CN105675846A - Foundation pit excavation model testing device capable of cooperatively hoisting phreatic water level and pressure-bearing water head - Google Patents
Foundation pit excavation model testing device capable of cooperatively hoisting phreatic water level and pressure-bearing water head Download PDFInfo
- Publication number
- CN105675846A CN105675846A CN201610205727.2A CN201610205727A CN105675846A CN 105675846 A CN105675846 A CN 105675846A CN 201610205727 A CN201610205727 A CN 201610205727A CN 105675846 A CN105675846 A CN 105675846A
- Authority
- CN
- China
- Prior art keywords
- water
- foundation pit
- support
- model
- model casing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N33/00—Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
- G01N33/24—Earth materials
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D33/00—Testing foundations or foundation structures
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Health & Medical Sciences (AREA)
- Remote Sensing (AREA)
- Medicinal Chemistry (AREA)
- Structural Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Geology (AREA)
- Civil Engineering (AREA)
- Paleontology (AREA)
- Mining & Mineral Resources (AREA)
- Food Science & Technology (AREA)
- General Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Analytical Chemistry (AREA)
- Biochemistry (AREA)
- General Health & Medical Sciences (AREA)
- General Physics & Mathematics (AREA)
- Immunology (AREA)
- Pathology (AREA)
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
Abstract
本发明公开了一种潜水位和承压水头协同升降的基坑开挖模型试验装置。包括模型箱、水箱、对称面挡土单元、基坑支护结构、承压架空层、承压水头调节系统和量测系统;模型箱包括模型箱框架、反力板等;水箱设置在模型箱内的右上方;对称面挡土单元通过螺栓固定在模型箱框架上;承压架空层设置在模型箱底部,与承压水头调节系统连接;承压水头调节系统由水压计、马里奥特瓶和支架组成;本发明可模拟基坑开挖过程中潜水位和承压水头的升降;量测不同潜水位和承压水头下基坑的水土压力和变形,整理相关试验数据并确定基坑受力和变形发展规律等问题,为潜水位和承压水头升降引起的基坑问题研究提供有效的试验数据支持,并对于之后理论分析模型提供依据。
The invention discloses a foundation pit excavation model test device in which a water level and a pressurized water head cooperate to rise and fall. Including model box, water tank, symmetric surface retaining unit, foundation pit support structure, pressure-bearing overhead layer, pressure-bearing head adjustment system and measurement system; model box includes model box frame, reaction plate, etc.; water tank is set in the model box The upper right inside; the symmetrical surface retaining unit is fixed on the frame of the model box by bolts; the pressure-bearing overhead layer is set at the bottom of the model box and connected with the pressure-bearing head adjustment system; Composed of a bottle and a bracket; the invention can simulate the rise and fall of the phreatic level and the pressurized water head during the excavation of the foundation pit; measure the water and soil pressure and deformation of the foundation pit under different phreatic levels and pressurized water heads, sort out relevant test data and determine the foundation pit Issues such as the development law of force and deformation provide effective experimental data support for the study of foundation pit problems caused by the rise and fall of phreatic level and confined water head, and provide a basis for the subsequent theoretical analysis model.
Description
技术领域 technical field
本发明涉及一种基坑模型试验装置,特别是涉及潜水位和承压水头升降条件下的基坑开挖模型试验装置,可用于模拟潜水位和承压水头升降时承压层和上覆弱透水性基坑土体之间的相互作用,研究不同潜水位和承压水头下基坑的水土压力响应和变形问题。 The invention relates to a foundation pit model test device, in particular to a foundation pit excavation model test device under the condition of rising and falling water levels and pressure water heads, which can be used for simulating pressure bearing layers and overlying weak points when the water level and pressure water heads rise and fall. The interaction between soil in permeable foundation pits is used to study the water and soil pressure response and deformation of foundation pits under different phreatic levels and confined water heads.
背景技术 Background technique
在滨海、沿江地区地下水丰富,工程中常面临深基坑坑底弱透水层以下尚存在承压层的情况,由于大型降水、季节性干旱、河流或湖泊水位线的季节性变化等将导致潜水位和承压水头发生升降,从而进一步影响基坑水土压力、变形和稳定性,潜水位和承压水头升降引起的基坑变形和失稳问题是该类地区深基坑工程的重大风险源之一。 There is abundant groundwater in the coastal and riverside areas, and the project often faces the situation that there is still a confined layer below the aquitard at the bottom of the deep foundation pit. Due to large-scale precipitation, seasonal drought, and seasonal changes in the water level of rivers or lakes, the water level will The rise and fall of the water level and the confined water head will further affect the water and soil pressure, deformation and stability of the foundation pit. The deformation and instability of the foundation pit caused by the rise and fall of the phreatic level and the confined water head are one of the major risk sources for deep foundation pit engineering in such areas .
相比于理论解析方法和有限元数值方法的研究采用既定的土体本构模型,计算得到的潜水位和承压水头升降引起的土体水土压力和变形大小对计算参数的选取具有很大的依赖性;实际工程中较难进行对基坑坑底(位于基坑开挖区域内)的水土压力实时监测,进行大量相似的工程监测数据统计分析以获得潜水位和承压水头升降引起的坑底弱透水层的变形规律的方法也很难实现;鉴于常重力下土工模型试验,不影响土体微观结构,土颗粒尺寸及土颗粒间相互作用关系与实际情况相符,能客观反映地下水和基坑土体的土颗粒之间的相互作用,广泛应用于考虑土体应力应变关系的微观研究。 Compared with the theoretical analysis method and the finite element numerical method using the established soil constitutive model, the calculated phreatic water level and the soil water and soil pressure and deformation of the soil caused by the rise and fall of the confined water head have a great influence on the selection of calculation parameters. Dependency; in actual engineering, it is difficult to monitor the water and soil pressure at the bottom of the foundation pit (located in the excavation area of the foundation pit) in real time, and carry out statistical analysis of a large number of similar engineering monitoring data to obtain the pit caused by the rise and fall of the phreatic level and the confined water head. The method of deformation law of the bottom aquitard is also difficult to realize; in view of the fact that the geotechnical model test under constant gravity does not affect the microstructure of the soil, the size of the soil particles and the interaction relationship between soil particles are consistent with the actual situation, and can objectively reflect the groundwater and foundation conditions. The interaction between soil particles in pit soil is widely used in microscopic studies considering the stress-strain relationship of soil.
目前,传统的地下水作用的相关土工模型试验研究,不考虑水中气体进入试验土体可能引起的非饱和土问题;考虑恒定潜水位作用的基坑模型试验,有研究(彭述权.砂土挡墙破坏机理宏细观研究[D].同济大学,2007.)采用薄膜通过电晕后涂抹环氧树脂的方法连接挡土墙和模型箱,该方法可获取试验土体中超静孔隙水压力、土压力和基坑变形数据,但薄膜电晕工艺较为复杂,挡墙位移较大时薄膜可能在移动过程中发生撕裂或由于土颗粒摩擦导致破损,无法顺利完成试验或进行重复试验。考虑地下潜水位变化影响的基坑模型试验,有研究(孙威.滨海地区深基坑性状的试验及理论研究[D].浙江大学,2015.)采用固定挡土墙的方法,该方法只能获得土体中超静孔隙水压力的变化情况,无法获得准确的土压力变化和基坑变形数据,与实际基坑工程在潜水位和承压水头升降作用下的响应情况仍存在较大差异。 At present, the traditional geotechnical model test research on the action of groundwater does not consider the unsaturated soil problem that may be caused by the gas in the water entering the test soil; the foundation pit model test considering the constant phreatic level has been studied (Peng Shuquan. Sand retaining wall failure Mechanism macro and micro research [D]. Tongji University, 2007.) The method of connecting the retaining wall and the model box by applying epoxy resin after the film passes through the corona, this method can obtain the excess static pore water pressure and earth pressure in the test soil and the deformation data of the foundation pit, but the film corona process is relatively complicated. When the displacement of the retaining wall is large, the film may be torn during the movement or damaged due to the friction of soil particles, and the test cannot be successfully completed or repeated tests. Considering the impact of underground water level changes on foundation pit model tests, there are studies (Sun Wei. Experimental and theoretical research on the behavior of deep foundation pits in coastal areas [D]. Zhejiang University, 2015.) using the method of fixing retaining walls, this method only The changes of the excess static pore water pressure in the soil can be obtained, but the accurate data of the earth pressure change and the deformation of the foundation pit cannot be obtained, which is still quite different from the response of the actual foundation pit project under the action of the phreatic level and the confined water head.
在基坑模型试验中,大多数研究针对每一级开挖和加撑完成工况下的基坑受力和变形情况展开,未考虑基坑在开挖或加撑过程中基坑的受力和变形情况。在考虑基坑开挖过程的模型试验中,有研究采用卸载等体积等重量的土袋(AzevedoRF.CentrifugeandAnalyticalModellingofExcavationinSand.PhDthesis,UniversityofColorado,Boulder,CO,USA,1983.)或排放代土液体(BoltonMDandPowrieW.Thecollapseofdiaphragmwallsretainingclay.Géotechnique,1987,37(3):335-353.)等方法模拟土体开挖卸载,此类方法不能准确模拟基坑开挖引起的土体中应力场的改变,与实际基坑开挖引起的基坑受力和变形情况仍存在一定的差异。大量模拟基坑开挖的模型试验采用预先埋设安装好支撑的挡土墙的方法,直接开挖基坑土体,不需要再进行加撑操作,该方法较为简单,但预置的所有内支撑都将在整个开挖过程中受力,显然与实际工程的基坑受力情况不相符合,也无法准确模拟基坑开挖过程中未加撑情况下基坑的受力和变形情况。目前有研究采用液压千斤顶向挡土墙支架施加力的方法模拟支撑的安装,该方法采用液压装置较复杂,当基坑开挖宽度较大时该方法并不适用。另外绝大多数基坑开挖模型的开挖对称面是垂直固定的挡板,通过向下抓土或掏土实现基坑开挖,该方法不能清晰界定开挖土层,会扰动未开挖的土体;该方法繁琐,不易操作,特别是基坑开挖模型的尺寸较大或需要开挖的土体较多时,试验操作的工作量相当大。因此,如何实现准确地土体开挖和支撑安装是基坑开挖模型试验中需要解决的重点问题。 In the foundation pit model test, most studies focus on the force and deformation of the foundation pit under the completion of each level of excavation and support, without considering the force of the foundation pit during excavation or support and deformation. In the model test considering the excavation process of the foundation pit, some studies have used soil bags of equal volume and weight to unload (Azevedo RF. Centrifuge and Analytical Modeling of Excavation in Sand. PhDthesis, University of Colorado, Boulder, CO, USA, 1983.) .Géotechnique, 1987,37(3):335-353.) and other methods to simulate soil excavation and unloading, this kind of method cannot accurately simulate the change of stress field in the soil caused by foundation pit excavation, and it is different from the actual foundation pit excavation There are still some differences in the stress and deformation of the foundation pit caused. A large number of model tests simulating the excavation of foundation pits adopt the method of pre-burying and installing the supporting retaining wall, and directly excavate the soil of the foundation pit without additional support operations. This method is relatively simple, but all the internal supports preset All will be stressed during the entire excavation process, which is obviously inconsistent with the stress of the actual engineering pit, and it is impossible to accurately simulate the stress and deformation of the foundation pit without support during the excavation process. At present, some studies have used the hydraulic jack to apply force to the retaining wall support to simulate the installation of the support. This method uses a hydraulic device, which is more complicated, and this method is not applicable when the excavation width of the foundation pit is large. In addition, the excavation symmetry plane of most foundation pit excavation models is a vertically fixed baffle, and the excavation of the foundation pit is realized by grabbing or digging down the soil. This method cannot clearly define the excavated soil layer and will disturb the unexcavated soil. soil; this method is cumbersome and difficult to operate, especially when the size of the excavation model of the foundation pit is large or there are many soils to be excavated, the workload of the test operation is quite large. Therefore, how to realize accurate soil excavation and support installation is the key problem to be solved in the foundation pit excavation model test.
发明内容 Contents of the invention
为了克服上述现有技术的不足,本发明提供了潜水位和承压水头协同升降的基坑开挖模型试验装置,解决了试验中潜水位和承压水头协同升降的模拟问题,可模拟潜水位和承压水头协同升降时地下水和基坑土体之间的相互作用,量测不同潜水位和承压水头下基坑的水土压力和变形,整理相关试验数据并确定潜水位和承压水头协同升降时基坑的受力和变形发展规律等问题,为潜水位和承压水头升降引起的基坑问题研究提供有效的试验数据支持,并为之后理论分析模型提供依据。 In order to overcome the deficiencies of the above-mentioned prior art, the present invention provides a foundation pit excavation model test device in which the phreatic level and the pressurized water head cooperate to rise and fall, which solves the simulation problem of the phreatic level and the pressurized water head coordinated rise and fall in the test, and can simulate the phreatic level The interaction between groundwater and foundation pit soil when it rises and falls in conjunction with the confined water head, measures the water and soil pressure and deformation of the foundation pit under different phreatic levels and confined water heads, sorts out relevant test data and determines the coordination between the phreatic level and the confined water head Issues such as the force and deformation development law of foundation pits during lifting provide effective experimental data support for the study of foundation pit problems caused by the rise and fall of phreatic level and confined water head, and provide a basis for the subsequent theoretical analysis model.
本发明解决其技术问题所采用的技术方案是:一种潜水位和承压水头协同升降的基坑开挖模型试验装置,包括模型箱、水箱、若干对称面挡土单元、基坑支护结构、承压架空层、承压水头调节系统和量测系统七个部分;所述模型箱由模型箱框架、钢化玻璃、模型箱底板、顶框、反力板和模型箱底座组成;所述模型箱框架的底部固定模型箱底板,前后两个侧面固定钢化玻璃;所述模型箱框架和反力板均固定在模型箱底座上,顶部通过顶框连接;所述模型箱的右侧底部安装连通承压架空层的第二通水阀门,用于连接模型箱和承压水头调节系统; The technical solution adopted by the present invention to solve the technical problem is: a foundation pit excavation model test device for coordinated lifting of the water level and the pressure water head, including a model box, a water tank, several symmetrical surface retaining units, and a foundation pit support structure , pressure-bearing overhead layer, pressure-bearing head adjustment system and measurement system seven parts; the model box is composed of model box frame, tempered glass, model box bottom plate, top frame, reaction plate and model box base; the model box The bottom plate of the model box is fixed on the bottom of the box frame, and the tempered glass is fixed on the front and rear sides; the frame of the model box and the reaction plate are fixed on the base of the model box, and the top is connected by the top frame; the bottom of the right side of the model box is installed and connected The second water valve of the pressurized overhead layer is used to connect the model box and the pressurized water head adjustment system;
所述水箱由带通水孔的铝板、条形铝板、水箱支架、水箱支架固定螺丝、刻度尺和第一通水阀门组成,通过水箱支架架设在模型箱内的右上方,用于控制和观测土体中的水位升降;所述带通水孔的铝板表面粘贴反滤土工织物,防止地下水变化过程中试验土体的流失;所述刻度尺粘贴在钢化玻璃上,可用于直接观测和记录潜水位变化情况;所述第一通水阀门设置在模型箱的右侧用以连通水箱; The water tank is composed of an aluminum plate with a water hole, a strip aluminum plate, a water tank bracket, a water tank bracket fixing screw, a scale and a first water valve, and is installed on the upper right of the model box through the water tank bracket for control and observation The water level in the soil rises and falls; the surface of the aluminum plate with water holes is pasted with anti-filtering geotextiles to prevent the loss of the test soil during the change of groundwater; the scale is pasted on the tempered glass and can be used for direct observation and recording of diving Position changes; the first water valve is set on the right side of the model box in order to communicate with the water tank;
所述对称面挡土单元为U型不锈钢条,通过螺栓固定在模型箱框架上;所述U型不锈钢条之间通过H型止水橡胶条连接,U型不锈钢条与模型箱框架通过S型止水橡胶条连接; The soil retaining unit on the symmetrical surface is a U-shaped stainless steel strip, which is fixed on the model box frame by bolts; the U-shaped stainless steel strips are connected by an H-shaped water-stop rubber strip, and the U-shaped stainless steel strip and the model box frame are connected by an S-shaped Water-stop rubber strip connection;
所述基坑支护结构包括挡土墙、挡土墙支架和若干支撑单元;所述挡土墙上部通过支架固定螺栓固定挡土墙支架,中部开有螺纹孔,通过螺纹孔螺纹连接安装支撑单元所需的支撑固定螺栓,两侧开槽固定止水橡胶条;所述止水橡胶条保证挡土墙移动过程中与模型箱接触面不发生漏水;所述支撑单元的一端具有内螺纹口,内螺纹口与支撑固定螺栓螺纹连接,实现支撑单元的安装; The support structure of the foundation pit includes a retaining wall, a retaining wall bracket and several supporting units; the upper part of the retaining wall is fixed with bracket fixing bolts to fix the retaining wall bracket, and the middle part is provided with a threaded hole, through which the threaded hole is threaded to install the support The support and fixing bolts required by the unit are grooved on both sides to fix the water-stop rubber strip; the water-stop rubber strip ensures that the contact surface with the model box does not leak during the movement of the retaining wall; one end of the support unit has an internal thread port , the internal threaded port is threaded with the support fixing bolts to realize the installation of the support unit;
所述承压架空层由带通水孔的不锈钢板、不锈钢短柱和反滤土工织物组成;所述带通水孔的不锈钢板底部固定不锈钢短柱,放置于模型箱内的模型箱底板上,并与模型箱的四个侧面密封连接;所述带通水孔的不锈钢板表面粘贴反滤土工织物; The pressure-bearing overhead layer is composed of a stainless steel plate with a water hole, a stainless steel short column and a filter geotextile; the stainless steel short column is fixed at the bottom of the stainless steel plate with a water hole, and placed on the bottom plate of the model box in the model box , and sealed with the four sides of the model box; the surface of the stainless steel plate with water holes is pasted with filter geotextile;
所述承压水头调节系统由水压计、马里奥特瓶和支架组成;所述水压计通过三通管连接模型箱和马里奥特瓶;所述支架上安装有定滑轮,钢丝绳绕过定滑轮连接马里奥特瓶和手摇器,通过手摇器控制马里奥特瓶的升降调节承压水头的大小;所述马里奥特瓶由有机玻璃圆筒、进气阀门、第三通水阀门、出气阀门和气囊组成;所述有机玻璃圆筒底部设置进气阀门和第三通水阀门,顶部设置出气阀门;所述进气阀门与气囊连接; The pressurized water head adjustment system consists of a water pressure gauge, a Marriott bottle and a bracket; the water pressure gauge is connected to the model box and the Marriott bottle through a three-way pipe; a fixed pulley is installed on the bracket, and the wire rope goes around The fixed pulley connects the Marriott bottle and the hand shaker, and the hand shaker controls the ups and downs of the Marriott bottle to adjust the size of the pressurized water head; the Marriott bottle is composed of a plexiglass cylinder, an air inlet valve, and a third water pass Valve, air outlet valve and air bag; the bottom of the plexiglass cylinder is provided with an air inlet valve and a third water valve, and the top is provided with an air outlet valve; the air inlet valve is connected to the air bag;
所述量测系统包括微型孔隙水压力传感器、微型土压力盒、位移传感器、多通道数据采集仪和数码照相机;所述微型孔隙水压力传感器、微型土压力盒、位移传感器通过信号传输线连接多通道数据采集仪;所述数码照相机放置于模型箱正前方。 The measurement system includes a miniature pore water pressure sensor, a miniature earth pressure cell, a displacement sensor, a multi-channel data acquisition instrument and a digital camera; A data acquisition instrument; the digital camera is placed directly in front of the model box.
进一步地,所述支撑单元包括实心铝杆、伸缩杆和支撑连接螺栓;所述实心铝杆上开有若干凹槽,一端具有内螺纹口;所述伸缩杆为空心铝管,伸缩杆上开有若干螺纹孔;所述支撑连接螺栓穿过伸缩杆上的螺纹孔抵住实心铝杆的凹槽。 Further, the support unit includes a solid aluminum rod, a telescopic rod and a supporting connecting bolt; the solid aluminum rod has several grooves, and one end has an internal thread; the telescopic rod is a hollow aluminum tube, and the telescopic rod is opened There are several threaded holes; said supporting connecting bolts pass through the threaded holes on the telescoping rods against the grooves of the solid aluminum rods.
进一步地,所述支撑单元包括第一支撑杆、第二支撑杆和套筒;所述第一支撑杆的一端具有外螺纹;所述第二支撑杆的一端具有内螺纹口,另一端具有外螺纹;所述套筒具有内螺纹通道,一端螺纹连接第一支撑杆,另一端螺纹连接第二支撑杆。 Further, the support unit includes a first support rod, a second support rod and a sleeve; one end of the first support rod has an external thread; one end of the second support rod has an internal thread opening, and the other end has an external thread thread; the sleeve has an internal thread channel, one end is threaded to the first support rod, and the other end is threaded to the second support rod.
进一步地,所述数码照相机在试验过程中应排除干扰,其位置不可发生挪动;可根据拍摄需要增设光源。 Further, the digital camera should eliminate interference during the test, and its position cannot be moved; light sources can be added according to shooting needs.
进一步地,所述模型箱框架由10mm厚的不锈钢钢条和不锈钢钢板焊接而成;所述钢化玻璃通过建筑胶水安装在模型箱框架内侧;所述模型箱底板和反力板为10mm厚的不锈钢钢板;所述顶框由20mm厚的不锈钢钢条焊接而成;所述模型箱主体和反力板通过四周点焊固定于模型箱底座;所述挡土墙为铝板,其厚度由试验模拟的挡土墙刚度计算得到;所述挡土墙支架为20mm厚的条状铝板;所述挡土墙在移动过程中始终与钢化玻璃保持垂直;所述第一通水阀门、第二通水阀门、进气阀门、第三通水阀门、出气阀门为铜芯阀门。 Further, the model box frame is welded by 10mm thick stainless steel bars and stainless steel plates; the tempered glass is installed inside the model box frame with construction glue; the model box bottom plate and reaction plate are 10mm thick stainless steel steel plate; the top frame is welded by 20mm thick stainless steel bars; the main body of the model box and the reaction plate are fixed on the base of the model box by spot welding around; the retaining wall is an aluminum plate, and its thickness is simulated by the test The stiffness of the retaining wall is calculated; the retaining wall support is a 20mm thick strip aluminum plate; the retaining wall is always kept perpendicular to the tempered glass during the movement; the first water valve and the second water valve , The intake valve, the third water valve, and the outlet valve are copper core valves.
进一步地,所述实心铝杆的直径、伸缩杆的壁厚、第一支撑杆的直径、第二支撑杆的直径和套筒的壁厚均由试验模拟的内支撑的刚度计算得到。 Further, the diameter of the solid aluminum rod, the wall thickness of the telescopic rod, the diameter of the first support rod, the diameter of the second support rod and the wall thickness of the sleeve are all calculated from the stiffness of the inner support simulated by the test.
进一步地,所述气囊内装有1atm的氮气。 Further, nitrogen gas of 1 atm is housed in the air bag.
进一步地,所述水箱和有机玻璃圆筒内的液体为无气水。 Further, the liquid in the water tank and the plexiglass cylinder is anaerobic water.
进一步地,模型箱内的底部试验土体为砾砂;上覆试验土体为弱透水性土体。 Further, the bottom test soil in the model box is gravel sand; the overlying test soil is weakly permeable soil.
进一步地,所述的弱透水性土体为粘质粉土;所述砾砂和弱透水性土体采用无气水饱和。 Further, the weakly permeable soil is clayey silt; the gravel and weakly permeable soil are saturated with airless water.
与现有技术相比,本发明的有益效果是: Compared with prior art, the beneficial effect of the present invention is:
1、本发明在试验前采用无气水饱和试验土体,试验过程中提供无气承压水环境,使得试验土体的孔隙充满无气水,如上操作有两点益处:一是避免水中气泡进入弱透水性土层引起土体的非饱和问题(与饱和土相比,非饱和土的力学特性存在较大差异和不确定性);二是避免水中气泡干扰微型孔隙水压力传感器影响其测量精度。 1. The present invention uses an airless water-saturated test soil before the test, and provides an airless pressurized water environment during the test, so that the pores of the test soil are filled with anaerobic water. The above operation has two advantages: one is to avoid air bubbles in the water Entering the impermeable soil layer causes the unsaturated problem of the soil (compared with the saturated soil, the mechanical properties of the unsaturated soil are quite different and uncertain); the second is to avoid the air bubbles in the water from interfering with the miniature pore water pressure sensor and affecting its measurement precision.
2、本发明水箱架设在模型箱内,采用玻璃胶密封水箱与模型箱之间的缝隙,带通水孔的铝板使得水箱内的水位与试验土体水位连通,可以通过调节水箱内的水位以模拟试验土体潜水位的升降;水箱上的刻度尺粘贴在钢化玻璃上,便于直接观测和记录潜水位变化情况。采用改进的马里奥特瓶,通过气囊内的氮气平衡马里奥特瓶内外的气压,利用氮气难溶于水的特性,为试验土体营造无气承压水环境,有效避免常规的马里奥特瓶供水时溶于水中的气泡引起的土体非饱和土问题;利用手摇器的自锁功能固定马里奥特瓶的高度保证提供稳定的承压水头压力;水压计连接模型箱与承压水头调节系统,可精确读取施加的承压水头压力的大小。 2. The water tank of the present invention is erected in the model box, and glass glue is used to seal the gap between the water tank and the model box. The aluminum plate with water holes makes the water level in the water tank communicate with the water level of the test soil body. The water level in the water tank can be adjusted to The rise and fall of the phreatic level of the simulated test soil; the scale on the water tank is pasted on the tempered glass, which is convenient for direct observation and recording of the phreatic level change. The improved Marriott bottle is used to balance the air pressure inside and outside the Marriott bottle through the nitrogen in the airbag, and the characteristics of nitrogen insoluble in water are used to create an airless pressurized water environment for the test soil, effectively avoiding the conventional Marriott. Unsaturated soil problems caused by air bubbles dissolved in water when the bottle is supplied with water; use the self-locking function of the hand shaker to fix the height of the Marriott bottle to ensure a stable pressurized water head pressure; the water pressure gauge connects the model box with the pressurized Head adjustment system for accurate reading of the applied confined head pressure.
3、本发明中的承压架空层一方面可实现从下向上充分饱和模型箱内的试验土体,有利于试验土体中气体的排出;另一方面连通承压水头调节系统以提供承压砾砂层不同的承压水头,与天然承压水的埋藏条件相近;承压砾砂层与上覆弱透水性土层直接接触将客观模拟承压水头升降过程中承压层与上覆弱透水性土层之间的相互作用,有利于进一步揭示承压水头升降引起的基坑土体水土压力响应和基坑土体变形规律。在水箱带通水孔的铝板和承压架空层带通水孔的不锈钢板的表面粘贴反滤土工织物,防止地下水变化过程中试验土体的流失。常重力条件下进行试验研究,不影响基坑土体的微观结构,使得土颗粒尺寸及土颗粒间相互作用关系与实际情况相符,有利于开展涉及土颗粒间相互作用的微观研究。 3. On the one hand, the pressure-bearing overhead layer in the present invention can fully saturate the test soil in the model box from bottom to top, which is beneficial to the discharge of gas in the test soil; on the other hand, it is connected with the pressure-bearing water head adjustment system to provide pressure-bearing The different confined water heads of the gravel sand layer are similar to the burial conditions of natural confined water; the direct contact between the confined gravel sand layer and the overlying weak permeable soil layer will objectively simulate the pressure between the confined layer and the overlying weak soil layer during the rise and fall of the confined water head. The interaction between the permeable soil layers is conducive to further revealing the water and soil pressure response of the foundation pit soil caused by the rise and fall of the confined water head and the deformation law of the foundation pit soil. The anti-filter geotextile is pasted on the surface of the aluminum plate with water holes in the water tank and the stainless steel plate with water holes in the pressure-bearing overhead layer to prevent the loss of the test soil during the change of groundwater. Experimental research under constant gravity does not affect the microstructure of the foundation pit soil, making the size of soil particles and the interaction relationship between soil particles consistent with the actual situation, which is conducive to the development of microscopic research involving the interaction between soil particles.
4、本发明采用水箱和承压架空层来控制潜水位和承压水头的协同升降,可以实现如下三种类型的实验操作: 4. The present invention uses the water tank and the pressure-bearing overhead layer to control the coordinated lifting of the phreatic level and the pressure-bearing head, and can realize the following three types of experimental operations:
(一)关闭水箱的第一通水阀门(潜水位不变),调节马里奥特瓶高度改变承压水头的大小,研究承压水头升降对基坑土体水土压力响应、变形的影响,通过水箱刻度线显示的水位线情况,获知承压水升降对基坑潜潜水位变化的影响; (1) Close the first water valve of the water tank (diving level remains unchanged), adjust the height of the Marriott bottle to change the size of the pressurized water head, and study the influence of the rise and fall of the pressurized water head on the water and soil pressure response and deformation of the foundation pit soil. The water level line displayed by the scale line of the water tank can be used to know the influence of the rise and fall of the confined water on the change of the diving level of the foundation pit;
(二)将马里奥特瓶固定在指定高度(承压水头不变),打开第一通水阀门调节水箱的水位线以控制试验土体的潜水位,研究潜水位升降对基坑土体水土压力响应、变形的影响,通过水压计显示的承压水头压力大小,获知基坑潜水位升降对承压水头压力变化的影响; (2) Fix the Marriott bottle at the specified height (the pressure-bearing water head remains unchanged), open the first water valve to adjust the water level line of the water tank to control the phreatic level of the test soil, and study the impact of the phreatic level rise and fall on the soil water and soil of the foundation pit. The influence of pressure response and deformation, through the pressure of the confined water head displayed by the water pressure gauge, the influence of the rise and fall of the phreatic level of the foundation pit on the pressure change of the confined water head is known;
(三)调节潜水位和承压水头的共同升降,研究潜水位和承压水位协同升降对基坑土体水土压力响应、变形的影响。 (3) Adjust the joint rise and fall of the phreatic level and the confined water head, and study the influence of the coordinated rise and fall of the phreatic level and the confined water level on the water and soil pressure response and deformation of the foundation pit soil.
5、本发明采用可拆卸的对称面挡土单元,临时支挡基坑被动区未开挖的土体,可在开挖每层土体前预先拆除对称面挡土单元,通过向基坑开挖对称面卸土的方法进行基坑开挖,相比与传统向下掏土取土的方法,本发明可明确每一层开挖土层不影响未开挖的,操作方便,大大减少了基坑开挖卸土的工作量。 5. The present invention adopts a detachable symmetrical surface retaining unit to temporarily support the unexcavated soil in the passive area of the foundation pit. The symmetrical surface retaining unit can be removed in advance before excavating each layer of soil. The excavation of the foundation pit is carried out by digging the symmetrical surface and unloading the soil. Compared with the traditional method of digging down and taking soil, the present invention can make it clear that each layer of excavated soil will not affect the unexcavated soil, and the operation is convenient, which greatly reduces the The workload of foundation pit excavation and soil unloading.
6、本发明可以同时模拟基坑开挖和加撑工序,得到基坑开挖和支撑安装过程中所引起的基坑应力场的变化,相比与传统基坑模型试验只考虑基坑开挖至某一深度或加撑完成的特定状态开展研究,更全面、准确地反映基坑开挖和支撑安装过程中基坑受力和基坑变形的响应情况;本发明在内支撑安装过程中不会对基坑未开挖的土体有扰动影响;内支撑与挡土墙之间通过螺纹固定连接,较之传统的基坑模型试验将内支撑架设在挡土墙上或者直接抵住挡土墙实现加撑的方法,更能客观地反映实际基坑工程开挖时的加撑情况;通过控制实心铝杆直径、伸缩杆壁厚、第一支撑杆直径、第二支撑杆直径和套筒的壁厚实现基坑内支撑刚度的模拟,更加客观地反映了内支撑对基坑开挖的工程影响;可根据土工模型试验的需求,调整内支撑元件的数量,以及挡土墙上的内支撑固定螺栓的位置和数量,模拟不同基坑的开挖情况。 6. The present invention can simultaneously simulate the foundation pit excavation and support process, and obtain the change of the foundation pit stress field caused by the foundation pit excavation and support installation process, compared with the traditional foundation pit model test that only considers the foundation pit excavation To carry out research at a certain depth or in a specific state where support is completed, more comprehensively and accurately reflect the response of foundation pit stress and foundation pit deformation in the process of foundation pit excavation and support installation; the present invention does not It will disturb the unexcavated soil of the foundation pit; the internal support and the retaining wall are fixedly connected by threads, compared with the traditional foundation pit model test where the internal support is erected on the retaining wall or directly against the retaining soil The method of adding support to the wall can more objectively reflect the support situation during the excavation of the actual foundation pit; by controlling the diameter of the solid aluminum rod, the wall thickness of the telescopic rod, the diameter of the first support rod, the diameter of the second support rod and the sleeve The wall thickness of the foundation pit realizes the simulation of the support stiffness, which more objectively reflects the engineering impact of the internal support on the excavation of the foundation pit; the number of internal support elements and the internal support on the retaining wall can be adjusted according to the requirements of the geotechnical model test Fix the position and quantity of bolts to simulate the excavation of different foundation pits.
7、本发明采用可伸缩支撑元件,可以模拟不同宽度的基坑开挖试验,相比与传统的基坑开挖模型试验采用固定长度的支撑或者可伸缩支撑仅用于实现支撑安装的实验思路,可采用同一套试验装置开展多组不同宽度的基坑开挖试验,减少了对试验装置的改装,节约了试验成本和模型制作时间,工作原理简单,操作方便,具有很大的实用性。 7. The present invention uses telescopic support elements, which can simulate foundation pit excavation tests of different widths. Compared with traditional foundation pit excavation model tests, fixed-length supports or telescopic supports are only used to realize the experimental ideas of support installation. , the same test device can be used to carry out multiple sets of excavation tests of foundation pits with different widths, which reduces the modification of the test device, saves the test cost and model making time, the working principle is simple, the operation is convenient, and it has great practicability.
附图说明 Description of drawings
图1(a)为采用第一类支撑的潜水位和承压水头协同升降的基坑开挖模型试验装置侧视图。 Figure 1(a) is a side view of the foundation pit excavation model test device using the first type of support for the coordinated rise and fall of the phreatic level and the confined water head.
图1(b)为采用第二类支撑的潜水位和承压水头协同升降的基坑开挖模型试验装置侧视图。 Figure 1(b) is a side view of the foundation pit excavation model test device using the second type of support for the coordinated rise and fall of the phreatic level and the confined water head.
图2(a)为采用第一类支撑的模型箱俯视图。 Figure 2(a) is a top view of the model box using the first type of support.
图2(b)为采用第二类支撑的模型箱俯视图。 Figure 2(b) is a top view of the model box using the second type of support.
图3为基坑开挖对称面示意图; Fig. 3 is a schematic diagram of the symmetry plane of foundation pit excavation;
图4为水箱侧视图; Fig. 4 is a side view of the water tank;
图5(a)为承压架空层结构的平面图。 Figure 5(a) is a plan view of the pressure-bearing overhead layer structure.
图5(b)为承压架空层结构的侧视图。 Figure 5(b) is a side view of the pressure-bearing overhead layer structure.
图6为挡土墙示意图。 Figure 6 is a schematic diagram of the retaining wall.
图7(a)为第一类支撑的基坑支护结构示意图。 Figure 7(a) is a schematic diagram of the foundation pit support structure of the first type of support.
图7(b)为第二类支撑的基坑支护结构示意图。 Figure 7(b) is a schematic diagram of the foundation pit support structure of the second type of support.
图中:模型箱1;模型箱框架1-1;钢化玻璃1-2;模型箱底板1-3;顶框1-4;反力板1-5;模型箱底座1-6;水箱2;带通水孔的铝板2-1;条形铝板2-2;水箱支架2-3;水箱支架固定螺丝2-4;刻度尺2-5;第一通水阀门2-6;对称面挡土单元3;固定对称面挡土单元的螺栓4;挡土墙5;止水橡胶条5-1;挡土墙支架6;支架固定螺栓7;支撑单元8;实心铝杆8-1;空心铝杆8-2;支撑连接螺栓8-3;第一支撑杆8-4;第二支撑杆8-5;套筒8-6;支撑固定螺栓8-7;承压架空层9;带通水孔的不锈钢板9-1;不锈钢短柱9-2;反滤土工织物9-3;第二通水阀门10;水压计11;马里奥特瓶12;有机玻璃圆筒12-1;进气阀门12-2;第三通水阀门12-3;出气阀门12-4;气囊12-5;支架13;定滑轮13-1;钢丝绳13-2;手摇器13-3;砾砂14-1;粘质粉土14-2;无气水15。 In the figure: model box 1; model box frame 1-1; tempered glass 1-2; model box bottom plate 1-3; top frame 1-4; reaction plate 1-5; model box base 1-6; water tank 2; Aluminum plate with water hole 2-1; strip aluminum plate 2-2; water tank bracket 2-3; water tank bracket fixing screw 2-4; scale 2-5; first water valve 2-6; symmetrical surface retaining Unit 3; Bolt 4 for fixing the retaining unit on the symmetrical plane; Retaining wall 5; Water-stop rubber strip 5-1; Retaining wall bracket 6; Bracket fixing bolt 7; Support unit 8; Rod 8-2; supporting connecting bolt 8-3; first supporting rod 8-4; second supporting rod 8-5; sleeve 8-6; supporting fixing bolt 8-7; The stainless steel plate 9-1 of hole; Air valve 12-2; third water valve 12-3; air outlet valve 12-4; air bag 12-5; bracket 13; fixed pulley 13-1; wire rope 13-2; -1; clayey silt 14-2; airless water 15.
具体实施方式 detailed description
下面结合附图和实施例对本发明进一步说明。 The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
如图1、图2所示,本发明潜水位和承压水头协同升降的基坑开挖模型试验装置,包括模型箱1、水箱2、若干对称面挡土单元3、基坑支护结构、承压架空层9、承压水头调节系统和量测系统七个部分。 As shown in Fig. 1 and Fig. 2, the foundation pit excavation model test device of the present invention that the phreatic level and the pressurized water head cooperate to rise and fall includes a model box 1, a water tank 2, several symmetrical surface retaining units 3, foundation pit support structures, The pressure-bearing overhead layer 9, the pressure-bearing water head adjustment system and the measurement system consist of seven parts.
所述模型箱1由模型箱框架1-1、钢化玻璃1-2、模型箱底板1-3、顶框1-4、反力板1-5和模型箱底座1-6组成;所述模型箱框架1-1的底部固定模型箱底板1-3,前后两个侧面固定钢化玻璃1-2;所述模型箱框架1-1和反力板1-5通过四周点焊固定于工字钢焊接而成的模型箱底座1-6上,顶部由不锈钢顶框1-4通过四周点焊连接;所述模型箱框架1-1由10mm厚的不锈钢钢条和不锈钢钢板焊接而成;所述钢化玻璃1-2通过建筑胶水安装在模型箱框架1-1内侧;所述模型箱底板1-3和反力板1-5为10mm厚的不锈钢钢板;所述顶框1-4由20mm厚的不锈钢钢条焊接而成; Described model box 1 is made up of model box frame 1-1, tempered glass 1-2, model box bottom plate 1-3, top frame 1-4, reaction plate 1-5 and model box base 1-6; The bottom of the box frame 1-1 is fixed to the bottom plate 1-3 of the model box, and the tempered glass 1-2 is fixed to the front and rear sides; the model box frame 1-1 and the reaction plate 1-5 are fixed to the I-beam by spot welding around On the welded model box base 1-6, the top is connected by spot welding around the stainless steel top frame 1-4; the model box frame 1-1 is welded by 10mm thick stainless steel bars and stainless steel plates; The toughened glass 1-2 is installed on the inside of the model box frame 1-1 by construction glue; the bottom plate 1-3 of the model box and the counter force plate 1-5 are stainless steel plates with a thickness of 10mm; the top frame 1-4 is made of 20mm thick Welded stainless steel bars;
所述水箱2由竖向放置的带通水孔的铝板2-1、横向放置的条形铝板2-2、前后两侧的钢化玻璃1-2和模型箱框架1-1的内壁通过玻璃胶连接形成,通过水箱支架2-3架设在模型箱1内的右上方,用于控制和观测土体中的水位升降;所述带通水孔的铝板2-1和水箱支架2-3由水箱支架固定螺丝2-4拧紧连接;所述带通水孔的铝板2-1表面粘贴反滤土工织物,防止地下水变化过程中试验土体的流失;所述刻度尺2-5设置在钢化玻璃1-2上可用于直接观测和记录潜水位变化情况;所述模型箱1的右侧安装连通水箱2的第一通水阀门2-6,用于控制水箱2内水位的升降。 The water tank 2 is composed of a vertically placed aluminum plate 2-1 with water holes, a horizontally placed strip-shaped aluminum plate 2-2, tempered glass 1-2 on the front and rear sides, and the inner wall of the model box frame 1-1 through glass glue. The connection is formed, and the water tank bracket 2-3 is erected on the upper right side of the model box 1 for controlling and observing the water level rise and fall in the soil; the aluminum plate 2-1 with water holes and the water tank bracket 2-3 are formed by the water tank The bracket fixing screw 2-4 is tightened and connected; the surface of the aluminum plate 2-1 with a water hole is pasted with a filter geotextile to prevent the loss of the test soil during the groundwater change process; the scale 2-5 is set on the toughened glass 1 -2 can be used to directly observe and record changes in the water level; the first water valve 2-6 connected to the water tank 2 is installed on the right side of the model box 1 to control the rise and fall of the water level in the water tank 2.
所述对称面挡土单元3为U型不锈钢条,通过螺栓4固定在模型箱框架1-1上;所述U型不锈钢条之间通过H型止水橡胶条连接,U型不锈钢条与模型箱框架1-1通过S型止水橡胶条连接; The symmetrical surface retaining unit 3 is a U-shaped stainless steel strip, which is fixed on the model box frame 1-1 by bolts 4; the U-shaped stainless steel strips are connected by an H-shaped water-stop rubber strip, and the U-shaped stainless steel strip is connected to the model box. The box frame 1-1 is connected by an S-shaped water-stop rubber strip;
所述基坑支护结构包括挡土墙5、挡土墙支架6和若干支撑单元8;所述挡土墙3在移动过程中始终与钢化玻璃1-2保持垂直;所述支撑单元8的一端具有内螺纹口,内螺纹口与支撑固定螺栓8-7螺纹连接,实现支撑单元8的安装; The foundation pit support structure includes a retaining wall 5, a retaining wall support 6 and several support units 8; the retaining wall 3 is always kept perpendicular to the tempered glass 1-2 during the movement; One end has an internal threaded port, and the internal threaded port is threadedly connected with the support fixing bolt 8-7 to realize the installation of the support unit 8;
所述承压架空层9由带通水孔的不锈钢板9-1、不锈钢短柱9-2和反滤土工织物9-3组成;所述带通水孔的不锈钢板9-1底部固定不锈钢短柱9-2,放置于模型箱1内的模型箱底板1-3上,并与模型箱1的四个侧面通过玻璃胶密封连接;所述带通水孔的不锈钢板9-1表面粘贴反滤土工织物9-3,防止承压水头变化过程中试验土体的流失; The pressure-bearing overhead layer 9 is composed of a stainless steel plate 9-1 with a water hole, a stainless steel short column 9-2 and a filter geotextile 9-3; the bottom of the stainless steel plate 9-1 with a water hole is fixed with stainless steel The short column 9-2 is placed on the bottom plate 1-3 of the model box 1 in the model box 1, and is sealed and connected with the four sides of the model box 1 through glass glue; the surface of the stainless steel plate 9-1 with a water hole is pasted Reverse filter geotextile 9-3, to prevent the loss of the test soil during the change of the confined water head;
所述模型箱1的右侧底部安装连通承压架空层9的第二通水阀门10,用于连接模型箱1和承压水头调节系统;模型箱1内的底部试验土体为砾砂14-1,以模拟承压土层;上覆试验土体为弱透水性土体,可采用粘质粉土14-2,采用无气水饱和; The bottom of the right side of the model box 1 is installed with a second water valve 10 connected to the pressure-bearing overhead layer 9, which is used to connect the model box 1 and the pressure-bearing head adjustment system; the bottom test soil in the model box 1 is gravel sand 14 -1, to simulate the confined soil layer; the overlying test soil is weakly permeable soil, and clay silt 14-2 can be used, saturated with airless water;
所述承压水头调节系统由水压计11、马里奥特瓶12和支架13组成;所述水压计11通过三通管连接模型箱1和马里奥特瓶12;所述马里奥特瓶12由有机玻璃圆筒12-1、进气阀门12-2、第三通水阀门12-3、出气阀门12-4和气囊12-5组成;所述有机玻璃圆筒12-1内的液体为无气水15;所述气囊12-5内装有1atm的氮气;所述支架13上安装有定滑轮13-1,钢丝绳13-2绕过定滑轮13-1连接马里奥特瓶12和手摇器13-3,通过手摇器13-3控制马里奥特瓶12的升降调节承压水头的大小;所述第一通水阀门2-6、第二通水阀门10、进气阀门12-2、第三通水阀门12-3、出气阀门12-4为铜芯阀门; The pressurized water head regulating system is composed of a water pressure gauge 11, a Marriott bottle 12 and a support 13; the water pressure gauge 11 is connected to the model box 1 and the Marriott bottle 12 through a three-way pipe; the Marriott bottle 12 is composed of organic glass cylinder 12-1, intake valve 12-2, third water valve 12-3, air outlet valve 12-4 and air bag 12-5; the liquid in the organic glass cylinder 12-1 It is anaerobic water 15; nitrogen gas of 1 atm is housed in the described air bag 12-5; fixed pulley 13-1 is installed on the described support 13, and steel wire rope 13-2 bypasses fixed pulley 13-1 to connect Marriott bottle 12 and hand The shaker 13-3 controls the lifting of the Marriott bottle 12 through the hand shaker 13-3 to adjust the size of the pressurized water head; the first water valve 2-6, the second water valve 10, and the intake valve 12 -2. The third water valve 12-3 and the air outlet valve 12-4 are copper core valves;
所述量测系统包括微型孔隙水压力传感器、微型土压力盒、位移传感器、多通道数据采集仪和数码照相机;所述微型孔隙水压力传感器、微型土压力盒、位移传感器通过信号传输线连接多通道数据采集仪;所述数码照相机放置于模型箱正前方,可根据拍摄需要增设光源;所述数码照相机在试验过程中应排除干扰,其位置不可发生挪动; The measurement system includes a miniature pore water pressure sensor, a miniature earth pressure cell, a displacement sensor, a multi-channel data acquisition instrument and a digital camera; Data acquisition instrument; the digital camera is placed directly in front of the model box, and a light source can be added according to the shooting needs; the digital camera should eliminate interference during the test process, and its position cannot be moved;
如图3所示,所述对称面挡土单元3的厚度为10mm,其宽度可根据需要模拟的开挖土层厚度进行调整;所述固定对称面挡土单元3的螺栓4的尺寸为M8,焊接固定于模型箱框架1-1上。 As shown in Figure 3, the thickness of the symmetric surface retaining unit 3 is 10mm, and its width can be adjusted according to the thickness of the excavated soil layer to be simulated; the size of the bolt 4 of the fixed symmetric surface retaining unit 3 is M8 , welded and fixed on the model box frame 1-1.
如图4所示,所述水箱2由带通水孔的铝板2-1、条形铝板2-2、水箱支架2-3、水箱支架固定螺丝2-4、刻度尺2-5和第一通水阀门2-6组成;所述带通水孔的铝板2-1表面排布有大量的通水圆孔,保证试验过程中水箱内的水位与试验土体水位连通且一致,以实现通过调节水箱内的水位来控制试验土体的潜水位升降。 As shown in Figure 4, the water tank 2 is composed of an aluminum plate 2-1 with water holes, a strip aluminum plate 2-2, a water tank bracket 2-3, a water tank bracket fixing screw 2-4, a scale 2-5 and a first The water valve 2-6 is composed of; the surface of the aluminum plate 2-1 with water holes is arranged with a large number of water holes to ensure that the water level in the water tank is connected and consistent with the water level of the test soil during the test, so as to realize the Adjust the water level in the water tank to control the rise and fall of the phreatic level of the test soil.
如图5(a)、图5(b)所示,所述带通水孔的不锈钢板9-1使得承压架空层9中的无气水与砾砂14-1承压层水力连通,提供砾砂14-1承压层的承压水头压力;所述带通水孔的不锈钢板9-1的厚度、通水孔的排布和不锈钢短柱9-2的排布应满足受力计算要求,使得承压架空层9足以承受试验土体的重量。 As shown in Figure 5(a) and Figure 5(b), the stainless steel plate 9-1 with a water hole makes the airless water in the pressure-bearing overhead layer 9 and the gravel sand 14-1 pressure-bearing layer hydraulically communicated, Provide the confined water head pressure of the gravel sand 14-1 containment layer; the thickness of the stainless steel plate 9-1 with water holes, the arrangement of the water holes and the arrangement of the stainless steel short columns 9-2 should meet the force requirements. Calculation requirements, so that the pressure-bearing overhead layer 9 is sufficient to bear the weight of the test soil.
如图6所示,所述挡土墙5为铝板,其厚度由试验模拟的挡土墙刚度计算得到;所述挡土墙支架6为20mm厚的条状铝板;所述挡土墙5上部通过支架固定螺栓7固定挡土墙支架6,中部开有螺纹孔,通过螺纹孔螺纹连接安装支撑单元8所需的支撑固定螺栓8-7,两侧开槽固定止水橡胶条5-1;所述止水橡胶条5-1保证挡土墙5移动过程中与模型箱1接触面不发生漏水;所述支架固定螺栓7和支撑固定螺栓8-7的尺寸为M8。 As shown in Figure 6, the retaining wall 5 is an aluminum plate, and its thickness is calculated by the stiffness of the retaining wall simulated by the test; the retaining wall support 6 is a 20mm thick strip aluminum plate; the upper part of the retaining wall 5 is The retaining wall bracket 6 is fixed by the bracket fixing bolt 7, and a threaded hole is opened in the middle, and the supporting fixing bolt 8-7 required for installing the supporting unit 8 is threaded through the threaded hole, and the water-stop rubber strip 5-1 is fixed by slotting on both sides; The water-stop rubber strip 5-1 ensures that no water leakage occurs on the contact surface with the model box 1 during the movement of the retaining wall 5; the size of the bracket fixing bolt 7 and the support fixing bolt 8-7 is M8.
如图7(a)、图7(b)所示,所述支撑固定螺栓8-7通过挡土墙5上的螺纹孔,拧紧固定于挡土墙5上。所述支撑单元8可采用以下两种形式: As shown in Fig. 7(a) and Fig. 7(b), the support fixing bolts 8-7 pass through the threaded holes on the retaining wall 5, and are screwed and fixed on the retaining wall 5. The supporting unit 8 can adopt the following two forms:
一、所述支撑单元8包括实心铝杆8-1、伸缩杆8-2和支撑连接螺栓8-3;所述实心铝杆8-1上开有若干凹槽,一端具有内螺纹口;所述伸缩杆8-2为空心铝管,伸缩杆8-2上开有若干螺纹孔;所述支撑连接螺栓8-3穿过伸缩杆8-2上的螺纹孔抵住实心铝杆8-1的凹槽,使得实心铝杆8-1和伸缩杆8-2紧密连接,在试验过程中不发生滑动。所述实心铝杆8-1的直径和空心铝杆8-2的厚度由试验模拟的支撑刚度计算得到;所述支撑连接螺栓8-3的尺寸可选择M6。 1. The support unit 8 includes a solid aluminum rod 8-1, a telescopic rod 8-2 and a support connecting bolt 8-3; the solid aluminum rod 8-1 has several grooves, and one end has an internal thread; The telescopic rod 8-2 is a hollow aluminum tube, and there are several threaded holes on the telescopic rod 8-2; the support connecting bolt 8-3 passes through the threaded holes on the telescopic rod 8-2 to resist the solid aluminum rod 8-1 The grooves make the solid aluminum rod 8-1 and the telescopic rod 8-2 tightly connected, and no sliding occurs during the test. The diameter of the solid aluminum rod 8-1 and the thickness of the hollow aluminum rod 8-2 are calculated from the supporting stiffness of the test simulation; the size of the supporting connecting bolt 8-3 can be selected as M6.
二、所述支撑单元8包括第一支撑杆8-4、第二支撑杆8-5和套筒8-6;所述第一支撑杆8-4的一端具有外螺纹;所述第二支撑杆8-5的一端具有内螺纹口,另一端具有外螺纹;所述套筒8-6具有内螺纹通道,一端螺纹连接第一支撑杆8-4,另一端螺纹连接第二支撑杆8-5。所述第一支撑杆8-4的直径、第二支撑杆8-5的直径和套筒8-6的壁厚由试验模拟的内支撑的刚度计算得到。 Two, the support unit 8 includes a first support rod 8-4, a second support rod 8-5 and a sleeve 8-6; one end of the first support rod 8-4 has an external thread; the second support rod One end of the rod 8-5 has an internal thread, and the other end has an external thread; the sleeve 8-6 has an internal thread channel, one end is threaded to the first support rod 8-4, and the other end is threaded to the second support rod 8- 5. The diameter of the first support rod 8-4, the diameter of the second support rod 8-5 and the wall thickness of the sleeve 8-6 are calculated from the stiffness of the inner support simulated by the test.
本发明的工作过程如下:首先将挡土墙5和挡土墙支架6通过支架固定螺栓7连接组装好;而后在挡土墙5上安装好土压力盒,两侧槽口嵌入止水橡胶条5-1,并在槽口和止水橡胶条5-1的缝隙涂抹环氧树脂;将组装好的挡土墙5通过挡土墙支架6架设在模型箱1内,保证挡土墙5与模型箱1两侧的钢化玻璃1-2垂直;在基坑开挖模型的对称面处安装对称面挡土单元3,通过固定对称面挡土单元的螺栓4固定于模型箱框架1-1上;向模型箱1内分层装填砾砂14-1夯实,填筑至指定高度;分层装填粘质粉土14-2夯实,直至填土完成,由通水第二通水阀门10以50L/天的速度向模型箱1通无气水饱和试验土体砾砂14-1和粘质粉土14-2,待土体完全饱和之后关闭通水第二通水阀门10;钻孔埋设孔隙水压力传感器,回填钻孔土体;在挡土墙5和基坑内外土体表面安装位移传感器,分别监测挡土墙5的位移和基坑土体变形情况; The working process of the present invention is as follows: first, the retaining wall 5 and the retaining wall bracket 6 are connected and assembled through the bracket fixing bolt 7; then the earth pressure box is installed on the retaining wall 5, and the notches on both sides are embedded with water-stop rubber strips 5-1, and apply epoxy resin in the gap between the notch and the water-stop rubber strip 5-1; the assembled retaining wall 5 is erected in the model box 1 through the retaining wall bracket 6 to ensure that the retaining wall 5 and The tempered glass 1-2 on both sides of the model box 1 is vertical; the symmetrical plane soil retaining unit 3 is installed at the symmetrical plane of the excavation model of the foundation pit, and is fixed on the model box frame 1-1 by the bolt 4 fixing the symmetrical plane soil retaining unit ; Fill the gravel sand 14-1 layer by layer in the model box 1 and compact it, and fill it to the specified height; fill it with clay silt 14-2 layer by layer, and compact it until the filling is completed, and the second water valve 10 will use 50L Pass the airless water saturated test soil gravel sand 14-1 and clayey silt 14-2 to the model box 1 at a speed of / day, and close the second water valve 10 after the soil is completely saturated; drill holes to bury the pores A water pressure sensor is used to backfill the borehole soil; displacement sensors are installed on the retaining wall 5 and the inner and outer soil surfaces of the foundation pit to monitor the displacement of the retaining wall 5 and the deformation of the foundation pit soil respectively;
打开第三通水阀门12-3和出气阀门12-4,通过第三通水阀门12-3向马里奥特瓶12的有机玻璃圆筒12-1内注入无气水15,由出气阀门12-4排出有机玻璃圆筒12-1内的气体;待有机玻璃圆筒12-1内注满无气水,关闭第三通水阀门12-3和出气阀门12-4;通过进气阀门12-2连接装有1atm氮气的气囊12-5;而后通过通水第二通水阀门10连接模型箱1和承压水头调节系统。 Open the third water valve 12-3 and the air outlet valve 12-4, inject airless water 15 into the plexiglass cylinder 12-1 of the Marriott bottle 12 by the third water valve 12-3, and the air outlet valve 12 -4 discharge the gas in the plexiglass cylinder 12-1; to be filled with anaerobic water in the plexiglass cylinder 12-1, close the third water valve 12-3 and the air outlet valve 12-4; through the intake valve 12 -2 connects the air bag 12-5 equipped with 1atm nitrogen; then connects the model box 1 and the pressurized water head regulating system through the second water valve 10 through water.
将数码照相机置于模型箱正前方(在试验过程中不可以挪动),调节相机参数,设置数码照相机的自动拍摄时间间隔为20s;若实验室光线不足,可在数码照相机两侧增设Led光源;利用数据采集仪采集记录试验初始状态下微型孔隙水压力传感器、微型土压力盒和位移传感器的读数,利用数码照相机拍摄试验初始状态下的试验土体照片; Place the digital camera directly in front of the model box (it cannot be moved during the test), adjust the camera parameters, and set the automatic shooting time interval of the digital camera to 20s; if the light in the laboratory is insufficient, add LED light sources on both sides of the digital camera; Use the data acquisition instrument to collect and record the readings of the micro-pore water pressure sensor, the micro-earth pressure cell and the displacement sensor in the initial state of the test, and use a digital camera to take photos of the test soil in the initial state of the test;
待上述试验准备工作完成之后,打开第一通水阀门2-6调节水箱2内的水位来模拟模型箱1内试验土体的潜水位升降;打开通水第二通水阀门10、第三通水阀门12-3和进气阀门12-2,并在整个基坑土体开挖和支撑安装过程中保持开启状态,实现承压水头调节系统向承压架空层9持续供给试验所需的承压水头;通过手摇器13-3调节马里奥特瓶12的高度,利用手摇器13-3的自锁功能固定马里奥特瓶12的高度,以控制承压水头的大小,由水压计11读取承压水头大小;拆除第一节对称面挡土单元,通过向基坑开挖对称面卸土的方法缓慢开挖挡土墙5左侧的土体;开挖至第一道支撑设计位置下方时,安装第一道支撑,通过支撑8一端的内螺纹与挡土墙5上的支撑固定螺栓8-7连接,通过调整支撑8的长度使之顶紧反力架1-5,完成支撑8的安装。完成第一道支撑安装之后继续开挖土体,采用相同的方法安装支撑,直至基坑开挖完成。 After the above-mentioned test preparations are completed, open the first water valve 2-6 to adjust the water level in the water tank 2 to simulate the rise and fall of the test soil in the model box 1; open the second water valve 10 and the third water valve The water valve 12-3 and the air intake valve 12-2 are kept open during the entire foundation pit soil excavation and support installation process, so as to realize the continuous supply of the pressure-bearing water head adjustment system to the pressure-bearing overhead layer 9 required for the test. Pressure water head; adjust the height of the Marriott bottle 12 through the hand crank 13-3, and use the self-locking function of the hand crank 13-3 to fix the height of the Marriott bottle 12 to control the size of the pressurized water head. Measure 11 to read the size of the confined water head; remove the retaining unit on the symmetrical plane of the first section, and slowly excavate the soil on the left side of the retaining wall 5 by excavating the symmetrical plane to the foundation pit; excavate to the first When the support design position is below, the first support is installed, and the internal thread at one end of the support 8 is connected with the support fixing bolt 8-7 on the retaining wall 5, and the length of the support 8 is adjusted to tighten the reaction frame 1-5 , complete the installation of support 8. After the installation of the first support is completed, continue to excavate the soil, and install the support in the same way until the excavation of the foundation pit is completed.
在整个基坑开挖试验过程中,通过水箱2施加基坑开挖各个工况相对应的潜水位,通过承压水头调节系统施加基坑开挖各个工况相对应的承压水头;通过数据采集仪连续采集记录试验过程中微型孔隙水压力传感器、微型土压力盒和位移传感器的读数,通过触发数码照相机拍摄整个试验过程中试验土体变形的照片。 During the whole foundation pit excavation test process, the water tank 2 is used to apply the water level corresponding to each working condition of the foundation pit excavation, and the pressure water head corresponding to each working condition of the foundation pit excavation is applied through the pressure head adjustment system; through the data The acquisition instrument continuously collects and records the readings of the miniature pore water pressure sensor, miniature earth pressure cell and displacement sensor during the test, and triggers the digital camera to take pictures of the deformation of the test soil during the whole test.
通过分析数据采集仪采集记录的微型孔隙水压力传感器和微型土压力盒的读数,得出基坑整个开挖过程中潜水位和承压水头协同升降引起的水土压力响应规律;通过分析数据采集仪记录的位移传感器的读数,以及对数码照相机所拍摄的照片进行PIV图像分析,得出土体的位移场,从而得知基坑土体随潜水位和承压水头协同升降的变形规律。 By analyzing the readings of the micro-pore water pressure sensor and the micro-earth pressure cell collected and recorded by the data acquisition instrument, the water and soil pressure response law caused by the coordinated rise and fall of the phreatic level and the confined water head during the entire excavation process of the foundation pit is obtained; through the analysis of the data acquisition instrument The readings of the recorded displacement sensor and the PIV image analysis of the photos taken by the digital camera can be used to obtain the displacement field of the soil, so as to know the deformation law of the excavation soil with the coordinated rise and fall of the phreatic level and the confined water head.
上述实施例为本发明的一个优选实施方式,是对本发明内容及其应用的进一步说明,不应理解为本发明仅适用于上述实施例。凡基于本发明原理和发明内容所实现的技术均属于本发明的范围。 The above embodiment is a preferred implementation mode of the present invention, and is a further description of the content of the present invention and its application, and it should not be understood that the present invention is only applicable to the above embodiment. All technologies implemented based on the principles and contents of the present invention belong to the scope of the present invention.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610205727.2A CN105675846B (en) | 2016-04-01 | 2016-04-01 | Phreatic table and the excavation of foundation pit model test apparatus of artesian head collaboration lifting |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610205727.2A CN105675846B (en) | 2016-04-01 | 2016-04-01 | Phreatic table and the excavation of foundation pit model test apparatus of artesian head collaboration lifting |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN105675846A true CN105675846A (en) | 2016-06-15 |
| CN105675846B CN105675846B (en) | 2017-07-28 |
Family
ID=56308301
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610205727.2A Expired - Fee Related CN105675846B (en) | 2016-04-01 | 2016-04-01 | Phreatic table and the excavation of foundation pit model test apparatus of artesian head collaboration lifting |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN105675846B (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108267370A (en) * | 2018-01-31 | 2018-07-10 | 浙江大学 | A kind of one-dimensional cylinder test device and method for simulating the kinetic head boundary effect soil body |
| CN109580368A (en) * | 2018-11-19 | 2019-04-05 | 同济大学 | Excavation Deformation of Deep Foundation Pits character centrifugal model test device in a kind of multilayer artesian water stratified formations |
| CN110044796A (en) * | 2019-05-15 | 2019-07-23 | 河海大学 | Geotechnical fibre filter performance and multifunctional tester |
| CN110221042A (en) * | 2019-06-27 | 2019-09-10 | 合肥工业大学 | A device for simulating the coupling effect of foundation pit excavation stress field and groundwater seepage field |
| CN110485483A (en) * | 2019-08-19 | 2019-11-22 | 浙江大学 | A device for simulating the whole process of foundation pit surge disaster |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111238932B (en) * | 2020-01-15 | 2020-11-27 | 中国地质大学(武汉) | Test device and test method for research on the deformation characteristics of micro-pile formed by crushed soil |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101915721A (en) * | 2010-06-24 | 2010-12-15 | 同济大学 | A test method for simulating the change of soil permeability coefficient in foundation pit |
| CN203025185U (en) * | 2012-12-26 | 2013-06-26 | 同济大学 | Foundation pit model test device |
| CN104099953A (en) * | 2013-04-08 | 2014-10-15 | 同济大学 | Centrifugal model testing device for simulating pressure water head change and stability of foundation pit |
| JP2015098737A (en) * | 2013-11-20 | 2015-05-28 | 大裕株式会社 | Loading test equipment |
| JP2016011492A (en) * | 2014-06-27 | 2016-01-21 | 鹿島建設株式会社 | Pile survey method |
| CN205720219U (en) * | 2016-04-01 | 2016-11-23 | 浙江大学 | Phreatic table and artesian head work in coordination with the excavation of foundation pit model test apparatus of lifting |
-
2016
- 2016-04-01 CN CN201610205727.2A patent/CN105675846B/en not_active Expired - Fee Related
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101915721A (en) * | 2010-06-24 | 2010-12-15 | 同济大学 | A test method for simulating the change of soil permeability coefficient in foundation pit |
| CN203025185U (en) * | 2012-12-26 | 2013-06-26 | 同济大学 | Foundation pit model test device |
| CN104099953A (en) * | 2013-04-08 | 2014-10-15 | 同济大学 | Centrifugal model testing device for simulating pressure water head change and stability of foundation pit |
| JP2015098737A (en) * | 2013-11-20 | 2015-05-28 | 大裕株式会社 | Loading test equipment |
| JP2016011492A (en) * | 2014-06-27 | 2016-01-21 | 鹿島建設株式会社 | Pile survey method |
| CN205720219U (en) * | 2016-04-01 | 2016-11-23 | 浙江大学 | Phreatic table and artesian head work in coordination with the excavation of foundation pit model test apparatus of lifting |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108267370A (en) * | 2018-01-31 | 2018-07-10 | 浙江大学 | A kind of one-dimensional cylinder test device and method for simulating the kinetic head boundary effect soil body |
| CN109580368A (en) * | 2018-11-19 | 2019-04-05 | 同济大学 | Excavation Deformation of Deep Foundation Pits character centrifugal model test device in a kind of multilayer artesian water stratified formations |
| CN110044796A (en) * | 2019-05-15 | 2019-07-23 | 河海大学 | Geotechnical fibre filter performance and multifunctional tester |
| CN110221042A (en) * | 2019-06-27 | 2019-09-10 | 合肥工业大学 | A device for simulating the coupling effect of foundation pit excavation stress field and groundwater seepage field |
| CN110485483A (en) * | 2019-08-19 | 2019-11-22 | 浙江大学 | A device for simulating the whole process of foundation pit surge disaster |
Also Published As
| Publication number | Publication date |
|---|---|
| CN105675846B (en) | 2017-07-28 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105716960B (en) | Excavation of foundation pit model test apparatus under complicated groundwater environment | |
| CN105672379B (en) | The excavation of foundation pit model test apparatus of dynamic artesian water effect | |
| CN111337650B (en) | Multifunctional test device for researching seepage damage mechanism of underground engineering soil body | |
| CN105675846B (en) | Phreatic table and the excavation of foundation pit model test apparatus of artesian head collaboration lifting | |
| CN107290501B (en) | Experimental device and method for seepage instability and water inrush of filling medium in fractured-fault-type geological structure | |
| CN105842421A (en) | Foundation pit model testing apparatus capable of simulating excavation process | |
| CN105716958B (en) | Simulate the foundation model experimental rig of artesian head lifting | |
| CN105672378B (en) | Simulate the excavation of foundation pit model test apparatus of artesian head lifting | |
| CN113720994B (en) | Device and method for testing stability of excavation face of shield tunnel under spring condition | |
| CN105862933B (en) | The foundation model experimental rig of dynamic artesian water effect | |
| CN105696636B (en) | Can in Simulation of Excavation Process WATER LEVEL CHANGES excavation models experimental rig | |
| CN105716959B (en) | It is a kind of can simulated groundwater position dynamic change excavation models experimental rig | |
| CN205712215U (en) | The excavation of foundation pit model test apparatus of simulation artesian head lifting | |
| CN205712213U (en) | The dynamically excavation of foundation pit model test apparatus of artesian water effect | |
| CN114001857A (en) | External water pressure testing device and testing method for tunnel lining of water-rich stratum | |
| CN108195739A (en) | Pressure-controlled seepage tests mechanism and Seepage flow time measuring device | |
| CN105866349B (en) | Three-dimensional visualization slip casting effect chamber | |
| CN205898756U (en) | Three -dimensional visual slip casting effect proof box and slip casting, seepage flow and loading test device thereof | |
| CN205720219U (en) | Phreatic table and artesian head work in coordination with the excavation of foundation pit model test apparatus of lifting | |
| CN205506572U (en) | Ground model test device that simulation artesian head goes up and down | |
| CN108387710A (en) | A kind of experimental rig and method for simulating the rectangle head boundary effect soil body | |
| CN205719795U (en) | Excavation of foundation pit model test apparatus under complicated groundwater environment | |
| CN108593513A (en) | A kind of experimental rig and method for simulating the dynamic artesian water effect soil body | |
| CN110835932A (en) | Model test device capable of realizing multi-azimuth adjustment for influence of double-tunnel excavation on pile foundation | |
| CN117233360B (en) | Test device and method for simulating research on influence mechanism of ground grouting on shield tunnel |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |