CN205822174U CN201620740245.2U CN201620740245U CN205822174U CN 205822174 U CN205822174 U CN 205822174U CN 201620740245 U CN201620740245 U CN 201620740245U CN 205822174 U CN205822174 U CN 205822174U
Authority
CN
China
Prior art keywords
pile
pipe pile
steel
cover plate
slurry outlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620740245.2U
Other languages
Chinese (zh)
Inventor
宗钟凌
宋明志
贺会军
吕凤伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaihai Institute of Techology
Original Assignee
Huaihai Institute of Techology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaihai Institute of Techology filed Critical Huaihai Institute of Techology
Priority to CN201620740245.2U priority Critical patent/CN205822174U/en
Application granted granted Critical
Publication of CN205822174U publication Critical patent/CN205822174U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

This utility model provides a kind of miniature steel pipe pile and grouting strengthening method, described miniature steel pipe pile includes steel-pipe pile, the bottom of described steel-pipe pile connects pile top shrouding, it is communicated with inside piling bar pipe on described pile top shrouding and the slurry outlet of pile top periphery soil layer, carrying out consolidation process by twice slip casting soil layer following to pile crown, the self drainage utilizing grouting material is good, the feature such as fast hard, the strongest, ungauged regions, microdilatancy, can quickly, be effectively improved foundation capability, and then improve stake end bearing capacity;And utilizing reverse frustoconic rubber stopper effectively to prevent the mixing of cement mortar and grouting material, it is ensured that grouting material is in the intensity of pile crown.

Description

Miniature steel pipe pile
Technical field
This utility model belongs to construction engineering technical field, is specifically related to a kind of miniature steel pipe pile.
Background technology
Miniature steel pipe pile is the one of piling bar, has the strength of materials high, implants soil layer ability strong, and soil compaction during pile driving impact is little, The advantages such as pile compacting equipment is light, easy to connect, have a wide range of applications in engineering construction and reinforcing.But owing to its diameter is little, Stake weekly form area is little, little with the frictional force of soil, causes miniature steel pipe single-pile vertical orientation bearing capacity limited, therefore, and miniature steel pipe pile Pile spacing is less, consumption is high, costly, for reduce cost, with steel-pipe pile, mostly open slurry outlet, such as Chinese invention patent Grouting type micro steel pipe pile disclosed in CN102493437A and grouting strengthening method, described grouting type micro steel pipe pile includes steel Pipe, described steel pipe sidewall is provided with some groups of spaced slurry outlet groups vertically, and the outside of each group of slurry outlet group is all cased with Rubber seal.Grouting strengthening method of the present utility model is: after pile sinking terminates, by carrying out pressure in the steel pipe of hollow Slip casting, uses grouting equipment and applies pressure, the serosity that can solidify is uniformly injected into pile body periphery by the slurry outlet on pile body Soil layer, under pressure serosity permeate, spread in by note layer, filling and compacted, the loosest soil particle cementation is become one Individual entirety, thus reach pile soil horizon is carried out consolidation process, improve pile foundation bearing capacity, but the miniature steel pipe pile of this structure exists Stake Zhou Kaikong slip casting, improves limited to the bearing capacity of pile foundation.
It addition, the material being currently used for slip casting is more, performance and the range of variety classes slurry material also have larger difference, In engineering construction and reinforcing, more conventional injecting paste material has pea gravel concreten, cement mortar, chemical grouting material etc., various injecting paste materials All there are following pluses and minuses:
Concrete: in concrete, particle diameter is relatively big, and pile body need to open bigger hole, weakens relatively big to steel-pipe pile cross section, mixed Though solidifying soil has certain mobility, but uses in minor-diameter steel-tube, construction more difficulty, and it is difficult to pressure note Slurry;
Cement mortar: cement mortar has good mobility, penetrating power is strong, easily realizes slip casing by pressure, but hard after slip casting Changing speed relatively slow, easily form linker between the adjacent each stake in slip casting steel pipe neighboring area, slip casting effect does not often reach pre- Phase effect;
Chemical pulp: chemical pulp is solution state, the property noted is good, but it is expensive, and foundation soil and water quality are had one Fixed pollution risk.
Utility model content
The technical problems to be solved in the utility model be to provide one can quickly, be effectively improved foundation capability, enter And improve a miniature steel pipe pile for end bearing capacity.
For solving above-mentioned technical problem, the technical scheme of offer of the present utility model is:
A kind of miniature steel pipe pile, including steel-pipe pile, the bottom of described steel-pipe pile is provided with pile top shrouding, and described pile top is sealed Plate includes the pile top of inverted cone and is fixed on the circular pile head shrouding bottom described pile top, is communicated with on described pile crown shrouding Inside steel-pipe pile and the slurry outlet of stake substratum, the upper end of described steel-pipe pile is provided with pile crown jointing, and slip casing by pressure pipe leads to Cross pile crown jointing to access inside steel-pipe pile, during slip casing by pressure: rubber stopper by the cement mortar on the grouting material of bottom and top every Open.
Preferred as one, in this utility model, pile crown shrouding is by the fan section that cross pile top cutting is 4 homalographics, often Fan section described in one is provided with a vertical slurry outlet and and tilts slurry outlet, and described inclination slurry outlet is positioned at outside vertical slurry outlet Side.
In this utility model, the bottom in each described fan section is provided with cover plate, and described cover plate includes the first lid being hinged Plate and the second cover plate, described first cover plate and the second cover plate are covered on vertical slurry outlet and inclination accordingly by key drop rotating shaft The exit of slurry outlet, cover plate diameter is bigger than described slurry outlet diameter, forms one-way flow valve.During slip casting, cover plate launches one Fixed angle (less than 60 °), slip casting terminate after under overfall effect, cover plate can fast automatic Guan Bi, it is ensured that grouting material does not returns Stream, soil does not enter in steel pipe.
Preferred as one, the first cover plate in this utility model and the second cover plate are equipped with only gusset of putting more energy into.No It is only capable of strengthening cover plate rigidity, and expanded angle is limited, grouting material can be effectively ensured and do not reflux, can improve the efficiency of slip casting..
Preferred as one, slip casing by pressure pipe described in this utility model is provided with slip casting controlled valve, can realize quantitatively Pressure cement injection.
Preferred as one, rubber stopper described in this utility model is reverse frustoconic, can effectively prevent cement mortar and filling The mixing of slurry, it is ensured that grouting material is in the intensity of pile crown;
Preferred as one, the diameter of pile crown shrouding described in this utility model is compared with the big 5 ~ 10mm of outer diameter of steel pipes, Ke Yiyou Effect concentrates on below pile crown when mainly being discharged by grouting material.
The grouting strengthening method of a kind of miniature steel pipe pile, its grouting strengthening method comprises the steps:
(1), before construction, pile top shrouding processes 4 vertical slurry outlets and 4 inclination slurry outlets, at pile top shrouding Bottom is arranged in correspondence with 4 cover plates;
(2) according to Specific construction place, the joint number of required steel-pipe pile is calculated;
(3) bottom of first segment steel-pipe pile is installed the pile top shrouding of manufactured inverted cone, then passes through counter-force Shelf structure squeezes into soil layer by pressing under first segment steel-pipe pile;
(4), after first segment steel-pipe pile is depressed into position, welds second section steel pipe in the upper end of first segment steel pipe, weld successively Connect, until the pile top shrouding of first segment steel-pipe pile bottom arrives the degree of depth under the soil layer needed for construction;
(5) carry out no pressure slip casting in the passage formed inside all steel-pipe pile groups welded, fill strength grade The grouting material of >=40MPa, the gas in evacuated tube and water;
(6) at the upper end open of steel-pipe pile group filling grouting material, reverse frustoconic rubber stopper is filled in, logical in 5-10 minute Cross pile crown jointing and slip casing by pressure pipe accessed steel-pipe pile group inner channel, inwardly add cement injection by slip casing by pressure pipe, The grouting pressure utilizing cement mortar forces reverse frustoconic rubber stopper descending, until vertically being gone out on pile top shrouding by all grouting materials Slurry hole and inclination slurry outlet are expressed in the periphery soil layer of pile top shrouding;
(7) after slip casing by pressure terminates, the cement mortar that steel-pipe pile group inner channel is injected by pressure is filled closely knit, previous without pressure The grouting material that power is injected is filled in pile top periphery soil layer formation and expands pile crown to.
Having the beneficial effect that of technique scheme of the present utility model:
This utility model is to open slurry outlet on the pile top shrouding of steel-pipe pile, first carries out no pressure in steel-pipe pile and injects filling Slurry, when grouting material is full of steel pipe inner volume, fills in reverse frustoconic shape rubber stopper at steel pipe oral area, then in 5 ~ 10 minutes Inject cement mortar to steel overpressure, by actively applying pressure, grouting material is expressed to steel pipe by the slurry outlet opened in advance In the periphery soil body of stake pile top, the self drainage utilizing grouting material (strength grade >=40MPa) is good, fast hard, the strongest, ungauged regions, micro- The features such as expansion, can quickly, be effectively improved foundation capability, and then improve stake end bearing capacity;And utilize reverse frustoconic rubber Plug effectively prevents the mixing of cement mortar and grouting material, it is ensured that grouting material is in the intensity of pile crown.
Accompanying drawing explanation
Fig. 1 is schematic diagram before slip casing by pressure;
Fig. 2 is schematic diagram in slip casing by pressure;
Fig. 3 is schematic diagram after slip casing by pressure;
Fig. 4 is pile crown cross pile top schematic diagram;
Fig. 5 is the key drop rotated;
Fig. 6 is to cover tightly the key drop under state;
Fig. 7 is the key drop under deployed condition
1 pile top in figure;2, steel-pipe pile;3 grouting materials;4 rubber stoppers;5 cement mortars;6 pile crown jointings;7 slip casting switch valves Door;8 slip casing by pressure pipes;The pile crown expanded after 9 slip castings;10 cross pile tops;11 pile crown shroudings;12 straight holes;13 inclined holes;14 key drops Rotating shaft;15 cover plates;16 put more energy into only gusset.
Detailed description of the invention
For making the technical problems to be solved in the utility model, technical scheme and advantage clearer, below in conjunction with accompanying drawing And specific embodiment is described in detail.
As it can be seen, a kind of miniature steel pipe pile, including steel-pipe pile 2, it is welded with pile top shrouding in the bottom of steel-pipe pile 2, Pile top shrouding is exactly the pile top 1 of inverted cone and is welded in the circular pile head shrouding 11 bottom pile top 1, and pile crown shrouding 11 has 8 Individual slurry outlet, these 8 slurry outlets can connect inside steel-pipe pile 2 and stake substratum, and the upper end of steel-pipe pile 2 is provided with pile crown and connects Joint 6, slip casing by pressure pipe 8 accesses inside steel-pipe pile 2, during slip casing by pressure by pile crown jointing 6: reverse frustoconic rubber stopper 4 The most descending and the cement mortar 5 of the grouting material 3 of bottom with top is separated, when truncated cone-shaped rubber stopper 4 goes downwards to steel-pipe pile 2 During lower end, now it is filled with cement mortar 5 inside steel-pipe pile 2, and grouting material 3 has been stuffed entirely with in pile top periphery soil layer, shape The pile crown 9 expanded after becoming slip casting, grouting material, compared with the big 5 ~ 10mm of outer diameter of steel pipes, can be concentrated mainly on by the diameter of pile crown shrouding 11 Below pile crown.
Pile top in this utility model is cross pile top 10, and pile crown shrouding 11 is welded and fixed with cross pile top 10, and pile crown seals Plate 11, by the fan section that cross pile top 10 cutting is 4 homalographics, each described fan section has vertical slurry outlet 12 He One tilts slurry outlet 13, tilts slurry outlet 13 and is positioned at the outside of vertical slurry outlet, such pile crown shrouding 11 has 8 pulps Hole, at each group of vertical slurry outlet 12 with tilt and be mounted on cover plate 15 on slurry outlet 13, cover plate 15 include being hinged the One cover plate and the second cover plate, the first cover plate and the second cover plate are covered on vertical slurry outlet 12 He accordingly by key drop rotating shaft 14 Tilting the exit of slurry outlet 13, cover plate diameter is bigger than slurry outlet diameter, so can form one-way flow valve, at steel pipe Stake 2 is when being initially pushed down into soil layer, and cover plate is Guan Bi, is possible to prevent earth to enter into inside steel-pipe pile 2 the, now there may be A small amount of moisture enters, and can be emptied by moisture when grouting material 3 enters.Being equipped with only gusset 16 of putting more energy on cover plate 15, this practicality is new The slip casing by pressure pipe 8 of type is provided with slip casting controlled valve 7, can realize quantitative slip casing by pressure.
As it can be seen, the grouting strengthening method of a kind of miniature steel pipe pile, its grouting strengthening method comprises the steps:
(1), before construction, pile top shrouding processes 4 vertical slurry outlets and 4 inclination slurry outlets, at pile top shrouding Bottom is arranged in correspondence with 4 cover plates;
(2) according to Specific construction place, the joint number of required steel-pipe pile is calculated;
(3) bottom of first segment steel-pipe pile is installed the pile top shrouding of manufactured inverted cone, then passes through counter-force Shelf structure squeezes into soil layer by pressing under first segment steel-pipe pile;
(4), after first segment steel-pipe pile is depressed into position, welds second section steel pipe in the upper end of first segment steel pipe, weld successively Connect, until the pile top shrouding of first segment steel-pipe pile bottom arrives the degree of depth under the soil layer needed for construction;
(5) carry out no pressure slip casting in the passage formed inside all steel-pipe pile groups welded, fill strength grade The grouting material of >=40MPa, the gas in evacuated tube and water;
(6) at the upper end open of steel-pipe pile group filling grouting material, reverse frustoconic rubber stopper is filled in, logical in 5-10 minute Cross pile crown jointing and slip casing by pressure pipe accessed steel-pipe pile group inner channel, inwardly add cement injection by slip casing by pressure pipe, The grouting pressure utilizing cement mortar forces reverse frustoconic rubber stopper descending, until vertically being gone out on pile top shrouding by all grouting materials Slurry hole and inclination slurry outlet are expressed in the periphery soil layer of pile top shrouding;
(7) after slip casing by pressure terminates, the cement mortar that steel-pipe pile group inner channel is injected by pressure is filled closely knit, previous without pressure The grouting material that power is injected is filled in pile top periphery soil layer formation and expands pile crown to.
Compared with existing miniature steel pipe pile and grouting strengthening method, the miniature steel pipe pile that this utility model embodiment provides And grouting strengthening method, have the advantage that
(1) construction method of this grouting and reinforcing, device therefor, connected mode are simple, it is easy to operation;(2) grouting used by To have self drainage good for material, firmly, the strongest, high-strength, ungauged regions, the feature such as microdilatancy, the most pollution-free to water quality and surrounding, from close Property is good, antirust etc.;(3) make full use of the feature of grouting material and cement mortar, grouting material high-early-strength but denseness is high, cement mortar flow Property good but early strength is low, be allowed to learn from other's strong points to offset one's weaknesses;(4) miniature steel pipe pile is only in perforate at the bottom of stake, can be to the supporting course at pile top place Neighbouring soil layer carries out basement process, can be effectively improved an end bearing capacity;(5) pile top shrouding is divided into four homalographic regions, has Benefit the axial compression of steel-pipe pile;(6) slurry outlet and the combination of vertical slurry outlet are tilted, it is simple to grouting material is wider at pile crown The interior pile crown forming expansion, is effectively improved bearing capacity of single pile;(7) 8 slurry outlets are arranged symmetrically with, it is simple to formed and expand stake uniformly Head, stress is more reasonable;(8) pile crown forms unidirectional grout, arranges rotating cover plate, it is ensured that soil does not enter steel on pile top shrouding In pipe, only gusset that cover plate is put more energy into, cover plate rigidity can not only be strengthened, and expanded angle is limited, grouting material can be effectively ensured not Backflow, improves the efficiency of slip casting;(9) the upper surface diameter of pile top shrouding 5-10mm bigger than pile body external diameter, can effectively prevent grouting Expect to reflux along tube wall, also can expansion pile head area;(10) filled closely knit by part grouting material and cement mortar in steel pipe, steel can be improved The strength and stiffness of pipe itself;(11) stake top filling adaptor is dismantled and assembled, reusable, economical environment-protective.
The above is preferred implementation of the present utility model, it is noted that for the ordinary skill of the art For personnel, on the premise of without departing from principle described in the utility model, it is also possible to make some improvements and modifications, these improve Also protection domain of the present utility model is should be regarded as with retouching.

Claims (7)

1. a miniature steel pipe pile, including steel-pipe pile (2), it is characterised in that the bottom of described steel-pipe pile (2) is provided with pile top Shrouding, described pile top shrouding includes the pile top (1) of inverted cone and is fixed on the circular pile head shrouding of described pile top (1) bottom (11), described pile crown shrouding (11) is communicated with steel-pipe pile (2) inner side and the slurry outlet of stake substratum, described steel-pipe pile (2) upper end is provided with pile crown jointing (6), and slip casing by pressure pipe (8) accesses steel-pipe pile (2) by pile crown jointing (6) Inner side, during slip casing by pressure: the cement mortar (5) of the grouting material (3) of bottom with top is separated by rubber stopper (4).
Miniature steel pipe pile the most according to claim 1, it is characterised in that: described pile crown shrouding (11) is by cross pile top (10) Cutting is the fan section of 4 homalographics, and each described fan section is provided with a vertical slurry outlet (12) and and tilts slurry outlet (13), described inclination slurry outlet (13) is positioned at the outside of vertical slurry outlet.
Miniature steel pipe pile the most according to claim 2, it is characterised in that: the bottom in each described fan section is provided with cover plate (15), described cover plate includes the first cover plate and the second cover plate being hinged, and described first cover plate and the second cover plate pass through cap bore Plate rotating shaft (14) is covered on vertical slurry outlet (12) accordingly and tilts the exit of slurry outlet (13), and described cover plate diameter compares institute State slurry outlet diameter big, form one-way flow valve.
Miniature steel pipe pile the most according to claim 3, it is characterised in that be all provided with on described first cover plate and the second cover plate Put more energy into only gusset (16).
Miniature steel pipe pile the most according to claim 1, it is characterised in that: described slip casing by pressure pipe (8) is provided with slip casting and opens Closing valve (7).
Miniature steel pipe pile the most according to claim 1, it is characterised in that: described rubber stopper (4) is reverse frustoconic.
Miniature steel pipe pile the most according to any one of claim 1 to 6, it is characterised in that described pile crown shrouding (11) Diameter is compared with the big 5 ~ 10mm of outer diameter of steel pipes.
CN201620740245.2U 2016-07-14 2016-07-14 Miniature steel pipe pile Withdrawn - After Issue CN205822174U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620740245.2U CN205822174U (en) 2016-07-14 2016-07-14 Miniature steel pipe pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620740245.2U CN205822174U (en) 2016-07-14 2016-07-14 Miniature steel pipe pile

Publications (1)

Publication Number Publication Date
CN205822174U true CN205822174U (en) 2016-12-21

Family

ID=57563721

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620740245.2U Withdrawn - After Issue CN205822174U (en) 2016-07-14 2016-07-14 Miniature steel pipe pile

Country Status (1)

Country Link
CN (1) CN205822174U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106013098A (en) * 2016-07-14 2016-10-12 淮海工学院 Miniature steel pipe pile and grouting reinforcement method
CN107975375A (en) * 2017-10-24 2018-05-01 济南城建集团有限公司 A kind of miniature steel pipe pile reinforced soft foundation construction method of city tunnel
CN109457695A (en) * 2018-11-14 2019-03-12 佛山市高明顺高木业有限公司 A kind of cement steel-pipe pile
CN111287207A (en) * 2019-12-31 2020-06-16 浙江工业大学 Calcareous sandy soil foundation solidification structure

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106013098A (en) * 2016-07-14 2016-10-12 淮海工学院 Miniature steel pipe pile and grouting reinforcement method
CN106013098B (en) * 2016-07-14 2018-06-05 淮海工学院 Miniature steel pipe pile and grouting strengthening method
CN107975375A (en) * 2017-10-24 2018-05-01 济南城建集团有限公司 A kind of miniature steel pipe pile reinforced soft foundation construction method of city tunnel
CN107975375B (en) * 2017-10-24 2019-01-11 济南城建集团有限公司 A kind of miniature steel pipe pile reinforced soft foundation construction method of city tunnel
CN109457695A (en) * 2018-11-14 2019-03-12 佛山市高明顺高木业有限公司 A kind of cement steel-pipe pile
WO2020098041A1 (en) * 2018-11-14 2020-05-22 佛山市高明顺高木业有限公司 Cement steel pipe pile
CN111287207A (en) * 2019-12-31 2020-06-16 浙江工业大学 Calcareous sandy soil foundation solidification structure
CN111287207B (en) * 2019-12-31 2021-11-05 浙江工业大学 Calcareous sandy soil foundation solidification structure

Similar Documents

Publication Publication Date Title
CN106013098B (en) Miniature steel pipe pile and grouting strengthening method
CN205822174U (en) Miniature steel pipe pile
CN104131556B (en) The construction method of the mutual foundation drainage pile for prestressed pipe of a kind of soft or hard interlayer
CN101532290B (en) Granule grouting pile of ripple plastic sleeve with hole for strengthening soft soil foundation and strengthening method
CN206722878U (en) A kind of mining light-duty filling counterfort
CN101858079B (en) Core filling tubular pile cement composite foundation pile and construction method
CN113529721B (en) Combined drilling and grouting pipe for grouting reinforcement of island reef weak stratum and construction method
CN105672307A (en) Expanded-base combination end pile bearing foundation
CN107513995A (en) A kind of bridge struction pile post grouting construction method
CN105714773A (en) Foundation treatment method
CN105756065B (en) A kind of drilling follow pipe pile side is segmented high-pressure slip-casting system and method
CN208201874U (en) A kind of open-cell cloth bag grouting structure
US11773555B2 (en) Methods and apparatuses for compacting soil and granular materials
CN107916663A (en) A kind of construction method for soft soil foundation
CN101586341A (en) Water sealing method for civil engineering groundwork
CN204000859U (en) The mutual foundation drainage pile for prestressed pipe of a kind of soft or hard interlayer
CN206015658U (en) It is applied to the grouting device of sand soil foundation ditch
CN205501998U (en) Expand end combination end -bearing pile basis
CN205276249U (en) Hot reinforcing pile
CN108221948A (en) A kind of method for processing foundation
CN107806085B (en) A kind of ultra-deep pit foundation encircles and hunts down water-stopping steel sheet pile and its construction method
CN107794933B (en) Hermetic seal structure and its construction method are encircled and hunted down in a kind of underwater construction
CN209243733U (en) A kind of compound gravity retaining wall structure of soft clay area ultra-deep foundation pit
CN207904912U (en) Band expands shoe stake side two-step-filling construction of prefabricated piles structure
CN102127910B (en) Method for constructing soil-cement composite foundation pile as core tubular pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20161221

Effective date of abandoning: 20180605

AV01 Patent right actively abandoned