CN204385748U - Novel tunnel structure - Google Patents

Novel tunnel structure Download PDF

Info

Publication number
CN204385748U
CN204385748U CN201420811950.8U CN201420811950U CN204385748U CN 204385748 U CN204385748 U CN 204385748U CN 201420811950 U CN201420811950 U CN 201420811950U CN 204385748 U CN204385748 U CN 204385748U
Authority
CN
China
Prior art keywords
side slope
grout
grout pipe
tunnel
landslide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420811950.8U
Other languages
Chinese (zh)
Inventor
杜帅群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201420811950.8U priority Critical patent/CN204385748U/en
Application granted granted Critical
Publication of CN204385748U publication Critical patent/CN204385748U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a novel tunnel structure, hang including the tunnel body, be located the tunnel body outside and detain the side slope and collapse the landslide body that links to each other with hanging the side slope of detaining, the side slope is provided with a plurality of grout pipes in collapsing the landslide body, through grout pipe grout back in the side slope collapse the landslide in form a plurality of layers of grout back up coat, grout pipe outer end still is provided with grout pipe extension, and grout pipe extension is located the tunnel portal front formation construction safety protection canopy, a plurality of grout holes have evenly been arranged on the grout pipe. The utility model discloses a squeeze into the grout pipe in the safe construction district of side slope, carry out preliminary anchor to the side slope, then grout to the side slope through the grout pipe, form the back up coat, then carry out side slope reinforcement and tunnel excavation construction under the protection of the construction safety canopy that the section formed prolongs life at the grout pipe. The workload of the landslide treatment of the hanging opening side slope is simplified, the adaptability of the tunnel hanging opening construction to geological conditions is improved, and the construction safety is improved.

Description

A kind of novel tunnel structure
Technical field
The utility model belongs to tunnel structure design field, specifically relates to a kind of novel tunnel structure.
Background technology
Tunnel engineering is widely used in the industry such as traffic, the energy of China, and its construction operation is complicated, especially in mouth hanging section, often because geological conditions does not meet requirement of strength, for reducing tunnel excavation and lining project amount, the reduction of erection time, there is various tunnel structure at present.As the publication number Chinese patent that is CN 203546685 U discloses a kind of tunnel structure of optimization, it comprises portal, barrel and is arranged on barrel mouth hanging position and the reinforced concrete soil cave body straight line ennation of connection portal and barrel, barrel be provided with tunnel mouth hanging side slope and originate in tunnel mouth hanging side slope, reinforced concrete soil cave body straight line ennation is provided with transitional seams with the junction of portal and barrel respectively, is provided with sealing in transitional seams.This technical scheme is the straightway extending tunnel bend head and the tail by arranging tunnel extension at mouth hanging place, to meet code requirement, avoid to new hole line from newly carrying out geological prospecting analysis, thus minimizing tunnel digs, lining project amount, to shorten the construction period, to save construction investment.But owing to needing to carry out large-scale side slope grouting, excavation and supporting during tunnel construction, therefore to mouth hanging position choose and hole line choose formed restriction.Once mouth hanging construction, domatic slumping unstability occurs and often cause comparatively large-engineering loss, except amendment hole line is from new mouth hanging, also cause casualties, the process of unstability face is also very difficult; Not only increase Construction Technology difficulty, too increase investment, great potential safety hazard is caused to the safety of constructor.
Utility model content
For solving the problem, the utility model provides a kind of novel tunnel structure.Thus reduce tunnel mouth hanging Geological Condition Requirement, reduce difficulty of construction and input, available protecting constructor's safety, shortens the construction period, cost saving.
The utility model is achieved by following technical solution.
A kind of novel tunnel structure; comprise tunnel body, be positioned at outside tunnel body buckle side slope and with the side slope rockfall landslide buckling side slope and be connected; some grout pipes are provided with in described side slope rockfall landslide; in side slope rockfall landslide, some layers of consolidation by grouting layer are formed after being in the milk by grout pipe; described grout pipe outer end is also provided with grout pipe extension, and grout pipe extension be positioned at tunnel formed in front of the door construction safety protection canopy.
Described grout pipe some grout holes have been evenly arranged.
Described grout pipe adopts floral tube or steel pipe to make, and its end first entering rock is taper.
Described consolidation by grouting layer completes the rear induration forming slurries and geologic body of grouting for utilizing grout pipe.
Safe construction section reserved when described grout pipe extension is construction grouting pipe.
The beneficial effects of the utility model are:
Compared with prior art: the utility model is by when particularly mouth hanging collapses at mouth hanging place; grout pipe is squeezed in the safe construction district of side slope; preliminary anchoring is carried out to side slope; then by grout pipe, side slope is in the milk; form back-up coat, then prolong the protection of the construction safety canopy that raw section is formed at grout pipe under, carry out slope reinforcement and Tunnel excavation.Simplify the workload of mouth hanging side slope slumping process, add the compliance of tunnel mouth hanging construction to geological conditions, add working security, shorten the construction period, save construction investment, there is significant economic benefit and good compliance.
Accompanying drawing explanation
Fig. 1 is section structure schematic diagram of the present utility model;
Fig. 2 is the A-A direction view of Fig. 1;
Fig. 3 is the structural representation of grout pipe in the utility model.
In figure: 1-tunnel body, 2-mouth hanging side slope, 3-side slope rockfall landslide, 4-consolidation by grouting layer, 5-grout pipe, 6-grout hole, 7-grout pipe extension.
Detailed description of the invention
The technical solution of the utility model is further described below in conjunction with accompanying drawing, but described in claimed scope is not limited to.
As shown in Figure 1, Figure 2, Figure 3 shows; the novel tunnel structure of one described in the utility model; comprise tunnel body 1, be positioned at outside tunnel body 1 buckle side slope 2 and with the side slope rockfall landslide 3 buckling side slope 2 and be connected; some grout pipes 5 are provided with in described side slope rockfall landslide 3; in side slope rockfall landslide 3, some layers of consolidation by grouting layer 4 are formed after being in the milk by grout pipe 5; described grout pipe 5 outer end is also provided with grout pipe extension 7, and grout pipe extension 7 be positioned at tunnel formed in front of the door construction safety protection canopy.The technical program squeezes into grout pipe by the safe construction district in side slope; preliminary anchoring is carried out to side slope; then by grout pipe, side slope is in the milk, forms back-up coat, then prolong the protection of the construction safety canopy that raw section is formed at grout pipe under, carry out slope reinforcement and Tunnel excavation.Simplify the workload of mouth hanging side slope slumping process, add the compliance of tunnel mouth hanging construction to geological conditions, add working security, shorten the construction period, save construction investment.
Described grout pipe 5 some grout holes 6 have been evenly arranged.
Described grout pipe 5 adopts floral tube or steel pipe to make, and its end first entering rock is taper, and namely the other end of floral tube or steel pipe is taper.In reality processing, grout pipe 5 can be processed with any steel pipe.
Described consolidation by grouting layer 4 completes the rear induration forming slurries and geologic body of grouting for utilizing grout pipe 5.
Safe construction section reserved when described grout pipe extension 7 is construction grouting pipe 5.It can be utilized as the basis of other safety prevention measures.
Above-mentioned tunnel 1 can be the tunnel of arbitrary form and purposes.
Above-mentioned mouth hanging side slope 2 can be any side slope type.
Above-mentioned side slope rockfall landslide 3 can be the rockfall landslide of arbitrary form.

Claims (5)

1. a novel tunnel structure, it is characterized in that: comprise tunnel body (1), be positioned at tunnel body (1) outside buckle side slope (2) and with the side slope rockfall landslide (3) buckling side slope (2) and be connected, some grout pipes (5) are provided with in described side slope rockfall landslide (3), by forming some layers of consolidation by grouting layer (4) after grout pipe (5) grouting in side slope rockfall landslide (3), described grout pipe (5) outer end is also provided with grout pipe extension (7), and grout pipe extension (7) be positioned at tunnel formed in front of the door construction safety protection canopy.
2. the novel tunnel structure of one according to claim 1, is characterized in that: described grout pipe (5) has been evenly arranged some grout holes (6).
3. the novel tunnel structure of one according to claim 1, is characterized in that: described grout pipe (5) adopts floral tube or steel pipe to make, and its end first entering rock is taper.
4. the novel tunnel structure of one according to claim 1, is characterized in that: described consolidation by grouting layer (4) completes the rear induration forming slurries and geologic body of grouting for utilizing grout pipe (5).
5. the novel tunnel structure of one according to claim 1, is characterized in that: described grout pipe extension (7) is safe construction section reserved time construction grouting pipe (5).
CN201420811950.8U 2014-12-19 2014-12-19 Novel tunnel structure Active CN204385748U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420811950.8U CN204385748U (en) 2014-12-19 2014-12-19 Novel tunnel structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420811950.8U CN204385748U (en) 2014-12-19 2014-12-19 Novel tunnel structure

Publications (1)

Publication Number Publication Date
CN204385748U true CN204385748U (en) 2015-06-10

Family

ID=53358481

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420811950.8U Active CN204385748U (en) 2014-12-19 2014-12-19 Novel tunnel structure

Country Status (1)

Country Link
CN (1) CN204385748U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109610481A (en) * 2018-11-28 2019-04-12 湘潭大学 A kind of supporting improvement construction method for tunnel portal concordant strong-weathered rock matter high gradient slope
CN110307005A (en) * 2019-07-09 2019-10-08 福建工程学院 Device and method for Strengthening Tunnel mountain body entrance landslide

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109610481A (en) * 2018-11-28 2019-04-12 湘潭大学 A kind of supporting improvement construction method for tunnel portal concordant strong-weathered rock matter high gradient slope
CN110307005A (en) * 2019-07-09 2019-10-08 福建工程学院 Device and method for Strengthening Tunnel mountain body entrance landslide
CN110307005B (en) * 2019-07-09 2021-08-17 福建工程学院 Device and method for reinforcing landslide at tunnel portal

Similar Documents

Publication Publication Date Title
CN203756182U (en) Support structure applied to shallow road tunnel in weak rock area
CN102937030B (en) Bolting-grouting integrated support method for zonal disintegration of deep roadway surrounding rock
CN103510957B (en) A kind of combined type coal uncovering method
CN103628911B (en) Work plane segmented gob-side entry retaining method is adopted/put to a kind of combining
WO2016206617A1 (en) Anti-collapse structure beside roadway based on 110 construction method for breaking roof
CN103061771B (en) Second mining mine fully mechanized coal face cuts eye driving and supporting method thereof
CN105443143B (en) A kind of coal mine gob roadway support device and its construction method
CN205277446U (en) Colliery collecting space area roadway support device
CN103089276A (en) Deep-shallow hole and high-low pressure coupling grouting technology
CN104863588A (en) Advanced pier column pre-arranging gob-side entry retaining method
CN204571912U (en) Water filling hole sealing device
CN204716271U (en) A kind of steel band suspension device that intersects
CN204385748U (en) Novel tunnel structure
CN203640745U (en) Gob-side entry retaining concrete mould bag with roof contacting function
CN205260049U (en) Deep roadway support uses novel concrete support
CN206581960U (en) The solid anchoring integral hydraulic expansion anchor pole of mining slip casting
CN204327112U (en) Tunnel hole-exiting advance support system
CN204436407U (en) The structure that the pre-Geological disaster prevention of the double-deck preliminary bracing of a kind of big cross section Support System in Soft Rock Tunnels occurs
CN204098954U (en) Dehydration barricade
CN206668287U (en) A kind of combined steel pipe concrete bow member for supporting
CN203515624U (en) Novel automatic grouting connector
CN201896623U (en) Pipe curtain device for penetration of deep lane of coal mine through fault and fracture zone
CN204299579U (en) A kind of tunnel grouting pipe passing through artificial accumulation waste-rock yard
CN205532633U (en) Tunnel bottom plate reinforcerment system
CN103758483A (en) Secondary hole sealing method for treating broken area after extraction of crossing hole

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant