CN206591804U - A kind of new bridge plate on construction site - Google Patents

A kind of new bridge plate on construction site Download PDF

Info

Publication number
CN206591804U
CN206591804U CN201720077696.7U CN201720077696U CN206591804U CN 206591804 U CN206591804 U CN 206591804U CN 201720077696 U CN201720077696 U CN 201720077696U CN 206591804 U CN206591804 U CN 206591804U
Authority
CN
China
Prior art keywords
plate
mainboard
cant board
construction site
new bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720077696.7U
Other languages
Chinese (zh)
Inventor
莊国礼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jin Yuan Pass Engineering Co Ltd
Original Assignee
Jin Yuan Pass Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jin Yuan Pass Engineering Co Ltd filed Critical Jin Yuan Pass Engineering Co Ltd
Priority to CN201720077696.7U priority Critical patent/CN206591804U/en
Application granted granted Critical
Publication of CN206591804U publication Critical patent/CN206591804U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of new bridge plate on construction site, including, mainboard, left plate and right plate located at mainboard bottom Liang Ge edges, the left plate is made of one piece with right plate with mainboard;One piece of cover plate is respectively provided with mainboard front end and rear end, left plate is identical with right plate structure, the two includes outer cant board, outer cant board bottom is to the mainboard inner bending formation lower bending side plate parallel with mainboard, lower bending side plate end is folded upward at forming interior cant board, and interior cant board tip edge is touched with mainboard bottom connection.Compared with the existing technology, the utility model adds the rigidity of bridge plate, and has prevented potential safety hazard.

Description

A kind of new bridge plate on construction site
Technical field
The utility model, which is related to one kind, is used for construction building site, is placed on scaffold or support frame and supplies workmen The new bridge plate of walking.
Background technology
In construction site, metal scaffolding can be typically built, each layer in scaffold places some metallic plates, is easy to apply Workman person walks shuttle work on a metal plate;Such metallic plate generally comprises mainboard, located at mainboard two bottom sides edge Left side plate, and the cover plate located at mainboard rear and front end portion, mainboard are typically made of one piece with preceding right plate, the lid at two ends Plate and preceding right plate enclose out a hollow frame with mainboard;And cover plate and left side plate are typically several times bent by one piece of metallic plate Formed afterwards, usually save cost, the inner vertical plate and mainboard on cover plate and left side plate that metallic plate is formed after several times bending Bottom or metallic plate inwall and not in contact with using such structure, there are two big drawbacks:1st, the inner vertical plate on left side plate is not Contacted with mainboard bottom interior wall, reduce the rigidity of mainboard;2nd, when workers carry's bridge plate, finger often touches mainboard The metal edges of inner vertical plate on lower section front and rear cover plate and left side plate, are easily hurt, and increase worker injuries' risk.
Utility model content
In order to solve the problem, the utility model purpose is to provide a kind of be used on left side plate on construction site Interior cant board upper end is upwardly extended until the edge of interior cant board is touched with mainboard bottom connection, and increase mainboard rigidity simultaneously prevents safety The new bridge plate of hidden danger.
To achieve the above object, the technical solution adopted in the utility model is:A kind of novel bridge on construction site Plate, including, mainboard, left plate and right plate located at mainboard bottom Liang Ge edges, the left plate and right plate and mainboard It is made of one piece;One piece of cover plate is respectively provided with mainboard front end and rear end, left plate is identical with right plate structure, and the two includes Outer cant board, outer cant board bottom to the mainboard inner bending formation lower bending side plate parallel with mainboard, lower bending side plate end to On be bent to form interior cant board, interior cant board tip edge is touched with mainboard bottom connection.
Preferably, the cover plate include outer vertical plate, outer vertical plate bottom to mainboard inner bending formation it is parallel with mainboard under it is curved Stood with outer folded plate, the end that lower bending plate end is folded upward at being formed the finger guard formed after inner vertical plate, inner vertical plate top bending Plate inwall is in contact.
Further, the finger guard continues to be bent to form jointing plate, the laminating with the end that outer vertical plate inwall is in contact Plate fits with outer vertical plate inwall.
A plurality of reinforcements are provided with mainboard bottom, the reinforcement is located between left plate and right plate and reinforcement It is parallel with cover plate
Advantageous effects:The side outer vertical plate of the left and right side plate of mainboard bottom left and right sides edge is formed after bending Interior cant board, top edge and the mainboard bottom connection of interior cant board are touched;Meanwhile, the outer vertical plate of the cover plate of mainboard rear and front end is passed through After bending, finger guard is ultimately formed, the finger guard end is in contact with outer vertical plate inwall, when carrying the bridge plate, workman's Hand is directly in contact with interior cant board surface or handguard plate surface, rather than the upper end-face edge phase with inner vertical plate or interior cant board Contact, so as to prevent that workman's hand from being hurt, compared with the existing technology, the utility model adds the rigidity of bridge plate, and Potential safety hazard is prevented.
Brief description of the drawings
Fig. 1 looks up Directional Decomposition schematic diagram to be of the present utility model;
Fig. 2 is schematic perspective view of the present utility model;
Fig. 3 is overlook direction decomposing schematic representation of the present utility model.
Embodiment
In order that those skilled in the art more fully understand this New Scheme, below in conjunction with the accompanying drawings with embodiment to this Utility model is described in further detail.
As Figure 1-3, a kind of new bridge plate on construction site, including, mainboard 1, located at mainboard bottom two Left plate 2 and right plate 3 at lateral edges, the left plate are made of one piece with right plate with mainboard;In mainboard front end and Rear end is respectively provided with one piece of cover plate 4, and the cover plate includes outer vertical plate 41, and outer vertical plate bottom is put down to mainboard inner bending formation and mainboard Capable lower bending plate 42, lower bending plate end is folded upward at forming the finger guard formed after inner vertical plate 43, inner vertical plate top bending 44 end is in contact with outer vertical plate inwall.
Closer in order to be fitted with the inwall of outer vertical plate 41, the end that the finger guard 44 is in contact with outer vertical plate inwall is continued Jointing plate 45 is bent to form, the jointing plate fits with outer vertical plate inwall.
Left plate 2 is identical with the structure of right plate 3, and this sentences the structure that left plate 2 and right plate 3 are described exemplified by left plate 2, The two, which includes outer cant board, i.e. left plate, includes outer cant board 21, and outer cant board bottom is to mainboard inner bending formation and mainboard Parallel lower bending side plate 22, lower bending side plate end is folded upward at forming interior cant board 23, interior cant board tip edge and master Plate bottom connection is touched.
A plurality of reinforcements 5 are provided with the bottom of mainboard 1, the reinforcement is located between left plate 2 and right plate 3 and added Strengthening tendons 5 is parallel with cover plate 4.
Although depicting the utility model by embodiment, it will be appreciated by the skilled addressee that the utility model has perhaps Shape changeable and change without departing from spirit of the present utility model, it is desirable to appended claim include these deformation and change without Depart from spirit of the present utility model.

Claims (4)

1. a kind of new bridge plate on construction site, including, mainboard, located at mainboard two bottom sides edge left plate and Right plate, the left plate is made of one piece with right plate with mainboard;One piece of cover plate is respectively provided with mainboard front end and rear end, its It is characterised by, left plate is identical with right plate structure, the two includes outer cant board, outer cant board bottom is to mainboard inner bending shape Into the lower bending side plate parallel with mainboard, lower bending side plate end is folded upward at forming interior cant board, interior cant board tip edge Touched with mainboard bottom connection.
2. a kind of new bridge plate on construction site as claimed in claim 1, it is characterised in that the cover plate includes outer Riser, outer vertical plate bottom is folded upward at being formed to the mainboard inner bending formation lower bending plate parallel with mainboard, lower bending plate end The end of the finger guard formed after inner vertical plate, inner vertical plate top bending is in contact with outer vertical plate inwall.
3. a kind of new bridge plate on construction site as claimed in claim 2, it is characterised in that the finger guard with it is outer The end that riser inwall is in contact continues to be bent to form jointing plate, and the jointing plate fits with outer vertical plate inwall.
4. a kind of new bridge plate on construction site as claimed in claim 1, it is characterised in that set on mainboard bottom There are a plurality of reinforcements, the reinforcement is located between left plate and right plate and reinforcement is parallel with cover plate.
CN201720077696.7U 2017-01-20 2017-01-20 A kind of new bridge plate on construction site Active CN206591804U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720077696.7U CN206591804U (en) 2017-01-20 2017-01-20 A kind of new bridge plate on construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720077696.7U CN206591804U (en) 2017-01-20 2017-01-20 A kind of new bridge plate on construction site

Publications (1)

Publication Number Publication Date
CN206591804U true CN206591804U (en) 2017-10-27

Family

ID=60128669

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720077696.7U Active CN206591804U (en) 2017-01-20 2017-01-20 A kind of new bridge plate on construction site

Country Status (1)

Country Link
CN (1) CN206591804U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2578722A (en) * 2018-11-05 2020-05-27 Canyon Metal Scaffolding Engineering Ltd Bridge plank applicable to construction sites

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2578722A (en) * 2018-11-05 2020-05-27 Canyon Metal Scaffolding Engineering Ltd Bridge plank applicable to construction sites

Similar Documents

Publication Publication Date Title
CN104060825B (en) Adjustable general stair template
CN206591804U (en) A kind of new bridge plate on construction site
CN206053299U (en) A kind of easy-to-mount concrete-pouring template
CN206928624U (en) A kind of heavy ladder cage for high-altitude building
CN204139567U (en) Aerial work platform
CN207110417U (en) A kind of new prefabricated modular is encorbelmented workbench
CN206000192U (en) A kind of large-scale horizontal opening protective device
CN206784886U (en) A kind of hanging basket
CN210369838U (en) Novel hanging basket type construction operation platform
CN203878949U (en) Aerial work frame used for manufacturing workshop of interior trim parts
CN208023939U (en) A kind of building scaffold falling-proof safety device
CN206220323U (en) A kind of easy-operating removable steel bar truss floor support plate of safety
CN209353660U (en) A kind of portable electric stair shaft workbench
CN204781873U (en) A people's bank of china's packway for construction layer
CN106917498A (en) A kind of Portable scaffold
CN207553449U (en) Floor and plate tendon protective layer thickness Comprehensive Control part
KR200483677Y1 (en) Safety board architectural scaffold
CN206888536U (en) One kind can have enough to meet the need split heads
CN207348787U (en) One kind maintenance cat ladder platform
JP3220072U (en) New scaffolding board used on construction sites
CN204435815U (en) Hoistway operation platform
CN206205487U (en) A kind of outrigger workmen lower channel
CN203879371U (en) Multifunctional ladder for interior trim part production workshop
CN213710952U (en) Ladder is hung with safety to construction
CN211229475U (en) Multifunctional ladder stand

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant