CN205714217U - Two lining concrete curing trolleys - Google Patents

Two lining concrete curing trolleys Download PDF

Info

Publication number
CN205714217U
CN205714217U CN201620347443.2U CN201620347443U CN205714217U CN 205714217 U CN205714217 U CN 205714217U CN 201620347443 U CN201620347443 U CN 201620347443U CN 205714217 U CN205714217 U CN 205714217U
Authority
CN
China
Prior art keywords
steel pipe
door frame
lining concrete
concrete curing
shower nozzle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620347443.2U
Other languages
Chinese (zh)
Inventor
舒育正
张云昊
钟凯
陈军义
许海锋
何康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SECOND BRANCH Co Ltd OF ZHEJIANG TRANSPORTATION ENGINEERING CONSTRUCTION GROUP Co Ltd
Original Assignee
SECOND BRANCH Co Ltd OF ZHEJIANG TRANSPORTATION ENGINEERING CONSTRUCTION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SECOND BRANCH Co Ltd OF ZHEJIANG TRANSPORTATION ENGINEERING CONSTRUCTION GROUP Co Ltd filed Critical SECOND BRANCH Co Ltd OF ZHEJIANG TRANSPORTATION ENGINEERING CONSTRUCTION GROUP Co Ltd
Priority to CN201620347443.2U priority Critical patent/CN205714217U/en
Application granted granted Critical
Publication of CN205714217U publication Critical patent/CN205714217U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to constructing tunnel field, aim to provide a kind of two lining concrete curing trolleys, it is the door frame set up by steel pipe and constitute door frame shaped, the bottom of door frame is provided with moving parts, top is provided with the suitable circular arc frame of the shape phase with tunnel Hu Ding hole, described door frame, by height-adjustable steel pipe support, is provided with diagonal brace between steel pipe;Described circular arc frame is provided with several outside shower nozzle, and shower nozzle is connected with water pump by water pipe.Water can be supplied directly into tunnel vault and spray by the utility model height adjustable, it is ensured that carry out omnibearing maintenance to tunnel double-lining, and operating efficiency is high, cost-effective.

Description

Two lining concrete curing trolleys
Technical field
The utility model relates to constructing tunnel field, more specifically, is a kind of two lining concrete Maintenance trolley.
Background technology
" two linings " is one of constructing tunnel term, refers to when tunnel excavation along face Driving into forward, the four sides, tunnel having scraped out thereafter then needs reinforcement." two lining " i.e. refer to through Tunnel surrounding after reinforcing still needs to continue the work that second consolidation does.
Vcehicular tunnel is permanent for service life due to needs, and therefore Second Lining Construction both can ensure tunnel Road permanent stabilization, safe, attractive in appearance in operation uses, is also as safety stock simultaneously The measure of kind, this requires that the concrete of tunnel double-lining should have enough intensity, can meet again The requirement of durability.
Tunnel concrete intensity and the influence factor of durability, except having raw material, match ratio etc. Outside, an also critically important influence factor, the i.e. maintenance of concrete.Major part tunnel at present In road construction, in hole, temperature is higher, and air is dried, as carried out maintenance not in time, in concrete Moisture can evaporate too fast, forms dehydrating phenomena, can make the cement granules having formed gelinite can not Abundant aquation, it is impossible to be converted into stable crystallization, lacks enough cohesive forces, thus can mix Solidifying soil surface occurs that sheet or shape come off.Additionally, when concrete not yet possesses enough intensity, The too early evaporation of moisture also can produce bigger contraction distortion, cup shake occurs, affects coagulation The durability of soil and globality.
Major part tunnel all uses artificial mark spraying water curing at present, often has some areas not have maintenance To (especially vault part), also have the phenomenons such as curing time is inadequate also to have, and maintenance is Whole effect is bigger by the subjective impact of maintenance workman;Present stage lacks a kind of mechanically operable Maintenance trolley.
Utility model content
The purpose of this utility model is to solve to limit to existing for two lining concrete nourishment Sex chromosome mosaicism, simultaneously for strengthening secondary maintenance effect, provides and a kind of can be used for the two of constructing tunnel Lining concrete curing trolley.
To achieve these goals, two lining concrete curing trolleys of the present utility model are taked following Technical scheme is achieved:
A kind of two lining concrete curing trolleys, are set up the door frame constituting door frame shaped, door by steel pipe The bottom of frame is provided with moving parts, and top is provided with the suitable circular arc of the shape phase with tunnel Hu Ding hole Frame, described door frame, by height-adjustable steel pipe support, is provided with diagonal brace between steel pipe;Described circle Arc frame is provided with several outside shower nozzle, and shower nozzle is connected with water pump by water pipe.
As further improvement of the utility model, described shower nozzle is movably installed on circular arc frame, Spray angle is made to can adjust.
As further improvement of the utility model, described shower nozzle is with water adjusting valve.
As further improvement of the utility model, described shower nozzle is with water strainer.
As further improvement of the utility model, the quantity of described shower nozzle is 7, uniformly Arrange.
As further improvement of the utility model, described circular arc frame is away from tunnel Hu Ding hole 20-50cm;Described door frame is provided with manual operation platform;Described platform is by being laid on level Supporting steel pipe on bamboo slab rubber formed;It is provided with cat ladder to install with described door frame in the both sides of platform Fixing.
As further improvement of the utility model, described cat ladder uses the steel of Φ 25 × 4mm Pipe, spacing is 30cm;Described door frame uses the coating steel pipe of Φ 42 × 4mm;Diagonal brace uses Φ The steel pipe of 25 × 4mm;Supporting steel pipe bottom bamboo slab rubber uses the coating steel pipe of Φ 42 × 4mm; The thickness of bamboo slab rubber is 1cm.
As further improvement of the utility model, described moving parts be traveling wheel or Universal rolling wheel.
As further improvement of the utility model, described door frame also hangs with reddish yellow alternate Warning lamp.
Compared to existing technology, the beneficial effects of the utility model are:
Water can be supplied directly into tunnel vault and spray by the 1st, the utility model height adjustable Spill, it is ensured that omnibearing maintenance is carried out to tunnel double-lining.
2nd, the curved arrangement of maintenance water pipe of the present utility model, above shower nozzle be uniformly arranged, And can turn and can adjust, face of therefore spraying water is uniformly preferable;Workman can be simultaneously to two on bamboo slab rubber platform Lining checks, serves preliminary examination effect.
3rd, being provided with pulley bottom the utility model, workman can promote chassis to tunnel double-lining Carry out maintenance, be greatly increased the length of maintenance, and operating efficiency is high, has saved cost of labor.
Brief description
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the side schematic view of Fig. 1.
In figure: 1 door frame, 2 bamboo slab rubber, 3 shower nozzles, 4 circular arc framves, 5 water pipes, 6 cat ladders, 7 pulleys, 8 water pumps, 9 supporting steel pipes, 10 diagonal braces.
Detailed description of the invention
With specific embodiment, the utility model is described in further detail below in conjunction with the accompanying drawings:
As depicted in figs. 1 and 2, of the present utility model two lining concrete curing trolleys, mainly by Door frame the 1st, pulley the 7th, water pump the 8th, water pipe the 5th, cat ladder the 6th, bamboo slab rubber the 2nd, shower nozzles 3 etc. form; Wherein, the main force structure of door frame 1 uses the coating steel pipe of Φ 42 × 4mm to build composition, This steel pipe uses the form of telescopic so that varying height positions, it is simple to be suitable for different tunnels Top construction;The steel pipe also using Φ 25 × 4mm between door frame stress steel pipe is carried out as diagonal brace 10 Consolidation process, the junction, two ends of diagonal brace 10 is tightened by nut respectively.Bamboo is laid on door frame 1 Manual operation platform made by offset plate 2, it is simple to workman is in top-operation and preliminary examination;The thickness of bamboo slab rubber 2 Degree is 1cm, and the supporting steel pipe 9 of bottom uses the coating steel pipe of Φ 42 × 4mm.The two of platform Side is provided with cat ladder 6, and cat ladder 6 uses the steel pipe of Φ 25 × 4mm, and spacing is 30cm;Door frame 1 Side be provided with water pump 8;Water pump 8 is connected with water pipe 5, and water pipe 5 is along cat ladder 6 up Arrange.
The bottom of door frame 1 arranges traveling wheel 7;Being also arranged above and arc top, tunnel of door frame 1 The suitable circular arc frame 4 of the shape phase in hole, away from tunnel Hu Ding hole 20cm;Circular arc frame 4 is provided with 7 Outside shower nozzle 3, the angle adjustable of shower nozzle 3, water yield size also can adjust.During work, Connecting water inlet pipe 5 and water pump 8, water is depressed into spray by water pipe 5 by the pressure using water pump 8 3, promote chassis walking with artificial, water sprays from shower nozzle 3, can spray water two linings Maintenance.
Additionally, the alternate warning lamp of reddish yellow can be hung with on door frame 1, vehicular traffic under chassis is risen Warning function, prevents from bumping against.
Finally, it is also noted that, listed above is only a concrete reality of the present utility model Execute example.Obviously, the utility model can also have many deformation, those of ordinary skill in the art The all deformation can directly derived from the utility model disclosure or associate, are all considered as It is protection domain of the present utility model.

Claims (9)

1. a lining concrete curing trolley, set up the door frame (1) constituting door frame shaped by steel pipe, the bottom of door frame (1) is provided with moving parts, top is provided with the suitable circular arc frame (4) of the shape phase with tunnel Hu Ding hole, it is characterized in that, described door frame (1), by height-adjustable steel pipe support, is provided with diagonal brace (10) between steel pipe;Described circular arc frame (4) is provided with several outside shower nozzle (3), and shower nozzle (3) is connected with water pump (8) by water pipe (5).
2. two lining concrete curing trolleys according to claim 1, it is characterised in that described shower nozzle (3) is movably installed on circular arc frame (4), makes spray angle can adjust.
3. two lining concrete curing trolleys according to claim 2, it is characterised in that described shower nozzle (3) is with water adjusting valve.
4. two lining concrete curing trolleys according to claim 3, it is characterised in that described shower nozzle (3) is with water strainer.
5. two lining concrete curing trolleys according to any one of claim 1 to 4, it is characterised in that the quantity of described shower nozzle (3) is 7, is uniformly arranged.
6. two lining concrete curing trolleys according to claim 1, it is characterised in that described circular arc frame (4) is away from tunnel Hu Ding hole 20-50cm;Described door frame (1) is provided with manual operation platform;Described platform is to be formed by the bamboo slab rubber (2) on the supporting steel pipe (9) of the level that is laid on;It is provided with cat ladder (6) in the both sides of platform and install fixing with described door frame (1).
7. two lining concrete curing trolleys according to claim 6, it is characterised in that described cat ladder (6) uses the steel pipe of Φ 25 × 4mm, and spacing is 30cm;Described door frame (1) uses the coating steel pipe of Φ 42 × 4mm;Diagonal brace (10) uses the steel pipe of Φ 25 × 4mm;The supporting steel pipe (9) of bamboo slab rubber (2) bottom uses the coating steel pipe of Φ 42 × 4mm;The thickness of bamboo slab rubber (2) is 1cm.
8. two lining concrete curing trolleys according to claim 1, it is characterised in that described moving parts is traveling wheel (7) or universal rolling wheel.
9. two lining concrete curing trolleys according to claim 1, it is characterised in that also hang with the alternate warning lamp of reddish yellow on described door frame (1).
CN201620347443.2U 2016-04-21 2016-04-21 Two lining concrete curing trolleys Active CN205714217U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620347443.2U CN205714217U (en) 2016-04-21 2016-04-21 Two lining concrete curing trolleys

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620347443.2U CN205714217U (en) 2016-04-21 2016-04-21 Two lining concrete curing trolleys

Publications (1)

Publication Number Publication Date
CN205714217U true CN205714217U (en) 2016-11-23

Family

ID=57295771

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620347443.2U Active CN205714217U (en) 2016-04-21 2016-04-21 Two lining concrete curing trolleys

Country Status (1)

Country Link
CN (1) CN205714217U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107269296A (en) * 2017-07-10 2017-10-20 中铁十局集团有限公司 One kind two serves as a contrast chassis and carries concrete curing device and its application method
CN108086999A (en) * 2017-12-12 2018-05-29 中交公局第二工程有限公司 Tunnel sprays trolley
CN108533289A (en) * 2018-05-23 2018-09-14 安徽华骅桥梁设备制造有限公司 One kind being used for tunnel steam curing trolley
CN110054508A (en) * 2019-04-10 2019-07-26 安徽智恒机械设备有限公司 A kind of tunnel spray is cared the car

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107269296A (en) * 2017-07-10 2017-10-20 中铁十局集团有限公司 One kind two serves as a contrast chassis and carries concrete curing device and its application method
CN108086999A (en) * 2017-12-12 2018-05-29 中交公局第二工程有限公司 Tunnel sprays trolley
CN108533289A (en) * 2018-05-23 2018-09-14 安徽华骅桥梁设备制造有限公司 One kind being used for tunnel steam curing trolley
CN110054508A (en) * 2019-04-10 2019-07-26 安徽智恒机械设备有限公司 A kind of tunnel spray is cared the car

Similar Documents

Publication Publication Date Title
CN205714217U (en) Two lining concrete curing trolleys
CN108643938B (en) Smooth surface shotcrete supporting structure of deep coal mine tunnel and construction method thereof
CN206801065U (en) A kind of side wall concrete automatic maintenance device
CN104264995A (en) Automatic spraying conservation system for high-rise building shear wall structure
CN108331334A (en) Shear wall, cylinder concrete structure large form hoisting type construction method
CN205677634U (en) Tunnel concrete maintenance spraying chassis
CN208762846U (en) A kind of maintenance of surface device
CN208619125U (en) A kind of tunnel secondary lining concrete curing trolley
CN205804904U (en) A kind of leveling unit
CN207513156U (en) A kind of scalable frame body for building
CN206468008U (en) Outer wall of basement one side formwork support system
CN207795271U (en) A kind of tunnel double-lining concrete is totally-enclosed to exempt from watering spray moisture-keeping maintaining trolley structure
CN204690763U (en) Long side slope protection concrete continuous fast pouring drawing-die system
CN111608049B (en) Concrete vibration maintenance auxiliary device for road construction
CN205818122U (en) A kind of high-speed railway large box girder concrete automatic spray curing system
CN205955766U (en) A simple and easy multi -functional dolly that is used for tunnel no. 2 lining concrete maintenance dust falls
CN209442884U (en) A kind of Super High creeping formwork promotion concrete curing device
CN204780925U (en) City gate hole type inclined shaft slipform platform truck pulls removal structure
CN209555779U (en) Cast-in-situ steel reinforced concrete guardrail sprinkling maintenance device
CN207109622U (en) A kind of free frame pin-connected panel railway Evacuation platform of steel
CN209557010U (en) A kind of full-automatic health trolley of Tunnel Second Lining
CN211395262U (en) Road surface leveling device for highway engineering operation
CN211368397U (en) Formwork support system
CN208803390U (en) Bridge strengthening hoistable platform
CN208431019U (en) A kind of tunnel double-lining sprinkling maintenance trolley

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant