CN205712084U - A kind of boring backfill The End-bearing Piles Foundation - Google Patents

A kind of boring backfill The End-bearing Piles Foundation Download PDF

Info

Publication number
CN205712084U
CN205712084U CN201620331636.9U CN201620331636U CN205712084U CN 205712084 U CN205712084 U CN 205712084U CN 201620331636 U CN201620331636 U CN 201620331636U CN 205712084 U CN205712084 U CN 205712084U
Authority
CN
China
Prior art keywords
pile
backfill
stake
stake holes
cement mixture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620331636.9U
Other languages
Chinese (zh)
Inventor
胡刚
余翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Huaxi Pipe Engineering Co Ltd
Original Assignee
Sichuan Huaxi Pipe Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Huaxi Pipe Engineering Co Ltd filed Critical Sichuan Huaxi Pipe Engineering Co Ltd
Priority to CN201620331636.9U priority Critical patent/CN205712084U/en
Application granted granted Critical
Publication of CN205712084U publication Critical patent/CN205712084U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of boring backfill The End-bearing Piles Foundation;Pile foundation is made up of stake holes, prefabricated pile body, cement mixture hardened layer, stake circumference packing course.Construction method is: position and hole at the bottom of hole close to or part go deep into holding force rock stratum;The cement mixture of predetermined thickness is injected in stake holes;Backfill residue stake holes;Before mixture condenses, carry out hammer piling at the center backfilling stake holes, make pile body run through backfill layer and cement mixture fills packing course, squeeze and be embedded in holding force rock stratum.Pile foundation described in the utility model can run through the rock stratum that direct hammer piling difficulty penetrates and prevent pile top sliding;Cement mixture can reinforce destroyed supporting course to be increased bearing capacity and prevents top softening of water seepage supporting course;Backfill layer can when pile sinking by compacted and to pile body provide constraint.Be applicable to strong, weathered mudstone, sandstone supporting course, that especially interlayer is thick, boulder is many, mechanical hole building easily collapses and supporting course rises and falls is big, the gradient is steep, meet the complicated geological that water easily softens.

Description

A kind of boring backfill The End-bearing Piles Foundation
Technical field
The utility model belongs to construction foundation working technical field, relates to a kind of boring backfill The End-bearing Piles Foundation.
Background technology
Concrete pile foundation, as a kind of conventional ground situation, is widely used in each field of civil engineering.No matter Being cast-in-situ bored pile or the prefabricated pile of hammering or static pressure construction, it is real that concrete pile foundation passes through engineering for many years both at home and abroad Trample application, have accumulated a large amount of experience and successful case, it was demonstrated that such base form technology maturation simultaneously has compared with other type of foundations Significant advantage.
In recent years, under the special geologic condition in some areas, owing to the stratum on holding force rock stratum has some strength, Cause general hammering or static pressure construction that prefabricated pile cannot be made to pass through these stratum and reach preferable holding force rock stratum, or holding force rock stratum End face has certain inclination be easily caused an end generation sliding and then produce impact to building safety, and these situations all leverage pre- The application of stake processed.
At present, industry replants, by first boring, the combination that the method into prefabricated pile defines a class prefabricated pile external wrapping concrete Pile foundation, this kind of pile foundation overcomes above-mentioned disadvantageous geologic condition, improves the bearing capacity of pile foundation, and work progress king-pile Body not damaged, without soil compaction effect, noiselessness vibrate, easily realize that the planting the plurality of advantages such as stake of major diameter prefabricated pile has wide Application prospect.
But these boring combined piles foundation preparation process need to pour into a mould a large amount of cement mixture in stake holes, before condensation When implanting prefabricated pile, cement mixture is little to provide the constraint of stake week, and the calibration of prefabricated pile puts in place, Jointing etc. operates tired Difficult.The geology of more loose easy collapse hole for soil property, easily causes some quality problems, and the construction period is by cement mixture age Impact and longer.Not only wasting raw material, forming process also wastes time and energy, and overall economic efficiency is relatively low.
Utility model content
The purpose of this utility model is to overcome the deficiencies in the prior art, provides one boring backfill end-bearing pile base at this Plinth, is extended through the structure design of design rock stratum by stake holes, cement mixture hardened layer, backfill layer, prefabricated pile body center, it is achieved Difficult penetrate running through of rock stratum, form the constraint of stake week by pile tube injection compacted backfill layer simultaneously, eliminate stake end sliding risk, add Consolidate holding force rock stratum, solve the softening impact on holding force rock stratum for the top infiltration, decrease the pile damage risk of work progress, Simplify pile extension operation, reduce the material consumption that pile foundation makes.
The utility model is achieved in that offer one boring backfill The End-bearing Piles Foundation, it is characterised in that: include stake Hole, prefabricated pile body, cement mixture hardened layer, stake circumference four parts of packing course, wherein close bottom the stake holes of preboring or part Going deep into holding force rock stratum, cement mixture hardened layer is positioned at bottom stake holes, and cement mixture hardened layer tightens pile extension circumference packing course, in advance Pile body processed includes precast pile and pile top, pile top run through down stake circumference packing course and cement mixture hardened layer and squeeze be embedded in holding force In rock stratum.
According to boring backfill The End-bearing Piles Foundation described in the utility model, it is characterised in that: the stake holes degree of depth is 5-80m, directly Footpath is 300-1800mm, gos deep into a length of 0-20m of supporting course.
According to boring backfill The End-bearing Piles Foundation described in the utility model, it is characterised in that: prefabricated pile body includes prefabricated pile Body and pile top, pile body diameter or the length of side are 200-1200mm, and pile body includes but is not limited to prestressed concrete pipe pile, prestressing force mixes In solidifying soil hollow square pile, prestressed concrete solid pile and other special-shaped precast piles, pile top includes but is not limited to concrete Soil pile top, pre-manufactured steel pile top.
According to boring backfill The End-bearing Piles Foundation described in the utility model, it is characterised in that: cement mixture hardened layer bag Including but being not limited to cement mortar, mortar, concrete, compression strength is 1-50MPa, and thickness is 0-10m, under cement mixture hardened layer Portion be filled in pile tip hammer penetrate rock fragment that bearing bed destroys, in crackle, top and the stake packing course that surrounds is staggered.
According to described in the utility model boring backfill The End-bearing Piles Foundation, it is characterised in that: stake circumference packing course include but not Being limited to the earthwork, dirt, sand material, boring slag, solid slag, using the loose backfill do not tamped, backfill layer thickness is 1-80m.
According to boring backfill The End-bearing Piles Foundation described in the utility model, it is characterised in that: prefabricated pile body axle center and stake holes Axle center deviation is less than 50mm, and pile top one end injection of prefabricated pile body passes through gos deep into holding force rock stratum 0.5-10m bottom stake holes.
According to boring backfill The End-bearing Piles Foundation described in the utility model, it is characterised in that: The End-bearing Piles Foundation passes through subdrilling Hole, then grouting and backfill, finally hammer piling before grouting material hardening.
The construction method of a kind of backfill The End-bearing Piles Foundation of holing, comprises the following steps:
A () is holed to stake holes in precalculated position close to or partly gos deep into holding force rock stratum;
B () injects the cement mixture of predetermined thickness in stake holes;
C () remains stake holes with backfill material backfill;
D () mixture condenses before, carry out the hammer piling of prefabricated pile at the stake holes center having backfilled, make prefabricated pile run through back Packing course and grout blanket, squeeze and be embedded in holding force rock stratum;
E () stands maintenance and reaches predetermined strength to cement mixture.
The stake holes degree of depth in described step (a) is 5-80m, a diameter of 300-1800mm, gos deep into a length of 0-of supporting course 20m。
Cement mixture in described step (b) includes but is not limited to cement mortar, mortar, concrete, and compression strength is 1- 50MPa, thickness is 0-10m, and cement mixture is under-filled penetrates rock fragment, the crackle that bearing bed destroys in pile tip hammer In, top is staggered with backfill layer.
Backfill material in described step (c) includes but is not limited to the earthwork, dirt, sand material, boring slag, solid slag, uses The loose backfill do not tamped, backfill layer thickness is 1-80m.
Prefabricated pile body in described step (d) includes precast pile (5) and pile top (6), and pile body diameter or the length of side are 200- 1200mm, it is solid that pile body includes but is not limited to prestressed concrete pipe pile, pre-stressed concrete hollow square stake, prestressed concrete In square pile and other special-shaped precast piles, pile top includes but is not limited to precast concrete pile top, pre-manufactured steel pile top.
Prefabricated pile body axle center in described step (d) is less than 50mm, pile top one end of prefabricated pile body with stake holes axle center deviation Injection passes through gos deep into holding force rock stratum 0.5-10m bottom stake holes.
The utility model has the advantage of: by the through difficult rock stratum penetrating of stake holes, make the pile top go deep into holding force rock stratum simultaneously Prevent sliding, add pile body bearing capacity;The cement mixture hardened layer at the stake end strengthens the holding force rock destroying when pile top is squeezed into Layer, increases lifting surface area and bearing capacity of pile foundation, still prevents top infiltration and softens impact to bearing course at pile end;Backfill layer is at pipe Stake is extruded closely knit after squeezing into, and provides constraint to prefabricated pile body;And described pile foundation is last by grouting backfill again of first holing The mode of hammer piling makes, and its soil compaction effect is little compared with direct hammering, the advantage having hammer piling and drilling pile concurrently.It is applicable to By force, the mud stone of middle rate of decay, sandstone supporting course, blocked up to interlayer, boulder is more, mechanical hole building when easy collapse hole and supporting course Meet the complicated geological that water easily softens, the supporting course big rise and fall gradient is steeper especially suitable.
Brief description
Fig. 1 is the profile of described pile foundation.
In figure: the 1st, stake holes, the 2nd, prefabricated pile body, the 3rd, cement mixture hardened layer, the 4th, stake circumference packing course, the 5th, precast pile, the 6th, Pile top.
Detailed description of the invention
Below in conjunction with accompanying drawing 1, the utility model is described in detail, to the technical side in the utility model embodiment Case is clearly and completely described, it is clear that described embodiment is only a part of embodiment of the utility model, rather than Whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not making creative work Under the premise of the every other embodiment that obtained, broadly fall into the scope of the utility model protection.
It as it is shown in figure 1, the utility model provides a kind of boring backfill The End-bearing Piles Foundation at this, is specifically achieved in that
Embodiment 1
According to geology and execution conditions use drilling machine in pile position by 400mm borehole to going deep into holding force rock stratum 1m, boring slag charge uses dry row's form to discharge.
Clear hole, once injects M7.5 mortar 0.5 side with certain denseness in stake holes.
Mortar injects after finishing, and the slag charge that backfill boring is discharged in stake holes is to completely filling out.
Backfill finish after, mortar condense before, will be equipped with precast concrete pile top a diameter of 300mm PHC pile tube by Hammer piling construction method adjusts positioning at stake holes center, makes pile body axis and stake holes axle center deviation be less than 30mm, hammer piling, Midway can pile extension, exceed bottom stake holes embedded supporting course until pipe pile end portion and meet till pile penetration requires.
Embodiment 2
According to geology and execution conditions use drilling machine in pile position by 600mm borehole to going deep into holding force rock stratum 5m, boring slag charge uses dry row's form to discharge.
Clear hole, once injects 1:0.5 high-consistency cement mortar 1 side mixed with thickener in stake holes.
Cement mortar injects after finishing, and backfills solid slag until completely filling out in stake holes.
After backfill finishes, before cement mortar condenses, will be equipped with the PHC pile tube of a diameter of 500mm of steel pile tip by hammering Pile sinking construction method adjusts positioning at stake holes center, makes pile body axis and stake holes axle center deviation be less than 30mm, hammer piling, halfway Can pile extension, exceed bottom stake holes embedded supporting course until pipe pile end portion and meet till pile penetration requires.
Described above to the disclosed embodiments, makes professional and technical personnel in the field be capable of or uses this practicality new Type.Multiple modifications to these embodiments will be apparent from for those skilled in the art, is determined herein The General Principle of justice can realize in the case of without departing from spirit or scope of the present utility model in other embodiments.Cause This, the utility model is not intended to be limited to the embodiments shown herein, and is to fit to and principles disclosed herein The wide scope consistent with features of novelty.

Claims (6)

1. a boring backfill The End-bearing Piles Foundation, it is characterised in that: include that stake holes (1), prefabricated pile body (2), cement mixture are hard Changing layer (3), stake circumference (4) four parts of packing course, wherein stake holes (1) base section of preboring gos deep into holding force rock stratum, cement mix Thing hardened layer (3) is positioned at stake holes (1) bottom, and cement mixture hardened layer (3) tightens pile extension circumference packing course (4), prefabricated pile body (2) Including precast pile (5) and pile top (6), pile top (6) run through down stake circumference packing course (4) and cement mixture hardened layer (3) and Squeeze and be embedded in holding force rock stratum.
2. boring backfill The End-bearing Piles Foundation according to claim 1, it is characterised in that: stake holes (1) degree of depth is 5-80m, directly Footpath is 300-1800mm, gos deep into a length of 0-20m of supporting course.
3. boring backfill The End-bearing Piles Foundation according to claim 1, it is characterised in that: prefabricated pile body includes precast pile (5) and pile top (6), pile body (5) diameter or the length of side are 200-1200mm, and pile body (5) is that prestressed concrete pipe pile, prestressing force mix Solidifying soil hollow square pile or prestressed concrete solid pile, pile top (6) is precast concrete pile top or pre-manufactured steel pile top.
4. boring backfill The End-bearing Piles Foundation according to claim 1, it is characterised in that: cement mixture hardened layer (3) resists Compressive Strength is 1-50MPa, and thickness is 0-10m, cement mixture hardened layer (3) under-filled pile tip hammer penetrate bearing bed break In bad rock fragment, crackle, top and stake circumference packing course (4) are staggered.
5. boring backfill The End-bearing Piles Foundation according to claim 1, it is characterised in that: stake circumference packing course (4) uses and does not rams Real loose backfill, backfill layer thickness is 1-80m.
6. boring backfill The End-bearing Piles Foundation according to claim 1, it is characterised in that: prefabricated pile body (2) axle center and stake holes (1) axle center deviation is less than 50mm, and pile top one end injection of prefabricated pile body (2) passes through gos deep into holding force rock stratum 0.5-10m bottom stake holes.
CN201620331636.9U 2016-04-20 2016-04-20 A kind of boring backfill The End-bearing Piles Foundation Active CN205712084U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620331636.9U CN205712084U (en) 2016-04-20 2016-04-20 A kind of boring backfill The End-bearing Piles Foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620331636.9U CN205712084U (en) 2016-04-20 2016-04-20 A kind of boring backfill The End-bearing Piles Foundation

Publications (1)

Publication Number Publication Date
CN205712084U true CN205712084U (en) 2016-11-23

Family

ID=57298799

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620331636.9U Active CN205712084U (en) 2016-04-20 2016-04-20 A kind of boring backfill The End-bearing Piles Foundation

Country Status (1)

Country Link
CN (1) CN205712084U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105780766A (en) * 2016-04-20 2016-07-20 四川华西管桩工程有限公司 Drilling backfill end bearing pile foundation and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105780766A (en) * 2016-04-20 2016-07-20 四川华西管桩工程有限公司 Drilling backfill end bearing pile foundation and construction method thereof

Similar Documents

Publication Publication Date Title
US7326004B2 (en) Apparatus for providing a rammed aggregate pier
CN204059124U (en) A kind of sand drain strong rammer grouting behind shaft or drift lining foundation reinforcing structure
CN107417182B (en) Expansion type high polymer cement slurry, grouting reinforcement device and grouting reinforcement method
CN103233454A (en) Processing method of soaking, vacuum preloading and slurry injecting for sand piles of collapsible loess foundation
KR100762991B1 (en) Precast piling method injected with high-strength mortar
CN103184734A (en) Implanted and grouted compound pile and construction method
CN106948340B (en) A kind of construction method of the Manual excavated pile structure of high polymer grouting protection
CN105780766A (en) Drilling backfill end bearing pile foundation and construction method thereof
CN105569071B (en) A kind of slip casting under water of cement-based material or mud jacking block ground mass foundation construction
CN105714773A (en) Foundation treatment method
CN104746505A (en) Method for treating miscellaneous fill foundation combing dynamic consolidation and compaction grouting
CN106522191A (en) Transformer substation foundation treatment method and application thereof
CN111794216A (en) Construction method of uplift carrier pile
CN104099925A (en) Construction device for concrete pile and construction method thereof
CN111636417A (en) Grouting type steel pipe pile and construction method thereof
CN112761166A (en) Construction method for shallow foundation pit of combined support of piles and pre-grouting steel pipes based on SMW (soil mixing wall) construction method
CN113863294B (en) PHC pipe pile internally provided with pile end grouting device and construction process thereof
CN212336070U (en) Karst foundation variable-rigidity primary-secondary pile
CN108824412A (en) Based on gabion wall reinforced earth and strong tamping combined soft base processing method
CN205712084U (en) A kind of boring backfill The End-bearing Piles Foundation
CN103821140A (en) Constructing method for reinforcing soft soil foundations
CN114164726B (en) Local deep excavation backfill structural roadbed and rapid construction method
CN103015438A (en) Collapsible loess subgrade landslide treatment method
CN202787275U (en) Tubular soil nailing wall of novel pneumatic impact anchor
RU121274U1 (en) ARTIFICIAL REINFORCED BASIS FOR ESTABLISHED OR RECONSTRUCTED BUILDING

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant