CN204917647U - Play gallows - Google Patents
Play gallows Download PDFInfo
- Publication number
- CN204917647U CN204917647U CN201520693363.8U CN201520693363U CN204917647U CN 204917647 U CN204917647 U CN 204917647U CN 201520693363 U CN201520693363 U CN 201520693363U CN 204917647 U CN204917647 U CN 204917647U
- Authority
- CN
- China
- Prior art keywords
- hanging beam
- suspension hook
- upending frame
- link plate
- supports
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model provides a play gallows, including the hanging beam, the whole rectangle steel construction that is of hanging beam, the flagging 5 -20cm in hanging beam both ends forms a class triangular structure, hanging beam both ends extreme point downside is provided with the supporting seat, hanging beam mid point upper end position is provided with the link plate, it supports to use the perpendicular bisector to be provided with the pull rod as datum line bilateral symmetry on the hanging beam on the side, the pull rod supports one end and fixes on the hanging beam, an other end link plate is connected fixedly, it supports transversely to be provided with a vaulting pole on the hanging beam downside, use the hanging beam perpendicular bisector to be provided with the lifting hook as datum line bilateral symmetry on the side around the hanging beam, the lifting hook all is provided with at least two at the left end and the right -hand member of hanging beam, the lifting hook is whole " nearly " the font structure that is of two side lifting hooks, the lifting hook just in time blocks to be put on the hanging beam.
Description
Technical field
The utility model belongs to traditional manufacture Fixture Design technical field, particularly relates to a kind of upending frame.
Background technology
More production auxiliary mould can be related in existing traditional mode of production Processing Firm, wherein in weight-lifting equipment is produced, upending frame is exactly that shape tooling device is assisted in a kind of very common production, different producers can design the upending frame of different model, variety classes, different pattern according to the difference of job specification, upending frame adopts simple splicing butt welding to form a kind of easy upending frame as a necessary frock general enterprises in the prior art, therefore lack creative design, just simply can complete the crane lifting service into this; Also because above technical reason lacks safety control when equipment use, operation with traditional is complicated, not easy to operate, applicability is narrow.
Summary of the invention
The purpose of this utility model is to overcome the deficiencies in the prior art, and provide that a kind of structure is simple, bulk strength is large, the upending frame of good operating stability, easy to operate, low cost of manufacture.
The purpose of this utility model is achieved in that a kind of upending frame, include hanging beam, described hanging beam entirety is rectangle steel structure, the described sagging 5-20cm in two ends, hanging beam two ends forms a class three-legged structure, supporting seat is provided with on the downside of described hanging beam two ends end points, described hanging beam mid point upper end position is provided with link plate, described hanging beam upper side is datum line is symmetrically set with pull bar support with midperpendicalar, described pull bar supports one end and is fixed on hanging beam, the other end one link plate is connected and fixed, described hanging beam downside is horizontally arranged with a strut to support, on described hanging beam front and back sides with hanging beam midperpendicalar for datum line is symmetrically set with suspension hook, described suspension hook is provided with at least two at the left end of hanging beam and right-hand member,
Described suspension hook be bilateral suspension hook entirety in " several " character form structure, described suspension hook just in time blocks and is placed on hanging beam.
Described link plate is the compoboard at least combined by two-layered steel plates, and is provided with lifting hole(eyelet) in the middle.
Described suspension hook card put with hanging beam on and be welded to connect with hanging beam.
Described pull bar supports, strut supports and is all connected with hanging beam with welding manner.
Described supporting seat is " work " word steelframe, and is connected with hanging beam with welding manner.
The beneficial effect that the utility model produces is:
First point: hanging beam adopts the new structure all having certain curvature, the two ends of hanging beam are designed to falling structure thus can the decentralization of thing be hung in the process of lifting, be convenient to the balance of hanging beam, prevent from lifting process, hanging the too high problem not easily balanced of thing center of gravity, hanging beam can realize different spans lifting with hanging beam midperpendicalar for two ends, datum line left and right are provided with at least two suspension hooks, make its applicability wider, suspension hook adopts " several " character form structure, make the suspension hook of the co-located on hanging beam front and back sides as a whole, then the hanging beam that suspension hook card is put is connected with hanging beam through welding process, make the connective stability of suspension hook better, because the upper end of " several " font suspension hook suspension hook when card is placed on hanging beam own has certain tenesmus intensity ability to bear, it is made not easily to hang the problem of thing overweight generation solder joint breaking releasing, effectively ensure that the safe operation of lifting process,
Second point: because link plate is main bearing part, need to possess larger intensity, again because upending frame belongs to a kind of simple consumptive material so autonomous Design is generally selected by enterprise, the link plate finding the intensity of use enough large is singly difficult to when designing, so adopt multiple plate to carry out Combination Welding, selection is more prone to, the lifting hole(eyelet) that position is arranged therebetween provides one to lift by crane position preferably;
Thirdly: the strut that the pull bar arranged in hanging beam upper end supported and be arranged at hanging beam downside supports with the use of strengthening hanging beam main body, avoid hanging the overweight problem causing hanging beam to bend even rupturing of thing, make the use safety coefficient of upending frame higher;
4th point: the supporting seat arranged in the downside at hanging beam two ends can make upending frame kiss the earth be have a Support Position, and can realize standing, and is convenient to the unhook of hanging thing;
5th point: above-described upending frame all have employed comparatively traditional welding technique, structure is comparatively simple, and processing more for convenience.
Total the utility model has that structure is simple, bulk strength is large, the advantage of good operating stability, easy to operate, low cost of manufacture.
Accompanying drawing explanation
Fig. 1 is the utility model integral structure schematic diagram.
Fig. 2 is the utility model suspension hook mounting structure schematic diagram.
Fig. 3 is the utility model cladding panel structure schematic diagram one.
Fig. 4 is the utility model cladding panel structure schematic diagram two.
In figure: 1, hanging beam 2, supporting seat 3, link plate 4, pull bar support 5, strut support 6, suspension hook 7, lifting hole(eyelet).
Detailed description of the invention
Below in conjunction with embodiment, the technical solution of the utility model is described further.
Embodiment 1
As shown in Fig. 1-4, a kind of upending frame, include hanging beam 1, described hanging beam 1 entirety is rectangle steel structure, the described sagging 6.5cm in two ends, hanging beam 1 two ends forms a class three-legged structure, supporting seat 2 is provided with on the downside of described hanging beam 1 two ends end points, described hanging beam 1 mid point upper end position is provided with link plate 3, described hanging beam 1 upper side is datum line is symmetrically set with pull bar support 4 with midperpendicalar, described pull bar supports 4 one end and is fixed on hanging beam 1, the other end one link plate 3 is connected and fixed, described hanging beam 1 downside is horizontally arranged with a strut and supports 5, on described hanging beam 1 front and back sides with hanging beam 1 midperpendicalar for datum line is symmetrically set with suspension hook 6, described suspension hook 6 is provided with two at the left end of hanging beam 1 and right-hand member,
Described suspension hook 6 be bilateral suspension hook entirety in " several " character form structure, described suspension hook 6 just in time blocks and is placed on hanging beam 1.
Described link plate 3 is the compoboard combined by three-ply plate, and is provided with lifting hole(eyelet) 7 in the middle.
Described suspension hook 6 card put with hanging beam 1 on and be welded to connect with hanging beam 1.
Described pull bar support 4, strut support 5 and are all connected with hanging beam 1 with welding manner.
Described supporting seat 2 is " work " word steelframe, and is connected with hanging beam 1 with welding manner.
The utility model is in use: first need, with cooperation lifting appliance, the lifting suspension hook of lifting appliance is connected link plate; Then fix by thing will be hung with the connecting shackle of flexible rope, the span of hanging thing according to difference selects suitable suspension hook span on hanging beam, but must adopt when selecting span with the hanging beam midperpendicalar symmetrical one group of hook that is datum line as lifting span; Finally will hang after thing fixes, lifting appliance carries out lifting by crane being sling by upending frame, and then thing lifting will be hung, can reduce hang thing center of gravity because hanging beam is chosen as the hanging beam structure with certain curvature in lifting process, enable to hang thing and obtain balance with the shortest time, wherein pull bar shoring and bracing supports the self-strength effectively can strengthening hanging beam, avoids causing hanging beam to bend when weight lifts by crane; To hang thing transfer time, when below is to extreme lower position, supporting seat first touches ground, plays a supporting role be convenient to coming off and removing of suspension hook to upending frame entirety.
Total the utility model has that structure is simple, bulk strength is large, the advantage of good operating stability, easy to operate, low cost of manufacture.
Claims (5)
1. a upending frame, include hanging beam, it is characterized in that: described hanging beam entirety is rectangle steel structure, the described sagging 5-20cm in two ends, hanging beam two ends forms a class three-legged structure, supporting seat is provided with on the downside of described hanging beam two ends end points, described hanging beam mid point upper end position is provided with link plate, described hanging beam upper side is datum line is symmetrically set with pull bar support with midperpendicalar, described pull bar supports one end and is fixed on hanging beam, the other end one link plate is connected and fixed, described hanging beam downside is horizontally arranged with a strut to support, on described hanging beam front and back sides with hanging beam midperpendicalar for datum line is symmetrically set with suspension hook, described suspension hook is provided with at least two at the left end of hanging beam and right-hand member,
Described suspension hook be bilateral suspension hook entirety in " several " character form structure, described suspension hook just in time blocks and is placed on hanging beam.
2. a kind of upending frame according to claim 1, is characterized in that: described link plate is the compoboard at least combined by two-layered steel plates, and is provided with lifting hole(eyelet) in the middle.
3. a kind of upending frame according to claim 1, is characterized in that: described suspension hook card put with hanging beam on and be welded to connect with hanging beam.
4. a kind of upending frame according to claim 1, is characterized in that: described pull bar supports, strut supports and is all connected with hanging beam with welding manner.
5. a kind of upending frame according to claim 1, is characterized in that: described supporting seat is " work " word steelframe, and is connected with hanging beam with welding manner.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520693363.8U CN204917647U (en) | 2015-09-09 | 2015-09-09 | Play gallows |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520693363.8U CN204917647U (en) | 2015-09-09 | 2015-09-09 | Play gallows |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204917647U true CN204917647U (en) | 2015-12-30 |
Family
ID=54966795
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520693363.8U Expired - Fee Related CN204917647U (en) | 2015-09-09 | 2015-09-09 | Play gallows |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204917647U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107324148A (en) * | 2017-08-18 | 2017-11-07 | 湖州市长兴隆昌丝绸有限公司 | A kind of new warp rebeaming machine feeding device |
CN110255350A (en) * | 2019-04-24 | 2019-09-20 | 武汉船用机械有限责任公司 | Hoisting fixture |
-
2015
- 2015-09-09 CN CN201520693363.8U patent/CN204917647U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107324148A (en) * | 2017-08-18 | 2017-11-07 | 湖州市长兴隆昌丝绸有限公司 | A kind of new warp rebeaming machine feeding device |
CN110255350A (en) * | 2019-04-24 | 2019-09-20 | 武汉船用机械有限责任公司 | Hoisting fixture |
CN110255350B (en) * | 2019-04-24 | 2020-12-08 | 武汉船用机械有限责任公司 | Hoisting tool |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202080812U (en) | Dedicated sling system for large-scaled reinforcing cage | |
CN204917647U (en) | Play gallows | |
CN201923772U (en) | Hoisting device for track slab | |
CN203889893U (en) | Steel plate transporting crane capable of preventing steel wire rope from twisting | |
CN202030431U (en) | Adjustable equalizing beam | |
CN206060035U (en) | A kind of releasing pulley hanger | |
CN106012861B (en) | The construction method of the mounting and positioning device of Wavelike steel webplate and the Wavelike steel webplate | |
CN107419665A (en) | A kind of method of large-span steel girder hoisting appliance and its hoisting steel beam | |
CN207566714U (en) | Large scale arc panel special hoisting bar | |
CN202944976U (en) | Hoisting device of light hollow partition board | |
CN215326407U (en) | Auxiliary mounting device for welding ball net rack | |
CN204057673U (en) | A kind of steel plate upending frame | |
CN204251194U (en) | A kind of Novel hanging tool | |
CN207143742U (en) | A kind of large-span steel girder hoisting appliance | |
CN203639113U (en) | Hoisting system for engineering construction and single-point type overturning support of hoisting system | |
CN209009988U (en) | A kind of hoisting device for reinforcement cage | |
CN204057676U (en) | A kind of Steel plate hoist | |
CN203428725U (en) | Resin sand model hoisting tool | |
CN207212407U (en) | Walking type tunnel center ditch water pipe installation trolley | |
CN206783097U (en) | A kind of lifting auxiliary mould of large scale equipment, large-scale frame structure | |
CN103508381A (en) | Lifting device | |
CN204873440U (en) | Big section section bar special lifting device of high -speed railway | |
CN209702112U (en) | A kind of steel arch-shelf hanging apparatus | |
CN206188205U (en) | Hoist device is used in prefabricated piping lane upset | |
CN105731239B (en) | The device that hanging device is shelved |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151230 Termination date: 20160909 |