A kind of vine plant climbing frame for urban landscaping engineering Download PDF

Info

Publication number
CN205682002U
CN205682002U CN201620564913.0U CN201620564913U CN205682002U CN 205682002 U CN205682002 U CN 205682002U CN 201620564913 U CN201620564913 U CN 201620564913U CN 205682002 U CN205682002 U CN 205682002U
Authority
CN
China
Prior art keywords
climbing frame
cross
bar
bridging
vine plant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620564913.0U
Other languages
Chinese (zh)
Inventor
樊天辉
向小峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Yuantai Environment Construction Engineering Co Ltd
Original Assignee
Jiangsu Yuantai Environment Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Yuantai Environment Construction Engineering Co Ltd filed Critical Jiangsu Yuantai Environment Construction Engineering Co Ltd
Priority to CN201620564913.0U priority Critical patent/CN205682002U/en
Application granted granted Critical
Publication of CN205682002U publication Critical patent/CN205682002U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of vine plant climbing frame for urban landscaping engineering, its drip irrigation device is to include cross bar, fixing bar, cross-bridging, described cross bar and fixing bar be arranged in parallel, described cross-bridging is fixedly installed between cross bar and fixing bar, described cross bar, cross-bridging, fixing bar are hollow object, the boring that described cross bar is connected the boring of end with cross-bridging, fixing bar is connected end with cross-bridging all connects, water, described cross bar is all had to be provided with some through holes away from cross-bridging end inside described cross bar, fixing bar, cross-bridging;This utility model effectively alleviates the soaring impact on vine plant of climbing frame own temperature, it is ensured that the safety growth of vine plant.

Description

A kind of vine plant climbing frame for urban landscaping engineering
Technical field
This utility model relates to a kind of vine plant grower field, more specifically, it relates to a kind of for city The vine plant climbing frame of landscape engineering.
Background technology
In the last few years, the concept of green building is gradually paid attention to by people, and architectonics is not ignored in the design of green building Intension, and green design strategies should be combined with the performance of building, pay attention to the coordination with neighboring buildings and landscape environment and Contribution to environment, it is to avoid oppressiveness is dull or ignores regional design.
At present, market discloses a kind of vine plant climbing frame (application number for urban landscaping engineering For 201520125930.X), it includes the first base, the second base, support beam, first moves post and second and move post, and first Base is provided with the first liftable column, and the second base is provided with the second liftable column, and support beam is arranged on the first liftable On column and the second liftable column, being provided with slide rail in support beam, first moves post and second moves post bottom and is equipped with sliding Rail match slide slide block, first moves post top is provided with the first fixing device, second move post top be provided with second fix Device, the first fixing device is installed with the first climbing pipe, and the second fixing device is provided with the second climbing pipe, the second climbing Guan Yan Extend in the first climbing pipe.Although this utility model has a simple in construction, using, easy for installation, applied widely, rattan class is planted Thing climbing is convenient, and climbing frame structure is firm, low cost, and service life is long, has safe and reliable effect, but makes actual Irradiate between and sunlight too high due to ambient temperature during with, when vine plant is also in the most intensive immature stage Time, vine plant cannot be completely covered climbing frame, summer climbing frame caused temperature to steeply rise by sunlight direct irradiation, climbing Vine plant can be caused scald when frame temperature is too high, cause plant that dead phenomenon occurs.
Utility model content
The deficiency existed for prior art, the purpose of this utility model is to provide one self temperature in high temperature environments Degree will not the vine plant climbing frame for urban landscaping engineering of drastically height.
For achieving the above object, this utility model provides following technical scheme: a kind of for urban landscaping engineering Vine plant climbing frame, including cross bar, fixing bar, cross-bridging, described cross bar and fixing bar be arranged in parallel, and described cross-bridging is solid Surely being arranged between cross bar and fixing bar, described cross bar, cross-bridging, fixing bar are hollow object, and described cross bar is with cross-bridging even Connect the boring of end, fixing bar is connected the boring of end and all connects with cross-bridging, described cross bar, fixes in bar, cross-bridging Portion all has water, described cross bar to be provided with some through holes away from cross-bridging end.
By using technique scheme, in the work progress of urban greening project, climbing frame is arranged on the outside in house, Due to environment temperature and the direct projection of sunlight, the temperature rising of climbing frame causes the plant on climbing frame to be scalded or withered, in order to Effectively lowering the temperature to climbing frame, climbing frame is arranged to hollow pipe fitting and inside fills water, water effectively enters to climbing frame The effect of row cooling, is provided with some through holes on cross bar and can ensure that water can evaporate discharge climbing frame after absorbing heat It is also convenient for the diffusion of heat simultaneously.
This utility model is further arranged to: described cross bar, cross-bridging, the outside of fixing bar are equipped with heat insulating mattress.
By using technique scheme, owing to water heat on absorption climbing frame is more slow, climbing frame is short Also can produce certain temperature in time and cause the scald of vine plant, wrap up heat insulating mattress in the outside of climbing frame, have further The temperature that ensure that climbing frame surface of effect will not heat up the fastest.
This utility model is further arranged to: described cross bar is provided with water filling port.
By using technique scheme, climbing frame is after the certain time used, and the water within climbing frame can gradually subtract Few, in order to effectively ensure stablizing of the internal water yield of climbing frame, cross bar is provided with water filling port, can be that climbing frame is quick Water filling so that the water yield within climbing frame may remain in a certain amount.
This utility model is further arranged to: be equipped with fixing bolt, described fixing spiral shell on described cross bar and fixing bar Bolt is vertical with the plane at cross-bridging place.
By using technique scheme, climbing frame needs the most fixing during installing, and fixing bolt is permissible Effectively being fixed on by climbing frame needs on metope to be mounted, ensures the fixing of climbing frame height, it is to avoid cross-bridging makes simultaneously Cause falling after rise due to action of gravity during with.
This utility model is further arranged to: described fixing bolt is equipped with sealing gasket with cross bar, fixing bar contact jaw.
By using technique scheme, inside climbing frame, be provided with moisture, fixing bolt through cross bar and fixing bar time Time may make the water loss within climbing frame, sets up sealing at the two ends that fixing bolt contacts with cross bar, fixing bar and is lined with Imitate ensure that water will not run off at fixing bolt.
This utility model is further arranged to: described fixing bar bottom surface is provided with fixed plate, and described fixed plate is provided with spiral shell Nail.
By using technique scheme, the when that climbing frame needing individually to be built up in somewhere, owing to there is no supporting surface Fixing, fixing bar is effectively attached with ground, in order to ensure stable connection so be provided with solid in the bottom surface of fixing bar Determine plate, increase the contact area of climbing frame and ground, further ensure stablizing of connection by screw placement ground simultaneously.
This utility model is further arranged to: described cross bar, cross-bridging, fixing bar are made by aluminium alloy.
By using technique scheme, according to the needs that construction is different, climbing frame needs mobile different position to carry out Installing, the lighter in weight of aluminium alloy self can quickly move installation, and aluminium alloy its rigidity is higher is hardly damaged.
This utility model is further arranged to: described vine plant climbing frame is sequentially provided with some and is connected by connector Connect.
By using technique scheme, due to the needs of urban afforestation, it is sometimes desirable to be separately provided greening wall or sky Between, multiple for climbing frame being fixedly installed is adapted to the use of different demands.
This utility model is further arranged to: described connector is arranged on cross bar and fixing bar, and described connector is Expansion link.
By using technique scheme, the need that the greening wall being independently arranged uses for homeostasis or other spaces , the adjacent climbing frame time needs to arrange different distances, and the climbing frame that the ability that expansion link self stretches is adjacent provides The effect of different distance.
This utility model is further arranged to: described expansion link is provided with clamping screw.
By use technique scheme, climbing frame be arranged on outside, when have people from the side through when occur collision Expansion link can be caused to bounce back so that the positional distance that climbing frame is arranged produces deviation, cause the fixing shakiness of climbing frame, by locking Bolt can effectively limit the motion of expansion link, it is ensured that stablizing between climbing frame.
In sum, this utility model has the advantages that
Effectively alleviate the soaring impact on vine plant of climbing frame own temperature, it is ensured that the safety of vine plant Growth;It is applicable to different environment, the greening wall of different spaces can be arranged as required to.
Accompanying drawing explanation
Fig. 1 is the structural representation representing embodiment one;
Fig. 2 is the structural representation representing embodiment two;
Fig. 3 is the structural representation representing water filling port;
Fig. 4 is the structural representation representing embodiment three;
Fig. 5 is the structural representation representing embodiment four.
Reference: 1, cross bar;11, through hole;12, water filling port;2, fixing bar;21, fixed plate;22, screw;3, intersect Support;4, heat insulating mattress;5, fixing bolt;6, sealing gasket;7, connector;8, clamping screw.
Detailed description of the invention
Below in conjunction with accompanying drawing, this utility model is described in further detail.
Embodiment one: a kind of vine plant climbing frame for urban landscaping engineering, as it is shown in figure 1, include cross bar 1, fixing bar 2, cross-bridging 3, cross-bridging 3 is fixed be connected with cross bar 1 and fixing bar 2, and cross bar 1 and fixing bar 2 be arranged in parallel, is needing Otherwise the when of level plant-climbing rack, drive cross-bridging 3 to realize the regulation of height, urban afforestation by regulation cross bar 1 In the work progress of engineering, climbing frame is arranged on the outside in house, due to environment temperature and the direct projection of sunlight, the temperature of climbing frame Rise and cause the plant on climbing frame to be scalded or withered, in order to effectively lower the temperature to climbing frame, climbing frame is arranged to hollow Pipe fitting and inside fill water, when the heat on climbing frame is delivered to above internal water when, water is effective by thermal evaporation The effect lowered the temperature is carried out to climbing frame;In order to ensure effectively to be discharged in climbing frame by the water of thermal evaporation, can be fast by heat The derivation climbing frame of speed, so being provided with some through holes 11 on cross bar 1, water evaporates by through hole 11 after absorbing heat Climbing frame can be discharged and facilitate the diffusion of heat.
Embodiment two: as shown in Figures 2 and 3, climbing frame is after the certain time used, and the water within climbing frame can gradually subtract Few, in order to effectively ensure stablizing of the internal water yield of climbing frame, need to carry out water filling to the inside of climbing frame, when the water yield reaches one The when of determining, the internal guarantee climbing frame heat everywhere of climbing frame can be only absorbed by the water the effect reaching cooling, so at horizontal stroke Water filling port 12 it is provided with, it is achieved that for the quick water filling of climbing frame so that the water within climbing frame may remain in necessarily on bar 1 Amount.Owing to water heat on absorption climbing frame is more slow, climbing frame the most also can produce certain temperature Causing the scald of vine plant, the temperature in order to ensure outside climbing frame will not heat up too fast, the outside of climbing frame parcel every Heat pad 4, heat insulating mattress 4 effectively avoids high-temperature gas and directly contacts with climbing frame, and to it also avoid sunlight direct for heat insulating mattress 4 simultaneously Being irradiated to above climbing frame, the temperature being effectively guaranteed climbing frame surface further will not heat up the fastest.
Embodiment three: as shown in Figure 4, climbing frame needs the most fixing during installing, and is being arranged by climbing frame The when of on the support surface, need effectively to fix climbing frame, can by the fixing bolt 5 on cross bar 1 and fixing bar 2 Needing on metope to be mounted to be effectively fixed on by climbing frame, when cross-bridging 3 stretches when, the height of climbing frame can produce Error, fixing bolt 5 ensures the fixing of climbing frame height simultaneously when of being fixed by cross bar 1, it is to avoid cross-bridging 3 is in the mistake used Journey causes falling after rise due to action of gravity.Moisture it is provided with, when fixing bolt 5 is through cross bar 1 and fixing bar 2 inside climbing frame Wait, destroy the sealing of cross bar 1 and fixing bar 2 itself, the water loss within climbing frame may be made;In order to ensure climbing Water within frame will not flow out from the position part at fixing bolt 5 place, contacts with cross bar 1, fixing bar 2 at fixing bolt 5 Sealing gasket 6 is set up at two ends, and the space between fixing bolt 5 and cross bar 1, fixing bar 2 is effectively filled up by sealing gasket 6, protects Demonstrate,prove water to run off at fixing bolt 5.When not having supporting surface to be fixed climbing frame when, climbing frame needs individually The when of being built up in somewhere, fixing bar 2 is effectively attached with ground, in order to ensure stable connection so at fixing bar The bottom surface of 2 is provided with fixed plate 21, and fixed plate 21 increases the contact area of climbing frame and ground, is provided with again spiral shell in fixed plate 21 Nail 22, implants ground by screw 22 simultaneously and further ensures stablizing of connection.According to the needs that construction is different, climbing frame needs Moving different positions to install, for convenience the installation of climbing frame and taking, the weight of climbing frame must be as far as possible Little, climbing frame to be ensured solid, so selecting aluminium alloy to make cross bar 1, cross-bridging 3, fixing bar 2, aluminum closes Self lighter in weight of gold can quickly move installation, and aluminium alloy its rigidity is higher is hardly damaged.
Embodiment four: a kind of vine plant climbing frame for urban landscaping engineering, as it is shown in figure 5, due to city The needs of greening, it is sometimes desirable to be separately provided greening wall or space, so being sequentially provided with climbing frame some and passing through to connect Part 7 connects, and is fixedly installed being connected by connector 7 between multiple climbing frames according to actual needs, is adapted to different demand Use, allow Ecological Projects in Urban Gardens have more selection.In order to adapt to the adjustment of different spaces, the greening being independently arranged Wall needed to arrange different distances, for side for homeostasis or the needs of other spaces use, adjacent climbing frame time Just connector 7 is arranged to expansion link by the regulation of distance, and the ability that expansion link self stretches can quickly realize adjacent climbing The adjustment of different distance between climbing frame;Climbing frame be arranged on outside, when have people from the side through when it is possible that collision Situation, when having external force to collide climbing frame when, due to the function that expansion link self is flexible, expansion link stress can be stretched The phenomenon of contracting, when the climbing frame set is when by External Force Acting, expansion link causes the positional distance of climbing frame to produce after shrinking Raw deviation so that climbing frame is fixed shakiness and caused vine plant impaired, in order to ensure that the stable of climbing frame is arranged on expansion link Having clamping screw 8, clamping screw 8 can effectively limit the motion of expansion link, it is ensured that stablizing between climbing frame.
This specific embodiment is only that it is not to restriction of the present utility model, ability to explanation of the present utility model The present embodiment can be made after reading this specification by field technique personnel as required does not has the amendment of creative contribution, but As long as all being protected by Patent Law in right of the present utility model.

Claims (10)

1. for a vine plant climbing frame for urban landscaping engineering, including cross bar (1), fixing bar (2), cross-bridging (3), described cross bar (1) and fixing bar (2) be arranged in parallel, and described cross-bridging (3) is fixedly installed on cross bar (1) and fixing bar (2) Between, it is characterized in that: described cross bar (1), cross-bridging (3), fixing bar (2) are hollow object, described cross bar (1) and cross-bridging (3) connect the boring of end, boring that fixing bar (2) is connected end with cross-bridging (3) all connects, and described cross bar (1), consolidates Fixed pole (2), cross-bridging (3) are internal all water, and described cross bar (1) is provided with some through holes (11) away from cross-bridging (3) end.
A kind of vine plant climbing frame for urban landscaping engineering the most according to claim 1, is characterized in that: institute State cross bar (1), cross-bridging (3), the outside of fixing bar (2) are equipped with heat insulating mattress (4).
A kind of vine plant climbing frame for urban landscaping engineering the most according to claim 2, is characterized in that: institute State cross bar (1) and be provided with water filling port (12).
A kind of vine plant climbing frame for urban landscaping engineering the most according to claim 3, is characterized in that: institute State and on cross bar (1) and fixing bar (2), be equipped with fixing bolt (5), described fixing bolt (5) and the plane at cross-bridging (3) place Vertically.
A kind of vine plant climbing frame for urban landscaping engineering the most according to claim 4, is characterized in that: institute State fixing bolt (5) and be equipped with sealing gasket (6) with cross bar (1), fixing bar (2) contact jaw.
A kind of vine plant climbing frame for urban landscaping engineering, its feature It is: described fixing bar (2) bottom surface is provided with fixed plate (21), and described fixed plate (21) is provided with screw (22).
A kind of vine plant climbing frame for urban landscaping engineering the most according to claim 6, is characterized in that: institute State cross bar (1), cross-bridging (3), fixing bar (2) are made by aluminium alloy.
A kind of vine plant climbing frame for urban landscaping engineering the most according to claim 1, if being sequentially provided with Do and connected by connector (7).
A kind of vine plant climbing frame for urban landscaping engineering the most according to claim 8, is characterized in that: institute Stating connector (7) to be arranged on cross bar (1) and fixing bar (2), described connector (7) is expansion link.
A kind of vine plant climbing frame for urban landscaping engineering the most according to claim 9, is characterized in that: Described expansion link is provided with clamping screw (8).
CN201620564913.0U 2016-06-14 2016-06-14 A kind of vine plant climbing frame for urban landscaping engineering Expired - Fee Related CN205682002U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620564913.0U CN205682002U (en) 2016-06-14 2016-06-14 A kind of vine plant climbing frame for urban landscaping engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620564913.0U CN205682002U (en) 2016-06-14 2016-06-14 A kind of vine plant climbing frame for urban landscaping engineering

Publications (1)

Publication Number Publication Date
CN205682002U true CN205682002U (en) 2016-11-16

Family

ID=57427229

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620564913.0U Expired - Fee Related CN205682002U (en) 2016-06-14 2016-06-14 A kind of vine plant climbing frame for urban landscaping engineering

Country Status (1)

Country Link
CN (1) CN205682002U (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108029442A (en) * 2018-01-25 2018-05-15 上海植物园 A kind of adjustable rattan teapoy device
CN108651081A (en) * 2018-05-31 2018-10-16 重庆市飞龙种业有限责任公司 Sponge gourd planting unit
CN109392499A (en) * 2017-09-23 2019-03-01 安顺市平坝区银河特色种植专业合作社 A kind of vegetable cultivation special-purpose supporting frame
CN109629818A (en) * 2019-01-31 2019-04-16 山东新活新材料科技有限公司 A kind of aluminium alloy climbing frame track
CN109695342A (en) * 2019-01-31 2019-04-30 山东新活新材料科技有限公司 A kind of all aluminium alloy climbing frame
CN111280007A (en) * 2020-04-01 2020-06-16 湖南省农业环境生态研究所 Three-dimensional cultivation method for polygonatum cyrtonema and trichosanthes kirilowii
CN112273170A (en) * 2020-11-05 2021-01-29 江苏徐淮地区徐州农业科学研究所(江苏徐州甘薯研究中心) Suspension type strawberry germplasm resource preservation method
CN113079877A (en) * 2021-03-02 2021-07-09 广州佩兰网络科技有限公司 Plant climbing device
CN113455238A (en) * 2021-07-14 2021-10-01 济南百合园林集团有限公司 Gardens construction is with combination formula support body of climbing rattan class plant
CN115443833A (en) * 2022-09-19 2022-12-09 枣庄市市中区乡村振兴服务中心 Prevent winding strutting arrangement for planting of melon stem tendril

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109392499A (en) * 2017-09-23 2019-03-01 安顺市平坝区银河特色种植专业合作社 A kind of vegetable cultivation special-purpose supporting frame
CN108029442A (en) * 2018-01-25 2018-05-15 上海植物园 A kind of adjustable rattan teapoy device
CN108651081A (en) * 2018-05-31 2018-10-16 重庆市飞龙种业有限责任公司 Sponge gourd planting unit
CN109629818B (en) * 2019-01-31 2024-02-09 山东新活新材料科技有限公司 Track for aluminum alloy climbing frame
CN109629818A (en) * 2019-01-31 2019-04-16 山东新活新材料科技有限公司 A kind of aluminium alloy climbing frame track
CN109695342A (en) * 2019-01-31 2019-04-30 山东新活新材料科技有限公司 A kind of all aluminium alloy climbing frame
CN109695342B (en) * 2019-01-31 2024-02-09 山东新活新材料科技有限公司 All-aluminum alloy climbing frame
CN111280007A (en) * 2020-04-01 2020-06-16 湖南省农业环境生态研究所 Three-dimensional cultivation method for polygonatum cyrtonema and trichosanthes kirilowii
CN112273170A (en) * 2020-11-05 2021-01-29 江苏徐淮地区徐州农业科学研究所(江苏徐州甘薯研究中心) Suspension type strawberry germplasm resource preservation method
CN113079877A (en) * 2021-03-02 2021-07-09 广州佩兰网络科技有限公司 Plant climbing device
CN113455238A (en) * 2021-07-14 2021-10-01 济南百合园林集团有限公司 Gardens construction is with combination formula support body of climbing rattan class plant
CN115443833A (en) * 2022-09-19 2022-12-09 枣庄市市中区乡村振兴服务中心 Prevent winding strutting arrangement for planting of melon stem tendril
CN115443833B (en) * 2022-09-19 2023-08-18 枣庄市市中区乡村振兴服务中心 Prevent winding support arrangement for planting of melon stem tendril

Similar Documents

Publication Publication Date Title
CN205682002U (en) A kind of vine plant climbing frame for urban landscaping engineering
JP4875919B2 (en) Wall greening system and wall greening method
CN201649392U (en) Roof building integrating virescence, energy conservation and water collection
CN108167741A (en) There are many energy-conserving road lamps of generation mode for a kind of gardens apparatus
CN204317148U (en) Edible mushroom photovoltaic green-house
ES2370553B1 (en) TOWER FOR SOLAR CONCENTRATION PLANT WITH NATURAL SHOT COOLING.
CN203675755U (en) Three-dimensional planting greenhouse with two independent regulating planting areas
JP2012075412A (en) Construction facility for rooftop greening using solar panel
CN208971445U (en) A kind of double slope surface dead-weight photovoltaic bracket
CN104350977B (en) Edible mushroom photovoltaic green-house
CN201766528U (en) Solar device
CN113728836A (en) Vertical greening system for building
CN211472825U (en) Retreat platform type building structure
CN107371886A (en) A kind of afforestation is moved with plant and places climbing frame
CN206365302U (en) A kind of photovoltaic greenhouse system suitable for severe cold environment
CN208983322U (en) A kind of novel air thermal type membrane deaerator
CN108419569B (en) A kind of vertical greening device for building wall
AU2020367203A1 (en) Noise control device
ES2334187B1 (en) SOLAR FOLLOWER OF THREE AXLES OF LARGE SURFACE.
TWM493256U (en) Rapid cooling structure for greenhouse
CN206452930U (en) The automatic water-replenishing device of Afforestation Landscape
Kamal Assessment of passive downdraft evaporative cooling technique for environmental sustainability in buildings
CN103704061B (en) There is the multifunctional stereo planting greenhouse of air barrier
CN219844223U (en) Building facade wall greening mounting frame
CN213071778U (en) Electric power cabinet with dampproofing function

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161116

Termination date: 20180614

CF01 Termination of patent right due to non-payment of annual fee