CN105784404A - Masonry false coal rock wall used for experiment of mine excavation equipment - Google Patents

Masonry false coal rock wall used for experiment of mine excavation equipment Download PDF

Info

Publication number
CN105784404A
CN105784404A CN201610295277.0A CN201610295277A CN105784404A CN 105784404 A CN105784404 A CN 105784404A CN 201610295277 A CN201610295277 A CN 201610295277A CN 105784404 A CN105784404 A CN 105784404A
Authority
CN
China
Prior art keywords
building block
horizontal
masonry
slot
pedestal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610295277.0A
Other languages
Chinese (zh)
Other versions
CN105784404B (en
Inventor
刘忆
何凡
黄传辉
范景欣
石端虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou University of Technology
Original Assignee
Xuzhou University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou University of Technology filed Critical Xuzhou University of Technology
Priority to CN201610295277.0A priority Critical patent/CN105784404B/en
Publication of CN105784404A publication Critical patent/CN105784404A/en
Application granted granted Critical
Publication of CN105784404B publication Critical patent/CN105784404B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M99/00Subject matter not provided for in other groups of this subclass
    • G01M99/005Testing of complete machines, e.g. washing-machines or mobile phones

Abstract

The invention belongs to coal mine mechanical experimental equipment, and particularly relates to a masonry false coal rock wall used for the experiment of mine excavation equipment. Three L-shaped masonry block inserting grooves (1-1) are equidistantly arranged on an L-shaped base (1) so that a first horizontal boss (1-2), a second horizontal boss (1-3), a first masonry block horizontal inserting groove (1-4) and a second masonry block horizontal inserting groove (1-5) are formed on the horizontal plane of the base (1). Bottom and middle part left end masonry blocks (3), top, middle and bottom part middle masonry blocks (5) and bottom and middle part right end masonry blocks (4) are inserted in the lower horizontal plane of the base (1). A top part left end masonry block (2) and a top part right end masonry block (6) are inserted above the left, middle and right masonry blocks of the middle part in an engaged way through the L-shaped inserting grooves (1-1) on the base, the bosses between the masonry blocks and the formed inserting grooves. According to the masonry false coal rock wall used for the experiment of the mine excavation equipment, low-cost and common material is adopted to manufacture the base so that time is saved, the formula material is saved and performance is reliable.

Description

Prospects for mining equipment development is tested with building formula vacation coal petrography wall by laying bricks or stones
Technical field
The invention belongs to coal mine machinery experimental facilities, test with building formula vacation coal petrography wall by laying bricks or stones particularly to a kind of Prospects for mining equipment development.
Background technology
Prospects for mining equipment development manufacturer is when carrying out whole machine experiment in factory, one of existing laboratory facilities are to use plain concrete or mix the false crag of other materials construction or false rib, on foundation pit sand-gravel cushion, pour overall false coal (rock) block, base component builds up one with experiment cutting units demultiplexing same material, places it in by the front end of experimental facilities.Being opened on the level land to false crag or laboratory table by experimental facilities, simulation carries out cut experiment, and this method there is the problem that false coal (rock) wall can not be reused, and repairing efficiency is long, is not suitable for using formula materials.If this method is for indoor, false coal (rock) block reuses when needing to repair, and Factory Building area occupied is big, another method of existing laboratory facilities is, being put the footless concrete block of large volume by experimental facilities front, this method is the most clumsy, and experimental data is the most accurate.
Summary of the invention
It is an object of the invention to overcome above-mentioned technical deficiency, it is provided that one can make to build coal petrography wall by laying bricks or stones and be suitable for frequent cutting test, solid and reliable, the Prospects for mining equipment development of low cost is tested with building formula vacation coal petrography wall by laying bricks or stones.
nullThe present invention solves technical problem and the technical scheme is that Prospects for mining equipment development experiment includes pedestal with building formula vacation coal petrography wall by laying bricks or stones,It is characterized on L-type pedestal, be equidistantly provided with three L-type building block slots,Pedestal level is made to form horizontal ledge one and horizontal ledge two、Building block horizontal slot one and building block horizontal slot two,By the horizontal ledge one set in the lower horizontal surface of pedestal、Horizontal ledge two、Building block horizontal slot one、Bottom building block horizontal slot two and L-type building block slot plug-in mounting、Middle part left end building block、Top、In、Building block and bottom in the middle of bottom、Middle part right-hand member building block,A left side at middle part、In、By the L-type slot on pedestal and building block boss each other and the slot occlusion plug-in mounting top left building block of formation above right building block、Top right-hand member building block,The most each building block all can be combined into reparation building block in the building block of vertical or horizontal employing multi-layer phase similar shape.
The invention has the beneficial effects as follows: Prospects for mining equipment development experiment uses the most common material to make pedestal with building formula vacation coal petrography wall by laying bricks or stones, boss is used at impact faces, groove is mutually twisted building block and forms false coal petrography wall, and can laterally or longitudinally build by laying bricks or stones with polylith combining form every piece of building block, adapt to repair coal petrography wall and keep the complete of false coal petrography wall, when therefore repairing, the molding duration is short, need not preserving period, can with repair with, building blockization processing and reparation are by cut body, time-consuming, save formula materials, dependable performance.
Accompanying drawing explanation
Illustrate with embodiment below in conjunction with accompanying drawing.
Fig. 1 is that Prospects for mining equipment development is tested with building formula vacation coal petrography wall construction figure by laying bricks or stones.
Fig. 2 is the shape and structure figure of the pedestal in Fig. 1.
Fig. 3 is the top left blocks shape structure chart in Fig. 1.
Fig. 4 is the bottom in Fig. 1, middle part left end blocks shape structure chart.
Fig. 5 is the bottom in Fig. 1, middle part right-hand member blocks shape structure chart.
Fig. 6 be the top in Fig. 1, in, blocks shape structure chart in the middle of bottom.
Fig. 7 is the top right-hand member blocks shape structure chart in Fig. 1.
In figure, 1-pedestal;1-1-L type building block slot;1-2-horizontal ledge one;1-3-horizontal ledge two;1-4-building block horizontal slot one;1-5-building block horizontal slot two;2-top left building block;The vertical boss of 2-1-top left building block one;2-2-top left building block horizontal ledge;The vertical boss of 2-3-top left building block two;Bottom 3-, middle part left end building block;3-1-convex platform one;3-2-convex platform two;3-3-lower convex platform;Bottom 4-, middle part right-hand member building block;4-1-building block convex platform;4-2-building block side boss;5-top, in, building block in the middle of bottom;Vertical boss before 5-1-;The left vertical boss of 5-2-;The right vertical boss of 5-3-;The right-hand member building block of 6-top;The vertical boss of 6-1-top right-hand member building block one;The vertical boss of 6-2-top right-hand member building block two;7-vacation coal petrography wall fixed body.
Detailed description of the invention
Embodiment, 1-7 referring to the drawings, Prospects for mining equipment development experiment is equidistantly to be provided with three L-type building block slot 1-1 on the pedestal 1 of L-type with building formula vacation coal petrography wall by laying bricks or stones, is engaged left, center, right end building block 3,5,4 bottom plug-in mounting by the lower grooves in building block 5 in the middle of horizontal ledge 1-2, horizontal ledge two 1-3, building block horizontal slot one 1-4, building block horizontal slot two 1-5 and L-type building block slot 1-1 and the lower convex platform 3-3 in bottom left end building block 3 that set, bottom, the lower grooves of bottom right-hand member building block 4 on the horizontal plane of pedestal 1.Bottom, in, connect the middle part building block 3,5,4 with left, center, right, bottom end building block 3,5,4 same shape by the building block convex platform 4-1 in the groove below building block 5 in the middle of the convex platform 3-1 in bottom left end building block 3, convex platform two 3-2, lower convex platform 3-3, middle part, front vertical boss 5-1, left vertical boss 5-2, right vertical boss 5-3, bottom right-hand member building block 4, building block side boss 4-2 plug-in mounting above right-hand member building block 3,5,4.Top left building block 2 is mutually twisted with the L-type building block slot 1-1 on convex platform one 3-1 in middle part left end building block 3, convex platform two 3-2, lower convex platform 3-3 and pedestal 1 by top left building block vertical boss one 2-1, top left building block vertical boss two 2-3, top left building block horizontal ledge 2-2 and is connected.In the middle of middle part, the top of building block 5 front vertical boss 5-1, left vertical boss 5-2, right vertical boss 5-3 and following groove are connected with pedestal 1 and top left building block 2, crown center building block 5 plug-in mounting.Top right-hand member building block 6 is mutually twisted by the groove below top right-hand member building block boss one 6-1, top right-hand member building block boss two 6-2 and top right-hand member building block is connected with building block 5 in the middle of middle part right-hand member building block 4 and middle part and pedestal 1.The pedestal 1 of false coal petrography wall uses pouring concrete on foundation pit sand-gravel cushion to be formed, building block on pedestal 1 uses the cement mortar meeting requirement of strength to build up each building block, it is plugged on pedestal 1 by each building block and forms up-narrow and down-wide simulation vacation coal petrography wall, be fixed in laboratory table with false coal petrography wall fixed body 7.
Prospects for mining equipment development experiment by the operation principle building formula vacation coal petrography wall by laying bricks or stones is: multiple building blocks of false coal petrography wall use groove and boss to be mutually twisted and are combined into one with pedestal 1 plug-in mounting and whole stop, it is carried out after cut makes false coal petrography wall destroyed at digger, the combination of building block vertical or horizontal many bodies can be used to change at destruction, need not all discard, saving material, repair time is short.

Claims (1)

  1. null1. a Prospects for mining equipment development is tested with building formula vacation coal petrography wall by laying bricks or stones,Including pedestal (1),It is characterized in that on L-type pedestal (1), be equidistantly provided with three L-types building block slot (1-1),Pedestal (1) horizontal plane is made to form horizontal ledge one (1-2) and horizontal ledge two (1-3)、Building block horizontal slot one (1-4) and building block horizontal slot two (1-5),By the horizontal ledge one (1-2) set in the lower horizontal surface of pedestal (1)、Horizontal ledge two (1-3)、Building block horizontal slot one (1-4)、Bottom building block horizontal slot two (1-5) and L-type building block slot (1-1) plug-in mounting、Middle part left end building block (3)、Top、In、Building block (5) and bottom in the middle of bottom、Middle part right-hand member building block (4),A left side at middle part、In、By the L-type slot (1-1) on pedestal and building block boss each other and slot occlusion plug-in mounting top left building block (2) of formation above right building block、Top right-hand member building block (6),The most each building block all can be combined into reparation building block in the building block of vertical or horizontal employing multi-layer phase similar shape.
CN201610295277.0A 2016-05-06 2016-05-06 Prospects for mining equipment development experiment is with building formula vacation coal petrography wall by laying bricks or stones Expired - Fee Related CN105784404B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610295277.0A CN105784404B (en) 2016-05-06 2016-05-06 Prospects for mining equipment development experiment is with building formula vacation coal petrography wall by laying bricks or stones

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610295277.0A CN105784404B (en) 2016-05-06 2016-05-06 Prospects for mining equipment development experiment is with building formula vacation coal petrography wall by laying bricks or stones

Publications (2)

Publication Number Publication Date
CN105784404A true CN105784404A (en) 2016-07-20
CN105784404B CN105784404B (en) 2018-06-19

Family

ID=56401846

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610295277.0A Expired - Fee Related CN105784404B (en) 2016-05-06 2016-05-06 Prospects for mining equipment development experiment is with building formula vacation coal petrography wall by laying bricks or stones

Country Status (1)

Country Link
CN (1) CN105784404B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101148928A (en) * 2007-11-08 2008-03-26 龚建良 Anti-vibration brick
KR20120020254A (en) * 2010-08-30 2012-03-08 김여일 Earthquake-proof mortarless interlocking modular block system and wall construction method
CN103233543A (en) * 2013-03-06 2013-08-07 宁波北仑大港科技创新服务中心 Self-locking building-free concrete building block
CN103806466A (en) * 2014-03-17 2014-05-21 重庆芳兰科技有限公司 Modular cross-wall structure for civil work
CN205748948U (en) * 2016-05-06 2016-11-30 徐州工程学院 Prospects for mining equipment development is tested with building formula vacation coal petrography wall by laying bricks or stones

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101148928A (en) * 2007-11-08 2008-03-26 龚建良 Anti-vibration brick
KR20120020254A (en) * 2010-08-30 2012-03-08 김여일 Earthquake-proof mortarless interlocking modular block system and wall construction method
CN103233543A (en) * 2013-03-06 2013-08-07 宁波北仑大港科技创新服务中心 Self-locking building-free concrete building block
CN103806466A (en) * 2014-03-17 2014-05-21 重庆芳兰科技有限公司 Modular cross-wall structure for civil work
CN205748948U (en) * 2016-05-06 2016-11-30 徐州工程学院 Prospects for mining equipment development is tested with building formula vacation coal petrography wall by laying bricks or stones

Also Published As

Publication number Publication date
CN105784404B (en) 2018-06-19

Similar Documents

Publication Publication Date Title
CN102289980B (en) Method for preparing preset cracks in hydrofracture simulation specimen
CN105784456B (en) It is a kind of to make the random mold for intersecting and running through crack sillar
CN205748948U (en) Prospects for mining equipment development is tested with building formula vacation coal petrography wall by laying bricks or stones
CN203049592U (en) Diamond slope protection brick
CN105784404A (en) Masonry false coal rock wall used for experiment of mine excavation equipment
CN104020028A (en) Combined test die for prefabricating fissures in dynamic-static mechanical similarity simulation test
CN202370152U (en) Non-run-through hollow brick for resisting earthquake by shear check block
CN211286252U (en) Tenon-and-mortise type stone expansion wall block and combined wall thereof
CN205748949U (en) Prospects for mining equipment development experiment base type entirety vacation coal petrography wall
CN204001371U (en) The spliced porous brick of sintering shale
CN204941015U (en) A kind of moveable assembled flag platform
CN205189214U (en) Close crack of environment -friendly mortise type wall brick
CN204326307U (en) The module wall that a kind of building construction uses
CN201144470Y (en) Anti-shock brick
CN104453017A (en) Module wall for house building
CN205343378U (en) Fragment of brick make -up machine
CN203891252U (en) High-strength earthquake-proof building masonry
CN219773206U (en) Pre-buried support piece for electric installation operation of piling type infilled wall
CN204645327U (en) Exempt from the building assembling type partition wall system of level fluting
CN205175115U (en) Dovetail groove refractory brick
CN203961808U (en) A kind of full screw earth auger construction CFG stake positioner at night
CN203994172U (en) A kind of cement block is made mould
CN203869926U (en) Combined test model for fissure pre-forming in dynamics and statics similarity simulation test
CN106996158A (en) It is a kind of for block for construction of building subassembly and preparation method thereof
CN203393891U (en) Combined type building component capable of being utilized as template

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180619

Termination date: 20190506

CF01 Termination of patent right due to non-payment of annual fee