CN207212407U - Walking type tunnel center ditch water pipe installation trolley - Google Patents

Walking type tunnel center ditch water pipe installation trolley Download PDF

Info

Publication number
CN207212407U
CN207212407U CN201721150906.7U CN201721150906U CN207212407U CN 207212407 U CN207212407 U CN 207212407U CN 201721150906 U CN201721150906 U CN 201721150906U CN 207212407 U CN207212407 U CN 207212407U
Authority
CN
China
Prior art keywords
fixture
monomer
anchor clamps
water pipe
landing leg
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721150906.7U
Other languages
Chinese (zh)
Inventor
杨玉林
高峰
卢明熙
补彬
陶香松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 19th Bureau Group Co Ltd
First Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Original Assignee
China Railway 19th Bureau Group Co Ltd
First Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 19th Bureau Group Co Ltd, First Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd filed Critical China Railway 19th Bureau Group Co Ltd
Priority to CN201721150906.7U priority Critical patent/CN207212407U/en
Application granted granted Critical
Publication of CN207212407U publication Critical patent/CN207212407U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

A walking type tunnel center ditch water pipe installation trolley relates to equipment for installing a tunnel center ditch water pipe. Mainly be for solving the current problem design that installation tunnel center ditch water pipe takes a lot of work, hard. It includes preceding landing leg and back landing leg, it is preceding, there is the wheel bottom of back landing leg, two crossbeams are fixed respectively in the top of preceding landing leg and back landing leg, be connected with the longeron between two crossbeams, it is preceding, even there is an oblique supporting beam between back landing leg and the longeron, it is preceding, the both ends of back horizontal pole are fixed respectively on two longerons, it is preceding, all there is chain block on the back horizontal pole, it has the anchor clamps mounting panel to hang on the chain block couple, there is anchor clamps on the anchor clamps mounting panel, anchor clamps include anchor clamps monomer A and anchor clamps monomer B, anchor clamps monomer A and anchor clamps monomer B's cross connection is on the anchor clamps mounting panel through the round pin axle, anchor clamps monomer A and anchor clamps monomer B's top. Has the advantages of labor saving and labor saving during operation.

Description

A kind of running type tunnel Central drain water pipe installs chassis
Technical field:
It the utility model is related to a kind of equipment for installing tunnel Central drain water pipe.
Background technology:
The installation of existing tunnel Central drain water pipe is more to be completed by the way of loading machine lifting and hand fit, but is being constructed When the clashing and breaking caused by the small ditch cable trench that can be to having completed construction of working space, and it is relative take a lot of work, arduously, integrated cost compared with It is high.
The content of the invention:
Technical problem to be solved in the utility model is to provide a kind of half machine that can realize the installation of Central drain water pipe Tool is turned into industry, and then improves water pipe installation quality and the running type tunnel Central drain water pipe installation chassis of operating efficiency.
What above-mentioned purpose was realized in:It includes two front leg struts and two rear support legs, after two front leg struts and two Wheel is arranged at the bottom of supporting leg, in addition to two crossbeams, one of crossbeam are fixed on the top of two front leg struts, and another is horizontal Beam is fixed on the top of two rear support legs, is connected with two longerons between two crossbeams, two front leg struts respectively with two longerons Between be connected with bearing diagonal beam, two rear support legs are also connected with bearing diagonal beam, in addition to front rail between two longerons respectively And rear transverse rod, the both ends of front rail and rear transverse rod are all separately fixed on two longerons, are fitted with front rail and rear transverse rod One chain block, has hung a fixture installing plate on the hook of each chain block lower end, on each fixture installing plate There is fixture, the fixture all includes fixture monomer A and fixture monomer B, fixture monomer A and fixture monomer B top are arranged in a crossed manner, Fixture monomer A and fixture monomer B infall are connected on fixture installing plate by bearing pin, fixture monomer A and fixture monomer B's Top is all respectively equipped with pin mounting hole, and two pin mounting holes also are provided with fixture installing plate, when lifting water by fixture Pin mounting hole on Guan Shi, fixture monomer A and fixture monomer B respectively with two pin mounting hole weights on fixture installing plate Close, be then fixed by pin.
Clip for limiting is additionally provided with wheel.
The utility model has the advantages that:The present apparatus is pushed into the top of installation water pipe position, with wheel limiting card during work Son fixes wheel, and operating personnel open the fixture of two chain block connections, distinguish fixture monomer A and fixture monomer B Water pipe both sides are clipped in, fixture is fixed with pin, operating personnel sling water pipe by chain block, fall after moving to riding position Under, bottom pin is unloaded, completes installation exercise.Push chassis to next scope of operation and repeat aforesaid operations progress water pipe installation exercise.Its Coordinate and manually walked in ditch both sides, simple in construction using special hanger, safety and stability, saving of labor during operation, laborsaving, convenient behaviour Make, it is succinct light, effectively improve water pipe installation quality and operating efficiency.
Brief description of the drawings:
Fig. 1 is main structure diagram of the present utility model, and 15 be water pipe in figure;
Fig. 2 is right side structural representation of the present utility model, and 15 be water pipe in figure, and 16 be pin.
Embodiment:
Referring to Figures 1 and 2, it includes two front leg struts 1 and two rear support legs 2, two front leg struts and two rear support legs Wheel 3 is arranged at bottom, in addition to two crossbeams 4, one of crossbeam are fixed on the top of two front leg struts, and another crossbeam is consolidated The top of two rear support legs is scheduled on, two longerons 5 are connected between two crossbeams, two front leg struts are respectively between two longerons Bearing diagonal beam 6 is connected with, two rear support legs are also connected with bearing diagonal beam, in addition to the He of front rail 7 between two longerons respectively The both ends of rear transverse rod 8, front rail and rear transverse rod are all separately fixed on two longerons, and one is fitted with front rail and rear transverse rod Individual chain block 9, has hung a fixture installing plate 10 on the hook of each chain block lower end, on each fixture installing plate There is fixture, the fixture all includes fixture monomer A11 and fixture monomer B12, fixture monomer A and fixture monomer B top intersect Set, fixture monomer A and fixture monomer B infall are connected on fixture installing plate by bearing pin, fixture monomer A and fixture list Body B top is all respectively equipped with pin mounting hole 13, and two pin mounting holes also are provided with fixture installing plate, when passing through fixture When lifting water pipe, the pin mounting hole on fixture monomer A and fixture monomer B is installed with two pins on fixture installing plate respectively Hole overlaps, and is then fixed by pin.
Clip for limiting 14 is additionally provided with wheel.

Claims (2)

1. a kind of running type tunnel Central drain water pipe installs chassis, including two front leg struts(1)With two rear support legs(2), Wheel is arranged at the bottom of two front leg struts and two rear support legs(3), it is characterized in that:Also include two crossbeams(4), it is one of horizontal Beam is fixed on the top of two front leg struts, and another crossbeam is fixed on the top of two rear support legs, is connected between two crossbeams Two longerons(5), two front leg struts are connected with bearing diagonal beam between two longerons respectively(6), two rear support legs are respectively with two Also bearing diagonal beam, in addition to front rail are connected between individual longeron(7)And rear transverse rod(8), the both ends of front rail and rear transverse rod are all It is separately fixed on two longerons, a chain block is fitted with front rail and rear transverse rod(9), each chain block lower end Hook on all hung a fixture installing plate(10), have fixture on each fixture installing plate, the fixture all includes fixture Monomer A(11)With fixture monomer B(12), fixture monomer A and fixture monomer B top are arranged in a crossed manner, fixture monomer A and fixture list Body B infall is connected on fixture installing plate by bearing pin, and fixture monomer A and fixture monomer B top are all respectively equipped with pin Sub- mounting hole(13), two pin mounting holes also are provided with fixture installing plate.
2. according to the running type tunnel Central drain water pipe installation chassis described in claim 1, it is characterized in that:Also set on wheel Limited location clamp(14).
CN201721150906.7U 2017-09-09 2017-09-09 Walking type tunnel center ditch water pipe installation trolley Active CN207212407U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721150906.7U CN207212407U (en) 2017-09-09 2017-09-09 Walking type tunnel center ditch water pipe installation trolley

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721150906.7U CN207212407U (en) 2017-09-09 2017-09-09 Walking type tunnel center ditch water pipe installation trolley

Publications (1)

Publication Number Publication Date
CN207212407U true CN207212407U (en) 2018-04-10

Family

ID=61823877

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721150906.7U Active CN207212407U (en) 2017-09-09 2017-09-09 Walking type tunnel center ditch water pipe installation trolley

Country Status (1)

Country Link
CN (1) CN207212407U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110685200A (en) * 2019-10-21 2020-01-14 中铁四院集团岩土工程有限责任公司 Positioning device, gutter forming assembly and gutter forming construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110685200A (en) * 2019-10-21 2020-01-14 中铁四院集团岩土工程有限责任公司 Positioning device, gutter forming assembly and gutter forming construction method

Similar Documents

Publication Publication Date Title
CN103072893B (en) Tool and method for overturning vertical equipment in nuclear power plant
CN204689550U (en) The support of the hanging suspension hook of scissor lift
CN207212407U (en) Walking type tunnel center ditch water pipe installation trolley
CN202017337U (en) Efficient elevator mechanism adhered to electric lifting scaffold
CN206065298U (en) A kind of suspension type reinforcement cage processing device
CN105006924A (en) Motor core-through device and core-through method thereof
CN201272667Y (en) Hanging rack for assembling and disassembling combined concrete rod
CN105152004B (en) Hoisting device for reinforcing beam of top surface inside box-shaped coal conveying gallery road
CN103498965B (en) Overturning and supporting device of jacket stand sheet
CN103738852B (en) Hoisting crane test mass device
CN202353110U (en) Sliding shoe guide rail type electric cable trailer
CN102496890B (en) Skid shoe guide rail type cable trailer
CN106320190A (en) Platform of bridge maintenance, consolidation and suspension construction
CN205529928U (en) Operation platform is removed in installation of bridge cable duct
CN204152219U (en) Side fascia stone tongs
CN204354853U (en) The auxiliary construction device that a kind of electrified railway is built
CN204984238U (en) Electrical power emergency repair ladder
CN208120540U (en) Tunnel construction trestle hoisting mechanism
CN203715136U (en) Tool for hoisting lifting hole cover plate in nuclear power plant
CN203593962U (en) Movable transversally-tensioning device of T-shaped beam bridge floor system
CN205170256U (en) A there is rail loop wheel machine device for TBM tunnel construction
CN105060124A (en) Intra-frame portal crane system and hoisting use method thereof
CN205023729U (en) Gallows frame
CN223303219U (en) A coal mine battery transportation device
CN206188205U (en) Hoist device is used in prefabricated piping lane upset

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant