CN205823159U - Advance borehole device under the conditions of the tight roof of a kind of colliery - Google Patents

Advance borehole device under the conditions of the tight roof of a kind of colliery Download PDF

Info

Publication number
CN205823159U
CN205823159U CN201620834488.2U CN201620834488U CN205823159U CN 205823159 U CN205823159 U CN 205823159U CN 201620834488 U CN201620834488 U CN 201620834488U CN 205823159 U CN205823159 U CN 205823159U
Authority
CN
China
Prior art keywords
platen
auxiliary
main
vertical rod
stop collar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620834488.2U
Other languages
Chinese (zh)
Inventor
张传玖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620834488.2U priority Critical patent/CN205823159U/en
Application granted granted Critical
Publication of CN205823159U publication Critical patent/CN205823159U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The holder device of the advance borehole used under the conditions of advance borehole device discloses a kind of colliery tight roof under the conditions of the tight roof of a kind of colliery of this utility model, it is not only convenient for rig is operated, tight roof boring dust can also be processed, it is also possible to the mud of rich water top board is processed.It is characterized in that upper connecting rod one end is placed in vertical rod by upper rotary shaft, the other end is placed on main body bearing by upper connecting shaft, lower connecting rod one end is placed in vertical rod by Shaft, the other end is placed on main body bearing by lower connecting shaft, rig bracket is placed in vertical rod, gripper shoe is placed on rig bracket, main stop collar is placed in gripper shoe side, auxiliary stop collar is placed in gripper shoe opposite side, connector is placed on platen, and fairlead is placed in the middle part of platen, and gear stone net is placed in inside platen, tube at one end and connector connect, and conduit is fixed along vertical rod by clip.

Description

Advance borehole device under the conditions of the tight roof of a kind of colliery
Technical field
Advance borehole device under the conditions of the tight roof of this utility model one colliery, relates to a kind of colliery tight roof condition The holder device of the advance borehole of lower use, belongs to mining equiment field.It is easy to rig is operated particularly to one, and The holder device that boring dust is processed.
Background technology
At present, tight roof is carried out advance borehole when, it is that workman's hand-held drill carries out top plate drilling, in boring During, owing to top board is the hardest, therefore, underground labour, bore operation when, needs many individuals to carry out coordinating brill more Hole, and the amount of labour is relatively big, lifts rig for a long time and is operated, easily causes rig and hurts sb.'s feelings event, and owing to tight roof needs To be continued to creeping into pressure, underground labour's physical demands is big, and drilling effect is bad, and the bigger particulate matter in holing, Also can cause potential safety hazard to underground labour, existing part uses the mode carrying out bore operation of support, and supporting structure is multiple Miscellaneous, and it is not easy to operation, simultaneously tight roof advance borehole when, in boring, dust can dissipate out boring when Come, the breathing of workman can be impacted, even if workman is with protective mast, also result in underground labour and narrow eye, affect workman Sight line, affect normal bore operation, and the top board of rich water carries out operation when, existing support works, in boring When, mud easily can flow out along with boring, workman's health can be caused to be stained with mud, also can pollute rig and support.
Summary of the invention
In order to improve above-mentioned situation, under the conditions of the tight roof of this utility model one colliery, advance borehole device provides one The holder device of the advance borehole used under the conditions of planting colliery tight roof, is not only convenient for operating rig, it is also possible to right Tight roof boring dust processes, it is also possible to process the mud of rich water top board.Simple in construction, convenient use.
Under the conditions of the tight roof of this utility model one colliery, advance borehole device is achieved in that this utility model one Under the conditions of planting colliery tight roof, advance borehole device is made up of subject support means, collection device and power set, and main body is propped up Support arrangement by vertical rod, upper connecting shaft, main body bearing, lower connecting shaft, Shaft, lower connecting rod, upper rotary shaft, upper connecting rod and Rig bracket forms, and upper connecting rod one end is placed in vertical rod by upper rotary shaft, and the other end is placed in main body by upper connecting shaft and props up On seat, lower connecting rod one end is placed in vertical rod by Shaft, and the other end is placed on main body bearing by lower connecting shaft, rig Propping up and be placed in vertical rod, collection device is by platen, clip, conduit, fairlead, gear stone net, main support spring, gripper shoe, master Stop collar, main gag lever post, auxiliary gag lever post, auxiliary stop collar, auxiliary support spring and connector composition, gripper shoe is placed in rig bracket On, main stop collar is placed in gripper shoe side, and auxiliary stop collar is placed in gripper shoe opposite side, and connector is placed on platen, and guiding is nested with In the middle part of platen, gear stone net is placed in inside platen, and tube at one end and connector connect, and conduit is fixed along vertical rod by clip, Main gag lever post one end is vertically arranged in bottom platen, and the other end passes main stop collar, and the other end of described main gag lever post is equipped with spacing Block, main support spring housing is placed on main gag lever post, and between platen and main stop collar, auxiliary gag lever post one end is vertically arranged in pressure Tray bottom, the other end passes auxiliary stop collar, and the other end of described auxiliary gag lever post is equipped with limited block, and auxiliary support spring housing is placed in auxiliary limit On the bar of position, and between platen and auxiliary stop collar, power set are by steel wire rope, fixed pulley, roller bearing, drum, rocking bar and rotating shaft Composition, fixed pulley is placed on main body bearing by roller bearing, and drum is placed on main body bearing by rotating shaft, and steel wire rope one end is fixed on In vertical rod, the other end is walked around fixed pulley and is curled on drum, and rocking bar is placed on drum, and described drum is provided with synchronization ratchet.
During use, fix main body bearing, then conduit and outside dust exhaust apparatus are connected, rig is arranged on rig On support, drill bit one end is arranged on rig, and the other end passes the fairlead in the middle part of platen, manually shakes rocking bar, and drum is and then Rocking bar rotates, and steel wire rope curls on drum, and steel wire rope pulls and moves in vertical rod, the design energy of described upper connecting rod and lower connecting rod Enough guaranteeing the stability during moving in vertical rod, in vertical rod, rig bracket synchronizes upper shifting, and drives rig and platen to move to top board Dynamic, when platen touches top board, rig bracket continues upper shifting, described main support spring and the design of auxiliary support spring, it is possible to make Platen is preferably pressed on top board, and after starting rig, upper along with vertical rod moves, and drill bit can carry out boring and make top board Industry, along with deepening continuously of bit bore, the rock dust in boring can only fall into platen, and bigger rock particles thing is kept off stone Net blocks, and the dust dropping into platen can be siphoned away by outside dust exhaust apparatus, prevents being good for of dust dissipation harm construction worker Health.Reach to be easy to rig is operated, and the purpose that boring dust is processed.Further, when entering at rich water top board The when of row advance borehole operation, conduit only need to be placed directly on underground or connect with suction pump, the water companion in top board Along with rock can drop in platen, bigger rock particles thing is kept off stone net and is blocked, and mixed soil pulp-water can be from conduit Discharge, or taken away by suction pump, it is possible to prevent the slime water when of advance borehole from workman being impacted.It is right to reach to be easy to Rig operates, and carries out the purpose of top board advance borehole.
Beneficial effect
One, simple in construction, convenient and practical.
Two, with low cost, it is easy to promote.
Accompanying drawing explanation
Accompanying drawing 1 is the structural representation of advance borehole device under the conditions of the tight roof of a kind of colliery of this utility model
Accompanying drawing 2 is that the structure of the collection device of advance borehole device is shown under the conditions of the tight roof of a kind of colliery of this utility model It is intended to
In accompanying drawing
Wherein part is: platen (1), clip (2), vertical rod (3), steel wire rope (4), fixed pulley (5), roller bearing (6), upper company Spindle (7), main body bearing (8), lower connecting shaft (9), drum (10), rocking bar (11), rotating shaft (12), Shaft (13), lower company Extension bar (14), upper rotary shaft (15), upper connecting rod (16), conduit (17), rig (18), drill bit (19), fairlead (20), keeps off stone Net (21), main support spring (22), gripper shoe (23), main stop collar (24), main gag lever post (25), rig bracket (26), auxiliary limit Position bar (27), auxiliary stop collar (28), auxiliary support spring (29), connector (30)
Detailed description of the invention:
When under the conditions of the tight roof of this utility model one colliery, advance borehole device is achieved in that use, fixing Good main body bearing (8), then connects conduit (17) and outside dust exhaust apparatus, rig (18) is arranged on rig bracket (26) On, drill bit (19) one end is arranged on rig (18), and the other end, through the fairlead (20) at platen (1) middle part, manually shakes Bar (11), drum (10) and then rocking bar (11) rotates, and steel wire rope (4) curls on drum (10), and steel wire rope (4) pulls vertical rod (3) upper moving, being designed to of described upper connecting rod (16) and lower connecting rod (14) guarantees stablizing during the upper shifting of vertical rod (3) Property, upper rig bracket (26) synchronization of vertical rod (3) moving, and drives rig (18) and platen (1) to move to top board, platen (1) connects When contacting top board, rig bracket (26) continuation moves, described main support spring (22) and the design of auxiliary support spring (29), it is possible to Making platen (1) preferably be pressed on top board, after starting rig (18), upper along with vertical rod (3) moves, and drill bit (19) can be right Top board carries out bore operation, and along with deepening continuously that drill bit (19) is holed, the rock dust in boring can only fall into platen (1), Bigger rock particles thing is kept off stone net (21) and is blocked, and the dust dropping into platen (1) can be siphoned away by outside dust exhaust apparatus, Prevent the health of dust dissipation harm construction worker.Reach to be easy to rig (18) is operated, and to boring dust at The purpose of reason.Further, when carrying out advance borehole operation at rich water top board when, only conduit (17) need to be placed directly on ground Connecting down or with suction pump, the water in top board can drop in platen (1) along with rock, bigger rock particles Thing is kept off stone net (21) and is blocked, and mixed soil pulp-water can be discharged from conduit (17), or is taken away by suction pump, it is possible to prevents from surpassing Workman is impacted by the slime water when of front boring.Reach to be easy to rig (18) is operated, carry out top board advance drilling The purpose in hole.

Claims (1)

1. an advance borehole device under the conditions of the tight roof of colliery, is characterized in that: by subject support means, collection device and dynamic Power apparatus form, subject support means by vertical rod, upper connecting shaft, main body bearing, lower connecting shaft, Shaft, lower connecting rod, on Rotary shaft, upper connecting rod and rig bracket composition, upper connecting rod one end is placed in vertical rod by upper rotary shaft, and the other end is by upper Connecting shaft is placed on main body bearing, and lower connecting rod one end is placed in vertical rod by Shaft, and the other end is put by lower connecting shaft On main body bearing, rig bracket is placed in vertical rod, and collection device is by platen, clip, conduit, fairlead, gear stone net, master Support spring, gripper shoe, main stop collar, main gag lever post, auxiliary gag lever post, auxiliary stop collar, auxiliary support spring and connector composition, support Plate is placed on rig bracket, and main stop collar is placed in gripper shoe side, and auxiliary stop collar is placed in gripper shoe opposite side, and connector is placed in pressure On dish, fairlead is placed in the middle part of platen, and gear stone net is placed in inside platen, and tube at one end and connector connect, and conduit is by fixing Button is fixed along vertical rod, and main gag lever post one end is vertically arranged in bottom platen, and the other end passes main stop collar, the other end of main gag lever post Being equipped with limited block, main support spring housing is placed on main gag lever post, and between platen and main stop collar, hang down in auxiliary gag lever post one end Disposed upright is bottom platen, and the other end passes auxiliary stop collar, and the other end of auxiliary gag lever post is equipped with limited block, and auxiliary support spring housing is placed in On auxiliary gag lever post, and between platen and auxiliary stop collar, power set by steel wire rope, fixed pulley, roller bearing, drum, rocking bar and Rotating shaft forms, and fixed pulley is placed on main body bearing by roller bearing, and drum is placed on main body bearing by rotating shaft, and steel wire rope one end is solid Being scheduled in vertical rod, the other end is walked around fixed pulley and is curled on drum, and rocking bar is placed on drum.
CN201620834488.2U 2016-07-29 2016-07-29 Advance borehole device under the conditions of the tight roof of a kind of colliery Expired - Fee Related CN205823159U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620834488.2U CN205823159U (en) 2016-07-29 2016-07-29 Advance borehole device under the conditions of the tight roof of a kind of colliery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620834488.2U CN205823159U (en) 2016-07-29 2016-07-29 Advance borehole device under the conditions of the tight roof of a kind of colliery

Publications (1)

Publication Number Publication Date
CN205823159U true CN205823159U (en) 2016-12-21

Family

ID=57557560

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620834488.2U Expired - Fee Related CN205823159U (en) 2016-07-29 2016-07-29 Advance borehole device under the conditions of the tight roof of a kind of colliery

Country Status (1)

Country Link
CN (1) CN205823159U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086663A (en) * 2018-02-05 2018-05-29 大荣建设集团有限公司 Interior architecture object top and wall column flank hole bar planting stent and its construction method
CN110410006A (en) * 2019-07-05 2019-11-05 太原理工大学 One kind creeping into drilling machine for special-shaped tunnel inclined roof panels

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086663A (en) * 2018-02-05 2018-05-29 大荣建设集团有限公司 Interior architecture object top and wall column flank hole bar planting stent and its construction method
CN110410006A (en) * 2019-07-05 2019-11-05 太原理工大学 One kind creeping into drilling machine for special-shaped tunnel inclined roof panels

Similar Documents

Publication Publication Date Title
CN105275415A (en) Full-automatic continuous drilling rig
CN205823159U (en) Advance borehole device under the conditions of the tight roof of a kind of colliery
CN206348169U (en) A kind of sampler used for geological prospecting
CN205349223U (en) Drilling equipment for building
CN104912476B (en) Rotary excavating pile driving mechanism of hydraulic pile driving equipment
CN102661128A (en) Automatic drill pipe placing and withdrawing device
CN201826811U (en) Drifting scraping device
CN204492706U (en) Coal roadway drilling construction protrusion-dispelling control of dust deslagging integrated apparatus
CN105401976A (en) Outburst prevention measure in wire saw joint-cutting region of coal seam floor
CN212003028U (en) Special drilling equipment for preventing and controlling water in coal mine tunnel
CN110206482B (en) Coal bed gas exploitation drilling equipment
CN100572741C (en) Portable well-digging machine
CN104438969B (en) Hammer hole indium steel wire shear device
CN202500508U (en) Automatic placing and taking device for drill rods
CN201908565U (en) Base plate anchor rope drilling machine for coal mine tunnel
CN105952376B (en) A kind of improved hydraulic track drill carriage device
CN108661635B (en) Nobody adopts face rope plane coal mining device
CN207453915U (en) Underground eyelet dredger
CN202249857U (en) Dust remover for mine
CN206458318U (en) A kind of low orientation drilling hydraulic drill rig of underground coal mine
CN108643833B (en) Coal mine drilling equipment
CN112482991B (en) Roofbolter with geology recognition function
CN112983262B (en) Pneumatic rotary drilling percussion drill for superhard rock
CN105134089A (en) Intelligent all-dimensional rotary mine drill
CN204200089U (en) A kind of petroleum geology exploration target drill

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161221

Termination date: 20170729