferably broken
It is broken.After the completion of cement block crushes, cylinder is closed.In this way, when being crushed to cement block, dust appearance pair can be prevented
The influence of surrounding environment.
Because having further included the first travel switch and the second travel switch, what the second slide bottom right was connected by screw
Mode is provided with the first travel switch, and the first travel switch is located at the second sliding block right, and the second slide bottom left passes through screw
The mode of connection is provided with the second travel switch, and the second travel switch is located at the second sliding block left, the second travel switch and first
Travel switch has circuit to be connected with the first motor, and when cement block is when broken, the first motor positive and negative alternate rotates, and then when second
When sliding block moves right, the second sliding block and the first stroke switch contact, the first motor rotate forward, and then the second sliding block is moved to the left,
Second sliding block is moved to the left to be contacted with the second travel switch, the first motor reversal, and then the second sliding block moves right.In this way, nothing
Need operating personnel to start the first motor positive and negative alternate to rotate, it is time saving and energy saving.
Because the material of bottom plate is Q235 steel, the load-bearing capacity of Q235 steel is strong, acidproof corrosion-resistant, adds the use of bottom plate
Service life.
(3)Beneficial effect
It is small that the utility model has reached time saving and energy saving, labor intensity, and in shattering process, dust can be purged, into
Without influencing surrounding environment, the effect of people's clothes is not made dirty also.
Brief description of the drawings
Fig. 1 is the first main structure diagram of the utility model.
Fig. 2 is second of main structure diagram of the utility model.
Fig. 3 is the third main structure diagram of the utility model.
Mark in attached drawing for:1- bottom plates, 2- support plates, 3- top plates, 4- bracing wires, 5- pulleys, the first slides of 6-, 7- first are slided
Block, the first springs of 8-, 9- crush frame, 10- crushing shells, 11- driving devices, the first motors of 111-, 112- gears, 113- racks,
The second slides of 114-, the second sliding blocks of 115-, 116- wedge blocks, 12- lifting gears, 121- transverse slats, 122- first through hole, 123- live
Lever, 124- contact rollers, 125- fixed baffles, 126- second springs, 13- dust-extraction units, 131- compression cylinders, 132- are fixed
Set, 133- outlet pipes, the first check valves of 134-, 135- nozzles, 136- water inlet pipes, the second check valves of 137-, 138- water tanks, 139-
Filler pipe, 1310- pistons, the second through holes of 1311-, 1312- cylinders, the first travel switches of 14-, the second travel switches of 15-.
Embodiment
The utility model is further described with reference to the accompanying drawings and examples.
Embodiment 1
A kind of traffic bridge cement block breaker, as shown in Figs. 1-3, includes bottom plate 1, support plate 2, top plate 3, bracing wire
4th, pulley 5, the first slide 6, the first sliding block 7, the first spring 8, broken frame 9, crushing shell 10, driving device 11 and lifting gear
12,1 crown center of bottom plate is provided with the first slide 6 by bolted connection, and the first slide 6 is in horizontally disposed, the first cunning
Rail 6 is equipped with the first sliding block 7 coordinated with it, and the first sliding block 7 is slidably matched with the first slide 6,7 left surface of the first sliding block of left side
The first spring 8 is connected with lower part and the first slide 6 between left surface, the top of the first sliding block 7 is pacified by bolted connection
Equipped with broken frame 9, the top of bottom plate 1 left and right sides is all provided with support plate 2 by bolted connection, and support plate 2 is to be symmetrical arranged,
Support plate 2 right flank in left side is equipped with lifting gear 12, and crushing shell 10, crushing shell 10 are connected with the lifting part of lifting gear 12
In in broken frame 9, both sides are all provided with pulley 5 to 2 left surface of right side support plate by bolted connection up and down, and pulley 5 is pair
Claim to set, the top of support plate 2 is provided with driving device 11, the driving part of driving device 11 and lifting by bolted connection
The rolling member contact of device 12, is connected with bracing wire 4 on the driving part of driving device 11,4 tail end of bracing wire around two pulleys 5 with
7 right flank middle part of the first sliding block of right side connects.
Embodiment 2
A kind of traffic bridge cement block breaker, as shown in Figs. 1-3, includes bottom plate 1, support plate 2, top plate 3, bracing wire
4th, pulley 5, the first slide 6, the first sliding block 7, the first spring 8, broken frame 9, crushing shell 10, driving device 11 and lifting gear
12,1 crown center of bottom plate is provided with the first slide 6 by bolted connection, and the first slide 6 is in horizontally disposed, the first cunning
Rail 6 is equipped with the first sliding block 7 coordinated with it, and the first sliding block 7 is slidably matched with the first slide 6,7 left surface of the first sliding block of left side
The first spring 8 is connected with lower part and the first slide 6 between left surface, the top of the first sliding block 7 is pacified by bolted connection
Equipped with broken frame 9, the top of bottom plate 1 left and right sides is all provided with support plate 2 by bolted connection, and support plate 2 is to be symmetrical arranged,
Support plate 2 right flank in left side is equipped with lifting gear 12, and crushing shell 10, crushing shell 10 are connected with the lifting part of lifting gear 12
In in broken frame 9, both sides are all provided with pulley 5 to 2 left surface of right side support plate by bolted connection up and down, and pulley 5 is pair
Claim to set, the top of support plate 2 is provided with driving device 11, the driving part of driving device 11 and lifting by bolted connection
The rolling member contact of device 12, is connected with bracing wire 4 on the driving part of driving device 11,4 tail end of bracing wire around two pulleys 5 with
7 right flank middle part of the first sliding block of right side connects.
Driving device 11 includes the first motor 111, gear 112, rack 113, the second slide 114,115 and of the second sliding block
Wedge block 116, the second slide 114 is provided among 3 bottom of top plate, the second slide 114 is in level by bolted connection
Setting, the second slide 114 is equipped with the second sliding block 115 coordinated with it, and the second sliding block 115 is slidably matched with the second slide 114,
Second sliding block, 115 bottom is provided with wedge block 116 by bolted connection, and 116 inclined-plane of wedge block connects with lifting gear 12
Touch, rack 113 is installed by bolted connection, rack 113 is in horizontally disposed, wedge shape in the middle part of 116 left surface of wedge block
116 right flank of block is connected with bracing wire 4, and 3 bottom left of top plate is provided with the first motor 111 by bolted connection, and first
Gear 112 is connected with by shaft coupling on the output shaft of motor 111, gear 112 is located at the front side of the first motor 111, gear 112
Above rack 113, gear 112 is engaged with rack 113.
Embodiment 3
A kind of traffic bridge cement block breaker, as shown in Figs. 1-3, includes bottom plate 1, support plate 2, top plate 3, bracing wire
4th, pulley 5, the first slide 6, the first sliding block 7, the first spring 8, broken frame 9, crushing shell 10, driving device 11 and lifting gear
12,1 crown center of bottom plate is provided with the first slide 6 by bolted connection, and the first slide 6 is in horizontally disposed, the first cunning
Rail 6 is equipped with the first sliding block 7 coordinated with it, and the first sliding block 7 is slidably matched with the first slide 6,7 left surface of the first sliding block of left side
The first spring 8 is connected with lower part and the first slide 6 between left surface, the top of the first sliding block 7 is pacified by bolted connection
Equipped with broken frame 9, the top of bottom plate 1 left and right sides is all provided with support plate 2 by bolted connection, and support plate 2 is to be symmetrical arranged,
Support plate 2 right flank in left side is equipped with lifting gear 12, and crushing shell 10, crushing shell 10 are connected with the lifting part of lifting gear 12
In in broken frame 9, both sides are all provided with pulley 5 to 2 left surface of right side support plate by bolted connection up and down, and pulley 5 is pair
Claim to set, the top of support plate 2 is provided with driving device 11, the driving part of driving device 11 and lifting by bolted connection
The rolling member contact of device 12, is connected with bracing wire 4 on the driving part of driving device 11,4 tail end of bracing wire around two pulleys 5 with
7 right flank middle part of the first sliding block of right side connects.
Driving device 11 includes the first motor 111, gear 112, rack 113, the second slide 114,115 and of the second sliding block
Wedge block 116, the second slide 114 is provided among 3 bottom of top plate, the second slide 114 is in level by bolted connection
Setting, the second slide 114 is equipped with the second sliding block 115 coordinated with it, and the second sliding block 115 is slidably matched with the second slide 114,
Second sliding block, 115 bottom is provided with wedge block 116 by bolted connection, and 116 inclined-plane of wedge block connects with lifting gear 12
Touch, rack 113 is installed by bolted connection, rack 113 is in horizontally disposed, wedge shape in the middle part of 116 left surface of wedge block
116 right flank of block is connected with bracing wire 4, and 3 bottom left of top plate is provided with the first motor 111 by bolted connection, and first
Gear 112 is connected with by shaft coupling on the output shaft of motor 111, gear 112 is located at the front side of the first motor 111, gear 112
Above rack 113, gear 112 is engaged with rack 113.
Lifting gear 12 includes transverse slat 121, motion bar 123, contact roller 124, fixed baffle 125 and second spring
126, support plate 2 right flank top in left side is provided with transverse slat 121 by bolted connection, and it is logical that the right side of transverse slat 121 is provided with first
Hole 122, first through hole 122 is interior to be equipped with motion bar 123, and 123 bottom of motion bar is pushed up with crushing shell 10 by bolted connection
Connection among portion, 123 top of motion bar are provided with contact roller 124, contact roller 124 and wedge shape by bolted connection
116 contact of incline plane of block, 123 top of motion bar are provided with fixed baffle 125,125 bottom of fixed baffle by bolted connection
Second spring 126 is connected between portion and the top of transverse slat 121, second spring 126 is sleeved on motion bar 123.
Embodiment 4
A kind of traffic bridge cement block breaker, as shown in Figs. 1-3, includes bottom plate 1, support plate 2, top plate 3, bracing wire
4th, pulley 5, the first slide 6, the first sliding block 7, the first spring 8, broken frame 9, crushing shell 10, driving device 11 and lifting gear
12,1 crown center of bottom plate is provided with the first slide 6 by bolted connection, and the first slide 6 is in horizontally disposed, the first cunning
Rail 6 is equipped with the first sliding block 7 coordinated with it, and the first sliding block 7 is slidably matched with the first slide 6,7 left surface of the first sliding block of left side
The first spring 8 is connected with lower part and the first slide 6 between left surface, the top of the first sliding block 7 is pacified by bolted connection
Equipped with broken frame 9, the top of bottom plate 1 left and right sides is all provided with support plate 2 by bolted connection, and support plate 2 is to be symmetrical arranged,
Support plate 2 right flank in left side is equipped with lifting gear 12, and crushing shell 10, crushing shell 10 are connected with the lifting part of lifting gear 12
In in broken frame 9, both sides are all provided with pulley 5 to 2 left surface of right side support plate by bolted connection up and down, and pulley 5 is pair
Claim to set, the top of support plate 2 is provided with driving device 11, the driving part of driving device 11 and lifting by bolted connection
The rolling member contact of device 12, is connected with bracing wire 4 on the driving part of driving device 11,4 tail end of bracing wire around two pulleys 5 with
7 right flank middle part of the first sliding block of right side connects.
Driving device 11 includes the first motor 111, gear 112, rack 113, the second slide 114,115 and of the second sliding block
Wedge block 116, the second slide 114 is provided among 3 bottom of top plate, the second slide 114 is in level by bolted connection
Setting, the second slide 114 is equipped with the second sliding block 115 coordinated with it, and the second sliding block 115 is slidably matched with the second slide 114,
Second sliding block, 115 bottom is provided with wedge block 116 by bolted connection, and 116 inclined-plane of wedge block connects with lifting gear 12
Touch, rack 113 is installed by bolted connection, rack 113 is in horizontally disposed, wedge shape in the middle part of 116 left surface of wedge block
116 right flank of block is connected with bracing wire 4, and 3 bottom left of top plate is provided with the first motor 111 by bolted connection, and first
Gear 112 is connected with by shaft coupling on the output shaft of motor 111, gear 112 is located at the front side of the first motor 111, gear 112
Above rack 113, gear 112 is engaged with rack 113.
Lifting gear 12 includes transverse slat 121, motion bar 123, contact roller 124, fixed baffle 125 and second spring
126, support plate 2 right flank top in left side is provided with transverse slat 121 by bolted connection, and it is logical that the right side of transverse slat 121 is provided with first
Hole 122, first through hole 122 is interior to be equipped with motion bar 123, and 123 bottom of motion bar is pushed up with crushing shell 10 by bolted connection
Connection among portion, 123 top of motion bar are provided with contact roller 124, contact roller 124 and wedge shape by bolted connection
116 contact of incline plane of block, 123 top of motion bar are provided with fixed baffle 125,125 bottom of fixed baffle by bolted connection
Second spring 126 is connected between portion and the top of transverse slat 121, second spring 126 is sleeved on motion bar 123.
Dust-extraction unit 13 is further included, dust-extraction unit 13 includes compression cylinder 131, fixing sleeve 132, outlet pipe 133, first
Check valve 134, nozzle 135, water inlet pipe 136, the second check valve 137, water tank 138, filler pipe 139, piston 1310 and cylinder
1312,121 bottom left of transverse slat is provided with compression cylinder 131 by bolted connection, and it is left that compression cylinder 131 is located at broken frame 9
Side, 131 left upper portion of compression cylinder are connected with water inlet pipe 136, and water inlet pipe 136 is set with being connected in compression cylinder 131 on water inlet pipe 136
There is the second check valve 137, support plate 2 left surface top in left side is provided with water tank 138 by bolted connection, and water tank 138 pushes up
Filler pipe 139 is connected with the left of portion, filler pipe 139 in water tank 138 with connecting, and 136 tail end of water inlet pipe is through the middle part of support plate 2 and water
138 lower right side of case connects, and water inlet pipe 136 crushes 9 left side top of frame by bolted connection with being connected in water tank 138
Fixing sleeve 132 is installed, is equipped with outlet pipe 133 in fixing sleeve 132, outlet pipe 133 is equipped with the first check valve 134, outlet pipe
133 wherein one end are connected with 131 right upper portion of compression cylinder, and outlet pipe 133 in compression cylinder 131 with connecting, 133 other end of outlet pipe
Nozzle 135 is installed by bolted connection, nozzle 135 is connected with outlet pipe 133, and nozzle 135 is located on broken frame 9
Side, is equipped with piston 1310 in compression cylinder 131, piston 1310 in being horizontally disposed with, piston 1310 with being slidably matched in compression cylinder 131,
The second through hole 1311 is provided among 131 bottom of compression cylinder, 1 top left side of bottom plate is provided with cylinder by bolted connection
1312, cylinder 1312 is in being vertically arranged, and the telescopic rod of cylinder 1312 is by the second through hole 1311 with connecting among 1310 bottom of piston
Connect.
The first travel switch 14 and the second travel switch 15 are further included, 114 bottom right of the second slide is connected by screw
The mode connect is provided with the first travel switch 14, and the first travel switch 14 is located at 115 right of the second sliding block, 114 bottom of the second slide
The mode that portion passes on left screw connection is provided with the second travel switch 15, and it is left that the second travel switch 15 is located at the second sliding block 115
Side, the second travel switch 15 and the first travel switch 14 have circuit to be connected with the first motor 111.
The material of bottom plate 1 is Q235 steel.
Operation principle:Operating personnel pour into cement block in broken frame 9 first, start driving device 11, driving device 11
The lifting part of driving part driving lifting gear 12 move up and down, it is broken that the lifting part of lifting gear 12 moves up and down drive
Slashings 10 moves up and down, and crushing shell 10, which moves up and down, crushes cement block, meanwhile, because of the effect of the first spring 8, driving dress
Put 11 also pulls the first sliding block 7 to move left and right by bracing wire 4, and the first sliding block 7 moves left and right the broken frame 9 of drive and moves left and right, and breaks
Broken frame 9, which moves left and right, rocks cement block, and then crushing shell 10 is more fully crushed to cement block.Work as cement block
After the completion of broken, driving device 11 is closed, you can take out the cement block crushed.
Because driving device 11 includes the first motor 111, gear 112, rack 113, the second slide 114, the second sliding block
115 and wedge block 116, the second slide 114 is installed by bolted connection among 3 bottom of top plate, the second slide 114 is in
Horizontally disposed, the second slide 114 is equipped with the second sliding block 115 coordinated with it, and the second sliding block 115 is slided with the second slide 114
Coordinate, 115 bottom of the second sliding block is provided with wedge block 116,116 inclined-plane of wedge block and lifting gear by bolted connection
12 contacts, 116 left surface of wedge block middle part are provided with rack 113 by bolted connection, and rack 113 is in be horizontally disposed with,
116 right flank of wedge block is connected with bracing wire 4, and 3 bottom left of top plate is provided with the first motor 111 by bolted connection,
Gear 112 is connected with by shaft coupling on the output shaft of first motor 111, gear 112 is located at the front side of the first motor 111, gear
112 engage positioned at the top of rack 113, gear 112 with rack 113, and when cement block is located in broken frame 9, operating personnel start
First motor, 111 positive and negative alternate rotates, and 111 positive and negative alternate rotation driven gear of the first motor, 112 positive and negative alternate rotates, gear
112 positive and negative alternates rotate band carry-over bar 113 and move left and right, and rack 113, which moves left and right, drives wedge block 116 to move left and right, and second
Slide 114 play the guiding role with the second sliding block 115, and wedge block 116 is moved left and right above and below the lifting part of driving lifting gear 12
It is mobile, and then the lifting part drive crushing shell 10 of lifting gear 12 moves up and down and cement block is crushed, meanwhile, wedge block
116 pull the first sliding block 7 to move left and right by bracing wire 4, and then driving broken frame 9 to move left and right makes crushing shell 10 more fully right
Cement block is crushed.After the completion of cement block crushes, the first motor 111 is closed.
Because lifting gear 12 includes transverse slat 121, motion bar 123, contact roller 124,125 and second bullet of fixed baffle
Spring 126,2 right flank top of left side support plate are provided with transverse slat 121 by bolted connection, and the right side of transverse slat 121 is provided with first
Through hole 122, is equipped with motion bar 123 in first through hole 122,123 bottom of motion bar by bolted connection with crushing shell 10
Crown center connects, and 123 top of motion bar is provided with contact roller 124, contact roller 124 and wedge by bolted connection
116 contact of incline plane of shape block, 123 top of motion bar are provided with fixed baffle 125, fixed baffle 125 by bolted connection
Second spring 126 is connected between bottom and the top of transverse slat 121, second spring 126 is sleeved on motion bar 123, when the first motor
When 111 positive and negative alternates rotate, wedge block 116 moves left and right, and then when contact roller 124 and the rolling of 116 contact of incline plane of wedge block,
Because of the effect of second spring 126, contact roller 124 drives motion bar 123 to move up and down, and it is broken that motion bar 123 moves up and down drive
Slashings 10 moves up and down, and then crushing shell 10 moves up and down and cement block is crushed.
Because having further included dust-extraction unit 13, dust-extraction unit 13 include compression cylinder 131, fixing sleeve 132, outlet pipe 133,
First check valve 134, nozzle 135, water inlet pipe 136, the second check valve 137, water tank 138, filler pipe 139, piston 1310 are gentle
Cylinder 1312,121 bottom left of transverse slat are provided with compression cylinder 131 by bolted connection, and compression cylinder 131 is located at broken frame 9
Left, 131 left upper portion of compression cylinder are connected with water inlet pipe 136, and water inlet pipe 136 in compression cylinder 131 with connecting, on water inlet pipe 136
Equipped with the second check valve 137, support plate 2 left surface top in left side is provided with water tank 138, water tank 138 by bolted connection
Top left side is connected with filler pipe 139, filler pipe 139 with connect in water tank 138,136 tail end of water inlet pipe through the middle part of support plate 2 and
138 lower right side of water tank connects, and water inlet pipe 136 crushes the side that 9 left side top of frame is bolted with being connected in water tank 138
Formula is provided with fixing sleeve 132, is equipped with outlet pipe 133 in fixing sleeve 132, outlet pipe 133 is equipped with the first check valve 134, water outlet
The wherein one end of pipe 133 is connected with 131 right upper portion of compression cylinder, and for outlet pipe 133 with being connected in compression cylinder 131, outlet pipe 133 is another
End is provided with nozzle 135 by bolted connection, and nozzle 135 is connected with outlet pipe 133, and nozzle 135 is located on broken frame 9
Side, is equipped with piston 1310 in compression cylinder 131, piston 1310 in being horizontally disposed with, piston 1310 with being slidably matched in compression cylinder 131,
The second through hole 1311 is provided among 131 bottom of compression cylinder, 1 top left side of bottom plate is provided with cylinder by bolted connection
1312, cylinder 1312 is in being vertically arranged, and the telescopic rod of cylinder 1312 is by the second through hole 1311 with connecting among 1310 bottom of piston
Connect, operating personnel are poured into water in water tank 138 by filler pipe 139 first, when crushing shell 10 cement block is carried out it is broken
Meanwhile the telescopic rod of operating personnel's startup cylinder 1312 moves up and down, the telescopic rod of cylinder 1312 moves up and down band piston
1310 move up and down, and when piston 1310 moves down, the water in water tank 138 is pumped into pressure by piston 1310 by water inlet pipe 136
In contracting cylinder 131, when piston 1310 moves up, the water in compression cylinder 131 is pushed into outlet pipe 133 by piston 1310, and then
Water in outlet pipe 133 is sprayed by nozzle 135, and the dust that water occurs when being sprayed on cement block to crushing is purged, meanwhile,
Cement block can also be made preferably to be broken.After the completion of cement block crushes, cylinder 1312 is closed.In this way, to cement block
When carrying out broken, it can prevent dust from the influence to surrounding environment occur.
Because having further included the first travel switch 14 and the second travel switch 15,114 bottom right of the second slide passes through spiral shell
The mode of nail connection is provided with the first travel switch 14, and the first travel switch 14 is located at 115 right of the second sliding block, the second slide
The mode that 114 bottom lefts are connected by screw is provided with the second travel switch 15, and the second travel switch 15 is located at the second sliding block
115 lefts, the second travel switch 15 and the first travel switch 14 have circuit to be connected with the first motor 111, when cement block is broken
When, 111 positive and negative alternate of the first motor rotates, and then when the second sliding block 115 moves right, the second sliding block 115 and the first stroke
The contact of switch 14, the first motor 111 rotates forward, and then the second sliding block 115 is moved to the left, and the second sliding block 115 is moved to the left and second
Travel switch 15 contacts, and the first motor 111 inverts, and then the second sliding block 115 moves right.In this way, start without operating personnel
First motor, 111 positive and negative alternate rotates, time saving and energy saving.
Because the material of bottom plate 1 is Q235 steel, the load-bearing capacity of Q235 steel is strong, acidproof corrosion-resistant, adds making for bottom plate 1
Use the service life.
Embodiment described above only expresses the preferred embodiment of the utility model, its description is more specific and detailed,
But it should not be interpreted as limiting the scope of the present invention.It should be pointed out that for the common of this area
For technical staff, without departing from the inventive concept of the premise, some deformations can also be made, improves and substitutes, these are all
Belong to the scope of protection of the utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.
Claims (6)
1. a kind of traffic bridge cement block breaker, it is characterised in that include bottom plate(1), support plate(2), top plate(3)、
Bracing wire(4), pulley(5), the first slide(6), the first sliding block(7), the first spring(8), broken frame(9), crushing shell(10), driving
Device(11)And lifting gear(12), bottom plate(1)Crown center is provided with the first slide by bolted connection(6), the
One slide(6)In horizontally disposed, the first slide(6)It is equipped with the first sliding block coordinated with it(7), the first sliding block(7)With first
Slide(6)It is slidably matched, the first sliding block of left side(7)Left surface lower part and the first slide(6)First is connected between interior left surface
Spring(8), the first sliding block(7)Top is provided with broken frame by bolted connection(9), bottom plate(1)At left and right sides of top
Support plate is all installed by bolted connection(2), support plate(2)To be symmetrical arranged, left side support plate(2)Right flank is equipped with lifting
Device(12), lifting gear(12)Lifting part on be connected with crushing shell(10), crushing shell(10)Positioned at broken frame(9)It is interior,
Right side support plate(2)Left surface is all provided with pulley in both sides by bolted connection up and down(5), pulley(5)To be symmetrical arranged,
Support plate(2)Top is provided with driving device by bolted connection(11), driving device(11)Driving part and lifting
Device(12)Rolling member contact, driving device(11)Driving part on be connected with bracing wire(4), bracing wire(4)Tail end bypasses
Two pulleys(5)With the first sliding block of right side(7)Right flank middle part connects.
A kind of 2. traffic bridge cement block breaker according to claim 1, it is characterised in that driving device(11)
Include the first motor(111), gear(112), rack(113), the second slide(114), the second sliding block(115)And wedge block
(116), top plate(3)Second slide is installed by bolted connection among bottom(114), the second slide(114)In water
It is flat to set, the second slide(114)It is equipped with the second sliding block coordinated with it(115), the second sliding block(115)With the second slide
(114)It is slidably matched, the second sliding block(115)Bottom is provided with wedge block by bolted connection(116), wedge block
(116)Inclined-plane and lifting gear(12)Contact, wedge block(116)Rack is installed by bolted connection in the middle part of left surface
(113), rack(113)In horizontally disposed, wedge block(116)Right flank and bracing wire(4)Connection, top plate(3)Bottom left passes through
Bolted mode is provided with the first motor(111), the first motor(111)Output shaft on gear is connected with by shaft coupling
(112), gear(112)Positioned at the first motor(111)Front side, gear(112)Positioned at rack(113)Top, gear(112)With tooth
Bar(113)Engagement.
A kind of 3. traffic bridge cement block breaker according to claim 2, it is characterised in that lifting gear(12)
Include transverse slat(121), motion bar(123), contact roller(124), fixed baffle(125)And second spring(126), left side branch
Plate(2)Right flank top is provided with transverse slat by bolted connection(121), transverse slat(121)Right side is provided with first through hole
(122), first through hole(122)It is interior to be equipped with motion bar(123), motion bar(123)Bottom is by bolted connection with crushing
Plate(10)Crown center connects, motion bar(123)Top is provided with contact roller by bolted connection(124), contact
Roller(124)With wedge block(116)Contact of incline plane, motion bar(123)Top is provided with fixed gear by bolted connection
Plate(125), fixed baffle(125)Bottom and transverse slat(121)Second spring is connected between top(126), second spring(126)
It is sleeved on motion bar(123)On.
4. a kind of traffic bridge cement block breaker according to claim 3, it is characterised in that further included dedusting
Device(13), dust-extraction unit(13)Include compression cylinder(131), fixing sleeve(132), outlet pipe(133), the first check valve
(134), nozzle(135), water inlet pipe(136), the second check valve(137), water tank(138), filler pipe(139), piston(1310)
And cylinder(1312), transverse slat(121)Bottom left is provided with compression cylinder by bolted connection(131), compression cylinder(131)
Positioned at broken frame(9)Left, compression cylinder(131)Left upper portion is connected with water inlet pipe(136), water inlet pipe(136)With compression cylinder
(131)Interior connection, water inlet pipe(136)It is equipped with the second check valve(137), left side support plate(2)Left surface top is connected by bolt
The mode connect is provided with water tank(138), water tank(138)Top left side is connected with filler pipe(139), filler pipe(139)With water tank
(138)Interior connection, water inlet pipe(136)Tail end runs through support plate(2)Middle part and water tank(138)Lower right side connects, water inlet pipe(136)
With water tank(138)Interior connection, crushes frame(9)Left side top is provided with fixing sleeve by bolted connection(132), fixing sleeve
(132)It is interior to be equipped with outlet pipe(133), outlet pipe(133)It is equipped with the first check valve(134), outlet pipe(133)Wherein one end with
Compression cylinder(131)Right upper portion connects, outlet pipe(133)With compression cylinder(131)Interior connection, outlet pipe(133)The other end passes through
Bolted mode is provided with nozzle(135), nozzle(135)With outlet pipe(133)Connection, nozzle(135)Positioned at broken frame
(9)Top, compression cylinder(131)It is interior to be equipped with piston(1310), piston(1310)In horizontally disposed, piston(1310)With compression cylinder
(131)Inside it is slidably matched, compression cylinder(131)The second through hole is provided among bottom(1311), bottom plate(1)Top left side passes through bolt
The mode of connection is provided with cylinder(1312), cylinder(1312)In being vertically arranged, cylinder(1312)Telescopic rod it is logical by second
Hole(1311)With piston(1310)Connection among bottom.
5. a kind of traffic bridge cement block breaker according to claim 4, it is characterised in that further included first
Travel switch(14)With the second travel switch(15), the second slide(114)The mode that bottom right is connected by screw is provided with
First travel switch(14), the first travel switch(14)Positioned at the second sliding block(115)Right, the second slide(114)Bottom left
The mode being connected by screw is provided with the second travel switch(15), the second travel switch(15)Positioned at the second sliding block(115)It is left
Side, the second travel switch(15)With the first travel switch(14)With the first motor(111)There is circuit connection.
A kind of 6. traffic bridge cement block breaker according to claim 5, it is characterised in that bottom plate(1)Material
Matter is Q235 steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720612855.9U CN207324925U (en) | 2017-05-30 | 2017-05-30 | A kind of traffic bridge cement block breaker |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720612855.9U CN207324925U (en) | 2017-05-30 | 2017-05-30 | A kind of traffic bridge cement block breaker |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207324925U true CN207324925U (en) | 2018-05-08 |
Family
ID=62425810
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720612855.9U Expired - Fee Related CN207324925U (en) | 2017-05-30 | 2017-05-30 | A kind of traffic bridge cement block breaker |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207324925U (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108940489A (en) * | 2018-06-20 | 2018-12-07 | 姜玉欣 | A kind of mine coal high-efficiency crushing device |
CN109162215A (en) * | 2018-10-29 | 2019-01-08 | 郭弘 | A kind of bridge strengthening equipment |
CN109162214A (en) * | 2018-10-29 | 2019-01-08 | 郭弘 | A kind of method of bridge strengthening |
CN109185615A (en) * | 2018-08-29 | 2019-01-11 | 九方安达工程技术集团有限责任公司 | Ultrasonic detector test device |
CN109201258A (en) * | 2018-08-28 | 2019-01-15 | 李彦 | A kind of aloe mud making apparatus for moisturizing hand lotion |
CN110064472A (en) * | 2019-04-25 | 2019-07-30 | 钟志刚 | A kind of quick shredding mechanism of food plastic rubbish |
CN110124771A (en) * | 2019-04-24 | 2019-08-16 | 翁宇彬 | A kind of finishing plastic garbage high-efficient treatment device |
CN110614177A (en) * | 2019-09-19 | 2019-12-27 | 马鞍山中千环保科技有限公司 | A spraying painting device for steel surface |
CN111729716A (en) * | 2020-06-03 | 2020-10-02 | 淮北辰威科技有限公司 | Fodder reducing mechanism |
-
2017
- 2017-05-30 CN CN201720612855.9U patent/CN207324925U/en not_active Expired - Fee Related
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108940489A (en) * | 2018-06-20 | 2018-12-07 | 姜玉欣 | A kind of mine coal high-efficiency crushing device |
CN108940489B (en) * | 2018-06-20 | 2020-08-07 | 准格尔旗永智煤炭有限公司 | High-efficient breaker of mine coal |
CN109201258A (en) * | 2018-08-28 | 2019-01-15 | 李彦 | A kind of aloe mud making apparatus for moisturizing hand lotion |
CN109185615A (en) * | 2018-08-29 | 2019-01-11 | 九方安达工程技术集团有限责任公司 | Ultrasonic detector test device |
CN109185615B (en) * | 2018-08-29 | 2020-07-31 | 九方安达工程技术集团有限责任公司 | Ultrasonic detector testing arrangement |
CN109162215A (en) * | 2018-10-29 | 2019-01-08 | 郭弘 | A kind of bridge strengthening equipment |
CN109162214A (en) * | 2018-10-29 | 2019-01-08 | 郭弘 | A kind of method of bridge strengthening |
CN109162214B (en) * | 2018-10-29 | 2020-06-02 | 南昌公路桥梁工程有限公司 | Bridge reinforcing method |
CN110124771A (en) * | 2019-04-24 | 2019-08-16 | 翁宇彬 | A kind of finishing plastic garbage high-efficient treatment device |
CN110064472A (en) * | 2019-04-25 | 2019-07-30 | 钟志刚 | A kind of quick shredding mechanism of food plastic rubbish |
CN110614177A (en) * | 2019-09-19 | 2019-12-27 | 马鞍山中千环保科技有限公司 | A spraying painting device for steel surface |
CN111729716A (en) * | 2020-06-03 | 2020-10-02 | 淮北辰威科技有限公司 | Fodder reducing mechanism |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207324925U (en) | A kind of traffic bridge cement block breaker | |
CN107127005A (en) | A kind of traffic bridge cement block breaker | |
CN107127171A (en) | A kind of traffic bridge roadblock device for high-efficiency cleaning | |
CN206315847U (en) | A kind of bulk stone breaker for building | |
CN206701673U (en) | One kind building special screening installation of sand | |
CN107138393A (en) | A kind of bridge sand screening plant | |
CN106238396A (en) | A kind of aluminum bits dedusting discharge opeing is with cleaning device | |
CN107476193B (en) | A kind of bridge construction pours device with clump | |
CN107971311A (en) | A kind of transport development barrel of cement cleaning plant | |
CN107042457A (en) | A kind of reinforced bar rust cleaning equipment for bridge construction | |
CN106955773A (en) | A kind of construction waste break process equipment | |
CN104986300A (en) | Cleaning boat for garbage on water surface | |
CN107511440A (en) | A kind of pile foundation reinforcing bar cutter device | |
CN107282571A (en) | A kind of Municipal Engineering Construction dress efficient cleaning equipment of Sand Bucket | |
CN107738729A (en) | The environmental sanitation ship of self-purging river surface | |
CN108035285A (en) | A kind of bridge expanssion joint cleaning plant | |
CN207071519U (en) | A kind of bridge sand screening plant | |
CN205875069U (en) | High efficiency device that sweeps away snow for bridge | |
CN107225624B (en) | A kind of bridge construction sawing apparatus | |
CN207071557U (en) | A kind of traffic bridge roadblock device for high-efficiency cleaning | |
CN107042186A (en) | A kind of bridge railing production pipe mopping device | |
CN108442297A (en) | A kind of municipal administration surface gathered water cleaning equipment | |
CN107859006A (en) | A kind of dam trash rack solid dirt cleaning plant | |
CN106902561A (en) | A kind of sewage disposal debris separation equipment | |
CN107186594A (en) | Reinforcing bar Rapid rust cleaning device is used in a kind of energy-saving bridge pier cast |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190927 Address after: The 224700 Jianhu people's Road No. 1 in Jiangsu Province Patentee after: Zhong Gang construction group Co., Ltd Address before: No. 29, Dahongpu Stone Carving City, Luoyang Town, Hui'an County, Quanzhou City, Fujian Province, 362100 Patentee before: Quanzhou tea fire Trading Co. Ltd. |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180508 Termination date: 20200530 |
|
CF01 | Termination of patent right due to non-payment of annual fee |