CN205804911U - A kind of builder's jack - Google Patents
A kind of builder's jack Download PDFInfo
- Publication number
- CN205804911U CN205804911U CN201620538465.7U CN201620538465U CN205804911U CN 205804911 U CN205804911 U CN 205804911U CN 201620538465 U CN201620538465 U CN 201620538465U CN 205804911 U CN205804911 U CN 205804911U
- Authority
- CN
- China
- Prior art keywords
- scaffold
- steel
- overhanging type
- steel beam
- type steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model discloses a kind of builder's jack, including support of encorbelmenting, scaffold and closing protection, scaffold building is being encorbelmented on the overhanging type steel beam supported, the end of encorbelmenting of overhanging type steel beam uses steel wire rope drawknot to fix, protection closed by sizing steel plate and its boarding wire mesh sheet composition scaffold, it is characterized in that, described overhanging type steel beam is shelved and is fixed on agent structure layer, scaffold is using overhanging type steel beam as supporting fixing point, end of encorbelmenting at overhanging type steel beam is provided with drawknot steel wire rope, space, the bottom sizing steel plate of scaffold carries out closing protection, every layer operation frame of scaffold uses its boarding wire mesh sheet to carry out closing protection.Builder's jack of the present utility model is a kind of increase sizing steel plate and steel fabric sheet on overhanging type steel tube clamps formula scaffold, form the scaffold of the profile steel overhanging with repeatable utilization, fire-proof function, on-the-spot protection safety is reliable, it is achieved that on-the-spot canalization processing and fabricating is installed.
Description
Technical field
This utility model belongs to building engineering field, particularly to major structure of construction and decorations constructing operation foot hands
Frame, scene is set up simple to operate, canalization processing and fabricating, it is simple to on-site construction operations, practical.
Background technology
Scaffold is the shelf set up for construction operation needs, is on the one hand the vertical and water of high-altitude construction year operation
Flat transport provides passage, on the other hand provides reliable work surface for work high above the ground personnel, is architectural engineering exterior wall, inside fitting
Accessory channel that the position that cannot directly reach is set up and security protection support body.Scaffold in building engineering construction be one extremely
Closing important technical measures, its quality set up is directly connected to the safety of subsequent construction, thus by the concern of each side and weight
Depending on.
Scaffold is widely used in the scene of construction, and along with the construction of high-rise building, general scaffold cannot
Meet the demand of superelevation construction, Building Construction is affected by place, peripheral environment, traditional console model foot hands
Mode set up by frame cannot adapt to the construction at scene.Builder's jack, builder's jack is occurred in that on the basis of general scaffold
The operation protection support body being suitable for job site is provided, but the carrying of builder's jack, fire prevention and safety are interrelated scarce
One can not.Improving steel tube fastener formula scaffold, increase sizing steel plate and carry out bottom lock, scaffold board uses its boarding wire
Mesh sheet, it is provided that a kind of canalization, safe and reliable builder's jack.
Summary of the invention
The purpose of this utility model is to overcome defect present in prior art, by builder's jack bottom lock
Protection and the improvement of scaffold board, it is provided that a kind of canalization, safe and reliable, convenient builder's jack is set up in job site.
A kind of builder's jack, protects including support of encorbelmenting, scaffold and closing, and scaffold building is outstanding support of encorbelmenting
Choosing on section steel beam, the end of encorbelmenting of overhanging type steel beam uses steel wire rope drawknot to fix, sizing steel plate and its boarding wire mesh sheet composition foot
Hand cradle closes protection, it is characterised in that described overhanging type steel beam is shelved and is fixed on agent structure layer, and scaffold is with overhanging type steel
Beam is as supporting fixing point, and the end of encorbelmenting at overhanging type steel beam is provided with drawknot steel wire rope, the space, bottom of scaffold sizing steel
Plate carries out closing protection, and every layer operation frame of scaffold uses its boarding wire mesh sheet to carry out closing protection.
Described overhanging type steel beam is No. 18 I-steel, a length of 3.0m, fixing 1.8m, cantilever span on the body construction
1.2m。
The fixing end of described overhanging type steel beam uses 3 to fix " U " type pre-embedded bolt with agent structure building structure beam slab,
Pre-embedded bolt is φ 20, and it is fixing that overhanging type steel beam uses keeper plate of steel to be connected with pre-embedded bolt, and keeper plate of steel length and width, thickness are a size of
250mm×100mm×10mm。
The end drawknot steel wire rope model 6 × 19 of encorbelmenting of described overhanging type steel beam, diameter 17 mm.
Described scaffold uses the steel tube fastener formula scaffold of Ф 48 × 3.0, is equipped with corresponding fastener and wall-connecting piece;Scaffold
Every layer of scaffold board uses φ 6 its boarding wire mesh sheet, wide 650mm, long 1800mm, steel wire grid spacing 50mm.
Described sizing steel plate uses " L " shape steel plate, is shelved on overhanging type steel beam, " L " shape steel plate width 1500mm, thickness
18mm, long 2000mm.
φ 20 " U " the type bolt of the most pre-buried fixing support type girder steel of encorbelmenting, " U " type bolt is according to design
Spacing and quantity are sequentially fixed in agent structure, then place No. 18 I-steel of overhanging type steel beam.The spacing of overhanging type steel beam
For 1500mm, length is generally 3000mm, and encorbelment the long 1200mm of end, the long 1800mm of fixing end, and the position of corner and cantilevered plate needs
Agreeing to through design accounting, overhanging type steel beam is by φ 20 " U " type pre-embedded bolt and 250mm × 100mm × 10mm keeper plate of steel bolt
Connect fixing.
Overhanging type steel beam is placed after fixing, and shelves " L " shape steel plate closing protection, " L " shape steel plate on overhanging type steel beam
Minor face as playing angle guardrail board, between steel plate, effectively overlap joint ensures to close the tight of protection.In type of encorbelmenting bottom scaffold
Lay on girder steel after steel plate is closed and set up steel tube fastener formula scaffold, use Ф 48 × 3.0 steel tube fastener to set up scaffold, vertical rod
Advance 1500mm, vertical rod transfer 900mm, scaffold step pitch 1800mm, scaffold building height is less than 20m, joins as requested
Put corresponding scaffold wall connecting piece.Lay its boarding wire mesh sheet scaffold board of every layer during setting up scaffold, and hang up properly peace
Full protection Dense mesh screen, drawknot steel wire rope after installation.
Builder's jack of the present utility model be a kind of increase on overhanging type steel tube clamps formula scaffold sizing steel plate and
Steel fabric sheet, forms the scaffold of the profile steel overhanging with repeatable utilization, fire-proof function, and on-the-spot protection safety is reliable, real
The canalization processing and fabricating having showed scene is installed.
Accompanying drawing explanation
Fig. 1 is builder's jack schematic diagram.
Reference: 1 overhanging type steel beam;2 drawknot steel wire ropes;3 sizing steel plates;4 its boarding wire mesh sheet;5—
Pre-embedded bolt;6 scaffolds;7 safe Dense mesh screens;8 agent structure layers.
For making the purpose of this utility model, technical scheme and advantage clearer, below in conjunction with the accompanying drawings to this utility model
Embodiment is described in further detail.
Detailed description of the invention
Builder's jack as shown in Figure 1, protects including support of encorbelmenting, scaffold and closing, and scaffold 6 rides upon encorbelments
On the overhanging type steel beam 1 supported, the end of encorbelmenting of overhanging type steel beam 1 uses drawknot steel wire rope 2 drawknot to fix, and sizing steel plate 3 is with fixed
Scaffold 6 is closed protection by shaped steel wire mesh sheet 4, and overhanging type steel beam 1 is shelved and is fixed on the pre-buried φ of agent structure layer 8 20 " U " type
On bolt 5, plug-in safe Dense mesh screen 7 after overhanging scaffold erection.
Overhanging type steel beam 1 is No. 18 I-steel, a length of 3.0m, fixing 1.8m, cantilever span 1.2m on the body construction.
End drawknot steel wire rope 2 model 6 × 19 of encorbelmenting of overhanging type steel beam 1, diameter 17 mm.Scaffold 6 uses the steel pipe of Ф 48 × 3.0
Design of coupler scaffold, is equipped with corresponding fastener and wall-connecting piece;Every layer of scaffold scaffold board uses φ 6 its boarding wire mesh sheet 6, wide
650mm, long 1800mm, steel wire grid spacing 50mm.
Sizing steel plate 3 uses " L " shape steel plate, is shelved on overhanging type steel beam 1, " L " shape steel plate width 1500mm, thickness
18mm, long 2000mm.
Its manufacture method is as follows:
1, " U " type bolt embedment
" U " type bolt is processed producer in specialty and is made, pre-buried to job site.Agent structure floor reinforcing bar binding completes
After, before concreting, the spacing according to overhanging type steel beam and the location dimension of " U " type bolt, calculate " U " type bolt and master
The distance of body structure axis, fixes bolt and is reliably connected with agent structure.
2, overhanging type steel beam is placed
Agent structure floor concreting completes, and starts to install overhanging type steel beam after reaching certain intensity.No. 18 works
Word manufactures overhanging type steel beam, installs the long 1.8m of fixing end, cantilever span 1.2m on the body construction.Overhanging type steel beam
Be placed in pre-buried " U " type bolt, put on 250mm × 100mm × 10mm(length × width x thickness) rectangle steel pressing plate fixed plate,
The cap nut of configuration dimension is fixed.
3, suspension scaffold bottom lock shoulder guard is installed
After overhanging type steel beam is laid, the bottom lock protection sizing steel plate 3 of builder's jack is installed, successively by " L " shaped steel
Plate is shelved on overhanging type steel beam, and " L " shape steel plate is reliably connected with overhanging type steel beam, and between steel plate, overlap joint is tight, with body junction
The position of structure contact meets the requirement of scaffold high-altitude Junk prevention.
4, scaffold building
At overhanging type steel beam position of sound production scaffold upright rod, set up order: put leger → by root establish bar and with greatly
Cross bar buckles → fills little cross bar and buckles → install first step leger and each vertical rod with vertical rod, leger and buckle → pacify first
Walk the interim hound of little cross bar → installation second step leger → little cross bar of installation second step → add, top and the big horizontal stroke of second step
Bar fastening (even wall pull bar is good and sound and drawknot point is removed the most afterwards) → install third and fourth step leger and little cross bar, the company of installation
Wall bar and drawknot point → connect vertical rod → add bridging → paving foot handsheet+tie up guard rail+skirt bar, hangs safety net protection → peace
Fill next step.
Take and carry out written telling somebody what one's real intentions are with constructing operation personnel before tearing scaffold open, work high above the ground check UP qualified after work on duty
Industry.Steel tube fastener passes through sampling observation retrial, qualified rear use.Use after onsite acceptance after having set up 6~8m scaffolds.Foot hands
Frame coordinative construction progress is set up, and a scaffolding height is less than more than adjacent wall-connecting piece two steps;If it exceeds adjacent wall-connecting piece with
Upper two steps, it is impossible to when arranging wall-connecting piece, should take support to draw fixation and building structure drawknot.
5, bridging is arranged
Rise along scaffold longitudinal direction two ends and corner, be barricaded as shears at the whole length of scaffold lateral surface and height brace
Support, is continuously disposed in outside scaffold in proper order.From outside scaffold two ends and corner, every 6 vertical rods set together, often
Road bridging width not less than 4 across, the inclination angle on brace and ground preferably between 45 degree and 60 degree, bridging is along the continuous cloth of frame height
Put.Bridging is crossed over vertical rod radical and is no more than 7.Bridging brace rotary buckle is fixed on intersecting therewith horizontal water
On the external part of flat bar or column.
6, protective equipment
Every layer of scaffold board uses its boarding wire mesh sheet 4 of φ 6 to lay, and scaffold alien invasion completely hangs safe Dense mesh screen 7, operation
On layer (work layer) bottom, 200mm height border arranges and sets up 1 road skirting board, completely spreads scaffold board.The above scaffold of overhang layer should be every
Setting horizontal protective (horizontal blanket net) every two-layer and height less than 10m, horizontal protective is to building edge.
7, security protection drawknot steel wire rope is installed
Scaffold has been set up with project progress, and the agent structure concrete strength of pre-buried suspension ring reaches more than 80%, carries out
The installation of security protection drawknot steel wire rope.Steel wire rope is pierced in the hanger of pre-buried suspension ring and overhanging type steel beam, by suspension ring one end
With no less than two Quincunx screw fastenings, with solid no less than two Quincunx screw fastenings after then other end steel wire rope first being strained
Fixed.
Claims (6)
1. a builder's jack, protects including support of encorbelmenting, scaffold and closing, and scaffold building is encorbelmented support of encorbelmenting
On section steel beam, the end of encorbelmenting of overhanging type steel beam uses steel wire rope drawknot to fix, sizing steel plate and its boarding wire mesh sheet composition foot hands
Protection closed by frame, it is characterised in that described overhanging type steel beam is shelved and is fixed on agent structure layer, and scaffold is with overhanging type steel beam
As supporting fixing point, the end of encorbelmenting at overhanging type steel beam is provided with drawknot steel wire rope, the space, bottom of scaffold sizing steel plate
Carrying out closing protection, every layer operation frame of scaffold uses its boarding wire mesh sheet to carry out closing protection.
2. builder's jack as claimed in claim 1, it is characterised in that described overhanging type steel beam is No. 18 I-steel, length
For 3.0m, fixing 1.8m, cantilever span 1.2m on the body construction.
3. builder's jack as claimed in claim 1, it is characterised in that the fixing end of described overhanging type steel beam uses 3 to " U "
Type pre-embedded bolt is fixed with agent structure building structure beam slab, and pre-embedded bolt is φ 20, and overhanging type steel beam uses with pre-embedded bolt
Keeper plate of steel connects fixing, keeper plate of steel length and width, thickness a size of 250mm × 100mm × 10mm.
4. builder's jack as claimed in claim 1, it is characterised in that the end drawknot steel wire rope of encorbelmenting of described overhanging type steel beam
Model 6 × 19, diameter 17 mm.
5. builder's jack as claimed in claim 1, it is characterised in that described scaffold uses the steel pipe of Ф 48 × 3.0 to buckle
Part formula scaffold, is equipped with corresponding fastener and wall-connecting piece;Every layer of scaffold scaffold board employing φ 6 its boarding wire mesh sheet, wide 650mm,
Long 1800mm, steel wire grid spacing 50mm.
6. builder's jack as claimed in claim 1, it is characterised in that described sizing steel plate uses " L " shape steel plate, is shelved on
On overhanging type steel beam, " L " shape steel plate width 1500mm, thickness 18mm, long 2000mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620538465.7U CN205804911U (en) | 2016-06-03 | 2016-06-03 | A kind of builder's jack |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620538465.7U CN205804911U (en) | 2016-06-03 | 2016-06-03 | A kind of builder's jack |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205804911U true CN205804911U (en) | 2016-12-14 |
Family
ID=57501373
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620538465.7U Active CN205804911U (en) | 2016-06-03 | 2016-06-03 | A kind of builder's jack |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205804911U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108442678A (en) * | 2018-05-01 | 2018-08-24 | 浙江绿城房屋服务系统有限公司 | Slope roof type skin repair crosshead and its construction method |
CN112196247A (en) * | 2020-09-30 | 2021-01-08 | 北京港源建筑装饰工程有限公司 | Manufacturing method of steel wire rope net platform and steel wire rope net platform |
CN113668831A (en) * | 2021-08-20 | 2021-11-19 | 舜元建设(集团)有限公司 | Movable overhanging scaffold |
CN114482515A (en) * | 2022-01-10 | 2022-05-13 | 中国建筑第八工程局有限公司 | Comprehensive attachment device for nonstandard super high floors of super high-rise building |
-
2016
- 2016-06-03 CN CN201620538465.7U patent/CN205804911U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108442678A (en) * | 2018-05-01 | 2018-08-24 | 浙江绿城房屋服务系统有限公司 | Slope roof type skin repair crosshead and its construction method |
CN112196247A (en) * | 2020-09-30 | 2021-01-08 | 北京港源建筑装饰工程有限公司 | Manufacturing method of steel wire rope net platform and steel wire rope net platform |
CN113668831A (en) * | 2021-08-20 | 2021-11-19 | 舜元建设(集团)有限公司 | Movable overhanging scaffold |
CN114482515A (en) * | 2022-01-10 | 2022-05-13 | 中国建筑第八工程局有限公司 | Comprehensive attachment device for nonstandard super high floors of super high-rise building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108643544B (en) | High-altitude overhanging construction platform support system and construction method | |
CN205804911U (en) | A kind of builder's jack | |
CN103635643B (en) | The construction method of nigh-level synthesis steel bar concrete cylindrical shell | |
CN203867216U (en) | Detachable steel frame supporting structure for ultra-high-rise building cantilevered plate | |
CN208380060U (en) | Exterior wall builder's jack | |
CN106639045B (en) | A kind of prefabricated assembled steel plate-concrete combined shear wall structural system and its construction method | |
CN206053274U (en) | The external scaffolding device of the perpendicular BAIYE outer visor of skyscraper and glass curtain wall dual-purpose | |
CN103291076A (en) | Multilayer steel truss fragmented reverse hoisting construction method in arc-shaped frame | |
CN205077845U (en) | Building core section of thick bamboo well hydraulic pressure intelligence operation scaffold that climbs | |
CN103982040B (en) | A kind of construction of super highrise building vertical multi-transportation device | |
CN103352537B (en) | Overall load bearing heat preserving wallboard and production construction process thereof | |
CN111910902A (en) | Construction method of high-altitude double-layer overlong cantilever reinforced concrete structure | |
CN107447973A (en) | A kind of unilateral suspension type aerial movement steel platform | |
CN106400691A (en) | Integrated construction process for anti-collision wall formwork | |
CN106892315A (en) | A kind of additional elevator hoistways of framework assembled | |
CN201420385Y (en) | Overhanging type unloading platform for building construction | |
CN106703262A (en) | Fire-proof sealing structure in curtain wall interlayers designed based on raised flooring and construction method thereof | |
CN103993666A (en) | Improved supporting system construction method suitable for large overhung outer floating plate roof | |
CN203924662U (en) | A kind of attaching integral lifting scaffold | |
CN205955213U (en) | Mortar stirring canopy can be had enough to meet need in job site | |
CN208363666U (en) | It is a kind of for build face side construction safety protection frame | |
CN204804129U (en) | Prefabricated concrete floor entirely for building | |
CN111236603B (en) | Comprehensive construction method for steel plate mesh overhanging scaffold | |
CN109653484B (en) | Roofing superelevation faces external hanging flower basket mounting structure of empty curtain engineering | |
CN205077886U (en) | Shaped steel protection canopy of encorbelmenting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |