CN205769474U - A kind of loading go-cart for three coordinate balladeur trains - Google Patents
A kind of loading go-cart for three coordinate balladeur trains Download PDFInfo
- Publication number
- CN205769474U CN205769474U CN201620644690.9U CN201620644690U CN205769474U CN 205769474 U CN205769474 U CN 205769474U CN 201620644690 U CN201620644690 U CN 201620644690U CN 205769474 U CN205769474 U CN 205769474U
- Authority
- CN
- China
- Prior art keywords
- coordinate
- loading
- cart
- balladeur trains
- bracing frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Handcart (AREA)
Abstract
The utility model discloses a kind of loading go-cart for three coordinate balladeur trains that three coordinate balladeur trains guarantees can be made to load steadily and will not be damaged;Including base, the support at base two ends and the wheel of base bottom, being provided with upper end bracing frame between two stands, the same end side surface of two stands is equipped with Extension support, be equipped with lower end bracing frame between Extension support, upper end bracing frame is provided with many limited posts;This loading go-cart being used for three coordinate balladeur trains can be simultaneously suitable for the loading transport of multiple three coordinate balladeur trains, and transportation is the most reliable.
Description
Technical field
This utility model relates to part means of transport field, particularly to a kind of loading go-cart for three coordinate balladeur trains.
Background technology
Loading go-cart as the term suggests being the go-cart for transporting piece-goods, go-cart kind beautiful jade in the market is full
Mesh.
As disclosed on patent application text, a kind of part loads go-cart (application number: 201320320384.6), including propping up
Supporting plate etc. on frame, support, supporting plate can load goods and part, and realize the transport to goods and part.But this kind
Part loads and is only applicable to load some smooth parts on the supporting plate of go-cart, when by relatively big for some weight and irregular part,
Three coordinate balladeur trains as shown in Fig. 7-8, when being positioned on the supporting plate of this load wagon, during propelling loading car, irregularly
Part cannot fixed on supporting plate, i.e. can produce on supporting plate and rock, and now the structure such as corner on part will be with
The surface of supporting plate produces certain shock, not only supporting plate can be produced damage and part also can be made by no small damage.
Utility model content
The purpose of this utility model is to provide one can make three coordinate balladeur trains ensure to load steadily and will not be damaged
The loading go-cart for three coordinate balladeur trains.
Above-mentioned technical purpose of the present utility model has the technical scheme that a kind of sliding for three coordinates
The loading go-cart of frame, including base, the support at base two ends and the wheel being arranged on base bottom, is provided with between described two stands
Upper end bracing frame, the same end side surface of described two stands is equipped with Extension support, is equipped with lower end bracing frame between described Extension support,
Described upper end bracing frame is provided with many limited posts.
By using technique scheme, can be by the inner surface of the upper end work surface of three coordinate balladeur trains Yu upper end bracing frame
Laminating, by the outer surface laminating of the lower end work surface of three coordinate balladeur trains with lower end bracing frame, the most i.e. can realize three coordinates sliding
Fixing in the go-cart of this loading of frame, owing to the upper and lower side of now three coordinate balladeur trains is fixed the most in the go-cart of this loading,
And do not have the part contacted to be in vacant state with the go-cart of this loading, and limited post is now also had can three coordinates to be slided
Erect certain position-limiting action, it is to avoid three coordinate balladeur trains occur, when transport, the phenomenon that sliding is rocked in the go-cart of this loading,
So that to the transport of three coordinate balladeur trains very the most reliable.
This utility model is arranged further: described upper end bracing frame is provided with groove, and upper end bracing frame is divided by described groove
For left end support frame and right-hand member bracing frame, described limited post is separately positioned on left end support frame and right-hand member bracing frame.
By using technique scheme, upper end bracing frame has been divided into left and right two bracing frames by arranging of groove, is now
Three coordinate balladeur trains all can be placed in the two ends, left and right that may be implemented in support simultaneously, substantially increases the fortune of the loading to three coordinate balladeur trains
Defeated efficiency.
This utility model is arranged further: is provided with polylith between described left end support frame and right-hand member bracing frame and connects fixing
Plate, described limited post is arranged at connecting in fixed plate.
By using technique scheme, connect fixed plate and can strengthen the company between left end support frame and right-hand member bracing frame
Connect intensity, so that the placement transport that three coordinate balladeur trains are in the go-cart of this loading is more solid and reliable.
This utility model is arranged further: described connection fixed plate is respectively close to left end support frame and the two of right-hand member bracing frame
End is equipped with U-type groove, and the diameter of described limited post is more than the diameter of U-type groove, and the lower end of described limited post is provided with and is slidably connected at U
Sliding post in type groove, described sliding post external peripheral surface is provided with limiting plate, and described connection fixed plate is provided with multiple for limit
The groove that position plate grafting is placed.
By using technique scheme, the sliding in U-type groove of the sliding post can realize limited post and connect fixed plate
On the regulation of displacement, i.e. three coordinate balladeur trains can be carried out the most spacing solid according to the placement situation of three coordinate balladeur trains
Fixed.
This utility model is arranged further: described sliding post bottom is provided with connecting plate, and the diameter of described connecting plate is more than U-shaped
The diameter of groove.
By using technique scheme, under the effect of connecting plate, can avoid the occurrence of in the displacement carrying out limited post
During regulation, owing to dynamics holds situation that is inaccurate and that the structure of limited post pulled out from U-type groove completely.
This utility model is arranged further: described limited post external peripheral surface is provided with rubber sleeve.
By using technique scheme, under the effect of rubber sleeve, it is possible to prevent limited post that three coordinate balladeur trains are being entered
During row position-limiting action, the phenomenon three coordinate balladeur trains worn and torn due to contact necessary between the two thus appearance.
This utility model is arranged further: on the lateral surface of two medial wall upper and lower end bracing frames of described upper end bracing frame
It is equipped with rubber blanket.
By using technique scheme, under the effect of rubber blanket, when upper end work surface and the lower end of three coordinate balladeur trains
When work surface is embedded on upper end bracing frame and lower end bracing frame respectively, so that two work surfaces of three coordinate balladeur trains will not be subject to
To abrasion, it is ensured that the precision of three coordinate balladeur trains.
This utility model is arranged further: described support is provided with push and pull bar away from the one side of upper end bracing frame.
By using technique scheme, can be by the force to push and pull bar, it is achieved to the transport loading go-cart
Journey, enhanced convenience is laborsaving.
This utility model is arranged further: described push and pull bar outer circumference surface is cased with foaming.
By use technique scheme, foaming effect under, be possible to prevent people when push and pull bar is exerted a force,
Staff will not be worn, and i.e. staff is served protective effect.
This utility model is arranged further: described lower end bracing frame is provided with circular arc chamfering with the connecting place of Extension support.
By using technique scheme, under the effect of circular arc chamfering, can avoid pedestrian or surrounding articles are gone out
The situation of existing gouging abrasion.
In sum, this utility model has the advantages that
1, go for the loading transport of three this irregular parts of coordinate balladeur train, and it is reliable to load transportation safety;
2, limited post can make three coordinate balladeur trains be fixed on the restriction having position when loading in go-cart;
3, the displacement of level can be had to regulate limited post according to on-the-spot concrete placement situation;
4, three coordinate balladeur trains will not be worn in loading transportation to use multiple simple structure ensure that.
Accompanying drawing explanation
Fig. 1 is the structural representation of embodiment 1;
Fig. 2 is office's enlarged drawing of A in Fig. 1;
Fig. 3 is the structural representation of embodiment 2;
Fig. 4 is the partial enlarged drawing of B in Fig. 3;
Fig. 5 is the structural representation of embodiment 3;
It is the partial enlarged drawing of C in Fig. 5 with 6;
Fig. 7 is the structural representation of the upper end work surface of three coordinate balladeur trains;
Fig. 8 is the structural representation of the lower end work surface of three coordinate balladeur trains.
In figure: 1, base;2, support;3, wheel;4, upper end bracing frame;41, groove;42, limited post;421, sliding post;
4211, limiting plate;4212, connecting plate;422, rubber sleeve;43, left end support frame;44, right-hand member bracing frame;45, fixed plate is connected;
451, groove;46, U-type groove;5, Extension support;6, lower end bracing frame;7, rubber blanket;8, push and pull bar;81, foaming;9, circular arc falls
Angle;10, upper end work surface;101, lower end work surface.
Detailed description of the invention
Below in conjunction with accompanying drawing, this utility model is described in further detail.
Embodiment 1: general loading can be provided with a big supporting plate in go-cart, part to be loaded transport, but,
For some irregular parts, as Figure 7-8, it is three coordinate balladeur trains, works including upper end work surface 10 and lower end
Face 101, when being placed on by this three coordinates balladeur train on the general supporting plate loading go-cart, three coordinate balladeur trains are due to for irregular
Shape, can only ensure that some face contacts with supporting plate, i.e. cannot ensure that each face can contact with the surface of supporting plate, now,
In transportation, run into the road surface more jolted, it will cause three coordinate balladeur train rocking in supporting plate, three coordinate balladeur trains
Structure continuous and supporting plate surface during rocking carries out continuous print shock, so that the structures essence on three report balladeur trains
Degree is affected, and even, supporting plate and three coordinate balladeur trains the most all can be by a certain degree of damages.
In order to avoid the problems referred to above, existing a kind of loading go-cart for three coordinate balladeur trains, as illustrated in fig. 1 and 2, mainly by
Base 1, the support 2 at base 1 two ends and wheel 3 form, and, between two stands 2, it is provided with a upper end bracing frame 4, upper
Having a groove 41 on end bracing frame 4, upper end bracing frame 4 be divide into left end support frame 43 and right-hand member bracing frame by groove 41
44, and, in order to strengthen the bonding strength between left end support frame 43 and right-hand member bracing frame 44, thus left end support frame 43 with
It is provided with polylith between right-hand member bracing frame 44 and connects fixed plate 45;Meanwhile, the same end side surface of two stands 2 is additionally provided with prolongs
Stretching frame 5, Extension support 5 is positioned between the lower section of upper end bracing frame 4, and Extension support 5 and is equipped with lower end bracing frame 6.
Now, when carrying out the loading to three coordinate balladeur trains, only the upper end work surface 10 of three coordinate balladeur trains need to be embedded in
On upper end bracing frame 4, i.e. making the upper end work surface 10 of three coordinate balladeur trains and the inner surface laminating of upper end bracing frame 4, three sit
The lower end work surface 101 of mark balladeur train is fitted with the outer surface of lower end bracing frame 6, thus the most i.e. achieves three coordinate balladeur trains and exist
This is fixed for the loading loaded in go-cart of three coordinate balladeur trains;Due to now three coordinate balladeur trains lower end work surface 101 simultaneously
The go-cart of this loading has obtained the fixing, so in transportation, not havinging rocking of three coordinate balladeur trains, and three of position
Multiple irregular of remaining of coordinate balladeur train is all suspended in space, so unnecessary friction will not be produced with loading to push away,
Thus while completing the transport of the loading to three coordinate balladeur trains, it is also possible to avoid three coordinate balladeur train Each part to be ground
Damage;Further, the lateral surface of the two medial surface upper and lower end bracing frame 6 of upper end bracing frame 4 all adds rubber blanket 7, to keep away
Exempt from bracing frame and the abrasion of three coordinate balladeur train work surfaces.
In the present embodiment, it has been divided into left end support frame 43 and right-hand member to prop up upper end bracing frame 4 due to the structure of groove 41
Support 44, and the same side mask of support 2 is provided with lower end bracing frame 6, it means that this pushes away for loading of three coordinate balladeur trains
Car so, can be considerably improved three seats for the placement of three left side balladeur trains at the two ends, left and right of support 2 simultaneously
The freight volume that mark balladeur train is carried out simultaneously, improves work efficiency.
In the present embodiment, owing to the go-cart of this loading is simultaneously suitable for the loading transport of multiple three coordinate balladeur trains, in order to make
Three coordinate balladeur trains when being loaded in the go-cart of this loading so that there is certain restriction the position of three coordinate balladeur trains, i.e. so that
Three coordinate balladeur trains of volume are farthest placed, so the most above-mentioned connection fixed plate 45 is the most permissible in the go-cart of this loading
According to the ratio of three coordinate balladeur trains, upper end bracing frame 4 is divided into several sections, and is provided with limited post 42 connecting in fixed plate 45
Structure, as in figure 2 it is shown, so that the position that three coordinate balladeur trains load when being placed in the go-cart of this loading has had certain
Limiting, staff only need to can ensure now this loading go-cart by three coordinate balladeur train on-line equipments between two limited posts 42
On the useful load of three coordinate balladeur trains be optimal number, convenience very and improve again work efficiency.
Embodiment 2: a kind of loading go-cart for three coordinate balladeur trains, is with the difference of embodiment 1, such as Fig. 3 and 4
Shown in, because of the existence of limited post 42, the upper end work surface 10 of three coordinate balladeur trains is being loaded on upper end bracing frame 4
During, the distance between two limited posts 42 is the biggest, it will the placement process of three coordinate balladeur trains is formed certain obstruction, this
Time will be not easy to the loading of three coordinate balladeur trains.
So, in the go-cart of this loading, as shown in Figure 4, the structure of limited post 42 be can realize level regulation spacing
Post 42;Regulate to realize the level that has of limited post 42, only need to offer a diameter in fixed plate 45 less than limited post 42 connecting
U-type groove 46, and add in the lower end of limited post 42 one can in U-type groove 46 the sliding post 421 of sliding up and down, sliding
The external peripheral surface moving post 421 is provided with limiting plate 4211, meanwhile, is connecting the groove of close U-type groove 46 in fixed plate 45
Mouth goes out to offer multiple groove 451 for limiting plate 4211 grafting.
When needing the position of limited post 42 is adjusted, only limited post 42 need to be pulled upwardly, make sliding post 421 exist
Can slide in U-type groove 46, the now slip of sliding post 421 can drive the slip of limited post 42, when needs limited post 42 exists
When a certain position is fixed, only need to unclamp the motive force to limited post 42, now limited post 42 falls automatically due to gravity, and drops down onto
In U-type groove 46, owing to the diameter of limited post 42 is more than the diameter of U-type groove 46, so, limited post 42 will not be from U-type groove 46
Slip down;Meanwhile, owing to limiting plate 4211 now can be in just grafting be placed on groove 451, so now not
On the premise of being pulled up by limited post 42, limited post 42 will be unable to continue sliding in U-type groove 46, the most just can realize
Fixing in this position of limited post 42.
So, during three coordinate balladeur trains are loaded in the go-cart of this loading, when having a certain limited post 42 to dress
When load process has hindered, the regulation of the displacement that limited post 42 is carried out trace can be facilitated so that three coordinate balladeur trains can be suitable
Being loaded in the go-cart of this loading of profit.
In the present embodiment, it is additionally provided with the diameter connecting plate 4212 more than U-type groove 46 in the lower end of sliding post 42, as
Shown in Fig. 4, being disposed to of connecting plate 4212 prevents when pulling up limited post 42, and strength is excessive, by limited post 42
Structure is being taken out completely from U-type groove 46, and the position adjustments process of limited post 42 is caused inconvenience.
Embodiment 3: a kind of loading go-cart for three coordinate balladeur trains, is with the difference of embodiment 2, such as Fig. 5 and 6
Shown in, it being used for the loading go-cart of three coordinate balladeur trains at this, lower end bracing frame 6 is provided with circular arc with the connecting place of Extension support 5
The connected mode of chamfering 9;Such be disposed to avoid the go-cart of this loading in transport pushing course, can be to pedestrian or article
Causing certain collision, pedestrian will not be understood goods and produce injury, hommization very by the junction of arc-shaped.
In the present embodiment, carry out promoting transport for the loading go-cart of three coordinate balladeur trains to this for convenience, so
Support 2 is equipped with push and pull bar 8 away from the one side of upper end bracing frame 4, as shown in Figure 6, push and pull bar 8 is also added into foaming 81
Setting so that staff is more easy and convenient and staff also defines certain protection in promoting conveying.
Detailed description of the invention, fits the inner surface of the upper end work surface 10 of three coordinate balladeur trains with upper end bracing frame 4, and three
The lower end work surface 101 of coordinate balladeur train is fitted with the outer surface of lower end bracing frame 6, thus the most i.e. achieves three coordinate balladeur trains
Fix for the loading loaded in go-cart of three coordinate balladeur trains at this;In loading process, limited post 42 can be pulled upwardly,
Making sliding post 421 can slide in U-type groove 46, the now slip of sliding post 421 can drive the slip of limited post 42, when
Needing limited post 42 when a certain position is fixed, only need to unclamp the motive force to limited post 42, now limited post 42 is due to gravity
Automatically fall, and drop down onto in U-type groove 46, meanwhile, under the effect of limiting plate 4211, it is possible to achieve limited post 42
Fixing in this position;Now when being loaded in the go-cart of this loading by three coordinates, limited post 42 can be simultaneously to three coordinates
Balladeur train serves the fixing of position.
This specific embodiment is only that it is not to restriction of the present utility model, ability to explanation of the present utility model
The present embodiment can be made after reading this specification by field technique personnel as required does not has the amendment of creative contribution, but
As long as all being protected by Patent Law in right of the present utility model.
Claims (10)
1. for the loading go-carts of three coordinate balladeur trains, including base (1), the support (2) at base (1) two ends be arranged on the end
The wheel (3) of seat (1) bottom, it is characterised in that: it is provided with upper end bracing frame (4), described two stands between described two stands (2)
(2) it is equipped with Extension support (5) in same end side surface, between described Extension support (5), is equipped with lower end bracing frame (6), described upper end
Bracing frame (4) is provided with many limited posts (42).
A kind of loading go-cart for three coordinate balladeur trains the most according to claim 1, it is characterised in that: described upper end supports
Frame (4) is provided with groove (41), and upper end bracing frame (4) is divided into left end support frame (43) and right-hand member bracing frame by described groove (41)
(44), described limited post (42) is separately positioned on left end support frame (43) and right-hand member bracing frame (44).
A kind of loading go-cart for three coordinate balladeur trains the most according to claim 2, it is characterised in that: described left end support
Being provided with polylith between frame (43) and right-hand member bracing frame (44) and connect fixed plate (45), described limited post (42) is arranged at connecting admittedly
Determine on plate (45).
A kind of loading go-cart for three coordinate balladeur trains the most according to claim 3, it is characterised in that: described connection is fixed
Plate (45) is equipped with U-type groove (46), described limited post respectively close to the two ends of left end support frame (43) and right-hand member bracing frame (44)
(42) diameter is more than the diameter of U-type groove (46), and the lower end of described limited post (42) is provided with and is slidably connected in U-type groove (46)
Sliding post (421), described sliding post (421) external peripheral surface is provided with limiting plate (4211), on described connection fixed plate (45)
It is provided with multiple groove (451) placed for limiting plate (4211) grafting.
A kind of loading go-cart for three coordinate balladeur trains the most according to claim 4, it is characterised in that: described sliding post
(421) bottom is provided with connecting plate (4212), and the diameter of described connecting plate (4212) is more than the diameter of U-type groove (46).
A kind of loading go-cart for three coordinate balladeur trains the most according to claim 5, it is characterised in that: described limited post
(42) external peripheral surface is provided with rubber sleeve (422).
A kind of loading go-cart for three coordinate balladeur trains the most according to claim 6, it is characterised in that: described upper end supports
It is equipped with rubber blanket (7) on the lateral surface of two medial walls upper and lower end bracing frame (6) of frame (4).
A kind of loading go-cart for three coordinate balladeur trains the most according to claim 7, it is characterised in that: described support (2)
One side away from upper end bracing frame (4) is equipped with push and pull bar (8).
A kind of loading go-cart for three coordinate balladeur trains the most according to claim 8, it is characterised in that: described push and pull bar
(8) outer circumference surface is cased with foaming (81).
A kind of loading go-cart for three coordinate balladeur trains the most according to claim 9, it is characterised in that: described lower end is propped up
Support (6) is provided with circular arc chamfering (9) with the connecting place of Extension support (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620644690.9U CN205769474U (en) | 2016-06-24 | 2016-06-24 | A kind of loading go-cart for three coordinate balladeur trains |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620644690.9U CN205769474U (en) | 2016-06-24 | 2016-06-24 | A kind of loading go-cart for three coordinate balladeur trains |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205769474U true CN205769474U (en) | 2016-12-07 |
Family
ID=58130811
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620644690.9U Expired - Fee Related CN205769474U (en) | 2016-06-24 | 2016-06-24 | A kind of loading go-cart for three coordinate balladeur trains |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205769474U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112249121A (en) * | 2020-11-10 | 2021-01-22 | 小刀科技股份有限公司 | Adjustable electric bicycle frame turnover vehicle |
-
2016
- 2016-06-24 CN CN201620644690.9U patent/CN205769474U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112249121A (en) * | 2020-11-10 | 2021-01-22 | 小刀科技股份有限公司 | Adjustable electric bicycle frame turnover vehicle |
CN112249121B (en) * | 2020-11-10 | 2023-08-29 | 小刀科技股份有限公司 | Adjustable electric bicycle frame turnover vehicle |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2009132518A1 (en) | Gravity transportation device | |
CN203198997U (en) | Glass carrier vehicle | |
CN205769474U (en) | A kind of loading go-cart for three coordinate balladeur trains | |
CN205186229U (en) | Timber carrier of drying for solid wood floor | |
CN207016175U (en) | A kind of suitable container corollary system for loading coil | |
CN203623740U (en) | Transporter used for stair ramp | |
CN205952919U (en) | Transport propeller shaft's small rail car in cabin | |
CN205971584U (en) | Industrial area pipe fitting transport vechicle for ground is executed to building | |
CN205892445U (en) | Circulating vertical lift elevator track system and have its elevator system | |
CN202987171U (en) | Horizontal bracket for coiled steel | |
CN204822550U (en) | But folded cascade stack band pulley seat transportation work or material rest | |
CN207061347U (en) | A kind of convertible article conveying drum | |
CN203766783U (en) | Electrified railway overhead contact system overhauling train | |
CN207699067U (en) | Telescopic balanced support hoisting transfer car(buggy) | |
CN214296079U (en) | Engineering material unloading and moving transport frame | |
CN203996333U (en) | A kind of factory transfer car of steel tube | |
CN209505815U (en) | A kind of bilayer table trolley | |
CN205675065U (en) | A kind of oil drum go-cart | |
CN102267470B (en) | Railway plate and wire rod transportation frame | |
CN112693719A (en) | A carrier for ceramic plate transports | |
CN204917599U (en) | Staircase transportation support frame | |
CN205312493U (en) | Novel commodity circulation coaster | |
CN204960971U (en) | Long rail conveyer of tunnel abrupt slope inclined shaft | |
CN205633963U (en) | Corridor handling device | |
CN203752968U (en) | Engineering transportation semitrailer and crawling ladder device thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161207 Termination date: 20190624 |
|
CF01 | Termination of patent right due to non-payment of annual fee |