CN205748948U - Prospects for mining equipment development is tested with building formula vacation coal petrography wall by laying bricks or stones - Google Patents
Prospects for mining equipment development is tested with building formula vacation coal petrography wall by laying bricks or stones Download PDFInfo
- Publication number
- CN205748948U CN205748948U CN201620403007.2U CN201620403007U CN205748948U CN 205748948 U CN205748948 U CN 205748948U CN 201620403007 U CN201620403007 U CN 201620403007U CN 205748948 U CN205748948 U CN 205748948U
- Authority
- CN
- China
- Prior art keywords
- building block
- slot
- pedestal
- horizontal
- building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Abstract
nullThis utility model belongs to coal mine machinery experimental facilities,Test with building formula vacation coal petrography wall by laying bricks or stones particularly to a kind of Prospects for mining equipment development,L-type pedestal (1) is equidistantly provided with three L-types building block slot (1 1),Pedestal (1) horizontal plane is made to form horizontal ledge one (1 2) and horizontal ledge two (1 3)、Building block horizontal slot one (1 4) and building block horizontal slot two (1 5),In the lower horizontal surface of pedestal (1) bottom plug-in mounting、Middle part left end building block (3)、Top、In、Building block (5) and bottom in the middle of bottom、Middle part right-hand member building block (4),A left side at middle part、In、By the L-type slot (1 1) on pedestal and building block boss each other and slot occlusion plug-in mounting top left building block (2) of formation above right building block、Top right-hand member building block (6),Prospects for mining equipment development experiment uses the most common material to make pedestal with building formula vacation coal petrography wall by laying bricks or stones,Time-consuming,Save formula materials,Dependable performance.
Description
Technical field
This utility model belongs to coal mine machinery experimental facilities, false with building formula by laying bricks or stones particularly to a kind of Prospects for mining equipment development experiment
Coal petrography wall.
Background technology
Prospects for mining equipment development manufacturer is when carrying out whole machine experiment in factory, and one of existing laboratory facilities are to use element mixed
Coagulate soil or mix the false crag of other materials construction or false rib, on foundation pit sand-gravel cushion, pouring false coal (rock) block of entirety,
Base component builds up one with experiment cutting units demultiplexing same material, places it in by the front end of experimental facilities.Set by experiment
On the standby level land opened to false crag or laboratory table, simulation carries out cut experiment, and this method there is the problem that false coal (rock)
Wall can not be reused, and repairing efficiency is long, is not suitable for using formula materials.If this method is for indoor, false coal (rock) block is again
When secondary use needs to repair, Factory Building area occupied is big, and another method of existing laboratory facilities is, is being put by experimental facilities front
Amplifying the footless concrete block of volume, this method is the most clumsy, and experimental data is the most accurate.
Summary of the invention
The purpose of this utility model is to overcome above-mentioned technical deficiency, it is provided that one can make to build coal petrography wall by laying bricks or stones and be suitable for frequently
Cutting test, solid and reliable, the Prospects for mining equipment development of low cost is tested with building formula vacation coal petrography wall by laying bricks or stones.
This utility model solves technical problem and the technical scheme is that Prospects for mining equipment development is tested with building formula vacation coal petrography by laying bricks or stones
Wall includes pedestal, is characterized in equidistantly being provided with three L-type building block slots on L-type pedestal, makes pedestal level form level convex
Platform one and horizontal ledge two, building block horizontal slot one and building block horizontal slot two, by setting in the lower horizontal surface of pedestal
Bottom horizontal ledge one, horizontal ledge two, building block horizontal slot one, building block horizontal slot two and L-type building block slot plug-in mounting, middle part
Left end building block, top, in, building block and bottom, middle part right-hand member building block in the middle of bottom, above the left, center, right building block at middle part, pass through base
L-type slot on seat and building block boss each other and the slot occlusion plug-in mounting top left building block of formation, top right-hand member are built
Block, the most each building block all can be combined into reparation building block in the building block of vertical or horizontal employing multi-layer phase similar shape.
The beneficial effects of the utility model are: Prospects for mining equipment development experiment uses the most common with building formula vacation coal petrography wall by laying bricks or stones
Pedestal made by material, uses boss at impact faces, and groove is mutually twisted building block and forms false coal petrography wall, and every piece of building block all
Laterally or longitudinally can build by laying bricks or stones with polylith combining form, adapt to repair coal petrography wall and keep the complete of false coal petrography wall, therefore repair
Time the molding duration short, it is not necessary to preserving period, can be with repairing with the processing of, building blockization with repair by cut body, time-consuming, saving is joined
Square bar material, dependable performance.
Accompanying drawing explanation
Illustrate with embodiment below in conjunction with accompanying drawing.
Fig. 1 is that Prospects for mining equipment development is tested with building formula vacation coal petrography wall construction figure by laying bricks or stones.
Fig. 2 is the shape and structure figure of the pedestal in Fig. 1.
Fig. 3 is the top left blocks shape structure chart in Fig. 1.
Fig. 4 is the bottom in Fig. 1, middle part left end blocks shape structure chart.
Fig. 5 is the bottom in Fig. 1, middle part right-hand member blocks shape structure chart.
Fig. 6 be the top in Fig. 1, in, blocks shape structure chart in the middle of bottom.
Fig. 7 is the top right-hand member blocks shape structure chart in Fig. 1.
In figure, 1-pedestal;1-1-L type building block slot;1-2-horizontal ledge one;1-3-horizontal ledge two;1-4-building block water
Plug flat groove one;1-5-building block horizontal slot two;2-top left building block;The vertical boss of 2-1-top left building block one;2-2-pushes up
Portion's left end building block horizontal ledge;The vertical boss of 2-3-top left building block two;Bottom 3-, middle part left end building block;3-1-convex platform
One;3-2-convex platform two;3-3-lower convex platform;Bottom 4-, middle part right-hand member building block;4-1-building block convex platform;4-2-building block side boss;
5-top, in, building block in the middle of bottom;Vertical boss before 5-1-;The left vertical boss of 5-2-;The right vertical boss of 5-3-;6-top right-hand member
Building block;The vertical boss of 6-1-top right-hand member building block one;The vertical boss of 6-2-top right-hand member building block two;7-vacation coal petrography wall fixed body.
Detailed description of the invention
Embodiment, referring to the drawings 1-7, Prospects for mining equipment development experiment is first-class at the pedestal 1 of L-type with building formula vacation coal petrography wall by laying bricks or stones
Away from being provided with three L-type building block slot 1-1, on the horizontal plane of pedestal 1 by horizontal ledge 1-2 that sets, horizontal ledge two 1-3,
Building block horizontal slot one 1-4, building block horizontal slot two 1-5 and L-type building block slot 1-1 and the lower convex platform in bottom left end building block 3
In the middle of 3-3, bottom, bottom the lower grooves occlusion plug-in mounting of the lower grooves in building block 5, bottom right-hand member building block 4, left, center, right end is built
Block 3,5,4.Bottom, in, above right-hand member building block 3,5,4 by the convex platform 3-1 in bottom left end building block 3, convex platform
Two 3-2, lower convex platform 3-3, groove below building block 5 in the middle of middle part, front vertical boss 5-1, left vertical boss 5-2, the right side are the most convex
Building block convex platform 4-1 in platform 5-3, bottom right-hand member building block 4, building block side boss 4-2 plug-in mounting connect to be built with left, center, right, bottom end
The middle part building block 3,5,4 of block 3,5,4 same shape.Top left building block 2 is by top left building block vertical boss one 2-1, top
Portion's left end building block vertical boss two 2-3, top left building block horizontal ledge 2-2 and convex platform one 3-in middle part left end building block 3
1, the L-type building block slot 1-1 on convex platform two 3-2, lower convex platform 3-3 and pedestal 1 is mutually twisted connection.Building block 5 in the middle of middle part
Top front vertical boss 5-1, left vertical boss 5-2, right vertical boss 5-3 and following groove and pedestal 1 and top left
Building block 2, crown center building block 5 plug-in mounting connect.Top right-hand member building block 6 is built by top right-hand member building block boss one 6-1, top right-hand member
The building block 5 middle with middle part right-hand member building block 4 and middle part of groove below block boss two 6-2 and top right-hand member building block and pedestal 1 are mutual
It is connected.The pedestal 1 of false coal petrography wall uses pouring concrete on foundation pit sand-gravel cushion to be formed, the building block on pedestal 1
Use and meet the cement mortar of requirement of strength and build up each building block, be plugged in by each building block formed on pedestal 1 up-narrow and down-wide
Simulation vacation coal petrography wall, be fixed in laboratory table with false coal petrography wall fixed body 7.
Prospects for mining equipment development experiment by the operation principle building formula vacation coal petrography wall by laying bricks or stones is: multiple building blocks of false coal petrography wall use ditch
Groove and boss are mutually twisted and are combined into one with pedestal 1 plug-in mounting and whole stop, and at digger, it are carried out cut and make false coal petrography wall be broken
After Huai, the combination of building block vertical or horizontal many bodies can be used to change at destruction, need not all discard, save material, repair time
Short.
Claims (1)
1. Prospects for mining equipment development is tested with building a formula vacation coal petrography wall by laying bricks or stones, including pedestal (1), it is characterised in that in L-type pedestal (1)
On be equidistantly provided with three L-types building block slot (1-1), make pedestal (1) horizontal plane form horizontal ledge one (1-2) and horizontal ledge two
(1-3), building block horizontal slot one (1-4) and building block horizontal slot two (1-5), by setting in the lower horizontal surface of pedestal (1)
Horizontal ledge one (1-2), horizontal ledge two (1-3), building block horizontal slot one (1-4), building block horizontal slot two (1-5) and L
Bottom type building block slot (1-1) plug-in mounting, middle part left end building block (3), top, in, building block (5) and bottom, middle part right-hand member in the middle of bottom
Building block (4), by the L-type slot (1-1) on pedestal and building block boss each other above the left, center, right building block at middle part
And formed slot occlusion plug-in mounting top left building block (2), top right-hand member building block (6), the most each building block all can longitudinally or
The building block of multi-layer phase similar shape is laterally used to be combined into reparation building block.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620403007.2U CN205748948U (en) | 2016-05-06 | 2016-05-06 | Prospects for mining equipment development is tested with building formula vacation coal petrography wall by laying bricks or stones |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620403007.2U CN205748948U (en) | 2016-05-06 | 2016-05-06 | Prospects for mining equipment development is tested with building formula vacation coal petrography wall by laying bricks or stones |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205748948U true CN205748948U (en) | 2016-11-30 |
Family
ID=57369465
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620403007.2U Withdrawn - After Issue CN205748948U (en) | 2016-05-06 | 2016-05-06 | Prospects for mining equipment development is tested with building formula vacation coal petrography wall by laying bricks or stones |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205748948U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105784404A (en) * | 2016-05-06 | 2016-07-20 | 徐州工程学院 | Masonry false coal rock wall used for experiment of mine excavation equipment |
-
2016
- 2016-05-06 CN CN201620403007.2U patent/CN205748948U/en not_active Withdrawn - After Issue
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105784404A (en) * | 2016-05-06 | 2016-07-20 | 徐州工程学院 | Masonry false coal rock wall used for experiment of mine excavation equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205748948U (en) | Prospects for mining equipment development is tested with building formula vacation coal petrography wall by laying bricks or stones | |
CN203049592U (en) | Diamond slope protection brick | |
CN105784404B (en) | Prospects for mining equipment development experiment is with building formula vacation coal petrography wall by laying bricks or stones | |
CN203174854U (en) | Load-bearing shock-resistant waterproof impervious anti-freezing crack-resistant cross-bore sound-proof self-heat-insulating air brick | |
CN202370152U (en) | Non-run-through hollow brick for resisting earthquake by shear check block | |
CN205046564U (en) | Modular cofferdam structure | |
CN205748949U (en) | Prospects for mining equipment development experiment base type entirety vacation coal petrography wall | |
CN103306274B (en) | Sintering stake and sintering stake preparation method | |
CN203961808U (en) | A kind of full screw earth auger construction CFG stake positioner at night | |
CN207224215U (en) | A kind of concrete experimental block mould of shape type variable easy mold release | |
CN205530929U (en) | Building garbage recovery's foraminiferous building block of three public generating circle head crosss and brickwork thereof | |
CN205382617U (en) | Building garbage recovery's foraminiferous building block of two hectogram generating circle head crosss and brickwork thereof | |
CN205189214U (en) | Close crack of environment -friendly mortise type wall brick | |
CN204098334U (en) | The building block of wedge-type interpenetrating structure | |
CN204326307U (en) | The module wall that a kind of building construction uses | |
CN204942926U (en) | A kind of fixed pedestal of blasting vibration measurement vibration sensor | |
CN204343329U (en) | A kind of Novel top pipe well | |
CN203768902U (en) | Pile endplate structure connected through screws | |
CN203305347U (en) | Assembly type cement brick combined mould | |
CN203891252U (en) | High-strength earthquake-proof building masonry | |
CN201896389U (en) | Combined masonry block | |
CN203729326U (en) | Retaining wall building block | |
CN205475983U (en) | Three public generating circle head cross building blocks and brickwork of building by laying bricks or stones thereof | |
CN203393891U (en) | Combined type building component capable of being utilized as template | |
CN201526110U (en) | Non-burned impermeable modular brick |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20161130 Effective date of abandoning: 20180619 |
|
AV01 | Patent right actively abandoned |