CN205823285U - A kind of reception working steel bushing of push-bench - Google Patents

A kind of reception working steel bushing of push-bench Download PDF

Info

Publication number
CN205823285U
CN205823285U CN201620697521.1U CN201620697521U CN205823285U CN 205823285 U CN205823285 U CN 205823285U CN 201620697521 U CN201620697521 U CN 201620697521U CN 205823285 U CN205823285 U CN 205823285U
Authority
CN
China
Prior art keywords
push
bench
steel bushing
sidewall
counter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620697521.1U
Other languages
Chinese (zh)
Inventor
王媛
杨雄
叶智威
陈为
梁敏
郭正群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN ROAD & BRIDGE CONSTRUCTION GROUP Co Ltd
Original Assignee
SHENZHEN ROAD & BRIDGE CONSTRUCTION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN ROAD & BRIDGE CONSTRUCTION GROUP Co Ltd filed Critical SHENZHEN ROAD & BRIDGE CONSTRUCTION GROUP Co Ltd
Priority to CN201620697521.1U priority Critical patent/CN205823285U/en
Application granted granted Critical
Publication of CN205823285U publication Critical patent/CN205823285U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of working steel bushing of push-bench, the jack after push-bench can be coordinated to be ejected by push-bench easily, and the supporting periphery ground that can consolidate.Described steel bushing includes columnar sidewall, described sidewall is welded with the counter-force seat ring flange being perpendicular to sidewall inwardly projecting annular near the end of jack, multiple counter-force seat ring flange that is supported on, and the stiffener of the right angled triangle between sidewall is welded between described counter-force seat ring flange and sidewall inwall.Compared with prior art, a kind of working steel bushing of push-bench that receives of this utility model includes the counter-force seat ring flange of columnar sidewall and inwardly projecting annular, counter-force seat ring flange can provide new start of a run to the jack on push-bench, and the spreading successively along with steel bushing, serve the effect of steel pipe supporting peripheral rock, counter-force seat ring flange, again as the ribbed stiffener of steel bushing, enhances the steel bushing support stiffness to managing outer country rock.

Description

A kind of reception working steel bushing of push-bench
Technical field
This utility model relates to the device used in a kind of pipe jacking construction technique, particularly in push-bench construction rear conduct A kind of steel bushing of boosting facility.
Background technology
Normal jacking construction is for put into push-bench at active well, and puts into sectional pipe of concrete at active well And make push-bench advance to received well direction, then at received well, push-bench is regained.But in case of exceptional circumstances, push-bench and It is just the most active in underground that push-bench pipe of concrete below does not arrives received well, and can not set up in the position that push-bench stops During received well, need a kind of effective manner to be regained by push-bench, and the engineering being not fully complete is completed.
Summary of the invention
This utility model provides a kind of working steel bushing of push-bench, and the jack after push-bench can be coordinated easily will Push-bench ejects, and the supporting periphery ground that can consolidate.
In order to solve above-mentioned technical problem, this utility model one receives the working steel bushing of push-bench, described steel bushing Cylinder includes columnar sidewall, and described sidewall is welded with near the end of jack and is perpendicular to sidewall inwardly projecting annular Counter-force seat ring flange, between described counter-force seat ring flange and sidewall inwall, weld multiple counter-force seat ring flange that is supported on, and The stiffener of the right angled triangle between sidewall.
Sidewall described in the utility model is that Plate Welding thick for polylith 20mm is constituted.
This utility model described counter-force seat ring flange be double welded joint full weld structure after the splicing of prefabricated curved plate Become.
Double welded joint full weld is used between stiffener described in the utility model and counter-force seat ring flange and sidewall inwall.
Annular spacing 25cm between stiffener described in the utility model.
Sidewall described in the utility model is made up of 9 block plate welding.
Counter-force seat ring flange described in the utility model is spliced to form by 9 pieces of curved plates.
Composition sidewall described in the utility model, the steel plate of counter-force seat ring flange are be prefabricated in the factory.
Compared with prior art, this utility model one reception working steel bushing of push-bench includes columnar sidewall And the counter-force seat ring flange of inwardly projecting annular, counter-force seat ring flange can provide new to the jack on push-bench Start of a run, and along with the spreading successively of steel bushing, serve the effect of steel pipe supporting peripheral rock, counter-force seat ring flange is again As the ribbed stiffener of steel bushing, enhance the steel bushing support stiffness to managing outer country rock.
Accompanying drawing explanation
Fig. 1 is that steel bushing coordinates the structural representation at tunnel in-cavity construction with push-bench.
Fig. 2 is the sectional structure schematic diagram that steel bushing coordinates jack construction.
Fig. 3 is the perspective view of steel bushing.
Detailed description of the invention
Below in conjunction with the accompanying drawings detailed description of the invention of the present utility model is described in further detail.
As shown in Fig. 13, this utility model one receives the working steel bushing of push-bench, in constructing at push-bench 1 Specific time the device that uses, push-bench 1 is by prior art, for using jack 2 to coordinate pipe of concrete jacking in the soil body Mode, normal form of construction work be active well increase pipe of concrete advance, but steel bushing described in the utility model 3 is used Pipe of concrete can not in the soil body situation of movement, need on the basis of original pipe of concrete jacking push-bench 1, therefore design Steel bushing 3 structure is for supporting peripheral rock between push-bench 1 tail end and former pipe of concrete and as the new row of push-bench 1 Cheng Qidian.It is provided with jack 2, along with the advance of push-bench 1, after jack 2 is retracted, the assembly of sections at push-bench 1 head-tail Welding steel bushing 3 carries out push pipe operation.
Concrete, described steel bushing 3 includes the cylinder side wall 31 surrounded by the steel plate thick not less than 20mm, at sidewall 31 The counter-force seat ring flange 32 of sidewall 31 inwardly projecting annular it is perpendicular to, at counter-force seat near the welding of the end of jack 2 Multiple right angled triangle being supported between counter-force seat ring flange 32 and sidewall 31 is welded between ring flange 32 and sidewall 31 inwall Stiffener 33.Described steel bushing 3 is the structure welded at the construction field (site), takes the part of steel bushing 3 to pipe of concrete And place's welding between push-bench, the most complete steel bushing 3 can not be by the passage of pipe of concrete.
The when of construction at the scene, when, after jack 2 jacking 50cm stroke, jack 2 is retracted, at the one before steel bushing 3 or Near one end of jack 2, welding forms new steel bushing 3 to pipe of concrete, and the mode of welding is first to weld sidewall 31, sidewall 31 Being spliced to form by polylith steel plate, preferably sidewall 31 is that nine block plates are spliced, then at sidewall 31 near the end of jack 2 Portion welding counter-force seat ring flange 32, counter-force seat ring flange 32 is also spliced to form for plurality of steel plates, preferably ring flange be nine pieces prefabricated After good curved plate splicing, double welded joint full weld is constituted, then at counter-force seat ring flange 32 and sidewall 31 inwall vertical angle The stiffener 33 of welding polylith right angled triangle reinforces the counter-force seat ring flange 32 of annular, the right angle portions of stiffener 33 just position At counter-force seat ring flange 32 and sidewall 31 inwall vertical angle, circumferential distance 25cm between stiffener 33 and stiffener 33, weldering Start jack 2 after connecting, make jack 2 withstand on the counter-force seat ring flange 32 welded and promote push-bench 1 before tunnel 3 Enter.So circulation is until by 1 whole jacking of push-bench to tunnel.Between counter-force seat ring flange 32 and sidewall 31, stiffener Double welded joint full weld is all used between 33 and counter-force seat ring flange 32 and sidewall 31.
Along with the spreading successively of steel bushing 3, serving the effect of steel pipe supporting peripheral rock, counter-force seat ring flange 32 is again As the ribbed stiffener of steel bushing 3, strengthen the steel bushing 3 support stiffness to managing outer country rock.

Claims (8)

1. the working steel bushing of reception push-bench, it is characterised in that: described steel bushing (3) includes columnar sidewall (31), described sidewall (31) is welded with near the end of jack (2) and is perpendicular to sidewall (31) inwardly projecting annular Counter-force seat ring flange (32), welds between described counter-force seat ring flange (32) and sidewall (31) inwall and multiple is supported on counter-force seat The stiffener (33) of the right angled triangle between ring flange (32), and sidewall (31).
A kind of reception working steel bushing of push-bench the most according to claim 1, it is characterised in that: described sidewall (31) Constitute for Plate Welding thick for polylith 20mm.
A kind of reception working steel bushing of push-bench the most according to claim 2, it is characterised in that: described counter-force seat Ring flange (32) is double welded joint full weld composition after prefabricated curved plate splicing.
A kind of reception working steel bushing of push-bench the most according to claim 3, it is characterised in that: described stiffener (33) double welded joint full weld is used and between counter-force seat ring flange (32) and sidewall (31) inwall.
A kind of reception working steel bushing of push-bench the most according to claim 4, it is characterised in that: described stiffener (33) annular spacing 25cm between.
A kind of reception working steel bushing of push-bench the most according to claim 5, it is characterised in that: described sidewall (31) It is made up of 9 block plate welding.
A kind of reception working steel bushing of push-bench the most according to claim 6, it is characterised in that: described counter-force seat method Blue dish (32) is spliced to form by 9 pieces of curved plates.
8. according to a kind of reception working steel bushing of push-bench described in claim 27 any one, it is characterised in that: institute State composition sidewall (31), the steel plate of counter-force seat ring flange (32) is be prefabricated in the factory.
CN201620697521.1U 2016-07-05 2016-07-05 A kind of reception working steel bushing of push-bench Expired - Fee Related CN205823285U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620697521.1U CN205823285U (en) 2016-07-05 2016-07-05 A kind of reception working steel bushing of push-bench

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620697521.1U CN205823285U (en) 2016-07-05 2016-07-05 A kind of reception working steel bushing of push-bench

Publications (1)

Publication Number Publication Date
CN205823285U true CN205823285U (en) 2016-12-21

Family

ID=57564323

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620697521.1U Expired - Fee Related CN205823285U (en) 2016-07-05 2016-07-05 A kind of reception working steel bushing of push-bench

Country Status (1)

Country Link
CN (1) CN205823285U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106014427A (en) * 2016-07-05 2016-10-12 深圳市路桥建设集团有限公司 Construction method of receiving well pipe jacking machine and steel sleeve for construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106014427A (en) * 2016-07-05 2016-10-12 深圳市路桥建设集团有限公司 Construction method of receiving well pipe jacking machine and steel sleeve for construction

Similar Documents

Publication Publication Date Title
CN203654299U (en) Steel support loose end
CN105252158A (en) Welding construction method for bottom plate of large storage tank
CN205225271U (en) Shield constructs portal collar tie beam structure suitable for shield constructs end not to be had with solid
CN104652421B (en) A kind of prefabricated pipe stake and method of attachment
CN205823285U (en) A kind of reception working steel bushing of push-bench
CN111593741A (en) Pipeline groove supporting device and construction method
CN104060606B (en) A kind of combined and spliced pile tube and pile extension method thereof
CN103526772A (en) Construction method of steel-structure combined base of tower crane
CN203755625U (en) Concrete pouring platform for use in rotary drilling pile with reversed steel pipe column
CN202925564U (en) Tunnel shield receiving structure without working well of existing cellar structure
CN103286465A (en) Construction method for preventing welding deformation of converter gasholder base plate
CN203334256U (en) Pile washing-out system of self-elevating platform pile legs
CN103195050A (en) Tube-jet combined pile supporting underground wall structure and construction method for same
CN203701087U (en) Prestressed concrete uplift pipe pile
CN203373751U (en) Triangular surrounding purlin for inner supporting system for foundation pit supporting
CN105221163A (en) A kind of frame for tunnel pipe sheet built and shield machine
CN205063960U (en) Compound tube coupling structure of rectangle push pipe
CN211498871U (en) Steel pipe slant internal stay underground structure
CN110005450B (en) Waterproof structure for subway station and shield tunnel interface and construction method
CN210003314U (en) Hydraulic support coal leakage hole
CN103938731B (en) Combination joint of prefabricated concrete beam and round concrete filled steel tubular column connected through pre-stressed steel bars and common steel bars
CN203741835U (en) Pile tip structure for prefabricated pipe pile
CN202273688U (en) Temporary plugging structure for underground vestibule
CN103962737A (en) Horizontal welding joint welding technology of steel rib column with section shaped like Chinese character 'tong'
CN106149682A (en) A kind of double reinforcement cage structure of poured pile base

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161221

Termination date: 20210705

CF01 Termination of patent right due to non-payment of annual fee