CN205713079U CN201620634068.XU CN201620634068U CN205713079U CN 205713079 U CN205713079 U CN 205713079U CN 201620634068 U CN201620634068 U CN 201620634068U CN 205713079 U CN205713079 U CN 205713079U
Authority
CN
China
Prior art keywords
aluminum alloy
back cord
square
leads
alloy square
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620634068.XU
Other languages
Chinese (zh)
Inventor
丁威
陈星�
雷涛
黄达琦
王亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201620634068.XU priority Critical patent/CN205713079U/en
Application granted granted Critical
Publication of CN205713079U publication Critical patent/CN205713079U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a kind of super large wall column formwork support system, relate to building engineering field.Including panel, wood a tree, used in making timber for boats, aluminum alloy square lead to back cord and Screw arbor with nut at both-ends, multiple described panels surround and are spliced into the pre-casting space of super large wall column, described panel is folded successively and is provided with the wooden a tree, used in making timber for boats being vertically arranged and horizontally disposed aluminum alloy square leads to back cord, it is the double square square tube being vertically arranged that described aluminum alloy square leads to back cord, and the two ends of described Screw arbor with nut at both-ends sequentially pass through panel respectively, aluminum alloy square leads to intermediate gap and the pad of back cord double square square tube;Described aluminum alloy square leads to back cord and is divided into front aluminum alloy square to lead to back cord and side aluminum alloy square leads to back cord, and described side aluminum alloy square leads to back cord and leads to back cord staggered cross with front aluminum alloy square and arrange;Described Screw arbor with nut at both-ends is horizontally and vertically uniformly arranged, and spacing is 430 480mm.The utility model is creative uses back cord light material, and rationally arranges template system structure, it is ensured that the quality of construction and safety, time saving and energy saving.

Description

A kind of super large wall column formwork support system
Technical field
The utility model relates to building engineering field, particularly relates to the form bracing system of high-rise building super large wall column.
Background technology
With carrying out in a large number of domestic construction, more than 300m overrunning high-rise building starts planning and designing in each city, builds life Produce and come into operation, becoming the landmark in city.But this type of building generally is the heavy in section chi of about 2m when design Very little wall column, and floor height is generally higher.The entity quality control difficulty of cast-in-place concrete is big, in order to meet building demand, and can be the end of at Layer wall column increases stiff steel reinforced column and steel plate wall, increase concrete grade, increases wall column thickness, rationally select shuttering supporting body System.For the wall column of heavy in section size, general employing channel-section steel is as the main joist of form bracing system, but the channel-section steel commonly using Back cord is long overweight, and on-the-spot practice of construction wastes time and energy.As used light material to do back cord, after construction casting, concrete quality is past Past not fully up to expectations, flatness is inadequate, and not up to safety standard.
Utility model content
In order to overcome the deficiency of above-mentioned situation, the purpose of this utility model is to provide a kind of super large wall column formwork supporter System.Including panel, wood a tree, used in making timber for boats, aluminum alloy square lead to back cord and Screw arbor with nut at both-ends, multiple described panels surround and are spliced into super large wall column and precoat Building space, described panel is folded successively and is provided with the wooden a tree, used in making timber for boats being vertically arranged and horizontally disposed aluminum alloy square leads to back cord, described aluminium alloy The logical back cord in side is the double square square tube being vertically arranged, and the two ends of described Screw arbor with nut at both-ends sequentially pass through panel respectively, aluminum alloy square leads to The intermediate gap of back cord double square square tube and pad;Described aluminum alloy square leads to back cord and is divided into front aluminum alloy square to lead to back cord and side aluminium Alloy side leads to back cord, and described side aluminum alloy square leads to back cord and leads to the setting of back cord staggered cross with front aluminum alloy square;Described to drawing Screw rod is horizontally and vertically uniformly arranged, and spacing is 430-480mm.
Further, described Screw arbor with nut at both-ends spacing is 450mm.
Further, described rectangular square tube 80 × 44 × 3mm.
The beneficial effects of the utility model are: in the construction of high-rise building super large wall column, creative employing back cord lightweight Material, and rationally arrange template system structure, it is ensured that the quality of construction and safety, also has that speed of application is fast, appropriation of labour power concurrently Few advantage.
Brief description
For the technical scheme being illustrated more clearly that in the utility model embodiment, required in embodiment being described below Accompanying drawing to be used is briefly described, it should be apparent that, the accompanying drawing in describing below is only some realities of the present utility model Execute example, for those of ordinary skill in the art, on the premise of not paying creative work, can also be according to these accompanying drawings Obtain other accompanying drawing, wherein:
Fig. 1 is front view of the present utility model.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the present utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of making creative work The all other embodiment being obtained, broadly falls into the scope of the utility model protection.
Certain is building the first high building, T1 high building height 452m, 95 layers on the ground, index bed floor height 4.45m;T2 high building height 315m, Upper 65 layers, index bed floor height 4.35m;Wherein basement totally 5 layers, locally 7 layers, wall thickness is 2m to the maximum, wall length is 11m, strength to the maximum Property post largest cross-sectional sized is 2.6m × 2.6m, and primary concreting height is up to 7.55m.For the wall column of heavy in section size, Prior art typically uses channel-section steel as the main joist of template system, and the utility model is creative uses 80 × 44 × 3mm aluminium to close Gold side's unifier replaces channel-section steel, and rationally arranges template system structure.
Refer to Fig. 1, described aluminum alloy square leads to back cord 3 for the double square square tube being vertically arranged.The horizontal stroke of described rectangular square tube Cross section is preferably 80mm length, 44mm width, the hollow pipe of 3mm thickness.3m long channel-section steel weight is about 30kg, and the long aluminum alloy square of 3m leads to weight It is about 12kg, according to the double flute steel of 3m as the main joist of template system, weight increase about 1 times.
This form bracing system includes multiple panel 4 and multiple Screw arbor with nut at both-ends 1, multiple described panels 4 surround be spliced into super Big wall column is precoated and is built space, and described panel 4 is folded successively and is provided with the wooden a tree, used in making timber for boats 6 being vertically arranged and horizontally disposed aluminum alloy square leads to back cord 3, it is the double square square tube being vertically arranged that described aluminum alloy square leads to back cord 3, and the double square square tube being vertically arranged be arranged in parallel and stays There is gap, in gap, accommodate Screw arbor with nut at both-ends 1.The two ends of described Screw arbor with nut at both-ends 1 sequentially pass through panel the 4th, aluminum alloy square respectively and lead to Gap among back cord 3 double square square tube and be attached at double square square tube for clamping iron and steel pad 2, during installation, it is only necessary to twist Double high-strength nuts of tight 1 liang of terminal of described Screw arbor with nut at both-ends get final product fixed form.Described panel 1 is thick for 15mm, described Screw arbor with nut at both-ends Select shank diameter 16mm.
Described aluminum alloy square leads to back cord 3 and is divided into front aluminum alloy square to lead to back cord 31 and side aluminum alloy square leads to back cord 33, institute State side aluminum alloy square to lead to back cord 33 and lead to back cord 31 staggered cross with front aluminum alloy square and arrange.
Through repetition test research, aluminum alloy square is led to the impact of back cord 3 deformation by test Screw arbor with nut at both-ends 1 spacing, it is ensured that execute Working medium amount and safety, described Screw arbor with nut at both-ends 1 horizontally and vertically uniformly arranges, and spacing is 430-480mm, preferably 450mm.
It is to lay as time back cord, described wood a tree, used in making timber for boats 6 a size of 45 × 90mm according to 200mm spacing that described wood imitates 6, is filled in Aluminum alloy square leads between back cord 3 and panel 4.
During model sheetinstallat, can be parallel at Screw arbor with nut at both-ends 1 add C16 reinforcing bar in the pre-casting space of described super large wall column and make For top die roller, it is ensured that sectional dimension accurately after concreting.
During site operation, during as occurred that aluminum alloy square leads to the length of back cord 3 less than the length of the super large wall cylindrical surface that need to design, The mode that super large wall cylindrical surface external-corner clamp is fixing can be used, be specially and use oblique pull screw rod to connect double back cord.
Aluminum alloy square leads to back cord 3 compares channel-section steel as template system main joist, directly increases the effect of carpenter's reinforcing template Rate, in the case of especially higher in heavy in section and floor height, during more than 5m floor height, two carpenters reinforce about a 2m detached column mould The efficiency of plate improves 40%~50%.
When aluminum alloy square leads to the processing of back cord 3 scale, the cutting comparing steel pipe in onsite application is easier to control, decreases material Material loss.Recyclable recycling is worth height, reclaims residual value and is up to more than the 80% of aluminium ingot.
Of the present utility model most important provide the benefit that: in the construction of high-rise building super large wall column, creative use the back of the body Stupefied light material, and rationally arrange template system structure, it is ensured that the quality of construction and safety, also has that speed of application is fast concurrently, takies The few advantage of labour.
The foregoing is only preferred embodiment of the present utility model, be not limited to the utility model, for this For the technical staff in field, the utility model can have various modifications and variations.All in spirit of the present utility model and principle Within, any modification, equivalent substitution and improvement etc. made, should be included within protection domain of the present utility model.

Claims (3)

1. a super large wall column formwork support system, it is characterised in that: include that panel (4), wood a tree, used in making timber for boats (6), aluminum alloy square lead to back cord (3) and Screw arbor with nut at both-ends (1), multiple described panels (4) are surrounded and are spliced into the pre-casting space of super large wall column, and described panel (4) is successively Folded being provided with the wooden a tree, used in making timber for boats (6) being vertically arranged and horizontally disposed aluminum alloy square leads to back cord (3), described aluminum alloy square leads to back cord (3) and is The double square square tube being vertically arranged, the two ends of described Screw arbor with nut at both-ends (1) sequentially pass through panel (4) respectively, aluminum alloy square leads to back cord (3) intermediate gap of double square square tube and steel plate washer (2);Described aluminum alloy square leads to back cord (3) and is divided into front aluminum alloy square to lead to back cord (31) and side aluminum alloy square leads to back cord (33), described side aluminum alloy square leads to back cord (33) and leads to back cord with front aluminum alloy square (31) staggered cross is arranged;Described Screw arbor with nut at both-ends (1) is horizontally and vertically uniformly arranged, and spacing is 430-480mm.
2. super large wall column formwork support system according to claim 1, it is characterised in that: between described Screw arbor with nut at both-ends (1) Away from for 450mm.
3. super large wall column formwork support system according to claim 1 and 2, it is characterised in that: described rectangular square tube size It is 80 × 44 × 3mm, described steel plate washer a size of 80*80*5mm.
CN201620634068.XU 2016-06-23 2016-06-23 A kind of super large wall column formwork support system Expired - Fee Related CN205713079U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620634068.XU CN205713079U (en) 2016-06-23 2016-06-23 A kind of super large wall column formwork support system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620634068.XU CN205713079U (en) 2016-06-23 2016-06-23 A kind of super large wall column formwork support system

Publications (1)

Publication Number Publication Date
CN205713079U true CN205713079U (en) 2016-11-23

Family

ID=57316727

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620634068.XU Expired - Fee Related CN205713079U (en) 2016-06-23 2016-06-23 A kind of super large wall column formwork support system

Country Status (1)

Country Link
CN (1) CN205713079U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106150077A (en) * 2016-06-23 2016-11-23 中国建筑第二工程局有限公司 A kind of super large wall column formwork support system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106150077A (en) * 2016-06-23 2016-11-23 中国建筑第二工程局有限公司 A kind of super large wall column formwork support system

Similar Documents

Publication Publication Date Title
CN204266590U (en) Sump, hoistway formwork bed die anti-floating system
CN211447708U (en) Super high-rise building construction elevator feeding platform support system that encorbelments
CN110306774A (en) A kind of installation method and device of spigot-and-socket builder's jack
CN206479124U (en) Roof steel bar protective layer thickness detects instrument
CN204001652U (en) The portable exterior wall operating platform of fabricated shear wall structure
CN205713079U (en) A kind of super large wall column formwork support system
CN106150077A (en) A kind of super large wall column formwork support system
CN207332288U (en) Rod-pulling type hanging basket suspension device on roof frame girder
CN202755649U (en) Rebar mold-supporting frame of cantilever slab
CN101881060B (en) Prestressed concrete mansard rigid-frame beam
CN204940863U (en) External wall construction outside large form bracket
CN203361642U (en) Assembled-structure cast-in-place stair steel molding plate
CN203640257U (en) Support of overhanging type scaffold
CN206902913U (en) A kind of high-altitude long-span overhung structure
CN103031949B (en) Arc-shaped main rib template support device
CN205822501U (en) A kind of body of wall of prestressing force grass stock mould block splicing
CN206000160U (en) A kind of wall construction is with carrying the large-scale plank sheathing of reinforced
CN104060762A (en) L-shaped steel pipe-steel framework recycled concrete combined pillar
CN106121219A (en) A kind of huge post of stiffness is without screw aluminum alloy formwork system
CN103362315A (en) Hanging bracket for hoisting pipeline integrally and construction method of hanging bracket
CN102220808A (en) Beam lowering construction method of frame structure
CN102444283A (en) Lateral bracing structure of building formwork
CN111535581A (en) Convenient and fast mounting and dismounting type combined prefabricated formwork applicable to building floor lowering position
CN205822778U (en) A kind of huge post of stiffness is without screw aluminum alloy formwork system
CN205976473U (en) Aluminum -wood formwork support device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161123

Termination date: 20170623