CN205857004U - A kind of construction beam - Google Patents

A kind of construction beam Download PDF

Info

Publication number
CN205857004U
CN205857004U CN201620824220.0U CN201620824220U CN205857004U CN 205857004 U CN205857004 U CN 205857004U CN 201620824220 U CN201620824220 U CN 201620824220U CN 205857004 U CN205857004 U CN 205857004U
Authority
CN
China
Prior art keywords
plate
girder
sections
crossbeam
construction beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620824220.0U
Other languages
Chinese (zh)
Inventor
孙立伟
李秀文
苏义春
武智慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qinhuangdao Zhongke Railway Steel Structure Co Ltd
Original Assignee
Qinhuangdao Zhongke Railway Steel Structure Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qinhuangdao Zhongke Railway Steel Structure Co Ltd filed Critical Qinhuangdao Zhongke Railway Steel Structure Co Ltd
Priority to CN201620824220.0U priority Critical patent/CN205857004U/en
Application granted granted Critical
Publication of CN205857004U publication Critical patent/CN205857004U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

This utility model provides a kind of construction beam;This just beam be to be spliced by three sections, work progress is possible not only to all splice and uses as D24 type construction beam, first segment can also be used as D20 type construction beam with the second sections splicing, also the second sections and the 3rd sections can be spliced and use as D16 type construction beam, also the second sections can be used alone as D12 type construction beam, it is achieved that a kind of multiple span of construction beam uses;It addition, this just girder construction simple, reasonable in design, occupation mode is very flexible, is suitable to railway and makes somebody a mere figurehead the construction of hardened link and promote the use of.

Description

A kind of construction beam
Technical field
This utility model relates to a kind of construction beam, belongs to railway technical field of construction equipment.
Background technology
When existing railway carries out culvert jacking, in order to ensure normal operation and the maintenance of existing line above culvert, prevent Only railway station track subsides, and needs erection construction just beam that existing line carries out built on stilts reinforcing.During erection construction just beam, need both There is the of short duration block that circuit carries out 1-2 hour.
At present, the built on stilts reinforcing present stage of existing railway in operation has mainly used three kinds of technology, horizontal lift vertical builder's jack sky and reinforces Method: i.e. using rail beam to do longeron, 40H shaped steel does crossbeam and lifts the built on stilts hardened link method on take-up road, and this method needs Parts are more, and structure is complicated and unstable, and safety coefficient is little, it is desirable to train speed limit 25km/h, it is impossible to meet movement requirement, existing It is not recommended that use;D type construction beam makes somebody a mere figurehead method for strengthening: i.e. use the D type construction beam of sizing to make somebody a mere figurehead hardened link, existing There are tetra-kinds of spans of D12, D16, D20, D24, although this method safety and stability, but, existing D24 splice type construction beam Splicing form is only available for the use of single span, occupation mode underaction;Construction beam makes somebody a mere figurehead method for strengthening continuously, will be fixing The method that the large-scale steel I-beam of modulus uses equal strength to connect forms the continuous beam of long span, and centre sets one or more Point define redundant structure, but, in the case of double track railway section distance between centers of tracks is less and sweep less time also without Method uses, and large-scale steel I-beam lateral stiffness is not enough, and less stable is unfavorable to traffic safety, and cost is high, particularly electrically Change railway section and cannot use Large-scale Hoisting equipment, use and there is beam body when manually setting a roof beam in place and topple the significant security risk such as unstability.
Utility model content
The purpose of this utility model is to provide a kind of construction beam to solve the problems referred to above;Due to this just beam be by Three sections are spliced, and be possible not only to all splice use as D24 type construction beam in work progress, it is also possible to can be by One sections and the splicing of the second sections use as D20 type construction beam, it is possible to splice the second sections and the 3rd sections as D16 Type construction beam uses, it is possible to be used alone as D12 type construction beam by the second sections, it is achieved that a kind of construction beam is multiple Span uses;It addition, this just girder construction simple, reasonable in design, occupation mode is very flexible, is suitable to railway and makes somebody a mere figurehead hardened link Construction is promoted the use of.
In order to achieve the above object, this utility model is realized by following technological means.
A kind of construction beam, it is by girder, splice plate, brace, primary nodal point plate, crossbeam, the first bracket, connecting plate, rubber Glue bearing, cantilever diaphragm, slag trap, the second bracket, hand hole, splice plate web, girder web plate part combine, its feature It is: girder upper end is provided with girder cover plate that girder cover plate upper end is provided with girder cover plate and strengthens lid, is provided with multiple master in girder Beam dividing plate, girder dividing plate both sides are provided with girder strength plate, and the girder left and right sides is provided with girder web plate, and girder lower end is provided with rubber Glue bearing, support plate, rubber support is fixed with support plate by gear foot;Being provided with some crossbeams between girder, crossbeam passes through First bracket, the second bracket, connecting plate are fixedly connected with girder, and the upper and lower two ends of crossbeam are provided with crossbearer cover plate, in the middle part of crossbeam Being provided with cantilever diaphragm, cantilever diaphragm is provided with fastener fixed plate, fastener fixed plate gripper shoe, crossbearer cover plate lower end is provided with Slag trap, is fixedly connected by the 3rd gusset plate, secondary nodal point plate, brace, primary nodal point plate between some crossbeams.
Described girder is to be spliced by three sections, and a length of 7895mm of first segment, second section segment length is 12730mm, the 3rd a length of 3827mm of sections, first segment and the second sections, the second sections and the 3rd sections are by splice plate phase Fixing connection, splice plate and girder web plate are provided with hand hole.
The three of girder sections are first used splice plate splicing by operation principle: before undercrossing tunnel frame bridge holds out against construction After complete, a girder is fallen within side supports plate, then by crossbeam from rail through use the first bracket, the second bracket, Connecting plate is connected with girder, and crossbeam top is connected with rail, then, by the first bracket, the second bracket, company by rail fastening Crossbeam is connected by fishplate bar with another root girder, then, by primary nodal point plate, secondary nodal point plate, the 3rd gusset plate, brace and crossbeam Connect, the excavation of Framed underpass bridge construction after installing, can be started.
This utility model mainly has the advantages that
1, this just beam be to be spliced by three sections, be possible not only to all to splice in work progress and construct as D24 type Just beam uses, it is also possible to can first segment be used as D20 type construction beam with the second sections splicing, it is possible to by the second sections Use as D16 type construction beam with the 3rd sections splicing, it is possible to the second sections is used alone as D12 type construction beam, Achieve a kind of multiple span of construction beam to use.
2, this just girder construction simple, reasonable in design, occupation mode is very flexible, is suitable to railway and makes somebody a mere figurehead the construction of hardened link Promote the use of.
Accompanying drawing explanation
Accompanying drawing 1 is the plan structure schematic diagram of a kind of construction beam of this utility model.
Accompanying drawing 2 is that the A-A of a kind of construction beam of this utility model is to structural representation.
Accompanying drawing 3 is the girder splicing construction schematic diagram of a kind of construction beam of this utility model.
As shown in Figure 1-Figure 3, each ingredient of above-mentioned a kind of construction beam is represented by following Arabic numerals:
Girder-1, splice plate-2, the 3rd gusset plate-3, secondary nodal point plate-4, brace-5, primary nodal point plate-6, crossbeam-7, First bracket-8, connecting plate-9, fastener fixed plate-10, fastener fixed plate gripper shoe-11, rubber support-12, support plate-13, Cantilever diaphragm-14, slag trap-15, the second bracket-16, gear foot-17, girder strength plate-18, girder dividing plate-19, girder cover plate add Strong lid-20, girder cover plate-21, hand hole-22, girder web plate-23.
Detailed description of the invention
Embodiment
As shown in Figure 1-Figure 3, a kind of construction beam, it by girder 1, splice plate 2, brace 5, primary nodal point plate 6, crossbeam 7, First bracket 8, connecting plate 9, rubber support 12, cantilever diaphragm 14, slag trap the 15, second bracket 16, hand hole 22, splice plate web 23, girder web plate 23 part combines.
As shown in Figure 1-Figure 3, girder 1 upper end is provided with girder cover plate 21, and girder cover plate 21 upper end is provided with girder cover plate Strengthening lid 20, be provided with multiple girder dividing plate 19 in girder 1, girder dividing plate 19 both sides are provided with girder strength plate 18, girder about 1 Both sides are provided with girder web plate 23, and girder 1 lower end is provided with rubber support 12, support plate 13, and rubber support 12 is by gear foot 17 Fix with support plate 13;Being provided with some crossbeams 7 between girder 1, crossbeam 7 is by first bracket the 8, second bracket 16, connection Plate 9 is fixedly connected with girder 1, and crossbeam about 7 two ends are provided with crossbearer cover plate, is provided with cantilever diaphragm (14) in the middle part of crossbeam 7, Being provided with fastener fixed plate 10, fastener fixed plate gripper shoe 11 on cantilever diaphragm 14, crossbearer cover plate lower end is provided with slag trap 15, It is fixedly connected by the 3rd gusset plate 3, secondary nodal point plate 4, brace 5, primary nodal point plate 6 between some crossbeams 7.
As shown in Figure 1-Figure 3, girder 1 is to be spliced by three sections, a length of 7895mm of first segment, second section segment length For 12730mm, the 3rd a length of 3827mm of sections, first segment and the second sections, the second sections and the 3rd sections are by splice plate 2 It is fixedly connected, splice plate 2 and girder web plate 23 are provided with hand hole 22.

Claims (2)

1. a construction beam, it by girder (1), splice plate (2), brace (5), primary nodal point plate (6), crossbeam (7), first N Lower limb (8), connecting plate (9), rubber support (12), cantilever diaphragm (14), slag trap (15), the second bracket (16), hand hole (22), spelling Fishplate bar web (23), girder web plate (23) part combines, and it is characterized in that: girder (1) upper end is provided with girder cover plate (21), Girder cover plate (21) upper end is provided with girder cover plate and strengthens lid (20), is provided with multiple girder dividing plate (19), girder in girder (1) Dividing plate (19) both sides are provided with girder strength plate (18), and girder (1) left and right sides is provided with girder web plate (23), girder (1) lower end Being provided with rubber support (12), support plate (13), rubber support (12) is fixed with support plate (13) by gear foot (17);Girder (1) being provided with some crossbeams (7) between, crossbeam (7) is by the first bracket (8), the second bracket (16), connecting plate (9) and girder (1) being fixedly connected, crossbeam (7) two ends up and down are provided with crossbearer cover plate, and crossbeam (7) middle part is provided with cantilever diaphragm (14), horizontal Being provided with fastener fixed plate (10), fastener fixed plate gripper shoe (11) on web (14), crossbearer cover plate lower end is provided with pushing off the slag Plate (15), by the 3rd gusset plate (3), secondary nodal point plate (4), brace (5), primary nodal point plate (6) phase between some crossbeams (7) Fixing connection.
A kind of construction beam the most according to claim 1, is characterized in that: girder (1) is to be spliced by three sections, the The one a length of 7895mm of sections, second section segment length is 12730mm, the 3rd a length of 3827mm of sections, first segment and the second sections, the Two sections and the 3rd sections are fixedly connected by splice plate (2), and splice plate (2) and girder web plate (23) are provided with hand hole (22)。
CN201620824220.0U 2016-07-28 2016-07-28 A kind of construction beam Active CN205857004U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620824220.0U CN205857004U (en) 2016-07-28 2016-07-28 A kind of construction beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620824220.0U CN205857004U (en) 2016-07-28 2016-07-28 A kind of construction beam

Publications (1)

Publication Number Publication Date
CN205857004U true CN205857004U (en) 2017-01-04

Family

ID=57653214

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620824220.0U Active CN205857004U (en) 2016-07-28 2016-07-28 A kind of construction beam

Country Status (1)

Country Link
CN (1) CN205857004U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106592350A (en) * 2017-02-23 2017-04-26 宝鸡中铁宝桥天元实业发展有限公司 Field installation method for railway turnout on temporary construction beam
CN106917345A (en) * 2017-05-03 2017-07-04 中铁第五勘察设计院集团有限公司 A kind of novel railway overhead device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106592350A (en) * 2017-02-23 2017-04-26 宝鸡中铁宝桥天元实业发展有限公司 Field installation method for railway turnout on temporary construction beam
CN106917345A (en) * 2017-05-03 2017-07-04 中铁第五勘察设计院集团有限公司 A kind of novel railway overhead device
CN106917345B (en) * 2017-05-03 2018-08-14 中铁第五勘察设计院集团有限公司 A kind of novel railway overhead device

Similar Documents

Publication Publication Date Title
CN100577915C (en) Erection method of large-span continuous steel truss arch
CN101550769B (en) Movable trestle
CN100482891C (en) Method for building railway bridge and simple support T beam bridge
CN101139821A (en) Method and system for erecting steel trusses by stay cable auxiliary complete cantilever
CN101380954A (en) Suspension train traffic system with hanging rail
CN206902566U (en) A kind of arch rib bridge girder cantilever construction Hanging Basket
CN201106155Y (en) Inclined guy cable auxiliary full cantaliver crane trussed steel beam device
CN106702909A (en) Integral swiveling structure for double-body steel box girder and construction method thereof
CN203498760U (en) Guiding device for large-span box girder pushing
CN201102544Y (en) Hanging train traffic system of hanging rail
CN205857004U (en) A kind of construction beam
CN202482776U (en) Web type bridge fabrication machine for bridge constructions under conditions of heavy winds and high altitudes
CN205857044U (en) A kind of novel construction beam
CN108677679A (en) Overhead steel reinforced concrete combination beam
CN102134832A (en) Movable support and movable support assisted method for erecting steel box beams through non-variable amplitude frame beam crane
CN213571497U (en) Large-span truss-type railway temporary beam structure
CN104179123A (en) Bridge fabrication machine capable of building and assembling two bridge segments
CN205205685U (en) Span wire pier is function portal device at most
CN109930469B (en) Steel box girder thin-wall pier rigid frame cable-stayed bridge suitable for straddle type monorail
CN108342980B (en) Railway suspension bridge upper bearing type steel truss bridge deck structure
CN111576248A (en) Dismantling method for cantilever cast-in-situ beam hanging basket system
CN213013854U (en) Widening stiffening beam railway suspension bridge structure system
CN213328632U (en) Suspension type monorail trolley-bus tie-rod arch bridge structure
CN201363154Y (en) Mobile trestle bridge
CN204112226U (en) A kind of holes connects does section assembling bridge manufacturing machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant