CN205713398U - 新型组合式铁塔 - Google Patents

新型组合式铁塔 Download PDF

Info

Publication number
CN205713398U
CN205713398U CN201620321689.2U CN201620321689U CN205713398U CN 205713398 U CN205713398 U CN 205713398U CN 201620321689 U CN201620321689 U CN 201620321689U CN 205713398 U CN205713398 U CN 205713398U
Authority
CN
China
Prior art keywords
steel tower
column unit
column
connected mode
combination type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620321689.2U
Other languages
English (en)
Inventor
潘成龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Haihui Tower Machinery Co Ltd
Original Assignee
Qingdao Haihui Tower Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Haihui Tower Machinery Co Ltd filed Critical Qingdao Haihui Tower Machinery Co Ltd
Priority to CN201620321689.2U priority Critical patent/CN205713398U/zh
Application granted granted Critical
Publication of CN205713398U publication Critical patent/CN205713398U/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型涉及钢结构铁塔的制造领域,具体是一种新型组合式铁塔,由立柱单元组装而成,其中:立柱单元为三棱柱结构,包括三根上横梁、三根竖梁、三根下横梁,三根上横梁和三根下横梁分别顺次连接形成两个三角形,三根竖梁将该两三角形连接,形成立柱单元;多个立柱单元上下连接形成铁塔立柱,铁塔共四根立柱。立柱单元内通过斜材进行加固,斜材与上横梁、竖梁、下横梁的连接方式为正反“Z”、正反“K”、“X”字形。上横梁、竖梁、下横梁间的连接方式为焊接或螺栓连接,立柱单元间的连接方式为螺栓连接。其有益效果是:通过立柱单元拼接进行组装铁塔,实现了快速架设,提高了组装精度,缩短了工期,同时保证了铁塔强度,适合广泛推广使用。

Description

新型组合式铁塔
技术领域
本实用新型涉及钢结构铁塔的制造领域,具体是一种新型组合式铁塔。
背景技术
输电线铁塔一般通过由上至下层层安装架设建成,施工效率低,工期长,实际误差偏大,因此,需要一种能够在出厂前加工成组装单元,现场架设时快速拼接的组合式铁塔。
实用新型内容。
本实用新型的目的在于提供一种新型组合式铁塔,以解决现有的上述问题。
本实用新型为了解决上述技术问题所采取的技术方案是:
一种新型组合式铁塔,由立柱单元组装而成,其中:所述立柱单元为三棱柱结构,包括三根上横梁、三根竖梁、三根下横梁,所述三根上横梁和所述三根下横梁分别顺次连接形成两个三角形,所述三根竖梁将该两三角形连接,形成立柱单元;所述多个立柱单元上下连接形成铁塔立柱,所述铁塔共四根立柱。
作为本实用新型的改进,所述立柱单元内通过斜材进行加固,所述斜材与所述上横梁、竖梁、下横梁的连接方式为正反“Z”、正反“K”、“X”字形。
作为本实用新型的改进,所述上横梁、竖梁、下横梁间的连接方式为焊接或螺栓连接,所述立柱单元间的连接方式为螺栓连接。
综上所述,本实用新型的有益效果是:
本实用新型通过立柱单元拼接进行组装铁塔,实现了快速架设,提高了组装精度,缩短了工期,同时保证了铁塔强度,适合广泛推广使用。
附图说明
图1为本实用新型的立柱单元立体图;
图2为本实用新型的立柱单元俯视图;
图3为本实用新型的立柱单元组装结构示意图;
图4为本实用新型组装后铁塔的横向视图。
其中,1立柱单元、101上横梁、102竖梁、103下横梁、2斜材。
具体实施方式
如图1至4所示,一种新型组合式铁塔,由立柱单元1组装而成,其中:立柱单元1为三棱柱结构,包括三根上横梁101、三根竖梁102、三根下横梁103,三根上横梁101和三根下横梁103分别顺次连接形成两个三角形,三根竖梁102将该两三角形连接,形成立柱单元1;多个立柱单元1上下连接形成铁塔立柱,铁塔共四根立柱。立柱单元1内通过斜材2进行加固,斜材2与上横梁101、竖梁102、下横梁103的连接方式为正反“Z”、正反“K”、“X”字形。上横梁101、竖梁102、下横梁103间的连接方式为焊接或螺栓连接,立柱单元1间的连接方式为螺栓连接。

Claims (3)

1.一种新型组合式铁塔,由立柱单元组装而成,其特征在于:所述立柱单元为三棱柱结构,包括三根上横梁、三根竖梁、三根下横梁,所述三根上横梁和所述三根下横梁分别顺次连接形成两个三角形,所述三根竖梁将该两三角形连接,形成立柱单元;所述立柱单元上下连接形成铁塔立柱,所述铁塔共四根立柱。
2.根据权利要求1所述的一种新型组合式铁塔,其特征在于:所述立柱单元内通过斜材进行加固,所述斜材与所述上横梁、竖梁、下横梁的连接方式为正反“Z”、正反“K”、“X”字形。
3.根据权利要求1所述的一种新型组合式铁塔,其特征在于:所述上横梁、竖梁、下横梁间的连接方式为焊接或螺栓连接,所述立柱单元间的连接方式为螺栓连接。
CN201620321689.2U 2016-04-18 2016-04-18 新型组合式铁塔 Expired - Fee Related CN205713398U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620321689.2U CN205713398U (zh) 2016-04-18 2016-04-18 新型组合式铁塔

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620321689.2U CN205713398U (zh) 2016-04-18 2016-04-18 新型组合式铁塔

Publications (1)

Publication Number Publication Date
CN205713398U true CN205713398U (zh) 2016-11-23

Family

ID=57308867

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620321689.2U Expired - Fee Related CN205713398U (zh) 2016-04-18 2016-04-18 新型组合式铁塔

Country Status (1)

Country Link
CN (1) CN205713398U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107487710A (zh) * 2017-09-22 2017-12-19 中船重工建筑工程设计研究院有限责任公司 三肢边柱双层肩梁支撑结构
TWI656268B (zh) * 2017-12-15 2019-04-11 蘇馥儀 Stacked transmission tower and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107487710A (zh) * 2017-09-22 2017-12-19 中船重工建筑工程设计研究院有限责任公司 三肢边柱双层肩梁支撑结构
CN107487710B (zh) * 2017-09-22 2018-12-07 中船重工建筑工程设计研究院有限责任公司 三肢边柱双层肩梁支撑结构
TWI656268B (zh) * 2017-12-15 2019-04-11 蘇馥儀 Stacked transmission tower and construction method thereof

Similar Documents

Publication Publication Date Title
CN105863076A (zh) 低层建筑全装配式连接结构
CN105735466B (zh) 预制墙柱一段式钢筋连接结构及方法
CN205779491U (zh) 分段预制式混凝土塔筒
CN105772969A (zh) 一种双节点整体焊接桁片制造及转运技术
CN204940886U (zh) 一种吊运连廊的机构
CN107386434A (zh) 一种混凝土柱与混凝土柱的新型装配式连接结构
CN102296705A (zh) 一种复式钢管混凝土柱与钢梁连接节点
CN205713398U (zh) 新型组合式铁塔
CN110130387A (zh) 一种集成式套笼的建造工艺
CN107975459A (zh) 风力发电机塔架与机舱的连接装置及其混凝土塔架
CN202227590U (zh) 钢筋混凝土柱的柱筋定位器
CN206707008U (zh) 一种钢柱与钢柱的新型装配式连接结构
CN205779502U (zh) 一种海上风电场垂直轴风力发电机拱桥式支撑结构
CN205369291U (zh) 一种大功率海上风力发电机组单桩基础集成式附件机构
CN203034821U (zh) 大跨度拱形倒三角管桁架组装整体胎具
CN202913338U (zh) 一种钢桁梁全焊桁片
CN209163043U (zh) 一种方中空夹层钢管混凝土柱与钢梁连接节点
CN201437613U (zh) 钢梁整体贯通式钢管混凝土柱、钢梁连接节点
CN212272461U (zh) 一种钢-混凝土组合塔架
CN214741846U (zh) 一种装配式风电机组圆截面混凝土支撑结构
CN108824765A (zh) 一种室外电梯钢结构井道及其施工方法
CN201952899U (zh) 可拆卸式板房的梁柱连接节点
CN106013421B (zh) 一种钢木复合的装配式纤维混凝土建筑的建造方法
CN201390969Y (zh) 无斜腹杆装配式双壁钢围堰结构
CN205557818U (zh) 预制墙柱一段式钢筋连接结构

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161123

Termination date: 20190418