CN205712219U - A kind of waterproof foundation pit support device of scalable based on excavation of foundation pit model test - Google Patents

A kind of waterproof foundation pit support device of scalable based on excavation of foundation pit model test Download PDF

Info

Publication number
CN205712219U
CN205712219U CN201620275447.4U CN201620275447U CN205712219U CN 205712219 U CN205712219 U CN 205712219U CN 201620275447 U CN201620275447 U CN 201620275447U CN 205712219 U CN205712219 U CN 205712219U
Authority
CN
China
Prior art keywords
foundation pit
retaining wall
support
excavation
model test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620275447.4U
Other languages
Chinese (zh)
Inventor
应宏伟
章丽莎
魏骁
张金红
沈华伟
王小刚
朱成伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University ZJU
Original Assignee
Zhejiang University ZJU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University ZJU filed Critical Zhejiang University ZJU
Priority to CN201620275447.4U priority Critical patent/CN205712219U/en
Application granted granted Critical
Publication of CN205712219U publication Critical patent/CN205712219U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model discloses a kind of waterproof foundation pit support device of scalable based on excavation of foundation pit model test.This device includes retaining wall and support.Retaining wall top is provided with multiple tracks bolt, is bolted retaining wall support;Being reserved with some fixing bolts in the middle part of retaining wall, both sides are provided with watertight rubber bar;Watertight rubber bar ensures not leak with model casing contact surface in retaining wall moving process;The one end supported has inner thread mouth, and inner thread mouth is connected with fixing bolt thread, it is achieved the installation of support.This apparatus structure is reasonable, installs easy to operate, can be used for displacement and the deformation of flexible retaining wall in excavation of foundation pit model test under simulated groundwater environment, and the excavation of foundation pit model test being correlated with and research provide a kind of effective means.

Description

A kind of waterproof foundation pit support device of scalable based on excavation of foundation pit model test
Technical field
This utility model relates to a kind of waterproof foundation pit support device of scalable based on excavation of foundation pit model test, particularly relate to can consider groundwater environment and the flexible retaining wall excavation of foundation pit model test apparatus of retaining wall embedded depth change simultaneously, conveniently excess pore water pressure, soil pressure and foundation pit deformation etc. in the Excavation Process soil body are monitored.
Background technology
In strand, the deep-foundation pit engineering of riparian area face rich groundwater, construction environment is complicated and difficulty of construction is big waits challenge, and foundation pit deformation that wherein groundwater effect causes and destabilization problems are one of material risk sources of such regional deep-foundation pit engineering.
Excavation of foundation pit model test is many at present does not consider groundwater effect, and the test soil body selects dry sand, the soil pressure of the main monitoring excavation of foundation pit soil body and foundation pit deformation, has larger difference with the excavation of foundation pit situation having groundwater effect.Consider groundwater effect excavation of foundation pit model test, have research (Sun Wei. the test of coastal region deep basal pit character and theoretical research [D]. Zhejiang University, 2015.) method using fixed retaining wall, the method can only monitor excess pore water pressure in the soil body, it is impossible to obtains soil pressure and foundation pit deformation data accurately.Separately have research (Peng Shuquan. sand barricade failure mechanism grand thin see research [D]. Tongji University, 2007.) thin film is used to connect retaining wall and model casing by smearing epoxy resin after the coarse process of method of corona, the method can obtain excess pore water pressure, soil pressure and foundation pit deformation data in the test soil body, but thin film Joining Technology is complex, when lateral diaphragm wall displacement is bigger, thin film may cause breakage due to soil particle friction in moving process, it is impossible to smoothly completes test or carries out repeating test.Therefore, the most simply, the movement of retaining wall is the problem needing in strand, riverine excavation of foundation pit model test to solve under simulated groundwater environment exactly.
Lot of experiments research shows that the stress of foundation ditch, deformation and stability and retaining wall embedded depth have much relations.In Practical Project; design usually can comprise multiple retaining wall embedded depth scheme; calculate finally by finite element numerical, the method for engineering experience analogy determines unique retaining wall embedded depth design, still lacks the relevant foundation ditch design reference suggestion that the retaining wall excavation of foundation pit model test of the relevant adjusting penetrating degree of depth provides.
Summary of the invention
In order to overcome above-mentioned the deficiencies in the prior art, this utility model provides a kind of waterproof foundation pit support device of scalable based on excavation of foundation pit model test, the retaining wall solved under the most accurate simulated groundwater environment in Excavation Process moves problem, and repeatable experimental study difference retaining wall embedded depth is on foundation ditch Water And Earth Pressures and the impact of deformation.
This utility model solves its technical problem and be the technical scheme is that a kind of waterproof foundation pit support device of scalable based on excavation of foundation pit model test, this device includes retaining wall and support, described retaining wall top is provided with multiple tracks bolt, is bolted retaining wall support;Being reserved with some fixing bolts in the middle part of described retaining wall, both sides are provided with watertight rubber bar;Described watertight rubber bar ensures not leak with model casing contact surface in retaining wall moving process;One end of described support has inner thread mouth, and inner thread mouth is connected with fixing bolt thread, it is achieved the installation of support.
Further, described support includes solid aluminum bar, expansion link and support connecting bolt;Having some grooves on described solid aluminum bar, one end has inner thread mouth;Described expansion link is hollow aluminum pipe, and expansion link has some screwed holes;Described support connecting bolt props up the groove of solid aluminum bar through the screwed hole on expansion link so that solid aluminum bar and expansion link compact siro spinning technology.
Further, described support includes the first support bar, the second support bar and sleeve;One end of described first support bar has external screw thread;One end of described second support bar has inner thread mouth, and the other end has external screw thread;Described sleeve has female thread passage, and threaded one end connects the first support bar, threaded second support bar of the other end.
Further, described watertight rubber bar is made up of semi-cylindrical rubber cavity and sheet rubber;Described sheet rubber embeds in the line of rabbet joint of retaining wall side, smears silica gel sealing and is arranged on retaining wall.
Further, described retaining wall is aluminium sheet, and the retaining wall rigidity that its thickness need to be simulated by model test determines.
Further, described retaining wall support is corrosion resistant plate.
Further, two sides that described model casing contacts with retaining wall are safety glass.
Compared with prior art, the beneficial effects of the utility model are:
1, in this utility model, retaining wall can occur corresponding displacement due to the inside and outside soil pressure difference in hole in Excavation Process, excess pore water pressure, soil pressure and foundation pit deformation in soil mass of foundation pit under the different excavating condition of monitoring, more can reflect the Water And Earth Pressures in actual base pit engineering digging process and foundation pit deformation response compared to the test method of fixed retaining wall.
2, this utility model can the base pit engineering environment of simulated groundwater effect, use the customization watertight rubber bar being made up of semi-cylindrical rubber cavity and sheet rubber to seal;Sheet rubber is embedded in the line of rabbet joint of retaining wall side, smear silica gel sealing and watertight rubber bar is arranged on retaining wall, on the one hand can reach the purpose preventing from leaking, on the other hand ensure that in retaining wall moving process, sealing rubber strip will not peel off;Semi-cylindrical rubber cavity can be crushed in retaining wall moving process, increasing the contact surface of watertight rubber bar and safety glass, be further ensured that retaining wall sealing rubber strip in moving process does not leaks with model casing contact surface, operation principle is simple, device is simple, installs easy to operate.
3, this utility model is provided with the multiple tracks bolt for fixed retaining wall support on retaining wall top, the test simulation of different retaining wall embedded depth can be realized, compared to conventional needle, the excavation models of different embedded depths is tested the method that the retaining wall needing to make differing heights completes test, eliminate the step for that the retaining wall of differing heights makes, save experimentation cost and modelling time.
4, this utility model can be with the propping operation in accurate simulation Excavation Process, and the soil body that will not excavate foundation ditch in inner support installation process has disturbing influence;It is threadably secured between inner support with retaining wall and is connected, than traditional excavation models test, inner support frame is located on retaining wall or lies directly against the method that retaining wall realizes propping, more can reflect propping situation when actual base pit engineering excavates objectively;Realized the simulation of internal support of foundation pit rigidity by control solid aluminum shank diameter and hollow aluminum bar wall thickness, more objectively reflect the inner support Effects on Engineering to excavation of foundation pit.
5, this utility model uses retractable supports element, the excavation of foundation pit test of different in width can be simulated, the support of regular length or retractable supports is used to be only used for realizing supporting the experimental considerations installed compared to traditional excavation of foundation pit model test, same set of assay device can be used to carry out the excavation of foundation pit test of many group different in width, decreasing the repacking to assay device, saved experimentation cost and modelling time, operation principle is simple, easy to operate, there is the biggest practicality.
6, this utility model according to the demand of geotechnical model test, can adjust the quantity of inner support element, and the inner support on retaining wall fixes position and the quantity of bolt, the excavation situation of the different foundation ditch of simulation.
Accompanying drawing explanation
Fig. 1 is the scalable waterproof foundation pit support device side view using the first kind to support.
Fig. 2 is the scalable waterproof foundation pit support device side view using Equations of The Second Kind to support.
Fig. 3 is retaining wall plane graph.
Fig. 4 is sealing rubber strip profile.
Fig. 5 is the waterproof foundation pit support device of scalable using the first kind to support application schematic diagram in model test.
Fig. 6 is the waterproof foundation pit support device of scalable using Equations of The Second Kind to support application schematic diagram in model test.
In figure: retaining wall 1;Retaining wall support 2;Bolt 3;Watertight rubber bar 4;Semi-cylindrical rubber cavity 4-1;Sheet rubber 4-2;Fixing bolt 5;Support 6;Solid aluminum bar 6-1;Hollow aluminum bar 6-2;Support connecting bolt 6-3;First support bar 6-4;Second support bar 6-5;Sleeve 6-6;Model casing 7;Model casing base 8;Reaction frame 9;The test soil body 10.
Detailed description of the invention
With embodiment, this utility model is further illustrated below in conjunction with the accompanying drawings.
As shown in Figure 1 and Figure 2, the waterproof foundation pit support device of this utility model scalable based on excavation of foundation pit model test, including retaining wall 1 and support 6.Described retaining wall 1 top is provided with multiple tracks bolt 3, by bolt 3 fixed retaining wall support 2;Being reserved with some fixing bolts 5 in the middle part of described retaining wall 1, both sides are provided with watertight rubber bar 4;Described watertight rubber bar 4 ensures not leak with model casing 7 contact surface in retaining wall 1 moving process;One end of described support 6 has inner thread mouth, and inner thread mouth is threadeded with fixing bolt 5, it is achieved support the installation of 6.
Preferably, described support 6 can use following two form:
One. as it is shown in figure 1, described support 6 includes solid aluminum bar 6-1, expansion link 6-2 and supports connecting bolt 6-3;Having some grooves on described solid aluminum bar 6-1, one end has inner thread mouth;Described expansion link 6-2 is hollow aluminum pipe, and expansion link 6-2 has some screwed holes;Described support connecting bolt 6-3 selects M6 bolt, props up the groove of solid aluminum bar 6-1 through the screwed hole on expansion link 6-2 so that solid aluminum bar 6-1 and expansion link 6-2 compact siro spinning technology.
Two. as in figure 2 it is shown, described support 6 includes the first support bar 6-4, the second support bar 6-5 and sleeve 6-6;One end of described first support bar 6-4 has external screw thread;One end of described second support bar 6-5 has inner thread mouth, and the other end has external screw thread;Described sleeve 6-6 has female thread passage, and threaded one end connects the first support bar 6-4, the threaded second support bar 6-5 of the other end.
As it is shown on figure 3, described retaining wall 1 is certain thickness aluminium sheet, the retaining wall Rigidity Calculation that its thickness need to be simulated by model test obtains.Described retaining wall support 2 is made up of the corrosion resistant plate that thickness is 20mm.M8 bolt selected by described bolt 3, and its position is determined by the embedded depth of retaining wall 1, and number of channels is tested, by the excavation of foundation pit changing retaining wall embedded depth, the group number needing to adjust and determined.M8 bolt selected by described fixing bolt 5, and quantity and position that its quantity and position are supported by foundation ditch determine.
As shown in Figure 4, described watertight rubber bar 4 is made up of semi-cylindrical rubber cavity 4-1 and sheet rubber 4-2;Described sheet rubber 4-2 embeds in the line of rabbet joint of retaining wall 1 side, smears silica gel sealing and is arranged on retaining wall 1, on the one hand can reach the purpose preventing from leaking, and on the other hand ensures that in retaining wall moving process, sealing rubber strip will not peel off;Described semi-cylindrical rubber cavity 4-1 can be crushed in retaining wall moving process, increases the contact surface of watertight rubber bar and safety glass, is further ensured that retaining wall sealing rubber strip in moving process does not leaks with model casing contact surface.
As shown in Figure 5, Figure 6, excavation of foundation pit model test under this utility model can be applicable to groundwater environment.Two sides that described model casing 7 contacts with retaining wall 1 are 20mm thickness safety glass, it is simple to retaining wall and the monitoring of land movement in test, and for ensureing, in retaining wall 1 moving process, drainage does not occur, the manufactured size required precision of model casing 7 is higher.
Work process of the present utility model is as follows: first select the position of bolt 3 to be fixed on retaining wall 1 by barricade support 2 according to the design embedded depth of retaining wall 1;Retaining wall 1 is placed in model casing 7, makes the watertight rubber bar 4 on retaining wall 1 vertical with the safety glass of model casing 7 both sides and be adjacent to;And the test soil body 10 inserted by backward model casing 7, bury pore water pressure sensor and soil pressure cell underground, by the most saturated for the test soil body 10 simultaneously;Installation position displacement sensor monitoring soil deformation and retaining wall displacement;Successively the test soil body 10 on the left of excavation retaining wall 1, successively excavates successively installation support 6;It is connected with the fixing bolt 5 on retaining wall 1 by supporting the female thread of 6 one end, is allowed to hold out against the reaction frame 9 being jointly fixed on model casing base 8 with model casing 7 by adjusting the length supporting 6, completes to support the installation of 6.Excess pore water pressure, soil pressure and foundation pit deformation in whole excavation of foundation pit process of the test, in the monitoring soil body, it is thus achieved that correlation test data, provides certain advisory opinion for similar design of foundation pit.

Claims (7)

1. the waterproof foundation pit support device of scalable based on excavation of foundation pit model test, this device include retaining wall (1) and Support (6), it is characterised in that described retaining wall (1) top is provided with multiple tracks bolt (3), by the fixing gear of bolt (3) Cob wall support (2);Described retaining wall (1) middle part is reserved with some fixing bolts (5), and both sides are provided with watertight rubber bar (4); One end of described support (6) has inner thread mouth, and inner thread mouth is threadeded with fixing bolt (5).
A kind of waterproof foundation pit support device of scalable based on excavation of foundation pit model test the most according to claim 1, its Being characterised by, described support (6) includes solid aluminum bar (6-1), expansion link (6-2) and supports connecting bolt (6-3);Institute Stating and have some grooves on solid aluminum bar (6-1), one end has inner thread mouth;Described expansion link (6-2) is hollow aluminum pipe, Some screwed holes are had on expansion link (6-2);Described support connecting bolt (6-3) is through the screwed hole on expansion link (6-2) Prop up the groove of solid aluminum bar (6-1).
A kind of waterproof foundation pit support device of scalable based on excavation of foundation pit model test the most according to claim 1, its Being characterised by, described support (6) includes the first support bar (6-4), the second support bar (6-5) and sleeve (6-6);Described One end of first support bar (6-4) has external screw thread;One end of described second support bar (6-5) has inner thread mouth, another End has external screw thread;Described sleeve (6-6) has female thread passage, and threaded one end connects the first support bar (6-4), another Hold threaded second support bar (6-5).
A kind of waterproof foundation pit support device of scalable based on excavation of foundation pit model test the most according to claim 1, its Being characterised by, described watertight rubber bar (4) is made up of semi-cylindrical rubber cavity (4-1) and sheet rubber (4-2);Described rubber Film (4-2) embeds in the line of rabbet joint of retaining wall (1) side, smears silica gel sealing and is arranged on retaining wall (1).
A kind of waterproof foundation pit support device of scalable based on excavation of foundation pit model test the most according to claim 1, its Being characterised by, described retaining wall (1) is aluminium sheet.
A kind of waterproof foundation pit support device of scalable based on excavation of foundation pit model test the most according to claim 1, its Being characterised by, described retaining wall support (2) is corrosion resistant plate.
A kind of waterproof foundation pit support device of scalable based on excavation of foundation pit model test the most according to claim 1, its Being characterised by, two sides that described model casing (7) contacts with retaining wall (1) are safety glass.
CN201620275447.4U 2016-04-01 2016-04-01 A kind of waterproof foundation pit support device of scalable based on excavation of foundation pit model test Withdrawn - After Issue CN205712219U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620275447.4U CN205712219U (en) 2016-04-01 2016-04-01 A kind of waterproof foundation pit support device of scalable based on excavation of foundation pit model test

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620275447.4U CN205712219U (en) 2016-04-01 2016-04-01 A kind of waterproof foundation pit support device of scalable based on excavation of foundation pit model test

Publications (1)

Publication Number Publication Date
CN205712219U true CN205712219U (en) 2016-11-23

Family

ID=57312177

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620275447.4U Withdrawn - After Issue CN205712219U (en) 2016-04-01 2016-04-01 A kind of waterproof foundation pit support device of scalable based on excavation of foundation pit model test

Country Status (1)

Country Link
CN (1) CN205712219U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105735377A (en) * 2016-04-01 2016-07-06 浙江大学 Adjustable waterproof foundation pit supporting device based on foundation pit excavation model test
CN108951718A (en) * 2018-06-08 2018-12-07 中国人民解放军63926部队 The physical experiments device and method of simulating excavation

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105735377A (en) * 2016-04-01 2016-07-06 浙江大学 Adjustable waterproof foundation pit supporting device based on foundation pit excavation model test
CN105735377B (en) * 2016-04-01 2017-11-17 浙江大学 A kind of adjustable waterproof foundation pit support device based on excavation of foundation pit model test
CN108951718A (en) * 2018-06-08 2018-12-07 中国人民解放军63926部队 The physical experiments device and method of simulating excavation

Similar Documents

Publication Publication Date Title
CN105716960B (en) Excavation of foundation pit model test apparatus under complicated groundwater environment
CN110453733B (en) Pile foundation bearing capacity self-balancing test device and test method in model test
CN105672379B (en) The excavation of foundation pit model test apparatus of dynamic artesian water effect
CN104075854A (en) Shield segment joint anti-penetrability performance test device
CN204613202U (en) The migration of a kind of simulate formation coal mining overlying strata and gushing water are burst sand experimental provision
Sun et al. Physical simulation of high-pressure water inrush through the floor of a deep mine
Lam et al. A new apparatus for modelling excavations
CN104614249A (en) Pressure chamber testing device and testing method for monitoring rock breaking multivariate precursory information
CN205712219U (en) A kind of waterproof foundation pit support device of scalable based on excavation of foundation pit model test
CN108562515A (en) A kind of Grouting Seepage in Rockmass slurries diffusion multifactorial experiment system
CN105735377A (en) Adjustable waterproof foundation pit supporting device based on foundation pit excavation model test
US20180364377A1 (en) Test system for microseismic test of rock mass fractures
CN104849428A (en) Experimental device for simulating overlaying strata migration and water and sand bursting of underground coal mining
CN105716959A (en) Foundation pit model test device capable of simulating dynamic change of underground water level
CN205712213U (en) The dynamically excavation of foundation pit model test apparatus of artesian water effect
CN105675846A (en) Foundation pit excavation model testing device capable of cooperatively hoisting phreatic water level and pressure-bearing water head
CN205242462U (en) Research anti -floating pile resists test device that foundation ditch suddenly gushes failure mechanisms
CN204882545U (en) In same direction as layer rock matter side slope testing system that slides
CN204359770U (en) Deep tunnel water bursting disaster two-dimensional physical simulation experiment system
CN205712215U (en) The excavation of foundation pit model test apparatus of simulation artesian head lifting
CN110082220A (en) A kind of porous guiding fracturing experiments device of true triaxial
CN117890563A (en) Rectangular jacking pipe thixotropic slurry drag reduction and fluid loss performance test system and method
CN114352249A (en) Thickened oil steam assisted gravity drainage experimental device and using method thereof
CN112196509B (en) Full-size multi-cluster flexible crack simulation device
KR200442378Y1 (en) Apparatus for testing shear stress in test bore hole

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20161123

Effective date of abandoning: 20171117