CN205663182U - Novel constructional steel springboard - Google Patents

Novel constructional steel springboard Download PDF

Info

Publication number
CN205663182U
CN205663182U CN201620525705.XU CN201620525705U CN205663182U CN 205663182 U CN205663182 U CN 205663182U CN 201620525705 U CN201620525705 U CN 201620525705U CN 205663182 U CN205663182 U CN 205663182U
Authority
CN
China
Prior art keywords
substrate
steel springboard
skirting board
base plate
springboard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620525705.XU
Other languages
Chinese (zh)
Inventor
周汉良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Hongtaisheng Construction Technology Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620525705.XU priority Critical patent/CN205663182U/en
Application granted granted Critical
Publication of CN205663182U publication Critical patent/CN205663182U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Drawing Aids And Blackboards (AREA)

Abstract

The utility model provides a novel constructional steel springboard has effectively solved the problem of landing on traditional steel springboard middle part downwarping machine constructor and the instrument follow steel springboard, the technical scheme of the utility model baseboard on including the rectangle base plate and locating the base plate, two parallel long edges of base plate are equipped with multiple hook, just the opening of couple down, the long edge of two parallels of base plate upper surface is located to the baseboard.

Description

A kind of novel building steel springboard
Technical field
This utility model relates to construction field of tool, is specially a kind of novel building steel springboard.
Background technology
Existing steel springboard is mostly minor face and arranges hook, and long limit is unsettled, and this structure easily causes steel springboard pars intermedia Divide and the most even fracture downwards, construction is caused potential safety hazard.And be not possible to prevent on existing steel springboard workmen or The baffle plate of person's construction tool landing, workmen easily steps on sky and landing, is placed on the construction tool on steel springboard more simultaneously Also it is easier to move to steel springboard edge and landing, lower section construction is caused potential safety hazard.
Utility model content
This utility model provides a kind of novel building steel springboard, efficiently solves and is bent downwardly machine in the middle part of conventional steel springboard Workmen and the instrument problem of landing from steel springboard.
The technical solution of the utility model is: include rectangular substrate and the skirting board being located on substrate, described substrate Two parallel long limits be provided with multiple hook, and described hook is opening down, and upper surface of base plate two is located at by described skirting board On the long limit that bar is parallel.
Preferred as such scheme, described skirting board is perpendicular to substrate and arranges, is connected with substrate by peg.
Preferred as such scheme, the two minor face sidewalls that described skirting board is perpendicular to substrate are provided with peg hole.
Preferred as such scheme, described substrate upper berth sets anti-slip material.
The beneficial effects of the utility model are: the steel jump board support intensity of said structure is high, good stability, it is possible to effectively Prevent workmen's foot from stepping on the landing of sky and construction tool, improve working security.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the connection diagram of homonymy two skirting board in this utility model.
Detailed description of the invention
Embodiment of the present utility model is described in detail below in conjunction with accompanying drawing.
As it is shown in figure 1, the structure of the present embodiment includes rectangular substrate 1 and the skirting board 2 being located on substrate 1, described base Two parallel long limits of plate 1 are provided with multiple hook 3, and described hook 3 is opening down, and described skirting board 2 is located on substrate 1 On the long limit that two, surface is parallel.
In the present embodiment, described skirting board 2 is perpendicular to substrate 1 and arranges, and is connected with substrate 1 by peg, described skirt The two minor face sidewalls being perpendicular to substrate on plate 2 are provided with peg hole 4, and described substrate 1 upper berth sets anti-slip material 6, such as expanded metal lath.
In use, hanging on the steel pipe 5 of scaffold by the hook on long for substrate two limit, the splicing of polylith steel springboard uses Time, utilize peg to be connected by skirting board adjacent for homonymy fixing.
In said structure, use the mode that multiple hook and skirting board are set on the long limit of conventional steel batten, be effectively increased The load bearing stength of steel springboard, skirting board effectively prevent the landing of workmen and construction tool simultaneously, reduces potential safety hazard.

Claims (4)

1. a novel building steel springboard, it is characterised in that: include rectangular substrate and the skirting board being located on substrate, described base Two parallel long limits of plate are provided with multiple hook, and described hook is opening down, and upper surface of base plate is located at by described skirting board Article two, on parallel long limit.
Novel building steel springboard the most according to claim 1, it is characterised in that: described skirting board is perpendicular to substrate and arranges, It is connected with substrate by peg.
Novel building steel springboard the most according to claim 1, it is characterised in that: it is perpendicular to the two of substrate on described skirting board Minor face sidewall is provided with peg hole.
Novel building steel springboard the most according to claim 1, it is characterised in that: described substrate upper berth sets anti-slip material.
CN201620525705.XU 2016-06-01 2016-06-01 Novel constructional steel springboard Expired - Fee Related CN205663182U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620525705.XU CN205663182U (en) 2016-06-01 2016-06-01 Novel constructional steel springboard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620525705.XU CN205663182U (en) 2016-06-01 2016-06-01 Novel constructional steel springboard

Publications (1)

Publication Number Publication Date
CN205663182U true CN205663182U (en) 2016-10-26

Family

ID=57159214

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620525705.XU Expired - Fee Related CN205663182U (en) 2016-06-01 2016-06-01 Novel constructional steel springboard

Country Status (1)

Country Link
CN (1) CN205663182U (en)

Similar Documents

Publication Publication Date Title
US20140318895A1 (en) Adjustable length scaffolding and method therefor
CN206752894U (en) A kind of standard regularization stair
CN202370234U (en) Tool type elevator hoistway construction platform
CN205296799U (en) Construction of elevator well and protection platform
CN205663182U (en) Novel constructional steel springboard
CN206397143U (en) A kind of rapid construction stair template
CN204139567U (en) Aerial work platform
CN204691249U (en) A kind of with can the stair step steel form of tread
CN203716424U (en) Adjustable staircase device
CN203878949U (en) Aerial work frame used for manufacturing workshop of interior trim parts
CN205777426U (en) One hangs overhanging scaffold
CN204255360U (en) A kind of wrap attachment
CN203201123U (en) Device capable of enabling worker to carry out ceiling suspending engineering nail hole coating work on ground
CN206220323U (en) A kind of easy-operating removable steel bar truss floor support plate of safety
CN206591804U (en) A kind of new bridge plate on construction site
CN104453204B (en) Overarm scaffold board
CN208884821U (en) A kind of adjustable damping packaging type pendant
CN204782025U (en) Stair that construction was used external corner protector of marking time
CN205637295U (en) It detains secretly to put up multi -functional both feet installation of smallpox
CN216007883U (en) Protection device for construction operation layer of elevator shaft
CN203793793U (en) Connecting seat of paper box packer
CN203160669U (en) Integrated inclined ladder structure used for putting up vertical pedestrian path in scaffold
CN208235918U (en) A kind of overhanging type mobile decorative finishing operating platform
CN103526916A (en) Device allowing nail hole painting operation of suspended ceiling project to be carried out on ground
CN109424130A (en) The technique of plank base construction efficiency is improved in construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201016

Address after: 430000 No.48, Baizhang Road, Zhangwan street, Caidian District, Wuhan City, Hubei Province

Patentee after: Wuhan hongtaisheng Construction Technology Co.,Ltd.

Address before: 430000, No. 35 Jing Yin Street, Wuchang District, Hubei, Wuhan

Patentee before: Zhou Hanliang

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161026