CN205778969U - A kind of self-advancing type pipe canopy anchor pole for tunnel weakness geology band country rock pretreatment - Google Patents
A kind of self-advancing type pipe canopy anchor pole for tunnel weakness geology band country rock pretreatment Download PDFInfo
- Publication number
- CN205778969U CN205778969U CN201620683875.0U CN201620683875U CN205778969U CN 205778969 U CN205778969 U CN 205778969U CN 201620683875 U CN201620683875 U CN 201620683875U CN 205778969 U CN205778969 U CN 205778969U
- Authority
- CN
- China
- Prior art keywords
- drilling rod
- pipe
- country rock
- self
- drill
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
A kind of self-advancing type pipe canopy anchor pole for tunnel weakness geology band country rock pretreatment, including drill bit, drilling rod, described drilling rod is the steel pipe of a hollow, drilling rod wall is provided with multiple injected hole, two ends of drill is equipped with external screw thread, drilling rod front end is spirally connected with drill bit and is connected, and rear end is spirally connected with the drill sleeve of a bit shank adapter.This utility model drilling rod is hollow pipe, after creeping into projected depth, need not move back brill, and directly to drilling rod internal injection, by drilling rod as pipe boron steel pipe, speed of application is fast, simple to operate, high treating effect.
Description
Technical field
This utility model relates to weak geology band country rock pretreatment or sump remedy construction field in constructing tunnel, specifically relates to
And it is a kind of for tunnel weakness geology band country rock or the anchor pole of the pipe canopy of sump remedy.
Background technology
In constructing tunnel, be frequently encountered by weak geology band country rock or landslide, for ensure constructing tunnel make smooth advances and
Ensureing construction safety, weak geology band country rock or landslide paragraph must be processed by job site.The most more conventional process
Mode has advanced tubule pre-pouring grout to process and large-scale lead pipe grouting pretreatment.Advanced tubule pre-pouring grout processes, and is first to exist
Weak geology band wall rock drill-hole, is then inserted into per-fore pouring liquid with small pipe to reinforce country rock in hole.The district that advanced tubule processes
Section is shorter, and typically at 3-5m, and in broken loose media country rock, boring is frequently encountered by hole clipping, collapse hole cannot the problem of inserted link etc.;
Super-front large pipe shed must perform guiding wall in hole, but builds guiding Qiang Jiguanpeng operating room behaviour in hole in the range of small space
Make difficulty big, and be also frequently encountered by the problem that cannot execute drilled as holes in broken loose media country rock, it is necessary to take with plumber's skill is executed
Work, costly.
Summary of the invention
The purpose of this utility model is to provide a kind of self-feeding anchor pile for tunnel weakness geology band country rock, to overcome
The problem that cannot execute drilled as holes in weak geology band or landslide incompact-deposit bodies country rock.
The technical solution of the utility model is as follows:
A kind of self-advancing type pipe canopy anchor pole for tunnel weakness geology band country rock pretreatment, including drill bit, drilling rod, its feature
Being: described drilling rod is the steel pipe of a hollow, drilling rod wall is provided with multiple injected hole, and two ends of drill is equipped with external screw thread, drilling rod
Front end is spirally connected with drill bit and is connected, and rear end is spirally connected with the drill sleeve of a bit shank adapter.
This utility model simple in construction, drilling rod body is hollow pipe, after creeping into projected depth, need not move back brill, directly to brill
Bar internal injection, by drilling rod directly as pipe boron steel pipe, need not install pipe boron steel pipe after first pore-forming, have construction speed in construction
Spend fast, simple to operate, high treating effect, the advantage such as economic and practical, construction speed can be effectively improved, reduce cost, it is to avoid be super
Front ductule processes paragraph bit freezing that is short and that be frequently encountered by broken loose media country rock, the defect of collapse hole, also solves big pipe
Canopy operation easier is big, take with the high difficult problem of pipe process costs.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is occupation mode schematic diagram of the present utility model.
Detailed description of the invention
As it is shown in figure 1, this utility model includes drill bit 1, drilling rod 2, described drilling rod 2 is the steel pipe of a hollow, on drilling rod wall
Being provided with multiple injected hole 3, drilling rod 2 two ends are equipped with external screw thread, and the front end of drilling rod 2 is spirally connected with drill bit 1 and is connected, rear end and a bit shank
The drill sleeve 4 of adapter is spirally connected.
In use, according to the needs of design drilling depth, drilling rod 2 can be by 2 or the hollow of more than 2 for this utility model
Lengths of steel pipes connects, and two cored steel pipeline sections are spirally connected by setting female sleeve pipe 5.
As in figure 2 it is shown, before pipe roof construction, first install 1 Pin and guide steelframe and open guide-localization on steelframe by design pitch
Hole;Drilling jumbo or handheld pneumatic rock drill 6 are connected with the bit shank 7 of bit shank adapter of the present utility model, drill bit and steel
Frame pilot hole centering is also adjusted and is executed brill angle, starts to creep into by the degree of depth, the angle of design.In drilling process, when drilling rod 2 length
When not reaching design drilling depth, back out bit shank adapter, reconnect one section of cored steel pipeline section with extension arm by sleeve pipe 5,
Then connect bit shank adapter to continue to execute drilling to completion with rig.After having crept into, back out bit shank adapter, after drilling rod
End connects grouting pipe and slip casting machine, carries out grouting and reinforcing rock mass, and hollow drill pipe, need not be additionally mounted directly as pipe boron steel pipe
Pipe boron steel pipe.
Claims (2)
1., for a self-advancing type pipe canopy anchor pole for tunnel weakness geology band country rock pretreatment, including drill bit, drilling rod, its feature exists
In: described drilling rod is the steel pipe of a hollow, and drilling rod wall is provided with multiple injected hole, and two ends of drill is equipped with external screw thread, before drilling rod
End is spirally connected with drill bit and is connected, and rear end is spirally connected with the drill sleeve of a bit shank adapter.
Self-advancing type pipe canopy anchor pole for tunnel weakness geology band country rock pretreatment the most according to claim 1, its feature
Being: described drilling rod is formed by connecting by the cored steel pipeline section of two or more than two, two cored steel pipeline sections are provided with one respectively
The sleeve pipe two ends of female thread are spirally connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620683875.0U CN205778969U (en) | 2016-06-30 | 2016-06-30 | A kind of self-advancing type pipe canopy anchor pole for tunnel weakness geology band country rock pretreatment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620683875.0U CN205778969U (en) | 2016-06-30 | 2016-06-30 | A kind of self-advancing type pipe canopy anchor pole for tunnel weakness geology band country rock pretreatment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205778969U true CN205778969U (en) | 2016-12-07 |
Family
ID=58127391
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620683875.0U Active CN205778969U (en) | 2016-06-30 | 2016-06-30 | A kind of self-advancing type pipe canopy anchor pole for tunnel weakness geology band country rock pretreatment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205778969U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112360524A (en) * | 2020-11-09 | 2021-02-12 | 紫金矿业集团股份有限公司 | Advanced support method for plate-bonded residual ore pile roadway |
CN113513518A (en) * | 2021-04-16 | 2021-10-19 | 海盐欣远科技股份有限公司 | Implanted connecting dental strip for tunnel wall |
CN114033317A (en) * | 2021-11-26 | 2022-02-11 | 上海宝冶集团有限公司 | Drilling is sent pipe and is annotated shell material integrative improvement drilling rod device |
-
2016
- 2016-06-30 CN CN201620683875.0U patent/CN205778969U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112360524A (en) * | 2020-11-09 | 2021-02-12 | 紫金矿业集团股份有限公司 | Advanced support method for plate-bonded residual ore pile roadway |
CN113513518A (en) * | 2021-04-16 | 2021-10-19 | 海盐欣远科技股份有限公司 | Implanted connecting dental strip for tunnel wall |
CN113513518B (en) * | 2021-04-16 | 2023-02-28 | 海盐欣远科技股份有限公司 | Implanted connecting dental strip for tunnel wall |
CN114033317A (en) * | 2021-11-26 | 2022-02-11 | 上海宝冶集团有限公司 | Drilling is sent pipe and is annotated shell material integrative improvement drilling rod device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100919628B1 (en) | If the excavation where the carbide tip is had excavation bit of the excavation system where the expansion and abridgment are possible | |
CN101798931B (en) | Construction technology method of large-scale lead pipe roofs of tunnels and underground engineering without workshops | |
CN103382817B (en) | The anti-blocking drilling rod of a kind of mine floor anchoring | |
CN205778969U (en) | A kind of self-advancing type pipe canopy anchor pole for tunnel weakness geology band country rock pretreatment | |
CN105064356A (en) | Prestress compound bar and cable anchoring device for supporting soft and loose soil mass | |
CN104847263A (en) | Coal bed methane far-end butt joint horizontal well drilling method | |
CN205918368U (en) | Bore notes an organic whole and retreat formula slip casting drilling rod | |
CN214273689U (en) | Tunnel in-situ extension prestressed anchor cable tensioning structure | |
CN206581960U (en) | The solid anchoring integral hydraulic expansion anchor pole of mining slip casting | |
CN204266925U (en) | A kind of coal mine roadway rock-reinforcing anti-collapse hole drill head | |
CN204283211U (en) | Plenty water weak surrounding rock tunnel advanced support pipe canopy pore-forming system smashed to pieces | |
CN201258477Y (en) | Thick covering layer preconsolidation grouting advanced tubule | |
CN103410542A (en) | Device and method for improving roadway base plate anchor rod anchor cable pore-forming efficiency and anchoring performance | |
CN202673167U (en) | Three-arris drill pipe special for coal mine underground gas drainage | |
CN209875198U (en) | Inverted expansion type high-strength tensile anchor rod for tunnel support | |
CN205713982U (en) | A kind of pile foundation construction drilling equipment being applicable to karst area | |
CN112610255B (en) | Tunnel construction method for penetrating through weak and broken surrounding rock | |
CN203412596U (en) | Grouting device and grouting pipe for deep rock tunnel | |
CN204358180U (en) | A kind of anchor pole check valve assembly | |
CN210530749U (en) | Self-advancing pipe shed drilling tool for tunnel soft rock excavation | |
CN204385748U (en) | A kind of novel tunnel structure | |
CN208280901U (en) | A kind of stone matter tunneltron canopy flatness control device | |
CN112832833A (en) | Glass fiber anchor rod mounting device, self-advancing glass fiber anchor rod and mounting method | |
CN201581814U (en) | Self-advancing drill bit | |
CN220167908U (en) | Grouting hole sealing device for underground water exploration and drainage drilling |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |