CN107269296A - One kind two serves as a contrast chassis and carries concrete curing device and its application method - Google Patents

One kind two serves as a contrast chassis and carries concrete curing device and its application method Download PDF

Info

Publication number
CN107269296A
CN107269296A CN201710555922.2A CN201710555922A CN107269296A CN 107269296 A CN107269296 A CN 107269296A CN 201710555922 A CN201710555922 A CN 201710555922A CN 107269296 A CN107269296 A CN 107269296A
Authority
CN
China
Prior art keywords
spraying pipeline
arch ring
water spraying
jack group
chassis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710555922.2A
Other languages
Chinese (zh)
Inventor
王更峰
李行利
王永太
郝洪兴
王文波
杨艳召
李迅
徐腾辉
邹强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 11th Bureau Group Co Ltd
Fourth Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd
Original Assignee
China Railway 11th Bureau Group Co Ltd
Fourth Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 11th Bureau Group Co Ltd, Fourth Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd filed Critical China Railway 11th Bureau Group Co Ltd
Priority to CN201710555922.2A priority Critical patent/CN107269296A/en
Publication of CN107269296A publication Critical patent/CN107269296A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor

Abstract

One kind two serves as a contrast chassis and carries concrete curing device and its application method, and device includes water injection system, and water injection system includes storage tank(1), water spraying pipeline and water pump, water spraying pipeline includes left arc water spraying pipeline(2)With right arc water spraying pipeline(3), multiple shower nozzles are provided with both(9), left arc water spraying pipeline(2)With storage tank(1)It is connected, right arc water spraying pipeline(3)With storage tank(1)It is connected.Method includes:Make left arch ring(6)With right arch ring(10)Exceed two lining chassis backforms, make left arch ring(6)With right arch ring(10)Cross two lining chassis side moulds, adjustment shower nozzle(9)The distance between concrete are served as a contrast with two, make left arc water spraying pipeline(2)With right arc water spraying pipeline(3)Spray water, watering maintenance is carried out to concrete.Concrete is conserved in time after realizing the lining cutting demoulding, the problem of currently concrete can not be conserved in time sometimes is solved.

Description

One kind two serves as a contrast chassis and carries concrete curing device and its application method
Technical field
The present invention relates to a kind of curing means, more specifically to one kind two serve as a contrast chassis carry concrete curing device and Its application method, belongs to tunnel concrete technical field of construction.
Background technology
Currently, with the development of Line for Passenger Transportation high-speed railway and highway, except the strict demand to roadbed sedimentation and deformation with Outside, the wind tunnel effect to tunnel also has strict demand, it is desirable to its meet train, automobile high-speed by when the wind pressure that produces will not Make two lining surface chip off-fallings, do not jeopardize driving safety;Therefore this requires two lining concretes to have enough intensity, also to there is good Durability.But, concrete is when not yet possessing sufficient intensity, due to heat, is air-dried, and is such as conserved not in time Moisture in concrete can be evaporated quickly, form dehydrating phenomena, and the evaporation of moisture too early can produce contraction distortion, drying shrinkage occurs Crackle, so as to influence the durability of concrete.
At present, generally concrete is conserved using various forms of spray chassis for tunnel double-lining maintenance.But, Influenceed by construction site, spray chassis is general only to be set behind two lining chassis, if two lining chassis influence because of construction speed It is difficult to push ahead, spray chassis will be unable to the timely maintenance of concrete, so as to have a strong impact on the maintenance effect of concrete.
The content of the invention
It is an object of the invention to only served as a contrast for the existing spray chassis conserved for tunnel double-lining two behind chassis Be provided with possibly can not maintenance timely to concrete, so as to maintenance effect bad the problems such as having a strong impact on concrete, there is provided one kind Two lining chassis carry concrete curing device and its application method.
To achieve the above object, technical solution of the invention is:One kind two serves as a contrast chassis and carries concrete curing device, Including water injection system, described water injection system includes storage tank, water spraying pipeline and water pump, and described water pump is connected with storage tank Connect, described water spraying pipeline includes the left arc water spraying pipeline and right arc water spraying pipeline for being arranged on two lining chassis door frame both sides, Multiple shower nozzles are provided with described left arc water spraying pipeline and right arc water spraying pipeline, left arc water spraying pipeline one end is close Close, the other end is connected as water inlet by left connection flexible pipe with storage tank, right arc water spraying pipeline one end is closed, the other end It is connected as water inlet by right connection flexible pipe with storage tank, the water inlet of left connection flexible pipe and the water inlet of right connection flexible pipe It is respectively arranged with switch gate valve.
Also include support system, described support system includes left arch ring, right arch ring, left jack group, right jack Group and workbench, described left arch ring and right arch ring bend camber according to tunnel cross-section, and left arch ring is fixed on left jack In group, right arch ring is fixed in right jack group, and described left arc water spraying pipeline is fixed on left arch ring, described right arc Water spraying pipeline is fixed on right arch ring, and described storage tank and water pump is arranged on workbench.
Also include running gear, described running gear includes road wheel and drive mechanism, described road wheel and drive Motivation structure is connected, and described left jack group and right jack group are separately fixed on road wheel.
A kind of two linings chassis carries the application method of concrete curing device, including following step:
Step one, left jack group and the right upward jacking of jack group, make left arch ring and right arch ring exceed two lining chassis backforms;
Step 2, left jack group jacking to the left, right jack group jacking to the right, makes left arch ring and right arch ring cross two lining chassis Bian Mo;
Step 3, controls left jack group and right jack group collapsing length, the distance between adjustment shower nozzle and two lining concrete;
Step 4, opens the switch gate valve of left arc water spraying pipeline and right arc water spraying pipeline water inlet, switches on the pump, make left arc Shape water spraying pipeline and right arc water spraying pipeline water spray;
Step 5, starts drive mechanism, left arch ring and right arch ring is moved back and forth at the top of two lining chassis, concrete is spilt Water curing.
Described step five also includes following step below:
After the completion of maintenance, starting drive mechanism makes road wheel move back and forth to two lining chassis away from face one end and stopping, and closes Water pump, switch gate valve are closed, left jack group and right jack group are shunk, declined, and left arch ring and right arch ring is retracted two lining chassis On the inside of template.
Compared with prior art, the beneficial effects of the invention are as follows:
1st, present inventive concept is novel, simple in construction, economic and practical;Without newly-increased stand, construction space take it is small and easy to operate, Construction is easy.
2nd, walking is with two lining chassis movements in hole of the present invention, so as to save the energy.
3rd, the present invention realize lining cutting the demoulding after concrete is conserved in time, solve currently concrete can not sometimes In time the problem of maintenance.
Brief description of the drawings
Fig. 1 is schematic structural view of the invention.
Fig. 2 is working condition front elevation of the present invention.
Fig. 3 is working condition side view of the present invention.
In figure, storage tank 1, left arc water spraying pipeline 2, right arc water spraying pipeline 3, left connection flexible pipe 4, right connection flexible pipe 5, Arch ring 6, left jack group 7, drive mechanism 8, shower nozzle 9, right arch ring 10, right jack group 11.
Embodiment
Below in conjunction with brief description of the drawings, the present invention is described in further detail with embodiment.
Referring to Fig. 1, one kind two serves as a contrast chassis and carries concrete curing device, including water injection system;Described water injection system bag Include storage tank 1, water spraying pipeline and water pump.Described water pump is connected with storage tank 1, and described water spraying pipeline includes being arranged on two Serve as a contrast the left arc water spraying pipeline 2 and right arc water spraying pipeline 3 of chassis door frame both sides, described left arc water spraying pipeline 2 and right arc Multiple shower nozzles 9 are provided with shape water spraying pipeline 3;Left one end of arc water spraying pipeline 2 is closed, the other end as water inlet passes through a left side Connection flexible pipe 4 is connected with storage tank 1, and right one end of arc water spraying pipeline 3 is closed, the other end is soft by right connection as water inlet Pipe 5 is connected with storage tank 1, and the water inlet of left connection flexible pipe 4 and the water inlet of right connection flexible pipe 5 are respectively arranged with breaker Valve.
Referring to Fig. 1, this curing means also includes support system, and described support system includes left arch ring 6, right arch ring 10th, left jack group 7, right jack group 11 and workbench.Described left arch ring 6 and right arch ring 10 is bent according to tunnel cross-section Camber, left arch ring 6 is fixed in left jack group 7, and right arch ring 10 is fixed in right jack group 11;Left jack group 7 is used In supporting left arch ring 6, controlling left arch ring 6 to move up and down and left arch ring 6 is entered working space, right jack group 11 is used for Supports right arch ring 10, control right arch ring 10 to move up and down and right arch ring 10 is entered working space, at the same adjust nozzle 9 with The distance between two lining concretes.Described left arc water spraying pipeline 2 is fixed on left arch ring 6, and described right arc water spraying pipeline 3 is consolidated It is scheduled on right arch ring 10;I.e. the main purpose of arch ring 6 is fixed water spraying pipeline.Described storage tank 1 and water pump are arranged on work On platform, i.e., workbench is for placing storage tank 1 and water pump.
Referring to Fig. 1, this curing means also includes running gear, and described running gear includes road wheel and drive mechanism 8;Described road wheel is connected with drive mechanism 8, and described left jack group 7 and right jack group 11 are separately fixed at walking On wheel.The driving road wheel of drive mechanism 8 moves back and forth to drive left arch ring 6 and right arch ring 10 to walk back and forth.
Referring to Fig. 1 to Fig. 3, a kind of two linings chassis carries the application method of concrete curing device, specifically includes following Step:
Step one, left jack group 7 and the upward jacking of right jack group 11, make left arch ring 6 and right arch ring 10 exceed two lining chassis Backform.
Step 2, the left jacking to the left of jack group 7, the right jacking to the right of jack group 11, gets over left arch ring 6 and right arch ring 10 Cross two lining chassis side moulds.
Step 3, controls left jack group 7 and the right collapsing length of jack group 11, adjustment shower nozzle 9 and two serve as a contrast concrete it Between distance.
Step 4, opens the switch gate valve of left arc water spraying pipeline 2 and the right water inlet of arc water spraying pipeline 3, switches on the pump, Left arc water spraying pipeline 2 and right arc water spraying pipeline 3 is set to spray water.
Step 5, starts drive mechanism 8, left arch ring 6 and right arch ring 10 is moved back and forth at the top of two lining chassis, to coagulation Soil carries out watering maintenance.
Referring to Fig. 1 to Fig. 3, further, described step five also includes following step below:After the completion of maintenance, open Dynamic drive mechanism 8 makes road wheel move back and forth to two lining chassis away from face one end and stop, and switches off the pump, switchs gate valve, Left jack group 7 and right jack group 11 are shunk, declined, and left arch ring 6 and right arch ring 10 is retracted on the inside of two lining trolley formworks.
Above content is to combine specific preferred embodiment further description made for the present invention, it is impossible to assert The specific implementation of the present invention is confined to these explanations.For general technical staff of the technical field of the invention, On the premise of not departing from present inventive concept, some simple deduction or replace can also be made, said structure should be all considered as belonging to Protection scope of the present invention.

Claims (5)

1. one kind two serves as a contrast chassis and carries concrete curing device, it is characterised in that:Including water injection system, described water injection system bag Include storage tank(1), water spraying pipeline and water pump, described water pump and storage tank(1)It is connected, described water spraying pipeline includes setting Left arc water spraying pipeline in two lining chassis door frame both sides(2)With right arc water spraying pipeline(3), described left arc water spraying pipeline (2)With right arc water spraying pipeline(3)On be provided with multiple shower nozzles(9), left arc water spraying pipeline(2)One end is closed, the other end Pass through left connection flexible pipe as water inlet(4)With storage tank(1)It is connected, right arc water spraying pipeline(3)One end is closed, the other end Pass through right connection flexible pipe as water inlet(5)With storage tank(1)It is connected, left connection flexible pipe(4)Water inlet and right connection it is soft Pipe(5)Water inlet be respectively arranged with switch gate valve.
2. a kind of two linings chassis according to claim 1 carries concrete curing device, it is characterised in that:Also include branch Support system, described support system includes left arch ring(6), right arch ring(10), left jack group(7), right jack group(11)With Workbench, described left arch ring(6)With right arch ring(10)Camber, left arch ring are bent according to tunnel cross-section(6)It is fixed on a left side Jack group(7)On, right arch ring(10)It is fixed on right jack group(11)On, described left arc water spraying pipeline(2)It is fixed on Left arch ring(6)On, described right arc water spraying pipeline(3)It is fixed on right arch ring(10)On, described storage tank(1)Set with water pump Put on workbench.
3. a kind of two linings chassis according to claim 2 carries concrete curing device, it is characterised in that:Also include row Walking system, described running gear includes road wheel and drive mechanism(8), described road wheel and drive mechanism(8)It is connected, Described left jack group(7)With right jack group(11)It is separately fixed on road wheel.
4. a kind of two linings chassis carries the application method of concrete curing device, it is characterised in that including following step:
Step one, left jack group(7)With right jack group(11)Upward jacking, makes left arch ring(6)With right arch ring(10)Exceed Two lining chassis backforms;
Step 2, left jack group(7)Jacking to the left, right jack group(11)Jacking to the right, makes left arch ring(6)With right arch ring (10)Cross two lining chassis side moulds;
Step 3, controls left jack group(7)With right jack group(11)Collapsing length, adjusts shower nozzle(9)With two lining concrete The distance between;
Step 4, opens left arc water spraying pipeline(2)With right arc water spraying pipeline(3)The switch gate valve of water inlet, switches on the pump, Make left arc water spraying pipeline(2)With right arc water spraying pipeline(3)Water spray;
Step 5, starts drive mechanism(8), make left arch ring(6)With right arch ring(10)Move back and forth at the top of two lining chassis, to mixed Solidifying soil carries out watering maintenance.
5. a kind of two linings chassis according to claim 4 carries the application method of concrete curing device, it is characterised in that Described step five also includes following step below:
After the completion of maintenance, drive mechanism is started(8)Move back and forth road wheel to deviate from face one end to two lining chassis and stop, Switch off the pump, switch gate valve, left jack group(7)With right jack group(11)Shrink, decline, make left arch ring(6)With right arch ring (10)Retract on the inside of two lining trolley formworks.
CN201710555922.2A 2017-07-10 2017-07-10 One kind two serves as a contrast chassis and carries concrete curing device and its application method Pending CN107269296A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710555922.2A CN107269296A (en) 2017-07-10 2017-07-10 One kind two serves as a contrast chassis and carries concrete curing device and its application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710555922.2A CN107269296A (en) 2017-07-10 2017-07-10 One kind two serves as a contrast chassis and carries concrete curing device and its application method

Publications (1)

Publication Number Publication Date
CN107269296A true CN107269296A (en) 2017-10-20

Family

ID=60072442

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710555922.2A Pending CN107269296A (en) 2017-07-10 2017-07-10 One kind two serves as a contrast chassis and carries concrete curing device and its application method

Country Status (1)

Country Link
CN (1) CN107269296A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107869353A (en) * 2017-12-12 2018-04-03 中交公局第二工程有限公司 Multifunctional tunnel Mobile workbench
CN108086999A (en) * 2017-12-12 2018-05-29 中交公局第二工程有限公司 Tunnel sprays trolley
CN108180023A (en) * 2018-01-17 2018-06-19 浙江交工集团股份有限公司 A kind of automatic track-type two serves as a contrast curing system and maintenance process
CN109236326A (en) * 2018-09-30 2019-01-18 中铁局集团有限公司 A kind of intelligence tunnel double-lining face spray maintenance trolley
CN109707409A (en) * 2019-01-11 2019-05-03 中铁十一局集团第四工程有限公司 A kind of tunnel double-lining concrete vibrating system
CN112661534A (en) * 2020-12-21 2021-04-16 成都锐龙机械制造有限公司 Tunnel secondary lining concrete spraying maintenance trolley
CN115341925A (en) * 2022-09-01 2022-11-15 中铁五局集团第一工程有限责任公司 Concrete area mould sprays maintenance system based on two lining platform trucks in tunnel

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201258746Y (en) * 2008-08-26 2009-06-17 张新泉 Overlapping type continuous conveyor construction tunnel synchronization lining trolley
CN201627587U (en) * 2010-03-25 2010-11-10 中国建筑第八工程局有限公司 Overhang operating platform fixedly connected onto complete sectional hydraulic trolley
CN202417529U (en) * 2012-01-17 2012-09-05 张新泉 Side through synchronous lining trolley used for construction of continuous transport machine for tunnel
CN202611713U (en) * 2012-04-09 2012-12-19 中铁二十一局集团第三工程有限公司 Second liner conservation dust removing construction trolley for tunnel
JP2013049963A (en) * 2011-08-30 2013-03-14 Sumitomo Mitsui Construction Co Ltd Curing device for tunnel lining concrete
CN103133012A (en) * 2012-11-20 2013-06-05 中铁十八局集团有限公司 Open type tunnel boring machine (TBM) on-site concrete inverted arch synchronous lining trolley
CN103924985A (en) * 2013-12-27 2014-07-16 中铁十八局集团有限公司 Cast-in-situ inverted arch lining trolley and concrete curing system in synchronous construction with TBM (tunnel boring machine) tunneling
CN203730010U (en) * 2013-09-02 2014-07-23 中铁十六局集团第一工程有限公司 Tunnel lining concrete curing trolley
CN204149309U (en) * 2014-10-16 2015-02-11 中建海峡建设发展有限公司 Tunnel double-lining maintenance dedusting spray chassis
CN204152524U (en) * 2014-09-28 2015-02-11 中铁建大桥工程局集团第一工程有限公司 A kind of highway tunnel tunneling boring two serves as a contrast the overall health chassis of concrete
CN205578010U (en) * 2016-05-03 2016-09-14 甘肃路桥建设集团有限公司 Integrative rack of two lining concrete maintenances in tunnel
CN205663446U (en) * 2015-10-26 2016-10-26 中国十七冶集团有限公司 Two lining concrete maintenance platform trucks in movable tunnel
CN205677634U (en) * 2016-06-07 2016-11-09 中铁十二局集团第一工程有限公司 Tunnel concrete maintenance spraying chassis
CN205714217U (en) * 2016-04-21 2016-11-23 浙江省交通工程建设集团有限公司第二分公司 Two lining concrete curing trolleys
CN207111114U (en) * 2017-07-10 2018-03-16 中铁十一局集团有限公司 One kind two serves as a contrast chassis and carries concrete curing device

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201258746Y (en) * 2008-08-26 2009-06-17 张新泉 Overlapping type continuous conveyor construction tunnel synchronization lining trolley
CN201627587U (en) * 2010-03-25 2010-11-10 中国建筑第八工程局有限公司 Overhang operating platform fixedly connected onto complete sectional hydraulic trolley
JP2013049963A (en) * 2011-08-30 2013-03-14 Sumitomo Mitsui Construction Co Ltd Curing device for tunnel lining concrete
CN202417529U (en) * 2012-01-17 2012-09-05 张新泉 Side through synchronous lining trolley used for construction of continuous transport machine for tunnel
CN202611713U (en) * 2012-04-09 2012-12-19 中铁二十一局集团第三工程有限公司 Second liner conservation dust removing construction trolley for tunnel
CN103133012A (en) * 2012-11-20 2013-06-05 中铁十八局集团有限公司 Open type tunnel boring machine (TBM) on-site concrete inverted arch synchronous lining trolley
CN203730010U (en) * 2013-09-02 2014-07-23 中铁十六局集团第一工程有限公司 Tunnel lining concrete curing trolley
CN103924985A (en) * 2013-12-27 2014-07-16 中铁十八局集团有限公司 Cast-in-situ inverted arch lining trolley and concrete curing system in synchronous construction with TBM (tunnel boring machine) tunneling
CN204152524U (en) * 2014-09-28 2015-02-11 中铁建大桥工程局集团第一工程有限公司 A kind of highway tunnel tunneling boring two serves as a contrast the overall health chassis of concrete
CN204149309U (en) * 2014-10-16 2015-02-11 中建海峡建设发展有限公司 Tunnel double-lining maintenance dedusting spray chassis
CN205663446U (en) * 2015-10-26 2016-10-26 中国十七冶集团有限公司 Two lining concrete maintenance platform trucks in movable tunnel
CN205714217U (en) * 2016-04-21 2016-11-23 浙江省交通工程建设集团有限公司第二分公司 Two lining concrete curing trolleys
CN205578010U (en) * 2016-05-03 2016-09-14 甘肃路桥建设集团有限公司 Integrative rack of two lining concrete maintenances in tunnel
CN205677634U (en) * 2016-06-07 2016-11-09 中铁十二局集团第一工程有限公司 Tunnel concrete maintenance spraying chassis
CN207111114U (en) * 2017-07-10 2018-03-16 中铁十一局集团有限公司 One kind two serves as a contrast chassis and carries concrete curing device

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107869353A (en) * 2017-12-12 2018-04-03 中交公局第二工程有限公司 Multifunctional tunnel Mobile workbench
CN108086999A (en) * 2017-12-12 2018-05-29 中交公局第二工程有限公司 Tunnel sprays trolley
CN108180023A (en) * 2018-01-17 2018-06-19 浙江交工集团股份有限公司 A kind of automatic track-type two serves as a contrast curing system and maintenance process
CN109236326A (en) * 2018-09-30 2019-01-18 中铁局集团有限公司 A kind of intelligence tunnel double-lining face spray maintenance trolley
CN109707409A (en) * 2019-01-11 2019-05-03 中铁十一局集团第四工程有限公司 A kind of tunnel double-lining concrete vibrating system
CN109707409B (en) * 2019-01-11 2023-08-22 中铁十一局集团第四工程有限公司 Tunnel secondary lining concrete vibrating system
CN112661534A (en) * 2020-12-21 2021-04-16 成都锐龙机械制造有限公司 Tunnel secondary lining concrete spraying maintenance trolley
CN115341925A (en) * 2022-09-01 2022-11-15 中铁五局集团第一工程有限责任公司 Concrete area mould sprays maintenance system based on two lining platform trucks in tunnel

Similar Documents

Publication Publication Date Title
CN107269296A (en) One kind two serves as a contrast chassis and carries concrete curing device and its application method
CN103352710B (en) The convertible tunnel overhead arch mould plate trolley of a kind of suspension and construction method thereof
CN203463112U (en) Self-propelled tunnel lining concrete curing rack
CN208179894U (en) A kind of prefabricated case beam automatic spray curing means
CN107988860B (en) A kind of rubber-tyred subway changes paving machine and its becomes across method
CN205630952U (en) Automatic maintenance system of case roof beam
CN106942026A (en) What rail mounted was walked has hanged aerial sprinkler system
CN207987052U (en) A kind of Bridge High-pier automatic spray health preserving equipment
CN102747733B (en) Pouring machine and pouring method for concrete of road shoulder on high-speed railroad bed section
CN205677634U (en) Tunnel concrete maintenance spraying chassis
CN209586386U (en) Tunnel-liner intelligence maintenance trolley
CN107869353A (en) Multifunctional tunnel Mobile workbench
CN207944955U (en) Tunnel widened section two serves as a contrast trolley
CN205223976U (en) Irrigation gallery concrete slipform device
CN207111114U (en) One kind two serves as a contrast chassis and carries concrete curing device
CN108556122A (en) PC track beam moulds
CN108180023A (en) A kind of automatic track-type two serves as a contrast curing system and maintenance process
CN208717763U (en) A kind of cast-in-place box culvert rapid molding device
CN207795271U (en) A kind of tunnel double-lining concrete is totally-enclosed to exempt from watering spray moisture-keeping maintaining trolley structure
CN108894802A (en) A kind of waterproof material is laid with trolley and its laying method
CN204123687U (en) Fiber winding machine is wound around platform
CN111706364A (en) Tunnel two lining concrete health preserving trolley
CN109372553B (en) Belt template assembly for primary support mould spraying of tunnel
CN201614939U (en) Three-dimensional space curved surface steel mould trolley
CN208330395U (en) Run disease tunnel assembled treatment structures construction operation trolley

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination