CN205713449U - A kind of detachable enclosure wall of fast stacking - Google Patents
A kind of detachable enclosure wall of fast stacking Download PDFInfo
- Publication number
- CN205713449U CN205713449U CN201620672399.2U CN201620672399U CN205713449U CN 205713449 U CN205713449 U CN 205713449U CN 201620672399 U CN201620672399 U CN 201620672399U CN 205713449 U CN205713449 U CN 205713449U
- Authority
- CN
- China
- Prior art keywords
- bar
- main
- latitude
- enclosure wall
- latitude bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses a kind of detachable enclosure wall of fast stacking, including main warp bar, pair through bar, main latitude bar, secondary latitude bar and foundation stone;Described main warp bar is fixedly mounted on foundation stone;Multiple main warp bars are in line, and uniform intervals is arranged, main latitude bar it is provided with between the top of adjacent two main warp bars, multiple secondary latitude bar it is provided with between adjacent two main warp bars, main latitude bar and be provided with multiple pair through bar between the secondary latitude bar of bottom, secondary the most interspersed between bar and secondary latitude bar, it is positioned at the main warp bar of same vertical plane, secondary through bar, main latitude bar, secondary latitude bar, three-dimensional three-way connector and three-dimensional four-way connector coordinate composition walled, walled has two, and interval is arranged, it is connected by multiple connection straps between two walleds, it is filled with stone packed layer between two walleds.The detachable enclosure wall of this fast stacking, it is simple to dismantle, reclaim cycling and reutilization, and can alleviate the thrust load bearing the strong rain of high wind, will not topple over, safety is high.
Description
Technical field
This utility model relates to technical field of building construction, specifically a kind of detachable enclosure wall of fast stacking.
Background technology
Hoarding is the important component part of construction, but the used hoarding in construction site, most
Use brick mix structure, namely by cement mortar, fragment of brick is sticked together formation enclosure wall.
There is following defect in the method for this construction enclosure wall:
(1) construction enclosure wall is adopted and is needed material many, and cement, water, brick, sand, coating etc. are easily-consumed products, the most recycling, no
Meet the main trend of energy-saving and environment friendly;
(2) when building enclosure wall, either building by laying bricks or stones or paint, being all by manually completing, workload is big, and efficiency is low, executes
Work cost is high;
(3), after building body completion, cleaning enclosure wall is disassembled inconvenient, it is still necessary to take considerable time and cost;
(4) enclosure wall is in building course, because be merely possible to build temporarily, all adhesive strengths are the highest, simultaneously body of wall
Being to close, when meeting with high wind strong rain vile weather, enclosure wall bears relatively high thrust load, and the degree collapsed is higher, also to people
People's livelihood life and composition of estate necessarily threaten.
Utility model content
The purpose of this utility model is to provide a kind of detachable enclosure wall of fast stacking, to solve in above-mentioned background technology
The problem proposed.
For achieving the above object, the following technical scheme of this utility model offer:
A kind of detachable enclosure wall of fast stacking, including main warp bar, pair through bar, main latitude bar, secondary latitude bar and foundation stone;Described base
Being embedded with metal insert in stone in advance, main warp bar one end is provided with the connecting portion matched with metal insert, and connecting portion is fixed on gold
Belonging in inserts, main warp bar is fixedly mounted on foundation stone with coordinating of metal insert by connecting portion, main warp bar and foundation stone quantity phase
With, and one_to_one corresponding;Described main warp bar is vertically arranged, and multiple main warp bars are in line, and uniform intervals is arranged, adjacent two masters
Being provided with main latitude bar between the top of bar, main latitude bar is horizontally disposed with, by three between main warp bar and the main latitude bar at two ends
It is connected to three-way connector, is connected by three-dimensional four-way connector between remaining main warp bar with main latitude bar, adjacent two main warp bars
Between the length direction uniform intervals of main warp bar is provided with multiple secondary latitude bar, secondary latitude bar is paralleled with main latitude bar, main latitude bar and
Between the secondary latitude bar of bottom, length direction uniform intervals along main latitude bar is provided with multiple pair through bar, secondary through bar and main warp
Bar is parallel, secondary the most interspersed between bar and secondary latitude bar, is positioned at the main warp bar of same vertical plane, pair through bar, main latitude bar, pair
Latitude bar, three-dimensional three-way connector and three-dimensional four-way connector coordinate composition walled, and described walled has two, and interval is arranged,
It is connected by multiple connection straps between two walleds, between two walleds, is filled with stone packed layer.
As further program of the utility model: arrange female thread in described metal insert, connecting portion is provided with
The external screw thread that female thread matches, is fixed by threaded engagement between connecting portion and metal insert.
As this utility model further scheme: be positioned at the secondary latitude bar distance ground 30mm of bottom.
As this utility model further scheme: described connection strap is horizontally disposed with and perpendicular with main latitude bar, multiple
Connection strap uniform intervals is arranged, and is positioned at the three-dimensional three-way connector that the connection strap at two ends is connected on walled, and remaining connection strap is even
The three-dimensional four-way connector being connected on walled, between adjacent two connection straps, the length direction uniform intervals along connection strap is provided with
Multiple secondary latitude bars, between two corresponding main latitude bars, the length direction uniform intervals along main latitude bar is provided with multiple pair through bar.
As this utility model further scheme: be all arranged at intervals with on described main warp bar, main latitude bar and connection strap
Multiple impressions.
As this utility model further scheme: the distance between adjacent two impressions is 80mm.
Compared with prior art, the beneficial effects of the utility model are:
1, the detachable enclosure wall of this fast stacking, its walled does not has cement to be connected with stone, is simple heap between stone yet
Buttress, does not has cement to connect, it is simple to dismantle, reclaim cycling and reutilization.
2, there is a large amount of space between the stone of the detachable enclosure wall of this fast stacking, it is possible to alleviate and bear the strong rain of high wind
Thrust load, will not topple over, and safety is high.
3, the detachable enclosure wall of this fast stacking, after walled fixes, stone can use mechanically direct topples over, from
Dynamicization degree is high, and efficiency is high.
Accompanying drawing explanation
Fig. 1 is the structural representation of the detachable enclosure wall of fast stacking.
Fig. 2 is the structural representation of main warp bar in the detachable enclosure wall of fast stacking.
Fig. 3 is the structural representation of main latitude bar in the detachable enclosure wall of fast stacking.
Fig. 4 is the main TV structure schematic diagram of three-dimensional four-way connector in the detachable enclosure wall of fast stacking.
Fig. 5 is the plan structure schematic diagram of three-dimensional four-way connector in the detachable enclosure wall of fast stacking.
Fig. 6 is the main TV structure schematic diagram of three-dimensional three-way connector in the detachable enclosure wall of fast stacking.
Fig. 7 is the plan structure schematic diagram of three-dimensional three-way connector in the detachable enclosure wall of fast stacking.
Fig. 8 is the structural representation of foundation stone in the detachable enclosure wall of fast stacking.
In figure: 1-stone packed layer, 21-main warp bar, 22-are secondary through bar, 23-main latitude bar, 24-pair latitude bar, 25-three-dimensional threeway
Connector, 26-three-dimensional four-way connector, 27-connection strap, 28-impression, 29-connecting portion, 3-foundation stone, 31-metal insert.
Detailed description of the invention
Below in conjunction with detailed description of the invention, the technical solution of the utility model is described in more detail.
Refer to Fig. 1-8, a kind of detachable enclosure wall of fast stacking, including main warp bar 21, secondary through bar 22, main latitude bar 23,
Secondary latitude bar 24 and foundation stone 3;Being embedded with metal insert 31 in described foundation stone 3 in advance, main warp bar 21 one end is provided with and metal insert 31
The connecting portion 29 matched, connecting portion 29 is fixed in metal insert 31, and main warp bar 21 is by connecting portion 29 and metal insert 31
Cooperation be fixedly mounted on foundation stone 3, main warp bar 21 is identical with foundation stone 3 quantity, and one_to_one corresponding, is main warp bar by foundation stone 3
21 provide support, and connecting portion 29 is without restriction with the connected mode of metal insert 31, in the present embodiment, it is preferred that described metal
Female thread is set in inserts 31, connecting portion 29 is provided with the external screw thread matched with female thread, connecting portion 29 and metal insert
Fixed by threaded engagement between 31, convenient dismounting;
Described main warp bar 21 is vertically arranged, and multiple main warp bars 21 are in line, and uniform intervals is arranged, adjacent two main warps
Being provided with main latitude bar 23 between the top of bar 21, main latitude bar 23 is horizontally disposed with, be positioned at two ends main warp bar 21 and main latitude bar 23 it
Between be connected by three-dimensional three-way connector 25, by three-dimensional four-way connector 26 phase between remaining main warp bar 21 with main latitude bar 23
Connecting, between adjacent two main warp bars 21, the length direction uniform intervals along main warp bar 21 is provided with multiple secondary latitude bar 24, secondary latitude bar
24 parallel with main latitude bar 23, owing to ground may be uneven, are positioned at the secondary latitude bar 24 of bottom apart from ground 30mm, from distance ground
Start to place first secondary latitude bar 24 at the 30mm of face, thus eliminate the impact that ground injustice is brought, main latitude bar 23 be positioned at
Between the secondary latitude bar 24 of lower end, length direction uniform intervals along main latitude bar 23 is provided with multiple pair through bar 22, secondary through bar 22 with main
Parallel through bar 21, secondary the most interspersed between bar 22 and secondary latitude bar 24, thus form the structure being similar to mesh grid, it is ensured that
Bonding strength, is positioned at the main warp bar 21 of same vertical plane, pair through bar 22, main latitude bar 23, secondary latitude bar 24, three-dimensional three-way connector
25 and three-dimensional four-way connector 26 coordinate composition walled, described walled has two, and interval arrange, pass through between two walleds
Multiple connection straps 27 are connected, and be filled with stone packed layer 1, thus form enclosure wall between two walleds;Described connection strap 27 level
Arrange, and perpendicular with main latitude bar 23, multiple connection strap 27 uniform intervals are arranged, and the connection strap 27 being positioned at two ends is connected to walled
On three-dimensional three-way connector 25, the three-dimensional four-way connector 26 that remaining connection strap 27 is connected on walled, adjacent two connections
Between bar 27, length direction uniform intervals along connection strap 27 is provided with multiple secondary latitude bar 24, two corresponding main latitude bars 23 it
Between be provided with multiple pair through bar 22 along the length direction uniform intervals of main latitude bar 23, thus formed at enclosure wall end face and be similar to braiding
The structure of net;
Multiple impression 28 all it is arranged at intervals with, it is preferred that adjacent two on described main warp bar 21, main latitude bar 23 and connection strap 27
Distance between individual impression is 80mm, say, that the distance between adjacent two secondary latitude bars 24 is 80mm, and adjacent two pairs
Distance between bar 22 is 80mm, and the impression 28 on main warp bar 21 is used for being wound around secondary latitude bar 24, the impression 28 on main latitude bar 23
It is used for being wound around secondary latitude bar 24 for being wound around secondary impression 28 on bar 22, connection strap 27.
The construction method of the detachable enclosure wall of described fast stacking, step is as follows:
1) foundation stone 3 is put into ground;
2) being arranged on foundation stone 3 by main warp bar 21, in the present embodiment, the connecting portion 29 of main warp bar 21 is pacified by threaded engagement
It is contained in the metal insert 31 on foundation stone 3;
3) on foundation stone 3, earthing is covered;
4) three-dimensional three-way connector 25 is installed on two the main warp bars 21 be positioned at two ends, remaining main warp bar 21 is installed
Three-dimensional four-way connector 26;
5) main latitude bar 23 is arranged between adjacent two main warp bars 21, wherein, is positioned at the main warp bar 21 at two ends and main latitude
It is connected by three-dimensional three-way connector 25 between bar 23, by three-dimensional four-way connector between remaining main warp bar 21 and main latitude bar 23
26 are connected;
6) successively pair is wound respectively along the impression 28 of main warp bar 21 and main latitude bar 23 with secondary latitude bar 24 through bar 22
Fixing, it is positioned at the main warp bar 21 of same vertical plane, pair through bar 22, main latitude bar 23, secondary latitude bar 24, three-dimensional three-way connector 25 and
Three-dimensional four-way connector 26 coordinates composition walled;
7) will connect fixing by connection strap 27 between two walleds, then stone of uniform size is poured into two walleds
Between, stone forms stone packed layer 1;
8) secondary latitude bar 24 is installed between adjacent two connection straps 27, pair is installed between two corresponding main latitude bars 23
Through bar 22, thus stone packed layer 1 upper end forms mesh grid, completes the installation of enclosure wall.
When disassembling enclosure wall, it is only necessary to according to the reverse procedure of above-mentioned steps.
The detachable enclosure wall of described fast stacking, its walled does not has cement to be connected with stone, is simple heap between stone yet
Buttress, does not has cement to connect, it is simple to dismantle, reclaim cycling and reutilization.Deposit between the stone of the detachable enclosure wall of described fast stacking
In a large amount of spaces, it is possible to alleviate the thrust load bearing the strong rain of high wind, will not topple over, safety is high.Described fast stacking is removable
Unloading formula enclosure wall, after walled fixes, stone can use mechanically direct topples over, and automaticity is high, and efficiency is high.
Above better embodiment of the present utility model is explained in detail, but this utility model is not limited to above-mentioned
Embodiment, in the ken that one skilled in the relevant art is possessed, it is also possible to without departing from this utility model ancestor
On the premise of purport, various changes can be made.
Claims (6)
1. the detachable enclosure wall of fast stacking, it is characterised in that include that main warp bar (21), pair are through bar (22), main latitude bar
(23), secondary latitude bar (24) and foundation stone (3);Being embedded with metal insert (31) in described foundation stone (3) in advance, main warp bar (21) one end is arranged
Having the connecting portion (29) matched with metal insert (31), connecting portion (29) is fixed in metal insert (31), main warp bar (21)
It is fixedly mounted on foundation stone (3) with coordinating of metal insert (31) by connecting portion (29), main warp bar (21) and foundation stone (3) quantity
Identical, and one_to_one corresponding;Described main warp bar (21) is vertically arranged, and multiple main warp bars (21) are in line, and uniform intervals is arranged,
Being provided with main latitude bar (23) between the top of adjacent two main warp bars (21), main latitude bar (23) is horizontally disposed with, and is positioned at the master at two ends
It is connected by three-dimensional three-way connector (25) between bar (21) with main latitude bar (23), remaining main warp bar (21) and main latitude bar (23)
Between by three-dimensional four-way connector (26) be connected, equal along the length direction of main warp bar (21) between adjacent two main warp bars (21)
Even being arranged at intervals with multiple secondary latitude bar (24), secondary latitude bar (24) parallels with main latitude bar (23), main latitude bar (23) be positioned under
It is provided with multiple pair through bar (22) along the length direction uniform intervals of main latitude bar (23) between the secondary latitude bar (24) of end, secondary through bar
(22) parallel with main warp bar (21), secondary the most interspersed between bar (22) and secondary latitude bar (24), it is positioned at same vertical plane
Main warp bar (21), pair connect through bar (22), main latitude bar (23), secondary latitude bar (24), three-dimensional three-way connector (25) and three-dimensional four-way
Part (26) coordinates composition walled, and described walled has two, and interval is arranged, by multiple connection straps (27) between two walleds
It is connected, between two walleds, is filled with stone packed layer (1).
The detachable enclosure wall of fast stacking the most according to claim 1, it is characterised in that described metal insert sets in (31)
Put female thread, connecting portion (29) be provided with the external screw thread matched with female thread, connecting portion (29) and metal insert (31) it
Between fixed by threaded engagement.
The detachable enclosure wall of fast stacking the most according to claim 2, it is characterised in that be positioned at the secondary latitude bar of bottom
(24) distance ground 30mm.
4. according to the detachable enclosure wall of fast stacking described in claim 1 or 2 or 3, it is characterised in that described connection strap (27)
It is horizontally disposed with, and perpendicular with main latitude bar (23), multiple connection straps (27) uniform intervals is arranged, and is positioned at the connection strap (27) at two ends
The three-dimensional three-way connector (25) being connected on walled, the three-dimensional four-way connector that remaining connection strap (27) is connected on walled
(26), between adjacent two connection straps (27), length direction uniform intervals along connection strap (27) is provided with multiple secondary latitude bar
(24) between two, corresponding main latitude bars (23), the length direction uniform intervals along main latitude bar (23) is provided with multiple pair through bar
(22).
The detachable enclosure wall of fast stacking the most according to claim 4, it is characterised in that described main warp bar (21), main latitude
Multiple impression (28) all it is arranged at intervals with on bar (23) and connection strap (27).
The detachable enclosure wall of fast stacking the most according to claim 5, it is characterised in that between adjacent two impressions away from
From for 80mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620672399.2U CN205713449U (en) | 2016-06-29 | 2016-06-29 | A kind of detachable enclosure wall of fast stacking |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620672399.2U CN205713449U (en) | 2016-06-29 | 2016-06-29 | A kind of detachable enclosure wall of fast stacking |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205713449U true CN205713449U (en) | 2016-11-23 |
Family
ID=57317537
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620672399.2U Expired - Fee Related CN205713449U (en) | 2016-06-29 | 2016-06-29 | A kind of detachable enclosure wall of fast stacking |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205713449U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105971393A (en) * | 2016-06-29 | 2016-09-28 | 皖西学院 | Detachable wall built through quick stacking and construction method of wall |
-
2016
- 2016-06-29 CN CN201620672399.2U patent/CN205713449U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105971393A (en) * | 2016-06-29 | 2016-09-28 | 皖西学院 | Detachable wall built through quick stacking and construction method of wall |
CN105971393B (en) * | 2016-06-29 | 2018-06-26 | 皖西学院 | A kind of detachable enclosure wall of fast stacking and its construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201687102U (en) | Assembled integral type shear wall structure system | |
CN103835413B (en) | Covered with Angles silk screen Mortar Plates in-line frame foamed concrete bearing wall and the practice | |
CN202017346U (en) | Late poured band hanging formwork structure | |
CN105134009B (en) | Sill coping concrete structure of frame structure infilled wall and construction method | |
CN206616862U (en) | Formwork root bracing means | |
CN208472974U (en) | A kind of steel bar girder plate end connects steel structure girder node structure | |
CN208533725U (en) | A kind of steel bar girder plate side and connection joints of steel structure structure | |
CN110792200A (en) | Masonry construction method without post-picking and pipe wrapping structure thereof | |
CN208379789U (en) | A kind of light steel house of environmental protection and energy saving | |
CN205713449U (en) | A kind of detachable enclosure wall of fast stacking | |
CN105863068A (en) | Box-type modular building and building method thereof | |
WO2024055623A1 (en) | Formwork-free and decoration-free cast-in-place structure and construction method therefor | |
CN202658765U (en) | Keel framework concrete anti-crack filling wall | |
CN105178593B (en) | Fill the mold method and structure of wall construction post | |
CN204238264U (en) | A kind of sole plate post-poured strip structure | |
CN203412312U (en) | Thermal-insulating integrated template wallboard construction building | |
CN111021365A (en) | Reusable foundation pit supporting device and using method | |
CN103195079B (en) | Installing type template, installing type template group and complete installing type plate device | |
CN109098307A (en) | Brick output enters the wall body structure and wall building method of stone | |
CN201695694U (en) | Differently-labeled concrete construction separating device in the same vertical structure of reinforced concrete wall | |
CN105971393B (en) | A kind of detachable enclosure wall of fast stacking and its construction method | |
CN201424811Y (en) | Special die for reserving opening on concrete cast-in-situ slab pipeline | |
CN212743447U (en) | Reinforced structure that building structure is firm anti collapsing | |
CN203428805U (en) | Combined tower crane base | |
CN207405923U (en) | A kind of column-shape curved surface building structure with mosaic pavement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161123 Termination date: 20180629 |