CN205822800U - A kind of high-altitude delivering concrete device - Google Patents

A kind of high-altitude delivering concrete device Download PDF

Info

Publication number
CN205822800U
CN205822800U CN201620658056.0U CN201620658056U CN205822800U CN 205822800 U CN205822800 U CN 205822800U CN 201620658056 U CN201620658056 U CN 201620658056U CN 205822800 U CN205822800 U CN 205822800U
Authority
CN
China
Prior art keywords
steel
bracket
altitude
concrete device
delivering concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620658056.0U
Other languages
Chinese (zh)
Inventor
陈星�
丁威
马德龙
黄达琦
曹建军
熊俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201620658056.0U priority Critical patent/CN205822800U/en
Application granted granted Critical
Publication of CN205822800U publication Critical patent/CN205822800U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of high-altitude delivering concrete device.The purpose of this utility model is to provide the high-altitude delivering concrete device of a kind of multi-functional auxiliary large span.This utility model includes Bailey bracket, steel truss support, Z bar bracket and preventer, it is characterised in that: described Bailey bracket is fixed on above steel truss support or Z bar bracket by I-steel.Described Bailey bracket is double monolayer Bailey bracket.Described steel truss support includes column and crossbeam, and this column is H profile steel, and crossbeam is lightweight I-beam, and crossbeam welds with column.Described Z bar bracket is the support being connected with Bailey bracket by U-shaped card.The middle part of described preventer is provided with channel-section steel bridging interval, and top is equipped with platform, and platform both sides are provided with guard rail.This utility model is mainly used in concrete conveyance, as walkway and driving transport channel etc..

Description

A kind of high-altitude delivering concrete device
Technical field
This utility model relates to a kind of conveyer device, particularly relates to a kind of high-altitude delivering concrete device.
Background technology
Transforming recently as city old shopping centre, increasing engineering occurs in the bustling location that surrounding enviroment are complicated And construction site is narrow and small.Operating mode is relative complex, version is diversified, it is bigger to occur between structure and structure to thus result in construction Span, the situation of the bigger discrepancy in elevation.And job site structure diversification, there is relatively large span, the discrepancy in elevation or knot between structure and structure Structure side, without shelving the multiple situations such as stress point position, only cannot meet the construction of job site by setting up the platforms such as scaffold Progress, construction requirement and difficulty of construction are big.
Conventionally employed steel pipe scaffold sets up UNICOM's support body, need to be set up by carrying out support body bottom foundation ditch or on force structure and Scaffolding height is higher, and there is the bigger discrepancy in elevation between structure is to need support body to carry out looking for slope, sets up that steel pipe scaffold support body height is big, danger Dangerous height and difficulty are big, and operation cannot ensure safety.The construction of conventional steel formwork system is respectively positioned on bottom foundation ditch, executes whole section The controllability of work safety is difficult to hold.And conventional steel scaffold building superelevation support body, and between structure, material turnover is tired Difficulty, attricist is bigger.
Therefore, it is necessary to provide a kind of new delivering concrete device to solve the problems referred to above.
Utility model content
In order to solve above-mentioned technical problem, this utility model provides a kind of high-altitude delivering concrete device.
For achieving the above object, technical solution of the present utility model is: a kind of high-altitude delivering concrete device, including Bailey bracket, steel truss support, Z bar bracket and preventer, it is characterised in that: described Bailey bracket is fixed on steel by I-steel Above truss support or Z bar bracket.
Described Bailey bracket is double monolayer Bailey bracket.
Described steel truss support includes column and crossbeam, and this column is H profile steel, and crossbeam is lightweight I-beam, and crossbeam is with vertical Post welds.
Described Z bar bracket is the support being connected with Bailey bracket by U-shaped card.The middle part of described preventer is provided with groove Steel cross strut is spaced, and top is equipped with platform, and platform both sides are provided with guard rail.
Described guard rail is to be set up by steel pipe transverse, is provided with foot guard plate and safety net inside steel pipe.
The beneficial effects of the utility model are:
1, large span, high-altitude UNICOM problem between structure and structure is solved, for concrete on construction site conveying, personnel and car Current;
2, construction area can be directly hoisted to after each component machines or with fender post, facade structures is fixing is connected, just Just quick and operation easier is relatively low, controllability is strong;
3, each material later stage all can carry out dismounting transhipment to it, economical and practical, and each component of conveyer device decreases and executes Work cost.
Accompanying drawing explanation
Fig. 1 is that Bailey bracket of the present utility model lifts scheme of installation.
Fig. 2 is steel truss support schematic diagram of the present utility model.
Fig. 3 is that Z-shape steel bracket of the present utility model fixes schematic diagram.
Fig. 4 is that schematic diagram set up by preventer of the present utility model.
In figure: 1-Bailey bracket, 2-platform, 3-reinforcing bar anchor foot, 4-steel truss support, 5-structure floor, 6-crossbeam, 7-U type Card, 8-column, 9-Z shape steel corbel, 10-Guan Liang, 11-embedded part, 12-channel-section steel, 13-bridging, 14-lays platform, and 15-keeps off foot Plate, 16-safety net, 17-guard rail.
Detailed description of the invention
Below in conjunction with the accompanying drawings this utility model and detailed description of the invention thereof are described further.
Refering to Fig. 1, Fig. 2, Fig. 3 and Fig. 4, this utility model includes Bailey bracket, steel truss support, Z bar bracket and protection Device, it is characterised in that: described Bailey bracket is fixed on above steel truss support or Z bar bracket by I-steel.
Described Bailey bracket is double monolayer Bailey bracket.
Described steel truss support includes column and crossbeam, and this column is H profile steel, and crossbeam is lightweight I-beam, and crossbeam is with vertical Post welds.
Described Z bar bracket is the support being connected with Bailey bracket by U-shaped card.The middle part of described preventer is provided with groove Steel cross strut is spaced, and top is equipped with platform, and platform both sides are provided with guard rail.
Described guard rail is to be set up by steel pipe transverse, is provided with foot guard plate and safety net inside steel pipe.
Wherein, Fig. 1 is Bailey bracket lifting scheme of installation, wherein the shellfish thunder of this utility model high-altitude delivering concrete device Frame 1 carries out assembly in level land, and assembled length≤24m, assembly carries out integral hoisting after completing.The overall level land assembly of Bailey bracket 1 is complete Become and lift and should meet both sides grade level before platform 2, it is ensured that Bailey bracket 1 lies against on structure on two sides.If side is Steel truss support or Z bar bracket, must check placement Bailey bracket plane absolute altitude and opposite side structural plane absolute altitude whether level.Hang When being filled to both ends horizontal locations of structures, carry out Bailey bracket leveling, be fixed with structural plane embedded bar anchor foot 3 after leveling;Hang When being filled to steel truss support or Z bar bracket, carry out Bailey bracket leveling, if local out-of-flatness and the discrepancy in elevation relatively I underlay steel occur Plate carries out levelling, if occurring, when the local discrepancy in elevation is relatively large, can carrying out levelling by underlay I-steel.If both sides are structure but exist The less discrepancy in elevation, can bury fixing embedded part underground with downside, above set I-steel and be connected with slugging, and high side embedded bar is solid with Bailey bracket Fixed, make Bailey bracket both sides level and stablize.
Fig. 2 is steel truss support schematic diagram of the present utility model, and steel truss support 4 is installed steel truss support column and used Q235B HW 200*200*8*12 shaped steel, crossbeam 6 uses Q235B18# lightweight I-beam, arranges U-shaped card between girder steel and steel column 7 are connected firmly.First carrying out anchor foot installation, every column 8 bottom arranges a piece 500 (length) * 350 (wide) * 20 (thick) Q235B steel plate, and offer four pre-embedded bolt holes, anchor foot is fixed at steel truss support 4 four post angle, and steel truss support installs emphasis Check steel truss support level.After steel truss support installs, tighten foundation bolt, and with cable wind rope drawknot in periphery embedded part On.
Fig. 3 is that Z-shape steel bracket of the present utility model fixes schematic diagram, and Bailey bracket 1 conveyer device is set up end and is positioned at support pile Time in structure, fix Bailey bracket 1 by Z bar bracket 9, Z bar bracket 9 use with after plant bolt embedded part 11 with hat beam 10 even Connect.Behind top, bar planting bolt must is fulfilled for drawing requirement, and bracket uses double nut to be tightened by bracket after installing.Z bar bracket 9 times Hook horizon bar, should hold out against support pile or structural facades so that the most fixing.Z bar bracket top is connected with slugging, for Ensure that steel corbel is stable at side and arranges horizon bar, support pile should be held out against and be welded and fixed with steel corbel facade so that be the most equal Fixing.
Fig. 4 is that schematic diagram set up by preventer of the present utility model.Conveyer device upper berth flat board, protective frame are set up, Bei Lei Frame 1 has lifted and after leveling has reinforced Bailey bracket 1, and reinforcement measure is that middle part arranges 10# channel-section steel bridging 13 and is spaced 3000mm.Top carries out laying platform 14, lays platform 14 and can be laid by template or checkered steel plate.Lay platform 14 both sides Arranging guard rail 17, guard rail 17 is set up by steel pipe and is arranged foot guard plate 15, completely hangs close mesh safety net 16, guard rail 17 It is highly 1200mm.

Claims (6)

1. a high-altitude delivering concrete device, including Bailey bracket, steel truss support, Z bar bracket and preventer, its feature It is: described Bailey bracket is fixed on above steel truss support or Z bar bracket by I-steel.
High-altitude delivering concrete device the most according to claim 1, it is characterised in that described Bailey bracket is double monolayer shellfish thunder Frame.
High-altitude delivering concrete device the most according to claim 1, it is characterised in that described steel truss support include column and Crossbeam, this column is H profile steel, and crossbeam is lightweight I-beam, and crossbeam welds with column.
High-altitude delivering concrete device the most according to claim 1, it is characterised in that described Z bar bracket is by U-shaped card The support being connected with Bailey bracket.
High-altitude delivering concrete device the most according to claim 1, it is characterised in that the middle part of described preventer is provided with Channel-section steel bridging is spaced, and top is equipped with platform, and platform both sides are provided with guard rail.
High-altitude delivering concrete device the most according to claim 5, it is characterised in that described guard rail is by steel pipe transverse Set up, inside steel pipe, be provided with foot guard plate and safety net.
CN201620658056.0U 2016-06-28 2016-06-28 A kind of high-altitude delivering concrete device Expired - Fee Related CN205822800U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620658056.0U CN205822800U (en) 2016-06-28 2016-06-28 A kind of high-altitude delivering concrete device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620658056.0U CN205822800U (en) 2016-06-28 2016-06-28 A kind of high-altitude delivering concrete device

Publications (1)

Publication Number Publication Date
CN205822800U true CN205822800U (en) 2016-12-21

Family

ID=57566008

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620658056.0U Expired - Fee Related CN205822800U (en) 2016-06-28 2016-06-28 A kind of high-altitude delivering concrete device

Country Status (1)

Country Link
CN (1) CN205822800U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106121238A (en) * 2016-06-28 2016-11-16 中国建筑第二工程局有限公司 A kind of high-altitude delivering concrete device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106121238A (en) * 2016-06-28 2016-11-16 中国建筑第二工程局有限公司 A kind of high-altitude delivering concrete device

Similar Documents

Publication Publication Date Title
CN103635643B (en) The construction method of nigh-level synthesis steel bar concrete cylindrical shell
CN103291076A (en) Multilayer steel truss fragmented reverse hoisting construction method in arc-shaped frame
CN106437130A (en) Inner roof external climbing type formwork construction platform for super high-rise building construction
CN102535845A (en) Construction method of bearing frame of corridor structure
CN107090975A (en) A kind of big across the cast-in-situ concrete beam Bailey bracket formwork construction method of superelevation
CN108979131B (en) Integral lifting platform device for high-rise building construction steel formwork and operation frame
CN103184722B (en) Large-span double-layer Bailey truss structure and construction method thereof
CN207294093U (en) A kind of large span steel truss integral lifting apparatus
CN111779248A (en) High formwork system and construction method thereof
CN103410320A (en) Dual-barrel continuous-slipping construction method of flexible platform of silo
CN202370233U (en) Pull rod type external wall cantilever discharging platform setting-up structure
CN106150057B (en) A kind of split blade type hydraulic pressure lift climbing frame
CN205662832U (en) Under hold formula beiLei beam steel suspension bridge
CN202214974U (en) 5.8 m ultrahigh external lifting scaffold
CN204781927U (en) Elevartor shaft formwork and elevartor shaft concrete placement operation platform
CN107059656A (en) Active service bridge maintenance repairs the construction method of boat scaffold operating platform
CN212507296U (en) High formwork system
CN205822800U (en) A kind of high-altitude delivering concrete device
CN101122115B (en) Construction method for tower crane shift
CN104831928B (en) High-altitude long-span concrete conjoined structure shuttering supporting steel platform construction method
CN209780193U (en) Suspension type scaffold
CN104989092B (en) A kind of construction method of high-altitude overhanging superposed type steel truss bearing platform
CN107217831A (en) High-rise building Core Walls Structure horizontal structure construction method
CN203547125U (en) Column type overall steel platform hydraulic creeping formwork
CN106121238A (en) A kind of high-altitude delivering concrete device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161221