CN205855776U - A kind of safety hook - Google Patents

A kind of safety hook Download PDF

Info

Publication number
CN205855776U
CN205855776U CN201620783240.8U CN201620783240U CN205855776U CN 205855776 U CN205855776 U CN 205855776U CN 201620783240 U CN201620783240 U CN 201620783240U CN 205855776 U CN205855776 U CN 205855776U
Authority
CN
China
Prior art keywords
hook
support bar
suspension ring
utility
safety
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620783240.8U
Other languages
Chinese (zh)
Inventor
熊野
李卫明
董军涛
李明
邓兆辉
苏弘泰
任杰
董彦亮
王腾
王必恒
陈炳元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd, First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201620783240.8U priority Critical patent/CN205855776U/en
Application granted granted Critical
Publication of CN205855776U publication Critical patent/CN205855776U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of safety hook, including suspension ring and the suspension hook that is connected with described suspension ring, described suspension hook includes hook body, the bottom of described hook body is provided with the S-shaped slot matched with the T-shaped hanging piece on precast stair, and, side, described hook body top is provided with support bar, and the block in the middle part of described support bar and described suspension ring offsets.The beneficial effects of the utility model: the S-shaped slot matched with the T-shaped hanging piece on precast stair by setting, it is thus possible to when lifting, directly engaged precast stair hanging piece can lift by safety hook, it is greatly improved convenience during lifting, and, owing to being snap-in structure, thus connectivity robustness when being also effectively guaranteed hoisting prefabricated stair.Additionally, by arranging support bar, and support bar is made to withstand block in the middle part of suspension ring such that it is able to effectively to prevent the suspension hook when secondary hoisting from occurring soft and breaking off relations, add safety during lifting.

Description

A kind of safety hook
Technical field
This utility model relates to hoisting technology field, it particularly relates to a kind of safety hook.
Background technology
In the historical process of building, conventional concrete pours the technique of construction high buildings and large mansions and has continued to use for many years, right The mode all using site operation to pour in stair and building construction is prepared.Along with the requirement of building trade gradually steps up, Cost, the construction speed of building is all increased, it has to the mode of construction of existing building is changed, has then developed prefabricated Sectionalized house.Prefabrication in workshop will be shifted to an earlier date by building element, then lift and install to scene.But, The lifting hanging piece of existing precast stair is without safety door hook, and during precast stair lifting, upper and lower hanging piece exists certain angle with steel wire rope Degree, easily occurs situation about breaking off relations during secondary hoisting, is unfavorable for the safty hoisting of in-situ precast stair.
For the problem in correlation technique, effective solution is the most not yet proposed.
Utility model content
The purpose of this utility model is to propose a kind of safety hook, with overcome in the presence of existing correlation technique above-mentioned not Foot.
The technical solution of the utility model is achieved in that
A kind of safety hook, including suspension ring and the suspension hook that is connected with described suspension ring, described suspension hook includes hook body, institute The bottom stating hook body is provided with the S-shaped slot matched with the T-shaped hanging piece on precast stair, and, described suspension hook is originally Side, body top is provided with support bar, and the block in the middle part of described support bar and described suspension ring offsets.
Wherein, described hook body is for being inverted Q font.
Wherein, described support bar is positioned at described Q font and stretches on the elongated end.
Wherein, one end that the block in the middle part of described support bar and described suspension ring offsets has kink.
The beneficial effects of the utility model: the S-shaped slot matched with the T-shaped hanging piece on precast stair by setting, It is thus possible to when lifting, directly being engaged precast stair hanging piece can be lifted by safety hook, is greatly improved and hangs Convenience during dress, and, owing to being snap-in structure, thus being connected firmly when being also effectively guaranteed hoisting prefabricated stair Property.Additionally, by arranging support bar, and support bar is made to withstand block in the middle part of suspension ring such that it is able to effectively to prevent at secondary During lifting, suspension hook occurs soft and breaks off relations, and adds safety during lifting.
Accompanying drawing explanation
In order to be illustrated more clearly that this utility model embodiment or technical scheme of the prior art, below will be to embodiment The accompanying drawing used required in is briefly described, it should be apparent that, the accompanying drawing in describing below is the most of the present utility model Some embodiments, for those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to according to this A little accompanying drawings obtain other accompanying drawing.
Fig. 1 is one of structural representation of safety hook according to this utility model embodiment;
Fig. 2 is the two of the structural representation of the safety hook according to this utility model embodiment.
In figure:
1, suspension ring;2, hook body;3, S-shaped slot;4, support bar;5, block.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of this utility model rather than whole Embodiment.Based on the embodiment in this utility model, the every other embodiment that those of ordinary skill in the art are obtained, all belong to Scope in this utility model protection.
According to embodiment of the present utility model, it is provided that a kind of safety hook.
As shown in Figure 1-2, include suspension ring 1 according to the safety hook of this utility model embodiment and connect with described suspension ring 1 The suspension hook connect, described suspension hook includes that hook body 2, the bottom of described hook body 2 are provided with and the T-shaped hanging piece on precast stair The S-shaped slot 3 matched, and, side, described hook body 2 top is provided with support bar 4, and described support bar 4 is with described Block 5 in the middle part of suspension ring 1 offsets.
Wherein, described hook body 2 is for being inverted Q font.
Wherein, described support bar 4 is positioned at described Q font and stretches on the elongated end.
Wherein, one end that the block 5 in the middle part of described support bar 4 and described suspension ring 1 offsets has kink.
Time specifically used, the S-shaped slot 3 in hook body 2 is docked with the T-shaped hanging piece on precast stair, and Engaging, it is ensured that T-shaped hanging piece is rotatable and does not falls off, is connected fixing with the steel wire rope of lifting appliance for suspension ring 1 the most again, and even Connect use, support the block 5 in the middle part of suspension ring 1 with support bar 4, thus the safety lifting of precast stair can be realized.
By such scheme of the present utility model, engage by arranging the S-shaped matched with the T-shaped hanging piece on precast stair Groove 3 such that it is able to when lifting, directly being engaged precast stair hanging piece can be lifted by safety hook, is greatly improved Convenience during lifting, and, owing to being snap-in structure, thus connection when being also effectively guaranteed hoisting prefabricated stair Fastness.Additionally, by arranging support bar 4, and support bar 4 is made to withstand the block 5 in the middle part of suspension ring 1 such that it is able to effective Prevent the suspension hook when secondary hoisting from occurring soft and breaking off relations, add safety during lifting.
The foregoing is only preferred embodiment of the present utility model, not in order to limit this utility model, all at this Within the spirit of utility model and principle, any modification, equivalent substitution and improvement etc. made, should be included in this utility model Protection domain within.

Claims (4)

1. a safety hook, it is characterised in that including suspension ring and the suspension hook being connected with described suspension ring, described suspension hook includes hanging Hook body, the bottom of described hook body is provided with the S-shaped slot matched with the T-shaped hanging piece on precast stair, and, institute Stating side, hook body top and be provided with support bar, the block in the middle part of described support bar and described suspension ring offsets.
Safety hook the most according to claim 1, it is characterised in that described hook body is for being inverted Q font.
Safety hook the most according to claim 2, it is characterised in that described support bar is positioned at described Q font and stretches On elongated end.
Safety hook the most according to claim 1, it is characterised in that the block phase in the middle part of described support bar and described suspension ring The one end supported has kink.
CN201620783240.8U 2016-07-25 2016-07-25 A kind of safety hook Expired - Fee Related CN205855776U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620783240.8U CN205855776U (en) 2016-07-25 2016-07-25 A kind of safety hook

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620783240.8U CN205855776U (en) 2016-07-25 2016-07-25 A kind of safety hook

Publications (1)

Publication Number Publication Date
CN205855776U true CN205855776U (en) 2017-01-04

Family

ID=57649453

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620783240.8U Expired - Fee Related CN205855776U (en) 2016-07-25 2016-07-25 A kind of safety hook

Country Status (1)

Country Link
CN (1) CN205855776U (en)

Similar Documents

Publication Publication Date Title
CN103993735A (en) Support system of roof inclined beam and slab cantilever structure and construction method of support system
CN104947719A (en) Basement roof post-cast strip hanging support formwork structure and post-cast strip construction method thereof
CN208563588U (en) The connection structure of Assembled Building bench and spandrel girder
CN111021749A (en) Simple hoisting mechanism for bare concrete exterior wall cladding and construction method thereof
CN203716326U (en) Rope connector
CN110158937A (en) A kind of no bracket is without counterweight hanging basket suspension structure and its construction method
CN102733608B (en) Construction method for spray head layer of granulation tower
CN102910532B (en) Method for butting and hoisting large box type derricks in air
CN205709343U (en) The inverse dress special building hoist of moldeed depth foundation ditch
CN208518306U (en) A kind of levels operation platform for lighting roof construction
CN205855776U (en) A kind of safety hook
CN109577564A (en) A kind of fixed structure of heavy grade roof tile
CN202609885U (en) Hanging basket suspension structure of stay cable type wall-straddling block
CN202988556U (en) Special lifting appliance for angle-steel type frame body
CN204690801U (en) Formwork erecting structure is hung in basement roof ater-casting
CN204252082U (en) Arch dam bracket plate device
CN105731271A (en) Combined tower crane for roof construction and construction method thereof
CN205259573U (en) A hanging flower basket hangs mechanism for high -rise roofing transformation
CN209161272U (en) A kind of construction elevator overhang steel corridor for facade contraction structure
CN208980193U (en) The curtain wall hanging apparatus of anticollision
CN107675892A (en) A kind of glass curtain wall monorail hoisting structure
CN208666878U (en) Small space profile hoisting device
CN205276893U (en) Building body outer wall hoists built -in fitting of trying to stop people from fighting each other
CN202012079U (en) Pile anchor for cable crane
CN206538951U (en) A kind of steelframe precast stair

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170104

Termination date: 20170725