CN105735377B - A kind of adjustable waterproof foundation pit support device based on excavation of foundation pit model test - Google Patents

A kind of adjustable waterproof foundation pit support device based on excavation of foundation pit model test Download PDF

Info

Publication number
CN105735377B
CN105735377B CN201610204554.2A CN201610204554A CN105735377B CN 105735377 B CN105735377 B CN 105735377B CN 201610204554 A CN201610204554 A CN 201610204554A CN 105735377 B CN105735377 B CN 105735377B
Authority
CN
China
Prior art keywords
foundation pit
retaining wall
support
excavation
model test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610204554.2A
Other languages
Chinese (zh)
Other versions
CN105735377A (en
Inventor
应宏伟
章丽莎
魏骁
张金红
沈华伟
王小刚
朱成伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University ZJU
Original Assignee
Zhejiang University ZJU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University ZJU filed Critical Zhejiang University ZJU
Priority to CN201610204554.2A priority Critical patent/CN105735377B/en
Publication of CN105735377A publication Critical patent/CN105735377A/en
Application granted granted Critical
Publication of CN105735377B publication Critical patent/CN105735377B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention discloses a kind of adjustable waterproof foundation pit support device based on excavation of foundation pit model test.The device includes retaining wall and support.Retaining wall top is provided with multiple tracks bolt, is bolted earth-retaining wall bracket;Some fixing bolts are reserved with the middle part of retaining wall, both sides are provided with watertight rubber bar;Watertight rubber bar ensures that leak does not occur with model casing contact surface in retaining wall moving process;One end of support has inner thread mouth, and inner thread mouth is threadedly coupled with fixing bolt, realizes the installation of support.The apparatus structure is reasonable, and installation operation is convenient, and available for the displacement and deformation of flexible retaining wall in excavation of foundation pit model test under simulated groundwater environment, a kind of effective means is provided to carrying out related excavation of foundation pit model test and research.

Description

A kind of adjustable waterproof foundation pit support device based on excavation of foundation pit model test
Technical field
The present invention relates to a kind of adjustable waterproof foundation pit support device based on excavation of foundation pit model test, more particularly to The flexible retaining wall excavation of foundation pit model test apparatus of groundwater environment and the change of retaining wall embedded depth can be considered simultaneously, it is convenient Excess pore water pressure, soil pressure and foundation pit deformation in the Excavation Process soil body etc. are monitored.
Background technology
Deep-foundation pit engineering in strand, riparian area faces rich groundwater, and construction environment is complicated and difficulty of construction is big Deng challenge, wherein foundation pit deformation caused by groundwater effect and destabilization problems are the material risk sources of such regional deep-foundation pit engineering One of.
Excavation of foundation pit model test does not consider groundwater effect more at present, and the experiment soil body selects dry sand, mainly monitors foundation ditch The soil pressure and foundation pit deformation of the soil body are excavated, the excavation of foundation pit situation with there is groundwater effect has larger difference.Consider underground water Excavation of foundation pit model test is acted on, having research, (experiment of Sun Wei coastal region deep basal pit characters and theoretical research [D] Zhejiang are big Learn, 2015.) excess pore water pressure in the soil body can only be monitored using the method for fixed retaining wall, this method, it is accurate to obtain Soil pressure and foundation pit deformation data.Separately having research, (grand thin sight research [D] the Tongji University of Peng Shu power sand barricade failure mechanisms is big Learn, 2007.) epoxy resin connection retaining wall and model casing, the party are smeared after the coarse processing of method that passes through corona using film Method can obtain excess pore water pressure, soil pressure and foundation pit deformation data in the experiment soil body, but film Joining Technology is complex, Film may cause breakage in moving process due to soil particle friction when lateral diaphragm wall displacement is larger, can not smoothly complete experiment or enter Row repeats to test.Therefore, more simply, exactly the movement of retaining wall is that strand, riverine foundation ditch are opened under simulated groundwater environment Digging in model test needs to solve the problems, such as.
Lot of experiments research shows that stress, deformation and the stability of foundation ditch and retaining wall embedded depth have much relations. In Practical Project, design can usually include multiple retaining wall embedded depth schemes, be calculated finally by finite element numerical, work The method of journey analogies of experience determines unique retaining wall embedded depth design, still lacks the earth-retaining of related adjusting penetrating depth The related foundation ditch design reference opinion that wall excavation of foundation pit model test provides.
The content of the invention
In order to overcome the above-mentioned deficiencies of the prior art, the invention provides a kind of based on the adjustable of excavation of foundation pit model test Waterproof foundation pit support device is saved, the retaining wall movement under effectively accurate simulated groundwater environment in Excavation Process is solved and asks Topic, and repeatable experimental study difference retaining wall embedded depth is to foundation ditch Water And Earth Pressures and the influence of deformation.
The technical solution adopted for the present invention to solve the technical problems is:It is a kind of based on the adjustable of excavation of foundation pit model test Waterproof foundation pit support device is saved, the device includes retaining wall and support, and the retaining wall top is provided with multiple tracks bolt, passes through bolt Fixed retaining wall support;Some fixing bolts are reserved with the middle part of the retaining wall, both sides are provided with watertight rubber bar;The sealing rubber Adhesive tape ensures that leak does not occur with model casing contact surface in retaining wall moving process;One end of the support has inner thread mouth, Inner thread mouth is threadedly coupled with fixing bolt, realizes the installation of support.
Further, the support includes solid aluminium bar, expansion link and support connecting bolt;It is provided with the solid aluminium bar Some grooves, one end have inner thread mouth;The expansion link is hollow aluminum pipe, and some screwed holes are provided with expansion link;The branch Support connecting bolt props up the groove of solid aluminium bar through the screwed hole on expansion link so that solid aluminium bar and expansion link closely connect Connect.
Further, the support includes first support bar, second support bar and sleeve;One end of the first support bar With external screw thread;One end of the second support bar has inner thread mouth, and the other end has external screw thread;The sleeve has interior spiral shell Line passage, threaded one end connection first support bar, other end threaded connection second support bar.
Further, the watertight rubber bar is made up of semi-cylindrical rubber cavity and sheet rubber;The sheet rubber insertion In the line of rabbet joint of retaining wall side, smear silica gel sealing and be arranged on retaining wall.
Further, the retaining wall is aluminium sheet, and the retaining wall rigidity that its thickness need to be simulated by model test determines.
Further, the earth-retaining wall bracket is stainless steel plate.
Further, two sides that the model casing contacts with retaining wall are safety glass.
Further, the position of the bolt is determined by retaining wall embedded depth, and road number is by change retaining wall embedded depth Excavation of foundation pit experiment need the group number that adjusts to determine.
Further, the quantity and position that the quantity of the fixing bolt and position are supported by foundation ditch determine.
Compared with prior art, the beneficial effects of the invention are as follows:
1st, the present invention in retaining wall in Excavation Process due to inside and outside hole soil pressure difference corresponding displacement can occur, supervise Excess pore water pressure, soil pressure and the foundation pit deformation under different excavating conditions in soil mass of foundation pit are surveyed, compared to fixed earth-retaining Water And Earth Pressures and the foundation pit deformation response that the test method of wall can more reflect in actual base pit engineering digging process.
2nd, the present invention can simulated groundwater effect base pit engineering environment, using by semi-cylindrical rubber cavity and sheet rubber The customization watertight rubber bar sealing of composition;By in the line of rabbet joint of sheet rubber insertion retaining wall side, silica gel sealing is smeared sealing rubber Adhesive tape is arranged on retaining wall, on the one hand can be reached the purpose for preventing leak, on the other hand be ensured in retaining wall moving process Watertight rubber bar will not peel off;Semi-cylindrical rubber cavity can be crushed in retaining wall moving process, increase sealing rubber The contact surface of adhesive tape and safety glass, being further ensured that retaining wall, sealing rubber strip and model casing contact surface be not in moving process Generation leak, operation principle is simple, and device is simple, and installation operation is convenient.
3rd, the present invention is provided with the bolt that multiple tracks is used for fixed retaining wall support on retaining wall top, it is possible to achieve different earth-retainings The test simulation of wall embedded depth, need to make different height compared to excavation models experiment of the conventional needle to different embedded depths Retaining wall come complete experiment method, eliminate different height retaining wall make the step for, saved experimentation cost and The modelling time.
4th, the present invention can be with the propping process in accurate simulation Excavation Process, will not be to base in inner support installation process Cheating the soil body not excavated has disturbing influence;Connection is threadably secured between inner support and retaining wall, than traditional foundation ditch mould Type tests the method that inner support frame was located on retaining wall or lain directly against retaining wall and realizes propping, more can objectively reflect reality Propping situation when border base pit engineering excavates;By controlling solid aluminum shank diameter and hollow aluminium bar wall thickness to realize internal support of foundation pit The simulation of rigidity, more objectively reflect Effects on Engineering of the inner support to excavation of foundation pit..
5th, the present invention uses retractable supports element, the excavation of foundation pit experiment of different in width can be simulated, compared to tradition Excavation of foundation pit model test using regular length support or retractable supports be only used for realize support installation experiment think Road, same set of experimental rig can be used to carry out the excavation of foundation pit experiment of multigroup different in width, reduce the repacking to experimental rig, Experimentation cost and modelling time are saved, operation principle is simple, easy to operate, has very big practicality.
6th, the present invention according to the demand of geotechnical model test, can adjust the quantity of inner support element, and on retaining wall The position of inner support fixing bolt and quantity, simulate the excavation situation of different foundation ditches.
Brief description of the drawings
Fig. 1 (a) is the adjustable waterproof foundation pit support device side view supported using the first kind.
Fig. 1 (b) is the adjustable waterproof foundation pit support device side view supported using the second class.
Fig. 2 is retaining wall plan.
Fig. 3 is sealing rubber strip profile.
Fig. 4 (a) is to be illustrated using application of the adjustable waterproof foundation pit support device of first kind support in model test Figure.
Fig. 4 (b) is to be illustrated using application of the adjustable waterproof foundation pit support device of the second class support in model test Figure.
In figure:Retaining wall 1;Earth-retaining wall bracket 2;Bolt 3;Watertight rubber bar 4;Semi-cylindrical rubber cavity 4-1;Sheet rubber 4-2;Fixing bolt 5;Support 6;Solid aluminium bar 6-1;Hollow aluminium bar 6-2;Support connecting bolt 6-3;First support bar 6-4;The Two support bar 6-5;Sleeve 6-6;Model casing 7;Model casing base 8;Reaction frame 9;Test the soil body 10.
Embodiment
The present invention is further described with reference to the accompanying drawings and examples.
As shown in Fig. 1 (a), Fig. 1 (b), adjustable waterproof pattern foundation pit supporting structure dress of the present invention based on excavation of foundation pit model test Put, including retaining wall 1 and support 6.The top of retaining wall 1 is provided with multiple tracks bolt 3, passes through the fixed retaining wall support 2 of bolt 3; The middle part of retaining wall 1 is reserved with some fixing bolts 5, and both sides are provided with watertight rubber bar 4;The watertight rubber bar 4 ensures gear Leak does not occur with the contact surface of model casing 7 in the moving process of cob wall 1;One end of the support 6 has inner thread mouth, inner thread mouth It is threadedly coupled with fixing bolt 5, realizes the installation of support 6.
Preferably, the support 6 can use following two forms:
Shown in one, such as Fig. 1 (a), the support 6 includes solid aluminium bar 6-1, expansion link 6-2 and support connecting bolt 6-3; Some grooves are provided with the solid aluminium bar 6-1, one end has inner thread mouth;The expansion link 6-2 is hollow aluminum pipe, expansion link Some screwed holes are provided with 6-2;The support connecting bolt 6-3 selects M6 bolts, is propped up through the screwed hole on expansion link 6-2 Solid aluminium bar 6-1 groove so that solid aluminium bar 6-1 and expansion link 6-2 are closely connected.
Shown in two, such as Fig. 1 (b), the support 6 includes first support bar 6-4, second support bar 6-5 and sleeve 6-6;Institute The one end for stating first support bar 6-4 has external screw thread;One end of the second support bar 6-5 has inner thread mouth, other end tool There is external screw thread;The sleeve 6-6 has an internal thread passage, threaded one end connection first support bar 6-4, other end threaded connection the Two support bar 6-5.
As shown in Fig. 2 the retaining wall 1 is certain thickness aluminium sheet, the retaining wall that its thickness need to be simulated by model test Rigidity Calculation obtains.The earth-retaining wall bracket 2 is made up of thickness of 20mm stainless steel plate.The bolt 3 selects M8 bolts, its Position is determined that road number needs what is adjusted by the excavation of foundation pit experiment of change retaining wall embedded depth by the embedded depth of retaining wall 1 Group number determines.The fixing bolt 5 selects M8 bolts, and the quantity and position that its quantity and position are supported by foundation ditch determine.
As shown in figure 3, the watertight rubber bar 4 is made up of semi-cylindrical rubber cavity 4-1 and sheet rubber 4-2;The rubber In the line of rabbet joint of film 4-2 insertion retaining walls 1 side, smear silica gel sealing and be arranged on retaining wall 1, on the one hand can reach prevents The purpose of leak, on the other hand ensure that sealing rubber strip will not peel off in retaining wall moving process;The semi-cylindrical rubber Glue chamer body 4-1 can be crushed in retaining wall moving process, increase the contact surface of watertight rubber bar and safety glass, further protect Demonstrate,prove retaining wall sealing rubber strip in moving process and leak does not occur with model casing contact surface.
As shown in Fig. 4 (a), Fig. 4 (b), present invention can apply to excavation of foundation pit model test under groundwater environment.The mould Two sides that molding box 7 contacts with retaining wall 1 are 20mm thickness safety glass, are easy to retaining wall and the prison of land movement in experiment Survey, to ensure that drainage does not occur in the moving process of retaining wall 1, the manufactured size required precision of model casing 7 is higher.
The course of work of the present invention is as follows:It will be kept off according to the position of the design embedded depth selection bolt 3 of retaining wall 1 first Wall bracket 2 is fixed on retaining wall 1;Retaining wall 1 is placed in model casing 7, makes watertight rubber bar 4 and model on retaining wall 1 The safety glass of the both sides of case 7 is vertical and is adjacent to;And backward model casing 7 inserts the experiment soil body 10, while embedded pore water pressure passes Sensor and soil pressure cell, 10 abundant saturation of the soil body will be tested;Displacement transducer monitoring soil deformation and retaining wall displacement are installed;By Layer excavates the experiment soil body 10 in the left side of retaining wall 1, successively excavates successively installation support 6;By the internal thread and gear that support 6 one end Fixing bolt 5 on cob wall 1 connects, and the length by adjusting support 6 is allowed to hold out against is fixed on model casing bottom jointly with model casing 7 Reaction frame 9 on seat 8, complete the installation of support 6.During whole excavation of foundation pit experiment, the super quiet pore water in the soil body is monitored Pressure, soil pressure and foundation pit deformation, correlation test data are obtained, certain advisory opinion is provided for similar design of foundation pit.

Claims (9)

1. a kind of adjustable waterproof foundation pit support device based on excavation of foundation pit model test, the device include retaining wall (1) and Support (6), it is characterised in that retaining wall (1) top is provided with multiple tracks bolt (3), passes through bolt (3) fixed retaining wall support (2);Some fixing bolts (5) are reserved with the middle part of the retaining wall (1), both sides are provided with watertight rubber bar (4);The watertight rubber Bar (4) ensures that leak does not occur with model casing (7) contact surface in retaining wall (1) moving process;One end of the support (6) has Inner thread mouth, inner thread mouth are threadedly coupled with fixing bolt (5), realize the installation of support (6).
2. a kind of adjustable waterproof foundation pit support device based on excavation of foundation pit model test according to claim 1, its It is characterised by, the support (6) includes solid aluminium bar (6-1), expansion link (6-2) and support connecting bolt (6-3);It is described solid Some grooves are provided with aluminium bar (6-1), one end has inner thread mouth;The expansion link (6-2) is hollow aluminum pipe, expansion link (6- 2) some screwed holes are provided with;The support connecting bolt (6-3) props up solid aluminium bar through the screwed hole on expansion link (6-2) The groove of (6-1) so that solid aluminium bar (6-1) and expansion link (6-2) closely connect.
3. a kind of adjustable waterproof foundation pit support device based on excavation of foundation pit model test according to claim 1, its It is characterised by, the support (6) includes first support bar (6-4), second support bar (6-5) and sleeve (6-6);Described first One end of strut (6-4) has external screw thread;One end of the second support bar (6-5) has inner thread mouth, and the other end has outer Screw thread;The sleeve (6-6) has an internal thread passage, threaded one end connection first support bar (6-4), other end threaded connection the Two support bars (6-5).
4. a kind of adjustable waterproof foundation pit support device based on excavation of foundation pit model test according to claim 1, its It is characterised by, the watertight rubber bar (4) is made up of semi-cylindrical rubber cavity (4-1) and sheet rubber (4-2);The sheet rubber In the line of rabbet joint of (4-2) embedded retaining wall (1) side, smear silica gel sealing and be arranged on retaining wall (1).
5. a kind of adjustable waterproof foundation pit support device based on excavation of foundation pit model test according to claim 1, its It is characterised by, the retaining wall (1) is aluminium sheet, and the retaining wall rigidity that its thickness need to be simulated by model test determines.
6. a kind of adjustable waterproof foundation pit support device based on excavation of foundation pit model test according to claim 1, its It is characterised by, the earth-retaining wall bracket (2) is stainless steel plate.
7. a kind of adjustable waterproof foundation pit support device based on excavation of foundation pit model test according to claim 1, its It is characterised by, two sides that the model casing (7) contacts with retaining wall (1) are safety glass.
8. a kind of adjustable waterproof foundation pit support device based on excavation of foundation pit model test according to claim 1, its It is characterised by, the position of the bolt (3) on retaining wall (1) top determines that road number is by change retaining wall by retaining wall (1) embedded depth (1) the group number that the excavation of foundation pit experiment of embedded depth needs to adjust determines.
9. a kind of adjustable waterproof foundation pit support device based on excavation of foundation pit model test according to claim 1, its It is characterised by, the quantity and position that the quantity of the fixing bolt (5) and position are supported by foundation ditch determine.
CN201610204554.2A 2016-04-01 2016-04-01 A kind of adjustable waterproof foundation pit support device based on excavation of foundation pit model test Active CN105735377B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610204554.2A CN105735377B (en) 2016-04-01 2016-04-01 A kind of adjustable waterproof foundation pit support device based on excavation of foundation pit model test

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610204554.2A CN105735377B (en) 2016-04-01 2016-04-01 A kind of adjustable waterproof foundation pit support device based on excavation of foundation pit model test

Publications (2)

Publication Number Publication Date
CN105735377A CN105735377A (en) 2016-07-06
CN105735377B true CN105735377B (en) 2017-11-17

Family

ID=56252747

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610204554.2A Active CN105735377B (en) 2016-04-01 2016-04-01 A kind of adjustable waterproof foundation pit support device based on excavation of foundation pit model test

Country Status (1)

Country Link
CN (1) CN105735377B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107436280A (en) * 2017-09-26 2017-12-05 中国科学院武汉岩土力学研究所 Curtain withdrawal device and curtain withdrawal system
CN113049381A (en) * 2021-03-11 2021-06-29 深圳市勘察研究院有限公司 Foundation pit support simulation test device and system
CN114582219B (en) * 2022-02-23 2023-08-11 山东高速工程建设集团有限公司 Foundation pit adjacent building construction simulation device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20070052089A (en) * 2005-11-16 2007-05-21 주식회사 삼보지반기술 Support load measurement way of concrete pail and the installation established on base
CN101831924A (en) * 2010-04-21 2010-09-15 上海交通大学 Simulator for blocking groundwater seepage by underground structure
CN201876370U (en) * 2010-10-21 2011-06-22 同济大学 Model testing device convenient for simulating foundation pit excavation support erection
CN203701157U (en) * 2013-11-29 2014-07-09 西南交通大学 Inner support clamp of simple geotechnical centrifuge for simulating pit excavation experiment
CN104912123A (en) * 2015-05-28 2015-09-16 浙江中林勘察研究股份有限公司 Foundation pit heaving model experimental device and method
CN205712219U (en) * 2016-04-01 2016-11-23 浙江大学 A kind of waterproof foundation pit support device of scalable based on excavation of foundation pit model test

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20070052089A (en) * 2005-11-16 2007-05-21 주식회사 삼보지반기술 Support load measurement way of concrete pail and the installation established on base
CN101831924A (en) * 2010-04-21 2010-09-15 上海交通大学 Simulator for blocking groundwater seepage by underground structure
CN201876370U (en) * 2010-10-21 2011-06-22 同济大学 Model testing device convenient for simulating foundation pit excavation support erection
CN203701157U (en) * 2013-11-29 2014-07-09 西南交通大学 Inner support clamp of simple geotechnical centrifuge for simulating pit excavation experiment
CN104912123A (en) * 2015-05-28 2015-09-16 浙江中林勘察研究股份有限公司 Foundation pit heaving model experimental device and method
CN205712219U (en) * 2016-04-01 2016-11-23 浙江大学 A kind of waterproof foundation pit support device of scalable based on excavation of foundation pit model test

Also Published As

Publication number Publication date
CN105735377A (en) 2016-07-06

Similar Documents

Publication Publication Date Title
CN105716960A (en) Foundation pit excavation model test device used in complicated groundwater environment
CN103645297B (en) The analogue means of karst collapse
CN104535728B (en) Two-dimensional physical simulation testing system for deeply-buried tunnel water bursting hazard and testing method thereof
CN104265365B (en) A kind of sand simulation test device and test method of bursting
CN105672379B (en) The excavation of foundation pit model test apparatus of dynamic artesian water effect
CN105735377B (en) A kind of adjustable waterproof foundation pit support device based on excavation of foundation pit model test
CN107807051A (en) Simulate the experimental rig and test method of Blasting Excavation off-load under three-dimensional loading environment
CN105696636B (en) Can in Simulation of Excavation Process WATER LEVEL CHANGES excavation models experimental rig
CN111351699B (en) Two-dimensional pressure-bearing overwater coal mining analog simulation test device and use method
CN105675846B (en) Phreatic table and the excavation of foundation pit model test apparatus of artesian head collaboration lifting
CN108195723A (en) A kind of osmotic grouting pilot system and method for reinforcing loose gravelly soil
CN105716959B (en) It is a kind of can simulated groundwater position dynamic change excavation models experimental rig
Lam et al. A new apparatus for modelling excavations
Sun et al. Physical simulation of high-pressure water inrush through the floor of a deep mine
CN205712213U (en) The dynamically excavation of foundation pit model test apparatus of artesian water effect
CN205786605U (en) A kind of this coal bed gas extraction experimental simulation device
CN104237486A (en) Mining fracturing simulating test device for sealing drilling
CN205242462U (en) Research anti -floating pile resists test device that foundation ditch suddenly gushes failure mechanisms
CN205712215U (en) The excavation of foundation pit model test apparatus of simulation artesian head lifting
CN205712219U (en) A kind of waterproof foundation pit support device of scalable based on excavation of foundation pit model test
CN105527195A (en) Large-deformation vane shear rheological test system for simulating debris flow initiation
CN105672378B (en) Simulate the excavation of foundation pit model test apparatus of artesian head lifting
CN110082220A (en) A kind of porous guiding fracturing experiments device of true triaxial
CN205720219U (en) Phreatic table and artesian head work in coordination with the excavation of foundation pit model test apparatus of lifting
CN205719795U (en) Excavation of foundation pit model test apparatus under complicated groundwater environment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant