CN207212407U - Walking type tunnel center ditch water pipe installation trolley - Google Patents
Walking type tunnel center ditch water pipe installation trolley Download PDFInfo
- Publication number
- CN207212407U CN207212407U CN201721150906.7U CN201721150906U CN207212407U CN 207212407 U CN207212407 U CN 207212407U CN 201721150906 U CN201721150906 U CN 201721150906U CN 207212407 U CN207212407 U CN 207212407U
- Authority
- CN
- China
- Prior art keywords
- fixture
- monomer
- anchor clamps
- water pipe
- landing leg
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
A walking type tunnel center ditch water pipe installation trolley relates to equipment for installing a tunnel center ditch water pipe. Mainly be for solving the current problem design that installation tunnel center ditch water pipe takes a lot of work, hard. It includes preceding landing leg and back landing leg, it is preceding, there is the wheel bottom of back landing leg, two crossbeams are fixed respectively in the top of preceding landing leg and back landing leg, be connected with the longeron between two crossbeams, it is preceding, even there is an oblique supporting beam between back landing leg and the longeron, it is preceding, the both ends of back horizontal pole are fixed respectively on two longerons, it is preceding, all there is chain block on the back horizontal pole, it has the anchor clamps mounting panel to hang on the chain block couple, there is anchor clamps on the anchor clamps mounting panel, anchor clamps include anchor clamps monomer A and anchor clamps monomer B, anchor clamps monomer A and anchor clamps monomer B's cross connection is on the anchor clamps mounting panel through the round pin axle, anchor clamps monomer A and anchor clamps monomer B's top. Has the advantages of labor saving and labor saving during operation.
Description
Technical field:
It the utility model is related to a kind of equipment for installing tunnel Central drain water pipe.
Background technology:
The installation of existing tunnel Central drain water pipe is more to be completed by the way of loading machine lifting and hand fit, but is being constructed
When the clashing and breaking caused by the small ditch cable trench that can be to having completed construction of working space, and it is relative take a lot of work, arduously, integrated cost compared with
It is high.
The content of the invention:
Technical problem to be solved in the utility model is to provide a kind of half machine that can realize the installation of Central drain water pipe
Tool is turned into industry, and then improves water pipe installation quality and the running type tunnel Central drain water pipe installation chassis of operating efficiency.
What above-mentioned purpose was realized in:It includes two front leg struts and two rear support legs, after two front leg struts and two
Wheel is arranged at the bottom of supporting leg, in addition to two crossbeams, one of crossbeam are fixed on the top of two front leg struts, and another is horizontal
Beam is fixed on the top of two rear support legs, is connected with two longerons between two crossbeams, two front leg struts respectively with two longerons
Between be connected with bearing diagonal beam, two rear support legs are also connected with bearing diagonal beam, in addition to front rail between two longerons respectively
And rear transverse rod, the both ends of front rail and rear transverse rod are all separately fixed on two longerons, are fitted with front rail and rear transverse rod
One chain block, has hung a fixture installing plate on the hook of each chain block lower end, on each fixture installing plate
There is fixture, the fixture all includes fixture monomer A and fixture monomer B, fixture monomer A and fixture monomer B top are arranged in a crossed manner,
Fixture monomer A and fixture monomer B infall are connected on fixture installing plate by bearing pin, fixture monomer A and fixture monomer B's
Top is all respectively equipped with pin mounting hole, and two pin mounting holes also are provided with fixture installing plate, when lifting water by fixture
Pin mounting hole on Guan Shi, fixture monomer A and fixture monomer B respectively with two pin mounting hole weights on fixture installing plate
Close, be then fixed by pin.
Clip for limiting is additionally provided with wheel.
The utility model has the advantages that:The present apparatus is pushed into the top of installation water pipe position, with wheel limiting card during work
Son fixes wheel, and operating personnel open the fixture of two chain block connections, distinguish fixture monomer A and fixture monomer B
Water pipe both sides are clipped in, fixture is fixed with pin, operating personnel sling water pipe by chain block, fall after moving to riding position
Under, bottom pin is unloaded, completes installation exercise.Push chassis to next scope of operation and repeat aforesaid operations progress water pipe installation exercise.Its
Coordinate and manually walked in ditch both sides, simple in construction using special hanger, safety and stability, saving of labor during operation, laborsaving, convenient behaviour
Make, it is succinct light, effectively improve water pipe installation quality and operating efficiency.
Brief description of the drawings:
Fig. 1 is main structure diagram of the present utility model, and 15 be water pipe in figure;
Fig. 2 is right side structural representation of the present utility model, and 15 be water pipe in figure, and 16 be pin.
Embodiment:
Referring to Figures 1 and 2, it includes two front leg struts 1 and two rear support legs 2, two front leg struts and two rear support legs
Wheel 3 is arranged at bottom, in addition to two crossbeams 4, one of crossbeam are fixed on the top of two front leg struts, and another crossbeam is consolidated
The top of two rear support legs is scheduled on, two longerons 5 are connected between two crossbeams, two front leg struts are respectively between two longerons
Bearing diagonal beam 6 is connected with, two rear support legs are also connected with bearing diagonal beam, in addition to the He of front rail 7 between two longerons respectively
The both ends of rear transverse rod 8, front rail and rear transverse rod are all separately fixed on two longerons, and one is fitted with front rail and rear transverse rod
Individual chain block 9, has hung a fixture installing plate 10 on the hook of each chain block lower end, on each fixture installing plate
There is fixture, the fixture all includes fixture monomer A11 and fixture monomer B12, fixture monomer A and fixture monomer B top intersect
Set, fixture monomer A and fixture monomer B infall are connected on fixture installing plate by bearing pin, fixture monomer A and fixture list
Body B top is all respectively equipped with pin mounting hole 13, and two pin mounting holes also are provided with fixture installing plate, when passing through fixture
When lifting water pipe, the pin mounting hole on fixture monomer A and fixture monomer B is installed with two pins on fixture installing plate respectively
Hole overlaps, and is then fixed by pin.
Clip for limiting 14 is additionally provided with wheel.
Claims (2)
1. a kind of running type tunnel Central drain water pipe installs chassis, including two front leg struts(1)With two rear support legs(2),
Wheel is arranged at the bottom of two front leg struts and two rear support legs(3), it is characterized in that:Also include two crossbeams(4), it is one of horizontal
Beam is fixed on the top of two front leg struts, and another crossbeam is fixed on the top of two rear support legs, is connected between two crossbeams
Two longerons(5), two front leg struts are connected with bearing diagonal beam between two longerons respectively(6), two rear support legs are respectively with two
Also bearing diagonal beam, in addition to front rail are connected between individual longeron(7)And rear transverse rod(8), the both ends of front rail and rear transverse rod are all
It is separately fixed on two longerons, a chain block is fitted with front rail and rear transverse rod(9), each chain block lower end
Hook on all hung a fixture installing plate(10), have fixture on each fixture installing plate, the fixture all includes fixture
Monomer A(11)With fixture monomer B(12), fixture monomer A and fixture monomer B top are arranged in a crossed manner, fixture monomer A and fixture list
Body B infall is connected on fixture installing plate by bearing pin, and fixture monomer A and fixture monomer B top are all respectively equipped with pin
Sub- mounting hole(13), two pin mounting holes also are provided with fixture installing plate.
2. according to the running type tunnel Central drain water pipe installation chassis described in claim 1, it is characterized in that:Also set on wheel
Limited location clamp(14).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721150906.7U CN207212407U (en) | 2017-09-09 | 2017-09-09 | Walking type tunnel center ditch water pipe installation trolley |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721150906.7U CN207212407U (en) | 2017-09-09 | 2017-09-09 | Walking type tunnel center ditch water pipe installation trolley |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207212407U true CN207212407U (en) | 2018-04-10 |
Family
ID=61823877
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201721150906.7U Active CN207212407U (en) | 2017-09-09 | 2017-09-09 | Walking type tunnel center ditch water pipe installation trolley |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207212407U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110685200A (en) * | 2019-10-21 | 2020-01-14 | 中铁四院集团岩土工程有限责任公司 | Positioning device, gutter forming assembly and gutter forming construction method |
-
2017
- 2017-09-09 CN CN201721150906.7U patent/CN207212407U/en active Active
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110685200A (en) * | 2019-10-21 | 2020-01-14 | 中铁四院集团岩土工程有限责任公司 | Positioning device, gutter forming assembly and gutter forming construction method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103072893B (en) | Tool and method for overturning vertical equipment in nuclear power plant | |
| CN204689550U (en) | The support of the hanging suspension hook of scissor lift | |
| CN207212407U (en) | Walking type tunnel center ditch water pipe installation trolley | |
| CN202017337U (en) | Efficient elevator mechanism adhered to electric lifting scaffold | |
| CN206065298U (en) | A kind of suspension type reinforcement cage processing device | |
| CN105006924A (en) | Motor core-through device and core-through method thereof | |
| CN201272667Y (en) | Hanging rack for assembling and disassembling combined concrete rod | |
| CN105152004B (en) | Hoisting device for reinforcing beam of top surface inside box-shaped coal conveying gallery road | |
| CN103498965B (en) | Overturning and supporting device of jacket stand sheet | |
| CN103738852B (en) | Hoisting crane test mass device | |
| CN202353110U (en) | Sliding shoe guide rail type electric cable trailer | |
| CN102496890B (en) | Skid shoe guide rail type cable trailer | |
| CN106320190A (en) | Platform of bridge maintenance, consolidation and suspension construction | |
| CN205529928U (en) | Operation platform is removed in installation of bridge cable duct | |
| CN204152219U (en) | Side fascia stone tongs | |
| CN204354853U (en) | The auxiliary construction device that a kind of electrified railway is built | |
| CN204984238U (en) | Electrical power emergency repair ladder | |
| CN208120540U (en) | Tunnel construction trestle hoisting mechanism | |
| CN203715136U (en) | Tool for hoisting lifting hole cover plate in nuclear power plant | |
| CN203593962U (en) | Movable transversally-tensioning device of T-shaped beam bridge floor system | |
| CN205170256U (en) | A there is rail loop wheel machine device for TBM tunnel construction | |
| CN105060124A (en) | Intra-frame portal crane system and hoisting use method thereof | |
| CN205023729U (en) | Gallows frame | |
| CN223303219U (en) | A coal mine battery transportation device | |
| CN206188205U (en) | Hoist device is used in prefabricated piping lane upset |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |