CN205818122U - A kind of high-speed railway large box girder concrete automatic spray curing system - Google Patents
A kind of high-speed railway large box girder concrete automatic spray curing system Download PDFInfo
- Publication number
- CN205818122U CN205818122U CN201620790906.2U CN201620790906U CN205818122U CN 205818122 U CN205818122 U CN 205818122U CN 201620790906 U CN201620790906 U CN 201620790906U CN 205818122 U CN205818122 U CN 205818122U
- Authority
- CN
- China
- Prior art keywords
- pipeline
- water
- steel pipe
- box girder
- large box
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000007921 spray Substances 0.000 title claims abstract description 34
- 239000004567 concrete Substances 0.000 title claims abstract description 20
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 61
- 239000010959 steel Substances 0.000 claims abstract description 61
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 44
- 239000008400 supply water Substances 0.000 claims abstract description 5
- 210000001015 abdomen Anatomy 0.000 claims 1
- 238000012423 maintenance Methods 0.000 abstract description 12
- 238000010276 construction Methods 0.000 abstract description 5
- 238000009434 installation Methods 0.000 abstract description 2
- 230000007423 decrease Effects 0.000 abstract 1
- 238000000151 deposition Methods 0.000 description 4
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 230000007613 environmental effect Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 206010016807 Fluid retention Diseases 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000004574 high-performance concrete Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000000275 quality assurance Methods 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 230000005641 tunneling Effects 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
A kind of high-speed railway large box girder concrete automatic spray curing system, is provided with water pump in cistern, supply water by fixing pipeline and moving channel connecting bottom board pipeline and web flange plate pipeline;Base plate pipeline and web flange plate pipeline are positioned at rectangular steel pipe two ends, round steel pipe two ends connect fixed support and with rectangular steel pipe mutually intert be connected, round steel pipe two ends are provided with road wheel simultaneously, road wheel contact track channel-section steel, hoist engine is supported connection round steel pipe by steel wire rope by four assembly pulleys, rectangular steel pipe is provided with spacing steel plate, track channel-section steel two ends are provided with deposits beam buttress, deposit installation travel control switch on beam buttress, water spray eye is set on base plate pipeline web flange plate pipeline and realizes automatic water jetting, traveling control system realizes walking, travel control device makes hoist engine invert, realize circulation walking automatically, water circulation system reaches to recycle, this kind of automatic sprinkler fire-extinguishing system decreases quantity and the labor intensity of operator, improve the maintenance quality of large box girder concrete, save water resource, save construction cost.
Description
Technical field
This utility model relates to high-speed railway large box girder curing means, is specifically related to a kind of high-speed railway large box girder and supports
Protection unit.
Background technology
In the last few years, the fast development advanced by leaps and bounds along with China's high ferro construction, superstructure used the bridge of prefabricated case beam
Beam also gets more and more, and prefabricated case beam is as the crucial partitioned project of bridge, it is desirable to beam body service life reaches 100 years, and this is the most right
Precast beam entity prescription is the highest, especially beam body concrete durability index, and durability index is not only embodied in high performance concrete
In original material amount used by match ratio, more it is embodied on the maintenance quality after beam body has been constructed.But during practice of construction, beam
Body concrete health preserving also rests in conventional artificial watering, owing to artificial watering is not only wasted time and energy, there is also beam body base plate,
The problem that in web flange plate and case, maintenance is not in place, it is possible to fundamentally improving precast beam concrete health preserving quality is also one
A difficult problem urgently to be resolved hurrily.Although the automatic spray craft of the fixing rotary that have employed at present in some similar gardens, carry
High health preserving level, but there is also the dead angle of health preserving, and pipe laying is many, shower nozzle usage amount is big, and water consumption is big, and use cost is high
Etc. shortcoming, the most not widely used by institute of unit in charge of construction, therefore, it is badly in need of one at high ferro prefabricated case beam construction field
Individual both simple, the most efficient and cost-effective automatic spray curing system solves this difficult problem.
Summary of the invention
In place of overcoming above-mentioned the deficiencies in the prior art, the invention provides a kind of utility model high-speed railway Large Box
Beam concrete automatic spray curing system, have low cost, easy to use, simple to operate, conserve water, spray the spy that coverage rate is complete
Point, provides a strong guarantee to prefabricated case beam health preserving quality.
To achieve these goals, the technical solution adopted in the utility model is:
A kind of high-speed railway large box girder concrete automatic spray curing system, is provided with water pump in cistern, supply water by fixing
Pipeline in pipeline and moving channel connecting bottom board pipeline, web flange plate pipeline and case;Base plate pipeline and web flange plate pipeline
Being positioned at rectangular steel pipe two ends, in case, pipeline is positioned at beam body inner chamber end face, and round steel pipe two ends connect fixed support and rectangle steel
Pipe mutually interts and connects, and round steel pipe two ends are provided with road wheel simultaneously, and road wheel contact track channel-section steel, hoist engine passes through steel wire rope
Being supported by four assembly pulleys and connect round steel pipe, rectangular steel pipe is provided with spacing steel plate, and track channel-section steel two ends are provided with deposits beam buttress, deposits
On beam buttress, travel switch is set.
In described base plate pipeline, web flange plate pipeline and case, pipeline is provided with water spray eye.
Hoist engine, assembly pulley, rope traction running gear are walked, under spacing steel plate and travel switch effect, it is achieved
Automatic Cycle is walked.
Base plate pipeline, web flange plate pipeline are consistent with large box girder outline with the form of fracture of pipeline in case, overall
Width is up to 13 meters, and pipeline is apart from beam body concrete lower edge vertical dimension 40 centimetres.
Spray water on pipeline in base plate pipeline, web flange plate pipeline and case eye diameter 1mm, spacing 5-10cm.
After the curing water sprayed out falls earthward, freely it is back to cistern by hardened ground, dash platform, charge for remittance slope
In, it is achieved water resource recycles.
The beneficial effects of the utility model are:
1) simple, saving material is made
Appearance profile cross dimensions according to high ferro box beam makes, and utilizes square steel and seamless steel pipe to make.
2) save artificial, simple to operate
After spray maintenance device installs, it is only necessary to a people is controlled by start stop switch, spray maintenance of can automatically walking, greatly
Reduce greatly cost of labor.
3) spray that coverage rate is complete, concrete curing quality assurance
This sprinkling curing system maintenance quality is high, there is not dead angle, and tunneling boring covers beam body outline, has ensured that beam body is mixed
Solidifying soil obtains effective maintenance.
4) using water wisely, beneficially environmental protection
This spray system uses cistern central water supply, and the water resource after maintenance can save water money with recycling
Source, beneficially environmental conservation.
Accompanying drawing explanation
Fig. 1 is top view of the present utility model.
Fig. 2 is front view of the present utility model.
Fig. 3 is top view in this utility model case.
Fig. 4 is front view in this utility model case.
Wherein, 1 is cistern;2 is water pump;3 is fixing pipeline;4 is moving channel;5 is base plate pipeline;6 is the web wing
Listrium pipeline;7 is track channel-section steel;8 is road wheel;9 is round steel pipe;10 is rectangular steel pipe;11 is fixed support;12 is elevator
Machine;13 is assembly pulley;14 is steel wire rope;15 is spacing steel plate;16 for depositing beam buttress;17 is travel switch;18 is pipeline in case,
19 is beam-ends channel-section steel.
Detailed description of the invention
Below in conjunction with accompanying drawing, this utility model is further discussed below.
As shown in Figure 1, 2, a kind of high-speed railway large box girder concrete automatic spray curing system, it is provided with water pump in cistern 1
2, cistern 1 is by pipeline 18 in fixing pipeline 3 and moving channel 4 connecting bottom board pipeline 5, web flange plate pipeline 6 and case;The end
Plate pipeline 5 and web flange plate pipeline 6 are positioned at rectangular steel pipe 10 two ends, and in case, pipeline 18 is positioned at beam body inner chamber end face, circular steel
Pipe 9 two ends connect fixed support 11 and with rectangular steel pipe 10 mutually intert be connected, round steel pipe 9 two ends are provided with road wheel 8 simultaneously,
Road wheel 8 contacts track channel-section steel 7, and hoist engine 12 is supported connection round steel pipe 9, rectangle by steel wire rope 14 by four assembly pulleys 13
Steel pipe 10 is provided with spacing steel plate 15, and track channel-section steel 7 two ends are provided with deposits beam buttress 16, deposits installation travel switch 17 on beam buttress 16,
Installing 4 assembly pulleys on beam-ends channel-section steel 19, three steel wire ropes drive pipeline 18 circulation walking in case, the end under the rotation of assembly pulley
Arranging water spray eye on plate pipeline web flange plate pipeline and realize automatic water jetting, traveling control system realizes walking, and Stroke Control fills
Put and make hoist engine invert, it is achieved circulation walking automatically, water circulation system reaches to recycle.
Arranging a cistern depositing beam pedestal limit, install water pump, the water-holding quantity of cistern need to persistently supply water and meet spray
Device two water supply requirements back and forth of walking, water pump need to meet the requirement of spray equipment water pressure, installs booster pump if desired and carries
High pressure of supply water.Water system is supplied water to base plate pipeline and web flange plate pipeline by water pump, fixing pipeline, moving channel
In described base plate pipeline 5, web flange plate pipeline 6 and case, pipeline 18 is provided with water spray eye.
Hoist engine 12, assembly pulley 13, steel wire rope 14 draw running gear walking, make at spacing steel plate 15 and travel switch 17
Under with, it is achieved Automatic Cycle is walked.
Installing a hoist engine depositing beam pedestal limit, install two channel-section steels and do track, spray maintenance device installs four wheels
Son is by hoist engine traction walking in channel-section steel, and curing means is linked to be entirety by steel wire rope and assembly pulley with hoist engine, is depositing beam
Installing travel switch on buttress, curing means one end of walking, after spacing steel plate touches travel switch, i.e. can return to circulation
Walking.
Base plate pipeline 5, web flange plate pipeline 6 are consistent with large box girder outline with the form of fracture of pipeline in case 18,
Overall width is up to 13 meters, and pipeline is apart from beam body concrete lower edge vertical dimension 40 centimetres.
Spray water on pipeline 18 in base plate pipeline 5, web flange plate pipeline 6 and case eye diameter 1mm, spacing 5-10cm.
Deposit through-hardening 5-10cm below beam pedestal, and dash platform is set in surrounding, certain charge for remittance slope is set, in water-retention
Water return outlet is reserved in one end, pond, and maintenance water is pooled to cistern after falling earthward, recycles.
After the curing water sprayed out falls earthward, freely it is back to cistern 1 by hardened ground, dash platform, charge for remittance slope
In, it is achieved water resource recycles.
Wherein support the fixed support of spray maintenance device, meet in moving process the most indeformable.
During use, opening and control start stop switch, water system, running gear, water circulation system work simultaneously, reach automatic
The effect of spray maintenance.
Claims (6)
1. a high-speed railway large box girder concrete automatic spray curing system, it is characterised in that cistern is provided with water pump in (1)
(2), supply water by fixing pipeline (3) and moving channel (4) connecting bottom board pipeline (5), web flange plate pipeline (6) and case inner tube
Road (18);Base plate pipeline (5) and web flange plate pipeline (6) are positioned at rectangular steel pipe (10) two ends, and in case, pipeline (18) is positioned at beam
Intracoelomic cavity end face, round steel pipe (9) two ends connect fixed support (11) and intert mutual with rectangular steel pipe (10) is connected, and justify simultaneously
Shape steel pipe (9) two ends are provided with road wheel (8), road wheel (8) contact track channel-section steel (7), and hoist engine (12) passes through steel wire rope (14)
Being supported by four assembly pulleys (13) and connect round steel pipe (9), rectangular steel pipe (10) is provided with spacing steel plate (15), track channel-section steel (7)
Two ends are provided with deposits beam buttress (16), deposits and installs travel control switch (17) on beam buttress (16), and beam-ends channel-section steel (19) is upper installs 4
Assembly pulley (13), three steel wire ropes drive pipeline (18) circulation walking in case, base plate pipeline abdomen under the rotation of assembly pulley (13)
Arranging water spray eye on plate flange plate pipeline and realize automatic water jetting, traveling control system realizes walking, and travel control device makes elevator
Machine (12) inverts, it is achieved circulation walking automatically, water circulation system reaches to recycle.
A kind of high-speed railway large box girder concrete automatic spray curing system the most according to claim 1, it is characterised in that institute
In base plate pipeline (5), web flange plate pipeline (6) and the case stated, pipeline (18) is provided with water spray eye.
A kind of high-speed railway large box girder concrete automatic spray curing system the most according to claim 1, it is characterised in that volume
Raise machine (12), assembly pulley (13), steel wire rope (14) traction running gear walking, make at spacing steel plate (15) and travel switch (17)
Under with, it is achieved Automatic Cycle is walked.
A kind of high-speed railway large box girder concrete automatic spray curing system the most according to claim 1, it is characterised in that the end
Plate pipeline (5), web flange plate pipeline (6) are consistent with large box girder outline with the form of fracture of pipeline in case (18), overall
Width is up to 13 meters, and pipeline is apart from beam body concrete lower edge vertical dimension 40 centimetres.
A kind of high-speed railway large box girder concrete automatic spray curing system the most according to claim 1, it is characterised in that the end
Pipeline (18) upper water spray eye diameter 1mm, spacing 5-10cm in plate pipeline (5), web flange plate pipeline (6) and case.
A kind of high-speed railway large box girder concrete automatic spray curing system the most according to claim 1, it is characterised in that spray
Drench after the curing water falls earthward, be freely back in cistern (1) by hardened ground, dash platform, charge for remittance slope, it is achieved water
Resource circulation utilization.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620790906.2U CN205818122U (en) | 2016-07-26 | 2016-07-26 | A kind of high-speed railway large box girder concrete automatic spray curing system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620790906.2U CN205818122U (en) | 2016-07-26 | 2016-07-26 | A kind of high-speed railway large box girder concrete automatic spray curing system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205818122U true CN205818122U (en) | 2016-12-21 |
Family
ID=57561584
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620790906.2U Expired - Fee Related CN205818122U (en) | 2016-07-26 | 2016-07-26 | A kind of high-speed railway large box girder concrete automatic spray curing system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205818122U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106836002A (en) * | 2017-04-11 | 2017-06-13 | 中国中铁航空港建设集团有限公司 | A kind of sprinkling equipment with high ferro bridge pier automatic maintenance function |
CN107881920A (en) * | 2017-11-30 | 2018-04-06 | 中铁大桥局集团第二工程有限公司 | A kind of cantilever box beam automatic spray curing means |
CN110228130A (en) * | 2019-06-27 | 2019-09-13 | 郑州铁路职业技术学院 | A kind of overpass prefabricated case beam circulating maintenance device |
-
2016
- 2016-07-26 CN CN201620790906.2U patent/CN205818122U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106836002A (en) * | 2017-04-11 | 2017-06-13 | 中国中铁航空港建设集团有限公司 | A kind of sprinkling equipment with high ferro bridge pier automatic maintenance function |
CN107881920A (en) * | 2017-11-30 | 2018-04-06 | 中铁大桥局集团第二工程有限公司 | A kind of cantilever box beam automatic spray curing means |
CN110228130A (en) * | 2019-06-27 | 2019-09-13 | 郑州铁路职业技术学院 | A kind of overpass prefabricated case beam circulating maintenance device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107654240B (en) | Spraying maintenance trolley | |
CN208202618U (en) | A kind of civil construction sprinkler | |
CN205818122U (en) | A kind of high-speed railway large box girder concrete automatic spray curing system | |
CN202029230U (en) | In-box automatic cycle spray device of a large scale box girder | |
CN104264995A (en) | Automatic spraying conservation system for high-rise building shear wall structure | |
CN207564676U (en) | It is a kind of to conserve the hydraulic self-creeping formwork with spray equipment convenient for high and huge bridge pier | |
CN105065056B (en) | A kind of underground coal mine multi-stage, energy-saving tunnel cleaning device | |
CN208251003U (en) | Highway engineering construction conserves depositing dust multiservice car | |
CN210969332U (en) | Bridge construction is with spraying maintenance system | |
CN207100008U (en) | A kind of Garden Engineering watering shower nozzle | |
CN209260518U (en) | A kind of highway maintenance equipment | |
CN208907210U (en) | A kind of bridge floor guardrail maintenance watering device | |
CN207332894U (en) | A kind of tunnel-liner spraying health promotion equipment and a kind of towed trolley | |
CN108505446A (en) | Bridge pier, continuous beam spray maintenance device | |
CN210712710U (en) | Watering equipment for civil engineering | |
CN107155824A (en) | A kind of agricultural Multifunctional sprinkler irrigation device | |
CN215441347U (en) | Concrete curing means for highway | |
CN206243149U (en) | Cleaning machine and its cleaning agent spray equipment | |
CN208627604U (en) | Release agent spraying platform | |
CN209557010U (en) | A kind of full-automatic health trolley of Tunnel Second Lining | |
CN210782383U (en) | Roadside bush irrigation equipment | |
CN210507056U (en) | Civil engineering building is with spreading husky grey device | |
CN204585562U (en) | The concrete sandstone material mix conveying appliance that band rinses | |
CN210906632U (en) | Sluice gate pier spraying device for hydraulic engineering | |
CN206873383U (en) | A kind of water sprinkling path equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161221 |