CN205802766U - A kind of framework of steel reinforcement integral hoisting tool - Google Patents
A kind of framework of steel reinforcement integral hoisting tool Download PDFInfo
- Publication number
- CN205802766U CN205802766U CN201620672840.7U CN201620672840U CN205802766U CN 205802766 U CN205802766 U CN 205802766U CN 201620672840 U CN201620672840 U CN 201620672840U CN 205802766 U CN205802766 U CN 205802766U
- Authority
- CN
- China
- Prior art keywords
- framework
- steel reinforcement
- girder
- integral hoisting
- hoisting tool
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
This utility model provides a kind of framework of steel reinforcement integral hoisting tool, girder including two parallel longitudinal settings, it is attached by some crossbeams between two described girders, for removably connecting between described crossbeam and girder, and each described crossbeam equally arranges, the upper surface of described girder is at least provided with one group of hoisting connecting piece, and the lower surface of described girder is provided with several for the hanging part mounting framework of steel reinforcement.Tension equalizer is passed to whole framework of steel reinforcement by girder by hoisting process, makes framework of steel reinforcement overall with lifting device synchronizing moving, it is to avoid framework of steel reinforcement deforms, and can accurately be controlled the Hoisting Position of framework of steel reinforcement simultaneously by lifting device, improve lifting efficiency.
Description
Technical field
This utility model relates to the aid technical field of prefabricated case beam reinforcement construction, particularly relates to a kind of framework of steel reinforcement
Integral hoisting tool.
Background technology
The industry development of the construction such as China Express Railway and highway in recent years is swift and violent, and bridge structure extensively should
With.Bridge construction needs to use the box beam of reinforced concrete structure, the box beam of reinforced concrete structure to be divided into prefabricated case beam with existing
Water box beam.During Construction of Precast Box Beam, reinforcing bar binding usually completes on the base of box beam, then by the steel reinforcement cage after colligation
Integral hoisting enters mould, carries out concreting.But tradition lifts the lifting that commonly used suspension ring coordinate with steel wire rope, due to prefabricated
After box beam steel bar overall binding, volume is big, Heavy Weight, and hoisting process impetus is susceptible to change, by force unbalance, reinforcing bar
Frame is easily deformed affects construction speed, causes unnecessary loss.
Therefore, how to invent and produce a kind of framework of steel reinforcement integral hoisting tool, it is possible to avoid framework of steel reinforcement to hang in entirety
Process of assembling deforms, and can improve again lifting efficiency, is those skilled in the art's technical problems urgently to be resolved hurrily.
Utility model content
This utility model provides a kind of framework of steel reinforcement integral hoisting tool, it is possible to avoid framework of steel reinforcement in integral hoisting
Journey deforms, and can improve again lifting efficiency.
Concrete technical scheme of the present utility model is as follows:
A kind of framework of steel reinforcement integral hoisting tool, including the girder of two parallel longitudinal settings, between two described girders
It is attached by some crossbeams, for removably connecting between described crossbeam and girder, and each described crossbeam equally cloth
Putting, the upper surface of described girder is at least provided with one group of hoisting connecting piece, and the lower surface of described girder is provided with several for mounting
The hanging part of framework of steel reinforcement.
As further improvement of the utility model, described girder is formed by the docking of some short beams, each described short beam it
Between removably connected by port connectors.
As further improvement of the utility model, described hoisting connecting piece includes being symmetrically distributed in hanging on two girders
Ring and for connecting the connection rope of described suspension ring and lifting appliance.
As further improvement of the utility model, described suspension ring are removably attached to described girder by securing member
Upper surface.
As further improvement of the utility model, the two ends of described connection rope are equipped with rope sling.
As further improvement of the utility model, described hanging part is located at the lower surface of described short beam between two parties.
This utility model beneficial effect: the framework of steel reinforcement integral hoisting tool that this utility model provides, hoisting process passes through
Tension equalizer is passed to whole framework of steel reinforcement by girder, makes framework of steel reinforcement overall with lifting device synchronizing moving, it is to avoid reinforcing bar
Framework deformation, can accurately be controlled the Hoisting Position of framework of steel reinforcement simultaneously, improve lifting efficiency by lifting device.
Accompanying drawing explanation
Fig. 1 is the structural representation of this utility model framework of steel reinforcement integral hoisting tool;
Fig. 2 is the profile of this utility model framework of steel reinforcement integral hoisting tool;
Wherein, 1, girder, 2, crossbeam, 3, hoisting connecting piece, 4, hanging part, 5, port connectors, 11, short beam, 31, hang
Ring, 32, connect rope, 33, securing member, 321, rope sling.
Detailed description of the invention
Because the problems of the prior art, this utility model provides a kind of framework of steel reinforcement integral hoisting tool, it is possible to
Avoid framework of steel reinforcement to deform in integral hoisting process, lifting efficiency can be improved again.
In order to of the present utility model technological thought is expanded on further, in conjunction with concrete application scenarios, to this utility model
Technical scheme illustrate.
As shown in Figure 1 and Figure 2, for the utility model proposes the structural representation of a kind of framework of steel reinforcement integral hoisting tool, bag
Include the girder 1 of two parallel longitudinal settings, be attached by some crossbeams 2 between two described girders 1, described crossbeam 2
And for removably connecting between girder 1, and each described crossbeam 2 is equally arranged, the upper surface of described girder 1 is at least provided with one
Group hoisting connecting piece 3, the lower surface of described girder 1 is provided with several for the hanging part 4 mounting framework of steel reinforcement.
Tension equalizer is passed to whole framework of steel reinforcement by girder 1 by hoisting process, makes framework of steel reinforcement overall with lifting
Instrument synchronizing moving, it is to avoid framework of steel reinforcement deforms, can accurately be controlled the Hoisting Position of framework of steel reinforcement simultaneously, carry by lifting device
High lifting efficiency.
Described girder 1 can relatively be welded by bar structural section port or be bolted and be formed, and stripe shape steel strength is high, lifts heavier
It is unlikely to deform during framework of steel reinforcement.
Described girder 1 can be formed by truss connection, and truss structure is lightweight, can reduce lifting weight.
In this utility model, described girder 1 is docked by some short beams 11 and is formed, and passes through port between each described short beam 11
Connector 5 removably connects.Described girder 1 can adjust length according to different frameworks of steel reinforcement, adapts to hanging of different framework of steel reinforcement
Dress demand.
In this utility model, can realize detachably linking by connector between described crossbeam 2 and girder 1.After dismounting
Crossbeam 2 and girder 1 are readily transported, and can assemble the most in real time, also can change lifting by changing the crossbeam 2 of different length
The width of instrument, meets the lifting demand of different in width framework of steel reinforcement.
In this utility model, described hoisting connecting piece 3 include the suspension ring 31 that are symmetrically distributed on two girders and for
Connect the connection rope 32 of described suspension ring and lifting appliance.Described suspension ring 31 are removably attached to described girder by securing member 33
The upper surface of 1.The described two ends connecting rope 32 are equipped with rope sling 321.The suspension ring 31 of demountable structure can be according to the steel of lifting
Muscles and bones frame difference changes link position, adjusts balance, and the connection rope 32 being provided with rope sling 321 is easy to quickly connect.
In this utility model, described hanging part 4 is located at the lower surface of described short beam 11 between two parties.Hanging part 4 is centrally located can
Making girder 1 stress equalization, the whole machine balancing making lifting device is more preferable.
In sum, framework of steel reinforcement integral hoisting tool of the present utility model, it is possible to avoid framework of steel reinforcement in integral hoisting
Process deforms, and can improve again lifting efficiency.
The foregoing is only preferred embodiment of the present utility model, be not limited to this utility model, for this
For the technical staff in field, this utility model can have various modifications and variations.All in spirit of the present utility model and principle
Within, any modification, equivalent substitution and improvement etc. made, within should be included in protection domain of the present utility model.
Claims (6)
1. a framework of steel reinforcement integral hoisting tool, it is characterised in that include the girder (1) of two parallel longitudinal settings, two
It is attached, for detachably to connect between described crossbeam (2) and girder (1) by some crossbeams (2) between described girder (1)
Connect, and each described crossbeam (2) equally arranged, the upper surface of described girder (1) at least provided with one group of hoisting connecting piece (3),
The lower surface of described girder (1) is provided with several for the hanging part (4) mounting framework of steel reinforcement.
2. a kind of framework of steel reinforcement integral hoisting tool as claimed in claim 1, it is characterised in that described girder (1) is by some
Root short beam (11) docking is formed, and is removably connected by port connectors (5) between each described short beam (11).
3. a kind of framework of steel reinforcement integral hoisting tool as claimed in claim 1, it is characterised in that described hoisting connecting piece (3)
Including the suspension ring (31) being symmetrically distributed on two girders and for connecting the connection rope (32) of described suspension ring and lifting appliance.
4. a kind of framework of steel reinforcement integral hoisting tool as claimed in claim 3, it is characterised in that described suspension ring (31) are by tight
Firmware (33) is removably attached to the upper surface of described girder (1).
5. a kind of framework of steel reinforcement integral hoisting tool as claimed in claim 3, it is characterised in that the two of described connection rope (32)
End is equipped with rope sling (321).
6. a kind of framework of steel reinforcement integral hoisting tool as claimed in claim 2, it is characterised in that described hanging part (4) is placed in the middle
It is located at the lower surface of described short beam (11).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620672840.7U CN205802766U (en) | 2016-06-29 | 2016-06-29 | A kind of framework of steel reinforcement integral hoisting tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620672840.7U CN205802766U (en) | 2016-06-29 | 2016-06-29 | A kind of framework of steel reinforcement integral hoisting tool |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205802766U true CN205802766U (en) | 2016-12-14 |
Family
ID=57511991
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620672840.7U Active CN205802766U (en) | 2016-06-29 | 2016-06-29 | A kind of framework of steel reinforcement integral hoisting tool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205802766U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109095343A (en) * | 2018-09-19 | 2018-12-28 | 华锦建设集团股份有限公司 | Assembled hanger |
CN110092288A (en) * | 2019-06-05 | 2019-08-06 | 上海建工四建集团有限公司 | Multilayer shear force wall reinforcing steel bar skeleton Lift-on/Lift-off System |
-
2016
- 2016-06-29 CN CN201620672840.7U patent/CN205802766U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109095343A (en) * | 2018-09-19 | 2018-12-28 | 华锦建设集团股份有限公司 | Assembled hanger |
CN110092288A (en) * | 2019-06-05 | 2019-08-06 | 上海建工四建集团有限公司 | Multilayer shear force wall reinforcing steel bar skeleton Lift-on/Lift-off System |
CN110092288B (en) * | 2019-06-05 | 2024-01-09 | 上海建工四建集团有限公司 | Multi-layer shear wall reinforcement cage hoisting system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202080812U (en) | Dedicated sling system for large-scaled reinforcing cage | |
CN101717035B (en) | Special hanger for hoisting super huge block steel box girder | |
CN204715211U (en) | Stiff skeleton and adopt the Sarasota constructing structure of this stiff skeleton | |
CN201567146U (en) | Suspender for eccentric component | |
CN201172574Y (en) | Precast beam reinforced bar hoisting rack | |
CN207030725U (en) | A kind of hanging-point adjustable suspender | |
CN205802766U (en) | A kind of framework of steel reinforcement integral hoisting tool | |
CN104326356A (en) | Construction platform hanger with clear stress and adjustable hanging point | |
CN100494576C (en) | Method for setting up box-type bridge body maintain engineering box outer hanging falsework | |
CN204096884U (en) | Pipe unit suspension bracket | |
CN202214131U (en) | Three-point lifting beam | |
CN201901516U (en) | Detachable steel structural hoisting fixture | |
CN107419665A (en) | A kind of method of large-span steel girder hoisting appliance and its hoisting steel beam | |
CN201785702U (en) | Lifting device for steel frame of continuous box girder | |
CN203781677U (en) | Trial mass device of crane | |
CN110285952A (en) | A kind of lifeboat hanger test tool | |
CN204211348U (en) | A kind of hanging apparatus | |
CN206735623U (en) | Framework of steel reinforcement hanging apparatus | |
CN103738852A (en) | Weight testing device of crane | |
CN203639016U (en) | Balance beam for hoisting reinforcing steel bars by tower crane | |
CN204281029U (en) | A kind of stressed clear and definite and adjustable operation platform suspender of suspension centre | |
CN203795318U (en) | Integral hoisting system for rebar cage for large members | |
CN207618879U (en) | Horizontal hanging beam hoisting structure | |
CN203667795U (en) | Suspensory rigging adopting series connection of five groups of vertically connected pulley blocks | |
CN208265608U (en) | Large-tonnage hoisting device for reinforcement cage |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |