CN205709619U - A kind of hanging apparatus - Google Patents

A kind of hanging apparatus Download PDF

Info

Publication number
CN205709619U
CN205709619U CN201620384846.4U CN201620384846U CN205709619U CN 205709619 U CN205709619 U CN 205709619U CN 201620384846 U CN201620384846 U CN 201620384846U CN 205709619 U CN205709619 U CN 205709619U
Authority
CN
China
Prior art keywords
lifting boom
transverse axis
sleeve pipe
hanging apparatus
hanging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620384846.4U
Other languages
Chinese (zh)
Inventor
李辉
曹龙滨
刘畅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 5 Co Ltd
Original Assignee
Sinohydro Bureau 5 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 5 Co Ltd filed Critical Sinohydro Bureau 5 Co Ltd
Priority to CN201620384846.4U priority Critical patent/CN205709619U/en
Application granted granted Critical
Publication of CN205709619U publication Critical patent/CN205709619U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of hanging apparatus, including two wheels and lifting boom, connect and have transverse axis between two wheels, lifting boom is across transverse axis, and is fixedly connected on transverse axis by vertical supporting bar, and lifting boom front end is additionally provided with fixing device;Described fixing device has included hanging clamp, plays hanging clamp and is fixed on the front end of described lifting boom by connecting rod;Described lifting boom includes sleeve pipe and the drag strut of interconnective leading portion and back segment power rail in being sleeved on sleeve pipe;Sleeve pipe is fixing with described vertical supporting bar to be connected.This utility model is with low cost, the lightest, and structural principle is easy-to-understand, and workmen can quickly grasp, and can be greatly saved manpower, and in shortening field, material is had bad luck the time, reduces raw material breakage rate, and practical, efficiency of construction is high.

Description

A kind of hanging apparatus
Technical field
This utility model relates to technique with the apparatus field of constructing, and is specially a kind of hanging apparatus.
Background technology
Along with the development of municipal works, the prefabricated component making construction application such as the flat stone in side is gradually promoted, but exist during practice of construction the prefabricated components such as the flat stone in side on construction ground in dispersion have bad luck and lift the bigger difficulty of existence, a dead lift difficulty is big, efficiency is low and cracky;In view of restriction and the consideration of economy of construction site, large-scale hoisting machinery is the most applicable.
Utility model content
For the problems referred to above, the purpose of this utility model is to provide a kind of light and flexible, and handling efficiency is high and does not easily cause the hanging apparatus that the flat stone in side is damaged.Technical scheme is as follows:
A kind of hanging apparatus, including two wheels and lifting boom, connects between two wheels and has transverse axis, and lifting boom is across transverse axis, and is fixedly connected on transverse axis by vertical supporting bar, and lifting boom front end is additionally provided with fixing device.
Further, described fixing device has included hanging clamp, plays hanging clamp and is fixed on the front end of described lifting boom by connecting rod.
Further, described lifting boom includes sleeve pipe and the drag strut of interconnective leading portion and back segment power rail in being sleeved on sleeve pipe;Sleeve pipe is fixing with described vertical supporting bar to be connected.
Further, described lifting boom tail end is further fixed on turning to tap.
Further, also including the brake unit being arranged on described wheel and turn to the braking rim brake on tap described in being arranged on, brake unit and braking rim brake are connected by braking connecting line.
Further, a plurality of skewed horizontal load bar also it is fixedly connected with between described lifting boom and transverse axis.
The beneficial effects of the utility model are: the device that this utility model provides can effectively solve that a dead lift difficulty is big, efficiency is low and a difficult problem for cracky, and this apparatus structure is simple, convenient to assemble and disassemble, with low cost, the lightest, structural principle is easy-to-understand, and workmen can quickly grasp, and can be greatly saved manpower, in shortening field, the time had bad luck by material, reducing raw material breakage rate, practical, efficiency of construction is high.
Accompanying drawing explanation
Fig. 1 is the structural representation of this utility model hanging apparatus.
1-wheel;2-transverse axis;3-vertical supporting bar;4-lifting boom;41-sleeve pipe;42-drag strut;43-power rail;44-fixes bolt;5-connecting rod;6-plays hanging clamp;7-skewed horizontal load bar;8-turns to tap;9-turns to tap;10-brakes rim brake;11-brakes connecting line;12-drag-line;13-side flat stone prefabricated component.
Detailed description of the invention
With specific embodiment, this utility model is described further below in conjunction with the accompanying drawings.As it is shown in figure 1, a kind of hanging apparatus, including two wheels 1 and lifting boom 4.Connect between two wheels 1 and have transverse axis 2, constitute handbarrow.Lifting boom 4 is across transverse axis 2, and is fixedly connected on transverse axis 2 by vertical supporting bar 3, and lifting boom 4 front end is additionally provided with fixing device.
The fixing device of the present embodiment has included hanging clamp 6, plays hanging clamp 6 and is fixed on the front end of described lifting boom 4 by connecting rod 5.Utilize what hanging clamp 6 can consolidate to fix the flat stone in side, with lifting to installation position, reached short-distance transport and the purpose of lifting of the prefabricated components such as flat stone inside construction site
The lifting boom 4 of the present embodiment include sleeve pipe 41 and be sleeved on sleeve pipe 41 in the drag strut 42 of interconnective leading portion and back segment power rail 43;Sleeve pipe 41 is fixing with described vertical supporting bar 3 to be connected.Power bar passes sleeve pipe 41, scalable power rail 43, the length of drag strut 42, reaches laborsaving and timesaving optimum efficiency.
Lifting boom 4 tail end of the present embodiment is further fixed on turning to tap 8, the most also includes the brake unit 9 being arranged on described wheel 1 and turns to the braking rim brake 10 on tap 8, brake unit 9 and braking rim brake 10 to be connected by braking connecting line 11 described in being arranged on.Turned to and skidding by the advance turning to tap 8 and braking rim brake 10 to control go-cart, improve safety and the motility of device.It addition, lifting boom 4 is strained also by drag-line 12, strengthen its intensity and rigidity.
Also it is fixedly connected with a plurality of skewed horizontal load bar 7 between lifting boom 4 and the transverse axis 2 of the present embodiment, is effectively increased the stability of lifting boom 4.
Power rail 43, drag strut 42 and handbarrow use lever principle to assemble, that is: two power on lever are acted on, with force, fulcrum, the principle that the size of resistance point is inversely proportional to their arm of force, i.e. power × power arm=resistance × resistance arm, at power rail 43 more than drag strut 42 and side, flat stone or prefabricated component quality keep constant in the case of, workmen is by applying less pressure to power rail 43 end, just can be easily by side, flat stone or prefabricated component transport or lifting are to the scope of operation, substantially increase efficiency of construction, solve side, the prefabricated component short distance liftings such as flat stone and a difficult problem for transport inconvenience, save manpower, the time is had bad luck in shortening field, decrease the breakage rate of prefabricated components, thus reduce construction cost.

Claims (6)

1. a hanging apparatus, it is characterized in that, including two wheels (1) and lifting boom (4), connect between two wheels (1) and have transverse axis (2), lifting boom (4) is across transverse axis (2), and be fixedly connected on transverse axis (2) by vertical supporting bar (3), lifting boom (4) front end is additionally provided with fixing device.
Hanging apparatus the most according to claim 1, it is characterised in that described fixing device has included hanging clamp (6), is played hanging clamp (6) and is fixed on the front end of described lifting boom (4) by connecting rod (5).
Hanging apparatus the most according to claim 1, it is characterised in that described lifting boom (4) include sleeve pipe (41) and be sleeved on sleeve pipe (41) in the drag strut (42) of interconnective leading portion and back segment power rail (43);Sleeve pipe (41) is fixing with described vertical supporting bar (3) to be connected.
Hanging apparatus the most according to claim 1, it is characterised in that described lifting boom (4) tail end is further fixed on turning to tap (8).
Hanging apparatus the most according to claim 4, it is characterized in that, also including the brake unit (9) being arranged on described wheel (1) and turn to the braking rim brake (10) on tap (8) described in being arranged on, brake unit (9) and braking rim brake (10) are connected by braking connecting line (11).
Hanging apparatus the most according to claim 1, it is characterised in that be also fixedly connected with a plurality of skewed horizontal load bar (7) between described lifting boom (4) and transverse axis (2).
CN201620384846.4U 2016-04-29 2016-04-29 A kind of hanging apparatus Expired - Fee Related CN205709619U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620384846.4U CN205709619U (en) 2016-04-29 2016-04-29 A kind of hanging apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620384846.4U CN205709619U (en) 2016-04-29 2016-04-29 A kind of hanging apparatus

Publications (1)

Publication Number Publication Date
CN205709619U true CN205709619U (en) 2016-11-23

Family

ID=57333050

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620384846.4U Expired - Fee Related CN205709619U (en) 2016-04-29 2016-04-29 A kind of hanging apparatus

Country Status (1)

Country Link
CN (1) CN205709619U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110629645A (en) * 2019-09-02 2019-12-31 中冶天工集团有限公司 Device for carrying and adjusting kerbs and stones and using method thereof
CN111634804A (en) * 2020-04-30 2020-09-08 康力电梯股份有限公司 Simple and easy car of transportation counterweight iron

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110629645A (en) * 2019-09-02 2019-12-31 中冶天工集团有限公司 Device for carrying and adjusting kerbs and stones and using method thereof
CN111634804A (en) * 2020-04-30 2020-09-08 康力电梯股份有限公司 Simple and easy car of transportation counterweight iron
CN111634804B (en) * 2020-04-30 2022-04-29 康力电梯股份有限公司 Simple and easy car of transportation counterweight iron

Similar Documents

Publication Publication Date Title
CN205769472U (en) Electric pole conveying arrangement
CN205709619U (en) A kind of hanging apparatus
CN203065087U (en) Novel mobile hoisting device
CN205954420U (en) Push away fortune rail dolly
CN206031434U (en) Large pipe transport vechicle
CN201506684U (en) Wheel type hanging beam movable gantry crane
CN203391894U (en) Wire pole hauling device
CN203922538U (en) A kind of trustship wheel
CN204570396U (en) D type is the traversing door frame of beam just
CN205075863U (en) Lightly transport shallow of pole boom man
CN206983978U (en) A kind of small rail car for improving sloping area roll guard conevying efficiency
CN204454245U (en) Equalizing bar special hanger
CN204641712U (en) Prevent the device that beam transportation vehicle slips
CN202984643U (en) Transfer device for wheel hub
CN205973541U (en) Tower crane is with electronic introduction device that hangs, breaks off relations certainly
CN204847932U (en) Cable pulley of device is walked crosswise to hoist cable
CN205222601U (en) Portable transfer frame of hoist girder gusset
CN204822890U (en) Dolly is transported to steel pipe
CN204506854U (en) The wheeled rear support leg of vehicle body transportation centre of gravity adjustment
CN208915190U (en) A kind of transport device for construction site Secondary Transport large diameter pipeline
CN203713935U (en) Carrying device for large and heavy steel wire coil
CN208563058U (en) A kind of installation tool of road side stone
CN202953745U (en) Transportation loading and unloading machine
CN203095316U (en) Pulling-pushing car for elevator repairing
CN203044742U (en) Adjustable bending machine for steel bars

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161123