CN205821982U - Propelled tunnel inverted arch trestle - Google Patents

Propelled tunnel inverted arch trestle Download PDF

Info

Publication number
CN205821982U
CN205821982U CN201620760722.1U CN201620760722U CN205821982U CN 205821982 U CN205821982 U CN 205821982U CN 201620760722 U CN201620760722 U CN 201620760722U CN 205821982 U CN205821982 U CN 205821982U
Authority
CN
China
Prior art keywords
trestle
inverted arch
trestle beam
propelled
tunnel inverted
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620760722.1U
Other languages
Chinese (zh)
Inventor
王清江
王悦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Technology and Business Institute
Original Assignee
Chongqing Technology and Business Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Technology and Business Institute filed Critical Chongqing Technology and Business Institute
Priority to CN201620760722.1U priority Critical patent/CN205821982U/en
Application granted granted Critical
Publication of CN205821982U publication Critical patent/CN205821982U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model discloses a kind of propelled tunnel inverted arch trestle, including trestle, travelling wheel and a spike;Described trestle includes trestle beam, truss frame for connecting and trestle driving means, trestle beam is two and Parallel Symmetric layout, trestle beam includes front trestle beam, middle trestle beam and rear trestle beam, front trestle beam, rear trestle beam is inserted through set and is connected with middle trestle joist support, front trestle beam and rear trestle soffit are equipped with tooth bar, described driving means includes two motor being fixed on middle trestle beam two ends, this device simple structure, easy to use, during constructing tunnel, for convenience of traveling vehicle on trestle, and avoid delaying work, when employing present arrangement avoids existing tunnel construction, trestle beam split is arranged, need to coordinate with tunnel excavation, constantly movable trestle beam, the problems such as inconvenient construction, realize the whole self-propelled movement of trestle.

Description

Propelled tunnel inverted arch trestle
Technical field
This utility model relates to Tunnel Engineering device field, specifically a kind of propelled tunnel inverted arch trestle.
Background technology
Present stage, during tunnel construction, after inverted arch excavation, need to use trestle to cross over excavation area, in order to vehicle is suitable Profit is current.Existing trestle mostly is separately positioned left and right sides trestle beam and forms one group, and general employing shaped steel processes, mobile Time, use the Mechanical Moving such as excavator or loader, during operation, extremely inconvenient and time-consuming, laborious.For ensureing that tunnel inverted arch is even More continuous construction, need to organize inverted arch trestle, therefore, need to develop one and can automatically walk, and crosses over inverted arch excavation area, pouring area simultaneously And Deng Ge region, maintenance district, the inverted arch trestle stand pushed ahead with tunnel inverted arch excavation construction is the most necessary and urgent.
Utility model content
In view of this, the purpose of this utility model is to provide a kind of propelled tunnel inverted arch trestle, it is to avoid existing tunnel During construction, the split of trestle beam is arranged, and need to coordinate with tunnel excavation, continuous movable trestle beam, it has not been convenient to the problems such as construction.
Propelled tunnel inverted arch trestle of the present utility model, including trestle, travelling wheel and a spike;Described trestle includes stack Bridge, truss frame for connecting and trestle driving means, trestle beam is that two and Parallel Symmetric are arranged, trestle beam include front trestle beam, Middle trestle beam and rear trestle beam, front trestle beam, rear trestle beam be inserted through with middle trestle joist support set be connected, front trestle beam and rear trestle beam Bottom surface is equipped with tooth bar, and described driving means includes two motor being fixed on middle trestle beam two ends, the output shaft of motor On be fixed with gear and by gear with corresponding before trestle beam or the rack gear connection of rear trestle soffit;Described travelling wheel It is located at front trestle beam front end, middle trestle beam front end and rear end and rear trestle beam rear end;Prop up spike to arrange with travelling wheel one_to_one corresponding.
Further, a length of 20m to the 50m of described trestle.
Further, described truss frame for connecting is fixedly connected between two middle trestle beams.
Further, described stack Bridge Sections is rectangular tubular section.
Further, trestle beam and inverted arch template with the use of, inverted arch pattern board supporting is on middle trestle beam.
The beneficial effects of the utility model are: this device simple structure, easy to use, during constructing tunnel, for convenience of trestle Upper traveling vehicle, and avoid delaying work, use trestle beam split when present arrangement avoids existing tunnel construction to arrange, need to open with tunnel Dig cooperation, continuous movable trestle beam, it has not been convenient to the problems such as construction, it is achieved the whole self-propelled movement of trestle.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
Fig. 1 is structural representation of the present utility model, as shown in the figure: the propelled tunnel inverted arch trestle of the present embodiment, bag Include trestle, travelling wheel 1 and a spike 2;Described trestle includes trestle beam, truss frame for connecting and trestle driving means, and trestle beam is two Individual and Parallel Symmetric is arranged, trestle beam includes front trestle beam 3, middle trestle beam 4 and rear trestle beam 5, front trestle beam 3, rear trestle Beam 5 wears with middle trestle beam 4 socket joint and is connected, and front trestle beam 3 and rear trestle beam 5 bottom surface are equipped with tooth bar 6, described driving means bag Include two motor 7 being fixed on middle trestle beam 4 two ends, the output shaft of motor 7 is fixed with gear and by gear and phase The front trestle beam 3 answered or the tooth bar 6 of rear trestle beam 5 bottom surface are in transmission connection;Described travelling wheel 1 is located at front trestle beam 3 front end, middle stack Bridge 4 front end and rear end and rear trestle beam 5 rear end;Prop up spike 2 to arrange with travelling wheel 1 one_to_one corresponding;Trestle beam is rectangle or side Shape tubular section, forward and backward trestle beam 5 stretches in middle trestle beam 4;Propping up spike 2 is Collapsible structure, for self-propelled tunnel inverted arch Propelled tunnel inverted arch trestle is supported positioning after being advanced into target location by trestle;This device simple structure, easy to use, During constructing tunnel, for convenience of traveling vehicle on trestle, and avoid delaying work, use trestle when present arrangement avoids existing tunnel construction Beam split is arranged, and need to coordinate with tunnel excavation, continuous movable trestle beam, it has not been convenient to the problems such as construction, it is achieved trestle is whole self-propelled Mobile.
In the present embodiment, a length of 20m to the 50m of described trestle, i.e. trestle beam total length are 20m to 50m, in the present embodiment Bridge stack beam length is 27m, 30m or longer;Utilize trestle girder span more excavation inverted arch district, pour inverted arch district and inverted arch maintenance district.
In the present embodiment, described trestle moving method is: front trestle beam 3 stretch out under the driving of motor 7 in trestle beam 4 Moving forward, travelling wheel 1 is along ground moving, and after putting in place, a spike 2 is supported on ground, excavates inverted arch;Open motor 7 afterwards, Middle trestle beam 4 and rear trestle beam 5 move forward, and after putting in place, a spike 2 is supported on ground;Front trestle beam 3 moves further along, as This is reciprocal, moves forward.
In the present embodiment, described truss frame for connecting is fixedly connected between two middle trestle beams 4;Forward and backward trestle beam 5 is contracted in In jackshaft bridge.
In the present embodiment, described stack Bridge Sections is rectangular tubular section;When making trestle pass through more stable and be easy to trestle Shrink.
In the present embodiment, trestle beam and inverted arch template with the use of, inverted arch pattern board supporting is on middle trestle beam 4.
Finally illustrating, above example is only in order to illustrate the technical solution of the utility model and unrestricted, although ginseng According to preferred embodiment, this utility model is described in detail, it will be understood by those within the art that, can be to this The technical scheme of utility model is modified or equivalent, without deviating from objective and the model of technical solutions of the utility model Enclosing, it all should be contained in the middle of right of the present utility model.

Claims (5)

1. a propelled tunnel inverted arch trestle, it is characterised in that: include trestle, travelling wheel and a spike;Described trestle includes Trestle beam, truss frame for connecting and trestle driving means, trestle beam is two and Parallel Symmetric layout, and trestle beam includes front trestle Beam, middle trestle beam and rear trestle beam, front trestle beam, rear trestle beam be inserted through with middle trestle joist support set be connected, front trestle beam and rear stack Bridge bottom surface is equipped with tooth bar, and described driving means includes two motor being fixed on middle trestle beam two ends, motor defeated It is fixed with gear on shaft and the rack gear by gear with corresponding front trestle beam or rear trestle soffit connects;Described walk Road wheel is located at front trestle beam front end, middle trestle beam front end and rear end and rear trestle beam rear end;Prop up spike and travelling wheel one_to_one corresponding Arrange.
A kind of propelled tunnel inverted arch trestle the most according to claim 1, it is characterised in that: a length of 20m of described trestle To 50m.
A kind of propelled tunnel inverted arch trestle the most according to claim 1, it is characterised in that: described truss frame for connecting is fixing even It is connected between two middle trestle beams.
A kind of propelled tunnel inverted arch trestle the most according to claim 1, it is characterised in that: described stack Bridge Sections is square Shape tubular section.
A kind of propelled tunnel inverted arch trestle the most according to claim 1, it is characterised in that: trestle beam is joined with inverted arch template Closing and use, inverted arch pattern board supporting is on middle trestle beam.
CN201620760722.1U 2016-07-19 2016-07-19 Propelled tunnel inverted arch trestle Expired - Fee Related CN205821982U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620760722.1U CN205821982U (en) 2016-07-19 2016-07-19 Propelled tunnel inverted arch trestle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620760722.1U CN205821982U (en) 2016-07-19 2016-07-19 Propelled tunnel inverted arch trestle

Publications (1)

Publication Number Publication Date
CN205821982U true CN205821982U (en) 2016-12-21

Family

ID=57563583

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620760722.1U Expired - Fee Related CN205821982U (en) 2016-07-19 2016-07-19 Propelled tunnel inverted arch trestle

Country Status (1)

Country Link
CN (1) CN205821982U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107725073A (en) * 2017-11-06 2018-02-23 中建八局第建设有限公司 A kind of simple more straddle type tunnel inverted arch trestle structure and construction methods
CN109183601A (en) * 2018-10-26 2019-01-11 河北创恒智能装备科技有限公司 Telescopic intelligent multifunctional inverted arch trestle and the construction method with the trestle

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107725073A (en) * 2017-11-06 2018-02-23 中建八局第建设有限公司 A kind of simple more straddle type tunnel inverted arch trestle structure and construction methods
CN107725073B (en) * 2017-11-06 2024-04-02 中建八局第一建设有限公司 Tunnel construction method based on simple trestle
CN109183601A (en) * 2018-10-26 2019-01-11 河北创恒智能装备科技有限公司 Telescopic intelligent multifunctional inverted arch trestle and the construction method with the trestle
CN109183601B (en) * 2018-10-26 2023-05-23 河北创恒智能装备科技有限公司 Telescopic intelligent multifunctional inverted arch trestle and construction method using trestle

Similar Documents

Publication Publication Date Title
CN105952482B (en) Self-propelled tunnel inverted arch lining trolley
CN203961992U (en) Portable full framing chassis
CN104594918B (en) Split integrated underground passage steel mold plate trolley and construction method thereof
CN201695321U (en) Multifunctional propelled tunnel inverted arch trestle
CN105155423A (en) Upward moving type movable formwork for continuous box girder construction
CN201581899U (en) Hydraulic drive walking type motorized cart of tunnel construction trestle
CN104481546A (en) Doubly curved arch construction method for enabling inclined shaft of soft rock tunnel to enter main tunnel
CN108442948B (en) Double-lane inverted arch trestle and construction method
CN111663430B (en) Angularly adjustable and horizontal adjustable removes landing stage
CN205821982U (en) Propelled tunnel inverted arch trestle
CN103774558A (en) Automatic travelling type moveable formwork used in bridge construction
CN104533460A (en) Construction method for concrete pouring of support-changing type formwork trolley and underground channel
CN204457807U (en) A kind of tunnel ditch cable channel hydraulic formwork trolley
CN104033159B (en) A kind of crawler unit and development machine
CN203248170U (en) Lining trolley for secondary lining construction of pedestrian crosswalk
CN103527218A (en) Multifunctional combined type concrete lining trolley
CN102330559A (en) Integral hydraulic steel formwork jumbo
CN202250105U (en) Integral hydraulic steel formwork trolley
CN208618251U (en) A kind of hydraulic inverted arch trestle in tunnel of constructing tunnel full-automation device
CN107060831A (en) One kind is used for tunnel groove constructing device
CN106192761A (en) A kind of method disassembling mobile formwork in bridge tunnel narrow short transition time section
CN102808632B (en) Full-circle type formwork trolley assembly and construction method thereof
CN208502797U (en) It is a kind of for Subway Tunnel can automatically walk trolley
CN203546622U (en) Folding-turning retractable type cantilever beam system of lower guide beam walking type bridge girder erection machine
CN208995926U (en) The mechanism poured for the wet joint concrete of section assembling box beam

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161221

Termination date: 20190719