CN205840895U - Stalk plate girder half assembled open-cut tunnel structure - Google Patents

Stalk plate girder half assembled open-cut tunnel structure Download PDF

Info

Publication number
CN205840895U
CN205840895U CN201620767023.XU CN201620767023U CN205840895U CN 205840895 U CN205840895 U CN 205840895U CN 201620767023 U CN201620767023 U CN 201620767023U CN 205840895 U CN205840895 U CN 205840895U
Authority
CN
China
Prior art keywords
abutment wall
arch
cut tunnel
tunnel structure
open
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620767023.XU
Other languages
Chinese (zh)
Inventor
卿伟宸
林本涛
朱勇
高杨
陶伟明
杨昌宇
郑伟
王建捷
郑尚峰
陈锡武
王若晨
黄华
曾琦
范胜利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201620767023.XU priority Critical patent/CN205840895U/en
Application granted granted Critical
Publication of CN205840895U publication Critical patent/CN205840895U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

Stalk plate girder half assembled open-cut tunnel structure, the difficult problem that, construction quality excessive with effectively solution super-span open-cut tunnel structure thickness is difficult to ensure that.It includes: outside abutment wall and inner side abutment wall, constructs along circuit bearing of trend;Arch truss, is arranged along circuit bearing of trend interval, and its two ends are respectively supported on the cushion cap on outside abutment wall, abutment wall top, inner side;T-shaped top board, is laid on the truss of arch, and its length direction is circuit bearing of trend;Arch waterproof layer, applies on T-shaped top board;Backfill layer, fills on the waterproof layer of arch between abutment wall top, outside to side slope surface;Water barrier, covers backfill layer surface.

Description

Stalk plate girder half assembled open-cut tunnel structure
Technical field
The present invention relates to open cut tunnel and build technical field, be specifically related to a kind of open-cut tunnel structure, it is adaptable to existing railway increasing is built bright Hole structure, or super-span open-cut tunnel structure.
Background technology
Enter railway construction in China high speed development after 21st century, along with quickly and greatly advising of Southwest Mountainous Areas high-speed railway Die repair is built, owing to the many factors such as, topographic and geologic complicated condition big by sweep, environmental requirement height are restricted, and Along Railway It is extremely difficult that part location sets station condition.Therefore, build high-speed railway route selection for improving hardships and dangers mountain area, set the degree of freedom at station, make Station, mountain area layout pattern is the most flexible, station function is more easy to be guaranteed, three lines, the station tunnel of four lines even more large span Building of road will be the most, along with increase and the increase of time depth of fill of hole open cut tunnel liner structure span, for ensureing knot Structure safety, open cut tunnel liner structure thickness is increasing.Design filled load in top, hole is tied less than 4m, general single-track railway open cut tunnel Structure thickness is 60cm, and double track railway open-cut tunnel structure thickness is 80cm, and four-track line open cut tunnel (clear span 21m~about 25m) structure is thick Degree reaches about 130cm;Being computed, to top, hole design filled load 30m, its lining thickness of the open-cut tunnel structure of clear span 25m is up to 2.5m, can not implement in Practical Project substantially.On the one hand, along with open cut tunnel span increases, structural thickness increases, and large volume is mixed Solidifying soil difficulty of construction increases, and construction quality is difficult to control to, and the mass concrete heat of hydration can not be taked effectively to eliminate and produce temperature Degree crack, causes the structure cannot life requirement.On the other hand, owing to open cut tunnel span increases, lining thickness increases, and causes coagulation When soil pours, chassis carrying is greatly increased;Simultaneously because open cut tunnel span increase, lining trolley weight is increased dramatically, chassis load and The problem brought that is increased dramatically of own wt is: the reliability of (1) trolley traveling system is difficult to ensure that;(2) chassis is in lining cutting After concreting, sedimentation is difficult to control to.Therefore have a strong impact on open cut tunnel concrete pouring quality and operation uses function.
Secondly, in existing line operated, on the one hand destroying due to part hole slope vegetation, rockfall is grown, For ensureing operation security, often need spreading open cut tunnel;On the other hand, due to preliminary engineering input, duration and the limit of route selection System, occurs in that a lot of roadbed gradient slope, and part side slope issues in factor effects such as weathering erosion, earthquake, heavy showers and changes The situations such as shape, cracking, supporting intensity decline, and even cave in, disrupted circuit operation.Can not be complete in conventional Slope Treatment means Eliminate operation security hidden danger, or its engineering puts into huge, when not having economic rationality, can increase and build open cut tunnel on existing foundation of road bed Engineering, to realize the permanent protection to region wire.Increase on the most wired and build the difficulty of open cut tunnel engineering and be, need at contact net Construct in the case of not power-off, and use tradition open cut tunnel liner structure and construction method, the transport of lining trolley, assembled with And trolley traveling is all insoluble difficulty in lining cutting pouring construction.Thus, it is ensured that the construction of existing railway spreading open cut tunnel connects Touch net not power-off, ensure the safety of driving and workmen simultaneously, find novel open-cut tunnel structure form and construction method gesture must OK.
Summary of the invention
The technical problem to be solved provides a kind of stalk plate girder half assembled open-cut tunnel structure, effectively to solve The difficult problem that super-span open-cut tunnel structure thickness is excessive, construction quality is difficult to ensure that.
The technical solution adopted for the present invention to solve the technical problems is as follows:
The stalk plate girder half assembled open-cut tunnel structure of the present invention, is characterized in that it includes: outside abutment wall and inner side abutment wall, edge Circuit bearing of trend is constructed;Arch truss, is arranged along circuit bearing of trend interval, and its two ends are respectively supported at outside abutment wall, interior On the cushion cap on side wall top;T-shaped top board, is laid on the truss of arch, and its length direction is circuit bearing of trend;Arch is waterproof Layer, applies on T-shaped top board;Backfill layer, fills on the waterproof layer of arch between abutment wall top, outside to side slope surface;Every Water layer, covers backfill layer surface.
Described outside abutment wall, abutment wall top, inner side cushion cap on be provided with shock mount, being supported at both ends in of arch truss On shock mount.
The invention has the beneficial effects as follows, be prevented effectively from super-span structure arch ring super-thickness and mass concrete and apply, it is to avoid The mass concrete heat of hydration causes the generation of the problems such as Lining Crack, thus open-cut tunnel structure safety, quality and resistance to are effectively ensured Property for a long time;Arch truss uses shock mount to be connected with both sides abutment wall, under rockfall effect, can effectively reduce falling rocks to lining cutting The percussion of structure, it is ensured that structural safety during operation;It is greatly reduced arch dead load, saves construction cost;Need not Lining trolley, easy construction is easy, can be used for the construction of newly-built super-span open cut tunnel it can also be used to existing railway increasing is built open cut tunnel and executed Work.
Accompanying drawing explanation
This specification includes following five width accompanying drawings:
Fig. 1 is the sectional drawing of stalk plate girder half assembled open-cut tunnel structure of the present invention;
Fig. 2 is the front view of arch truss in stalk plate girder half assembled open-cut tunnel structure of the present invention;
Fig. 3 is the enlarged drawing of A local in Fig. 1;
Fig. 4, Fig. 5 are the schematic diagrams of stalk plate girder half assembled open-cut tunnel structure construction method of the present invention.
Figure shows component, toponym and corresponding labelling: base plate 10, outside abutment wall 21, inner side abutment wall 22, purlin, arch Frame 30, pricncipal rafter 31a, truss lower boom 31b, vertical bar of truss 31c, truss diagonal web member 31d, T-shaped top board 40, arch is waterproof Layer 50, backfills layer 60, water barrier 61, shock mount 70, Central drain 80.
Detailed description of the invention
The present invention is described in detail with embodiment below in conjunction with the accompanying drawings.
With reference to Fig. 1 and Fig. 3, the stalk plate girder half assembled open-cut tunnel structure of the present invention includes: outside abutment wall 21 and inner side edge Wall 22, constructs along circuit bearing of trend;Arch truss 30, is arranged, outside its two ends are respectively supported at along circuit bearing of trend interval Side wall 21, inner side abutment wall 22 top cushion cap on;T-shaped top board 40, is laid on arch truss 30, and its length direction is circuit Bearing of trend;Arch waterproof layer 50, applies on T-shaped top board 40;Backfill layer 60, in outside abutment wall 21 top to side slope surface it Between fill on arch waterproof layer 50;Water barrier 61, covers backfill layer 60 surface.
Employing arch, open cut tunnel arch truss 30 and T-shaped top board 40, be prevented effectively from super-span structure arch ring super thick large volume Concrete applies, it is to avoid the mass concrete heat of hydration causes the generation of the problems such as Lining Crack, thus open cut tunnel knot is effectively ensured Structure safety, quality and durability.It is greatly reduced arch dead load simultaneously, saves construction cost
With reference to Fig. 1, described outside abutment wall 21, inner side abutment wall 22 top cushion cap on be provided with shock mount 70, purlin, arch Being supported at both ends on shock mount 70 of frame 30.Arch truss 30 and outside abutment wall 21, inner side abutment wall 22 use shock mount 70 Connect, under rockfall effect, the falling rocks percussion to liner structure can be effectively reduced, it is ensured that structure peace during operation Entirely.
With reference to Fig. 1, can between described outside abutment wall 21, inner side abutment wall 22 lower end on the basis of arrange and prolong along line direction The base plate 10 stretched, the transverse ends of base plate 10 consolidates with outside abutment wall 21, inner side abutment wall 22 respectively.Base plate arranges center water 10 times Ditch 80.
With reference to Fig. 4, Fig. 5 and Fig. 1, stalk plate girder half assembled open-cut tunnel structure of the present invention is constructed as follows:
1. excavation section by section apply inner side abutment wall 22 and outside abutment wall 21;
2. base plate 10 is applied;
3. after inner side abutment wall 22 and outside abutment wall 21 reach design strength, lifting arch truss 30;
4. T-shaped top board 40 is laid;
5. on T-shaped top board 40, lay arch waterproof layer 50, and apply backfill layer 60 and water barrier 61;
6. the construction appurtenant work such as lateral sulcus and cable trench;
Repeat the above steps 1.~the most several times, until this section of open cut tunnel has been constructed.
Whole work progress need not lining trolley, and easy construction is easy, can be used for the construction of newly-built super-span open cut tunnel, also Can be used for existing railway increasing and build open cut tunnel construction.

Claims (3)

1. stalk plate girder half assembled open-cut tunnel structure, is characterized in that it includes: outside abutment wall (21) and inner side abutment wall (22), along the line Road bearing of trend is constructed;Arch truss (30), is arranged along circuit bearing of trend interval, and its two ends are respectively supported at outside abutment wall (21), on the cushion cap on inner side abutment wall (22) top;T-shaped top board (40), is laid on arch truss (30), and its length direction is line Road bearing of trend;Arch waterproof layer (50), applies on T-shaped top board (40);Backfill layer (60), in outside abutment wall (21) top extremely Fill between side slope surface on arch waterproof layer (50);Water barrier (61), covers backfill layer (60) surface.
2. stalk plate girder half assembled open-cut tunnel structure as claimed in claim 1, is characterized in that: described outside abutment wall (21), interior Be provided with shock mount (70) on the cushion cap on side wall (22) top, arch truss (30) be supported at both ends in shock mount (70) On.
3. stalk plate girder half assembled open-cut tunnel structure as claimed in claim 1, is characterized in that: described outside abutment wall (21), interior Between side wall (22) lower end on the basis of the base plate (10) extended along line direction is set, the transverse ends of base plate (10) is respectively With outside abutment wall (21), inner side abutment wall (22) consolidation.
CN201620767023.XU 2016-07-20 2016-07-20 Stalk plate girder half assembled open-cut tunnel structure Active CN205840895U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620767023.XU CN205840895U (en) 2016-07-20 2016-07-20 Stalk plate girder half assembled open-cut tunnel structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620767023.XU CN205840895U (en) 2016-07-20 2016-07-20 Stalk plate girder half assembled open-cut tunnel structure

Publications (1)

Publication Number Publication Date
CN205840895U true CN205840895U (en) 2016-12-28

Family

ID=57625807

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620767023.XU Active CN205840895U (en) 2016-07-20 2016-07-20 Stalk plate girder half assembled open-cut tunnel structure

Country Status (1)

Country Link
CN (1) CN205840895U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106050273A (en) * 2016-07-20 2016-10-26 中铁二院工程集团有限责任公司 Straight-wall-plate-girder semi-assembling type open-cut tunnel structure and construction method thereof
CN110242306A (en) * 2019-06-28 2019-09-17 四川省交通勘察设计研究院有限公司 Open cut tunnel anti-side laminated structure and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106050273A (en) * 2016-07-20 2016-10-26 中铁二院工程集团有限责任公司 Straight-wall-plate-girder semi-assembling type open-cut tunnel structure and construction method thereof
CN110242306A (en) * 2019-06-28 2019-09-17 四川省交通勘察设计研究院有限公司 Open cut tunnel anti-side laminated structure and construction method

Similar Documents

Publication Publication Date Title
CN103485288B (en) A kind ofly pass through both wired double-deck jacking culvert construction technology
CN108005664A (en) A kind of hole pile construction method of platform structure
CN102226399A (en) Soft rock four-line large-span tunnel three-bench cable-bracing excavation construction method
CN105862930B (en) A kind of protection structure to creating existing tunnel below underground engineering
CN102226398A (en) Soft rock four-line large-span tunnel compound double-side wall bracing cable conversion excavation construction method
CN103572765B (en) Treatment and construction method of bridge site river bank expansive soil landslide positions
CN107130613A (en) Large span tunnel is just wearing the retaining structure and its construction method of existing barricade
CN102226407A (en) Four-line large-span tunnel cable-arch combined primary support structure
CN103967031A (en) Caisson and pile combined foundation of consolidated subsoil and construction method of caisson and pile combined foundation
CN202989952U (en) Tunnel lining structure with pile-foundation bearing arch
CN105587320B (en) Rich water sand-pebble layer abnormal shape deep shaft structural system and its construction method
CN205387720U (en) Tertiary light -duty retaining structure of double circular pile pile foundation of superelevation embankment
CN110158389A (en) A kind of light soil road structure and its construction method
CN106050262A (en) Composite lining structure for super-large-span pile-foundation-joist-based bearing arched tunnel and construction method thereof
CN103290847A (en) Inner oblique beam supporting structure for oversized-area deep foundation pit and construction method
CN105672450A (en) Laying method for large-aperture water draining pipeline parallel to upper part of existing metro tunnel structure
CN205840895U (en) Stalk plate girder half assembled open-cut tunnel structure
CN102146676A (en) High-steep side slope subgrade structure for mountain area
CN205805574U (en) A kind of super-span pile foundation joist carrying arch tunnel recombination liner structure
CN202148907U (en) Non-isoparametric initial-stage supporting structure of four-lane large-span tunnel
CN106050273A (en) Straight-wall-plate-girder semi-assembling type open-cut tunnel structure and construction method thereof
CN108166395A (en) A kind of construction method that beam bridge is built across Business Line
CN209669613U (en) A kind of road structure with pile foundation bent cap
CN105569055B (en) A kind of structure for preventing landslide
CN206667263U (en) A kind of foundation pit supporting construction