CN205826761U - A kind of full-automatic transformer pilot system - Google Patents
A kind of full-automatic transformer pilot system Download PDFInfo
- Publication number
- CN205826761U CN205826761U CN201620510526.9U CN201620510526U CN205826761U CN 205826761 U CN205826761 U CN 205826761U CN 201620510526 U CN201620510526 U CN 201620510526U CN 205826761 U CN205826761 U CN 205826761U
- Authority
- CN
- China
- Prior art keywords
- microcontroller
- test
- full
- pilot system
- transformer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Testing Electric Properties And Detecting Electric Faults (AREA)
Abstract
The utility model discloses a kind of full-automatic transformer pilot system, described pilot system includes experiment power supply, intelligent switch, tested power transformer, test platform, sensor detecting device, drive circuit microcontroller and touches display screen;Experiment power supply, intelligent switch and tested power transformer are packaged in a shell, and are sequentially connected electrically, and tested power transformer is connected with test platform and sensor detecting device respectively, and test platform and described sensor detecting device are all connected with microcontroller;Described microcontroller drives described experiment power supply by drive circuit, and microcontroller connects intelligent switch, controls intelligent switch and described tested power transformer turns off or cuts out, and microcontroller is also connected with touch display screen.Pass through this utility model, it is possible to tested power transformer is realized full automatic test, it is no longer necessary to artificially measure;And experiment power supply, intelligent switch and tested power transformer are encapsulated, improve electric power safety.
Description
Technical field
This utility model relates to transformer test technical field, is specifically related to a kind of full-automatic transformer pilot system.
Background technology
During power grid construction, the test to power transformer is extremely important, and test power transformer is at running
In operational factor.At present, domestic power transformer test is mostly all in craft or semi-automatic measuring stage, Automated water
Flat low, protective capability is weak, and test speed is slow, and inefficiency exists potential safety hazard.
Utility model content
In order to overcome the defect of prior art, this utility model provides a kind of full-automatic transformer pilot system.
The technical scheme that this utility model solves above-mentioned technical problem is as follows:
This utility model provides a kind of full-automatic transformer pilot system, and described pilot system includes experiment power supply, intelligence
Energy switch, tested power transformer, test platform, sensor detecting device, drive circuit microcontroller and touch display screen;
Described experiment power supply, intelligent switch and tested power transformer are packaged in a shell, and are sequentially connected electrically, institute
State tested power transformer to be connected with test platform and sensor detecting device respectively, described test platform and the inspection of described sensor
Survey device to be all connected with microcontroller;Described microcontroller drives described experiment power supply, described microcontroller by drive circuit
Connect intelligent switch, control described intelligent switch and described tested power transformer turns off or cuts out, described microcontroller
Also it is connected with touch display screen.
The beneficial effects of the utility model are: use test platform and sensor detecting device to enter tested power transformer
Row test, and test data is sent to microcontroller, test data is sent to touch display screen by microcontroller, for test people
Member checks;Microcontroller can also be by controlling disconnection and the Guan Bi of the tested power supply of intelligent switching control, it is achieved that to tested electricity
The full automatic test of power transformator, it is not necessary to artificially participate in, improve testing efficiency;Simultaneously because the usual voltage ratio of transformator is relatively
Height, easily gets an electric shock, it is achieved automatically and experiment power supply, intelligent switch and tested power transformer overall package are got up,
Also electric power safety has been ensured.
On the basis of technique scheme, this utility model can also improve as follows.
Further, described test platform has multiple test station, be respectively unloaded load testing station, D.C. resistance
Test station and transformator electric quantity test station, each test station is all disposed with the test circuit of correspondence, each test
Circuit is all electrically connected with tested power transformer, and each test circuit is all the most micro-with described by a signal conditioning circuit
Controller is electrically connected with.
Further, described sensor detecting device includes multiple sensor, and each sensor all becomes with tested electric power
Depressor connects, and each sensor is the most all electrically connected with described microcontroller by a signal conditioning circuit.
Further, the plurality of sensor is respectively temperature sensor, Smoke Sensor and sound transducer.
Further, also include that alarm device, described alarm device are connected with described microcontroller.
Described further have the beneficial effect that when microcontroller finds that the test data of tested power transformer occur abnormal
Time, then carry out abnormal alarm by alarm device.
Further, described microcontroller has control panel, and described control panel is provided with control knob, described micro-control
Device processed is connected with intelligent switch by circuit.
Described further having the beneficial effect that arranges control knob on the panel of microcontroller, can lead to control knob
Realize the long-range control to intelligent switch.
Further, also including remote monitoring center and mobile terminal, described remote monitoring center and mobile terminal are the most logical
Cross wireless communication unit to be connected with described microcontroller.
Described further have the beneficial effect that the test data of tested power transformer can will be uploaded to far by microcontroller
Range monitoring center and the mobile terminal being sent to director, it is achieved that remotely monitor.
Further, also including that photographic head, described photographic head are installed on the top of test platform, described photographic head is by collection
Line device is connected with described microcontroller.
Described further having the beneficial effect that realizes omnidistance video monitoring to test platform.
Accompanying drawing explanation
Fig. 1 is a kind of full-automatic transformer pilot system connection diagram of this utility model embodiment.
Detailed description of the invention
Being described principle of the present utility model and feature below in conjunction with accompanying drawing, example is served only for explaining this practicality
Novel, it is not intended to limit scope of the present utility model.
Embodiment, a kind of full-automatic transformer pilot system.
Seeing Fig. 1, the full-automatic transformer pilot system that the present embodiment provides includes experiment power supply, intelligent switch, tested
Power transformer, test platform, sensor detecting device, drive circuit, microcontroller and touch display screen;Described test electricity
Source, intelligent switch and tested power transformer are packaged in a shell, and are sequentially connected electrically.Owing to the voltage of transformator is usual
The highest, tested power supply, intelligent switch and tested power transformer are all integrated in a shell by the present embodiment, have ensured electric power
The electric power safety of transformator.Described tested power transformer is connected with test platform and sensor detecting device respectively, described
Test platform and described sensor detecting device are all connected with microcontroller;Described microcontroller drives described by drive circuit
Experiment power supply, described microcontroller connects intelligent switch, controls described intelligent switch and break described tested power transformer
Open or close and close.
Wherein, described test platform has multiple test station, be respectively unloaded load testing station, D.C. resistance test
Station and transformator electric quantity test station, each test station is all disposed with the test circuit of correspondence, i.e. unloaded load testing
Being provided with unloaded load testing circuit on station, D.C. resistance test station is provided with D.C. resistance test circuit, transformator electricity
It is provided with transformator electric quantity test circuit in amount test station.Each test circuit all electrically connects with tested power transformer
Connecing, each test circuit is the most all electrically connected with described microcontroller by a signal conditioning circuit, and each tests electricity
After tested power transformer is tested by road, the signal after test need to can send micro-after signal conditioning circuit is nursed one's health
Controller.
Described sensor detecting device includes multiple sensor, and each sensor is all connected with tested power transformer,
Each sensor is the most all electrically connected with described microcontroller by a signal conditioning circuit.Multiple sensors are respectively temperature
Degree sensor, Smoke Sensor and sound transducer.
Also including alarm device in the present embodiment, described alarm device is connected with described microcontroller, and microcontroller
Having control panel, described control panel is provided with control knob, and described control knob is connected with intelligent switch by circuit.
It addition, also include remote monitoring center and mobile terminal, described remote monitoring center and mobile terminal all pass through nothing
Line communication unit is connected with described microcontroller;And also include that photographic head, described photographic head are installed on the top of test platform,
Described photographic head is connected with described microcontroller by hub.
The work process of the full-automatic transformer pilot system that employing the present embodiment provides is: microcontroller is by driving electricity
Road drives experiment power supply, and microcontroller connects also by intelligent switch or between open test power supply and tested transformator
Path, starts and tests tested transformator or stop test.Multiple test station it is provided with on test platform, each
The test circuit of correspondence is set in test station, tested power transformer is tested;And employing sensor detecting device
Detecting tested power transformer, the data of test circuit test and the data of sensor detecting device detection are all passed through
Microcontroller it is sent to after signal condition.Test data is shown on local touch display screen by microcontroller, and
When the test data that microcontroller finds tested power transformer occur abnormal, then carry out abnormal alarm by alarm device.
The mobile terminal of remote monitoring center and director also remotely issued by test data by microcontroller, in order to tested electric power
The test of transformator remotely monitors, it is achieved full-automatic.
A kind of full-automatic transformer pilot system that the present embodiment provides, uses test platform and sensor detecting device pair
Tested power transformer is tested, and test data is sent to microcontroller, microcontroller can also to tested power supply and
Intelligent switch is controlled, it is achieved that test full automatic to tested power transformer, it is not necessary to artificially participate in, and improves test effect
Rate;Simultaneously because the usual voltage ratio of transformator is higher, easily get an electric shock, it is achieved full-automatic and by experiment power supply, intelligent switch with
And tested power transformer overall package gets up, also ensure electric power safety;Microcontroller is by tested power transformer
Test data is shown on touch display screen, when the test data that microcontroller finds tested power transformer note abnormalities,
Then carry out abnormal alarm by alarm device;The panel of microcontroller arranges control knob, it is achieved remote to intelligent switch
Process control;And at test platform photographic head installed above, test platform is carried out omnidistance video monitoring.
In the description of this specification, reference term " embodiment one ", " example ", " concrete example " or " some examples "
Deng description means to combine this embodiment or example describes concrete grammar, device or feature be contained in of the present utility model extremely
In a few embodiment or example.In this manual, the schematic representation of above-mentioned term is necessarily directed to identical
Embodiment or example.And, the specific features of description, method, device or feature can with one or more embodiments in office or
Example combines in an appropriate manner.Additionally, in the case of the most conflicting, those skilled in the art can be by this explanation
Different embodiments or the feature of example and different embodiment or example described in book are combined and combine.
The foregoing is only preferred embodiment of the present utility model, not in order to limit this utility model, all in this practicality
Within novel spirit and principle, any modification, equivalent substitution and improvement etc. made, should be included in guarantor of the present utility model
Within the scope of protecting.
Claims (8)
1. a full-automatic transformer pilot system, it is characterised in that described pilot system include experiment power supply, intelligent switch,
Tested power transformer, test platform, sensor detecting device, drive circuit microcontroller and touch display screen;
Described experiment power supply, intelligent switch and tested power transformer are packaged in a shell, and are sequentially connected electrically, described quilt
Examination power transformer is connected with test platform and sensor detecting device respectively, described test platform and described sensor detection dress
Put and be all connected with microcontroller;Described microcontroller drives described experiment power supply by drive circuit, and described microcontroller connects
Intelligent switch, controls described intelligent switch and described tested power transformer turns off or cuts out, described microcontroller also with
Touch display screen connects.
2. full-automatic transformer pilot system as claimed in claim 1, it is characterised in that have multiple survey on described test platform
Trial work position, is respectively unloaded load testing station, D.C. resistance test station and transformator electric quantity test station, each test
Station is all disposed with the test circuit of correspondence, and each test circuit is all electrically connected with tested power transformer, and each is surveyed
Examination circuit is the most all electrically connected with described microcontroller by a signal conditioning circuit.
3. full-automatic transformer pilot system as claimed in claim 1, it is characterised in that described sensor detecting device includes
Multiple sensors, each sensor is all connected with tested power transformer, and each sensor is the most all adjusted by a signal
Reason circuit is electrically connected with described microcontroller.
4. full-automatic transformer pilot system as claimed in claim 3, it is characterised in that the plurality of sensor is respectively temperature
Degree sensor, Smoke Sensor and sound transducer.
5. full-automatic transformer pilot system as claimed in claim 3, it is characterised in that also include alarm device, described report
Alarm device is connected with described microcontroller.
6. full-automatic transformer pilot system as claimed in claim 5, it is characterised in that described microcontroller has chain of command
Plate, described control panel is provided with control knob, and described microcontroller is connected with intelligent switch by circuit.
7. full-automatic transformer pilot system as claimed in claim 6, it is characterised in that also include remote monitoring center and shifting
Dynamic terminal, described remote monitoring center and mobile terminal are all connected with described microcontroller by wireless communication unit.
8. full-automatic transformer pilot system as claimed in claim 7, it is characterised in that also include photographic head, described shooting
Head is installed on the top of test platform, and described photographic head is connected with described microcontroller by hub.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620510526.9U CN205826761U (en) | 2016-05-30 | 2016-05-30 | A kind of full-automatic transformer pilot system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620510526.9U CN205826761U (en) | 2016-05-30 | 2016-05-30 | A kind of full-automatic transformer pilot system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205826761U true CN205826761U (en) | 2016-12-21 |
Family
ID=57558510
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620510526.9U Expired - Fee Related CN205826761U (en) | 2016-05-30 | 2016-05-30 | A kind of full-automatic transformer pilot system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205826761U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108414077A (en) * | 2018-02-06 | 2018-08-17 | 武汉理工大学 | One kind detecting alarm system based on monolithic processor controlled transformer noise |
-
2016
- 2016-05-30 CN CN201620510526.9U patent/CN205826761U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108414077A (en) * | 2018-02-06 | 2018-08-17 | 武汉理工大学 | One kind detecting alarm system based on monolithic processor controlled transformer noise |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206789957U (en) | A kind of switch gear room's track machine people's cruising inspection system | |
CN103258444A (en) | Parking space state sensing and indicating device and parking space state sensing and indicating method | |
CN207074246U (en) | A kind of GIS partial discharge on-line monitoring system | |
CN203311597U (en) | Intelligent combustion gas leakage detector | |
CN205826761U (en) | A kind of full-automatic transformer pilot system | |
CN207098748U (en) | Radio-type transformer station box environment centralized supervision system | |
CN201287997Y (en) | Elevator control system with gate interlock automatic detection | |
CN208206189U (en) | A kind of Intelligent Dynamic reliability test system | |
CN104569679B (en) | A kind of unloaded Durable test system of electric tool and garden instrument | |
CN206388047U (en) | A kind of Intelligent water level detection control apparatus | |
CN205412015U (en) | Fire box | |
CN202306323U (en) | Intelligent electrical detection system in driver cab | |
CN204832459U (en) | Driving box's detection device and system | |
CN208188669U (en) | A kind of portable controller tester | |
CN203799470U (en) | Infrared positioning alarm system | |
CN203786247U (en) | Testing apparatus for detecting bent and damaged degree of plug and socket | |
CN206906569U (en) | Great current mutual inductor site error verification mobile laboratory | |
CN206773445U (en) | A kind of wireless building robot control system(RCS) | |
CN203287502U (en) | Safety test device used for battery pack | |
CN206609956U (en) | A kind of LED lamp aging equipment | |
CN206331593U (en) | Semaphore circuit intelligent detection device | |
CN204592882U (en) | A kind of pipeline handing-over pipe fitting leak detection apparatus | |
CN203965932U (en) | Transformer station's temperature controller pick-up unit | |
CN103941706B (en) | A kind of well-control blowout prevention device lock shaft travel position measures system | |
CN207380497U (en) | Novel and multifunctional service robot |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161221 Termination date: 20170530 |
|
CF01 | Termination of patent right due to non-payment of annual fee |