CN205823285U - A kind of reception working steel bushing of push-bench - Google Patents
A kind of reception working steel bushing of push-bench Download PDFInfo
- Publication number
- CN205823285U CN205823285U CN201620697521.1U CN201620697521U CN205823285U CN 205823285 U CN205823285 U CN 205823285U CN 201620697521 U CN201620697521 U CN 201620697521U CN 205823285 U CN205823285 U CN 205823285U
- Authority
- CN
- China
- Prior art keywords
- push
- bench
- steel bushing
- sidewall
- counter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of working steel bushing of push-bench, the jack after push-bench can be coordinated to be ejected by push-bench easily, and the supporting periphery ground that can consolidate.Described steel bushing includes columnar sidewall, described sidewall is welded with the counter-force seat ring flange being perpendicular to sidewall inwardly projecting annular near the end of jack, multiple counter-force seat ring flange that is supported on, and the stiffener of the right angled triangle between sidewall is welded between described counter-force seat ring flange and sidewall inwall.Compared with prior art, a kind of working steel bushing of push-bench that receives of this utility model includes the counter-force seat ring flange of columnar sidewall and inwardly projecting annular, counter-force seat ring flange can provide new start of a run to the jack on push-bench, and the spreading successively along with steel bushing, serve the effect of steel pipe supporting peripheral rock, counter-force seat ring flange, again as the ribbed stiffener of steel bushing, enhances the steel bushing support stiffness to managing outer country rock.
Description
Technical field
This utility model relates to the device used in a kind of pipe jacking construction technique, particularly in push-bench construction rear conduct
A kind of steel bushing of boosting facility.
Background technology
Normal jacking construction is for put into push-bench at active well, and puts into sectional pipe of concrete at active well
And make push-bench advance to received well direction, then at received well, push-bench is regained.But in case of exceptional circumstances, push-bench and
It is just the most active in underground that push-bench pipe of concrete below does not arrives received well, and can not set up in the position that push-bench stops
During received well, need a kind of effective manner to be regained by push-bench, and the engineering being not fully complete is completed.
Summary of the invention
This utility model provides a kind of working steel bushing of push-bench, and the jack after push-bench can be coordinated easily will
Push-bench ejects, and the supporting periphery ground that can consolidate.
In order to solve above-mentioned technical problem, this utility model one receives the working steel bushing of push-bench, described steel bushing
Cylinder includes columnar sidewall, and described sidewall is welded with near the end of jack and is perpendicular to sidewall inwardly projecting annular
Counter-force seat ring flange, between described counter-force seat ring flange and sidewall inwall, weld multiple counter-force seat ring flange that is supported on, and
The stiffener of the right angled triangle between sidewall.
Sidewall described in the utility model is that Plate Welding thick for polylith 20mm is constituted.
This utility model described counter-force seat ring flange be double welded joint full weld structure after the splicing of prefabricated curved plate
Become.
Double welded joint full weld is used between stiffener described in the utility model and counter-force seat ring flange and sidewall inwall.
Annular spacing 25cm between stiffener described in the utility model.
Sidewall described in the utility model is made up of 9 block plate welding.
Counter-force seat ring flange described in the utility model is spliced to form by 9 pieces of curved plates.
Composition sidewall described in the utility model, the steel plate of counter-force seat ring flange are be prefabricated in the factory.
Compared with prior art, this utility model one reception working steel bushing of push-bench includes columnar sidewall
And the counter-force seat ring flange of inwardly projecting annular, counter-force seat ring flange can provide new to the jack on push-bench
Start of a run, and along with the spreading successively of steel bushing, serve the effect of steel pipe supporting peripheral rock, counter-force seat ring flange is again
As the ribbed stiffener of steel bushing, enhance the steel bushing support stiffness to managing outer country rock.
Accompanying drawing explanation
Fig. 1 is that steel bushing coordinates the structural representation at tunnel in-cavity construction with push-bench.
Fig. 2 is the sectional structure schematic diagram that steel bushing coordinates jack construction.
Fig. 3 is the perspective view of steel bushing.
Detailed description of the invention
Below in conjunction with the accompanying drawings detailed description of the invention of the present utility model is described in further detail.
As shown in Fig. 13, this utility model one receives the working steel bushing of push-bench, in constructing at push-bench 1
Specific time the device that uses, push-bench 1 is by prior art, for using jack 2 to coordinate pipe of concrete jacking in the soil body
Mode, normal form of construction work be active well increase pipe of concrete advance, but steel bushing described in the utility model 3 is used
Pipe of concrete can not in the soil body situation of movement, need on the basis of original pipe of concrete jacking push-bench 1, therefore design
Steel bushing 3 structure is for supporting peripheral rock between push-bench 1 tail end and former pipe of concrete and as the new row of push-bench 1
Cheng Qidian.It is provided with jack 2, along with the advance of push-bench 1, after jack 2 is retracted, the assembly of sections at push-bench 1 head-tail
Welding steel bushing 3 carries out push pipe operation.
Concrete, described steel bushing 3 includes the cylinder side wall 31 surrounded by the steel plate thick not less than 20mm, at sidewall 31
The counter-force seat ring flange 32 of sidewall 31 inwardly projecting annular it is perpendicular to, at counter-force seat near the welding of the end of jack 2
Multiple right angled triangle being supported between counter-force seat ring flange 32 and sidewall 31 is welded between ring flange 32 and sidewall 31 inwall
Stiffener 33.Described steel bushing 3 is the structure welded at the construction field (site), takes the part of steel bushing 3 to pipe of concrete
And place's welding between push-bench, the most complete steel bushing 3 can not be by the passage of pipe of concrete.
The when of construction at the scene, when, after jack 2 jacking 50cm stroke, jack 2 is retracted, at the one before steel bushing 3 or
Near one end of jack 2, welding forms new steel bushing 3 to pipe of concrete, and the mode of welding is first to weld sidewall 31, sidewall 31
Being spliced to form by polylith steel plate, preferably sidewall 31 is that nine block plates are spliced, then at sidewall 31 near the end of jack 2
Portion welding counter-force seat ring flange 32, counter-force seat ring flange 32 is also spliced to form for plurality of steel plates, preferably ring flange be nine pieces prefabricated
After good curved plate splicing, double welded joint full weld is constituted, then at counter-force seat ring flange 32 and sidewall 31 inwall vertical angle
The stiffener 33 of welding polylith right angled triangle reinforces the counter-force seat ring flange 32 of annular, the right angle portions of stiffener 33 just position
At counter-force seat ring flange 32 and sidewall 31 inwall vertical angle, circumferential distance 25cm between stiffener 33 and stiffener 33, weldering
Start jack 2 after connecting, make jack 2 withstand on the counter-force seat ring flange 32 welded and promote push-bench 1 before tunnel 3
Enter.So circulation is until by 1 whole jacking of push-bench to tunnel.Between counter-force seat ring flange 32 and sidewall 31, stiffener
Double welded joint full weld is all used between 33 and counter-force seat ring flange 32 and sidewall 31.
Along with the spreading successively of steel bushing 3, serving the effect of steel pipe supporting peripheral rock, counter-force seat ring flange 32 is again
As the ribbed stiffener of steel bushing 3, strengthen the steel bushing 3 support stiffness to managing outer country rock.
Claims (8)
1. the working steel bushing of reception push-bench, it is characterised in that: described steel bushing (3) includes columnar sidewall
(31), described sidewall (31) is welded with near the end of jack (2) and is perpendicular to sidewall (31) inwardly projecting annular
Counter-force seat ring flange (32), welds between described counter-force seat ring flange (32) and sidewall (31) inwall and multiple is supported on counter-force seat
The stiffener (33) of the right angled triangle between ring flange (32), and sidewall (31).
A kind of reception working steel bushing of push-bench the most according to claim 1, it is characterised in that: described sidewall (31)
Constitute for Plate Welding thick for polylith 20mm.
A kind of reception working steel bushing of push-bench the most according to claim 2, it is characterised in that: described counter-force seat
Ring flange (32) is double welded joint full weld composition after prefabricated curved plate splicing.
A kind of reception working steel bushing of push-bench the most according to claim 3, it is characterised in that: described stiffener
(33) double welded joint full weld is used and between counter-force seat ring flange (32) and sidewall (31) inwall.
A kind of reception working steel bushing of push-bench the most according to claim 4, it is characterised in that: described stiffener
(33) annular spacing 25cm between.
A kind of reception working steel bushing of push-bench the most according to claim 5, it is characterised in that: described sidewall (31)
It is made up of 9 block plate welding.
A kind of reception working steel bushing of push-bench the most according to claim 6, it is characterised in that: described counter-force seat method
Blue dish (32) is spliced to form by 9 pieces of curved plates.
8. according to a kind of reception working steel bushing of push-bench described in claim 27 any one, it is characterised in that: institute
State composition sidewall (31), the steel plate of counter-force seat ring flange (32) is be prefabricated in the factory.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620697521.1U CN205823285U (en) | 2016-07-05 | 2016-07-05 | A kind of reception working steel bushing of push-bench |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620697521.1U CN205823285U (en) | 2016-07-05 | 2016-07-05 | A kind of reception working steel bushing of push-bench |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205823285U true CN205823285U (en) | 2016-12-21 |
Family
ID=57564323
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620697521.1U Expired - Fee Related CN205823285U (en) | 2016-07-05 | 2016-07-05 | A kind of reception working steel bushing of push-bench |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205823285U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106014427A (en) * | 2016-07-05 | 2016-10-12 | 深圳市路桥建设集团有限公司 | Construction method of receiving well pipe jacking machine and steel sleeve for construction |
-
2016
- 2016-07-05 CN CN201620697521.1U patent/CN205823285U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106014427A (en) * | 2016-07-05 | 2016-10-12 | 深圳市路桥建设集团有限公司 | Construction method of receiving well pipe jacking machine and steel sleeve for construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203654299U (en) | Steel support loose end | |
CN105252158A (en) | Welding construction method for bottom plate of large storage tank | |
CN205225271U (en) | Shield constructs portal collar tie beam structure suitable for shield constructs end not to be had with solid | |
CN104652421B (en) | A kind of prefabricated pipe stake and method of attachment | |
CN205823285U (en) | A kind of reception working steel bushing of push-bench | |
CN111593741A (en) | Pipeline groove supporting device and construction method | |
CN104060606B (en) | A kind of combined and spliced pile tube and pile extension method thereof | |
CN103526772A (en) | Construction method of steel-structure combined base of tower crane | |
CN203755625U (en) | Concrete pouring platform for use in rotary drilling pile with reversed steel pipe column | |
CN202925564U (en) | Tunnel shield receiving structure without working well of existing cellar structure | |
CN103286465A (en) | Construction method for preventing welding deformation of converter gasholder base plate | |
CN203334256U (en) | Pile washing-out system of self-elevating platform pile legs | |
CN103195050A (en) | Tube-jet combined pile supporting underground wall structure and construction method for same | |
CN203701087U (en) | Prestressed concrete uplift pipe pile | |
CN203373751U (en) | Triangular surrounding purlin for inner supporting system for foundation pit supporting | |
CN105221163A (en) | A kind of frame for tunnel pipe sheet built and shield machine | |
CN205063960U (en) | Compound tube coupling structure of rectangle push pipe | |
CN211498871U (en) | Steel pipe slant internal stay underground structure | |
CN110005450B (en) | Waterproof structure for subway station and shield tunnel interface and construction method | |
CN210003314U (en) | Hydraulic support coal leakage hole | |
CN103938731B (en) | Combination joint of prefabricated concrete beam and round concrete filled steel tubular column connected through pre-stressed steel bars and common steel bars | |
CN203741835U (en) | Pile tip structure for prefabricated pipe pile | |
CN202273688U (en) | Temporary plugging structure for underground vestibule | |
CN103962737A (en) | Horizontal welding joint welding technology of steel rib column with section shaped like Chinese character 'tong' | |
CN106149682A (en) | A kind of double reinforcement cage structure of poured pile base |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161221 Termination date: 20210705 |
|
CF01 | Termination of patent right due to non-payment of annual fee |