CN205653787U - Soil nail is used in foundation ditch construction - Google Patents

Soil nail is used in foundation ditch construction Download PDF

Info

Publication number
CN205653787U
CN205653787U CN201620533941.6U CN201620533941U CN205653787U CN 205653787 U CN205653787 U CN 205653787U CN 201620533941 U CN201620533941 U CN 201620533941U CN 205653787 U CN205653787 U CN 205653787U
Authority
CN
China
Prior art keywords
pipe
soil nailing
locating part
middle pipe
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620533941.6U
Other languages
Chinese (zh)
Inventor
陈喜
刘全林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui University of Science and Technology
Original Assignee
Anhui University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui University of Science and Technology filed Critical Anhui University of Science and Technology
Priority to CN201620533941.6U priority Critical patent/CN205653787U/en
Application granted granted Critical
Publication of CN205653787U publication Critical patent/CN205653787U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a soil nail is used in foundation ditch construction, including tail pipe, mounting, well pipe and head pipe, the tail pipe with threaded connection between the well pipe, well pipe sets up to one at least, well pipe with pass through threaded connection between the head pipe, be equipped with trompil and locating part on the well tub of lateral wall, the trompil with communicate each other between the locating part, the inside fixed elastic component that is equipped with of locating part, the inside extension that is provided with of elastic component, the mounting with extension tail end sliding connection. The utility model relates to a rationally, can guarantee to have great frictional force between soil nail and the soil layer, can reduce soil nail's quantity to can retrieve reuse, resources are saved, very environmental protection.

Description

A kind of foundation pit construction soil nailing
Technical field
This utility model belongs to virtue and society's course teaching aid technical field, is specifically related to a kind of foundation ditch and executes Work soil nailing.
Background technology
Base pit engineering mainly includes foundation pit supporting system design and construction and earth excavation, be one comprehensive The strongest system engineering, it requires Geotechnical Engineering and Structural Engineering technical staff's close fit, pattern foundation pit supporting structure System is temporary structure, is no longer needed for after underground engineering construction completes, little in the excavation of foundation pit degree of depth In the case of (such as soft clay area, typically to when putting slope condition in 5m, at 4m during without putting slope condition In), using soil nail wall or composite soil nailing wall is a kind of both economical supporting side as the support system of foundation ditch Case.
At present, soil nailing wall structure of the prior art, the many employings of its soil nailing with injected hole steel pipe (or Reinforcing bar), by (or in boring) slip casting in pipe, it is achieved the reinforcing to the foundation ditch surrounding soil body, foundation ditch slope Face uses and hangs bar-mat reinforcement and spray concrete, makes the soil being reinforced and forms the compound soil body by the soil nailing of slip-crack surface, Be equivalent to gravity retaining wall, thus reach the purpose of supporting foundation pit, but, this utilize steel pipe or reinforcing bar to make For the soil nailing of material, because it is outside relatively smooth, and the frictional force produced between soil layer is less, therefore exists During construction, its demand is relatively big, the quantities of this construction being increased by.
Utility model content
The purpose of this utility model is to provide a kind of foundation pit construction soil nailing, to solve common soil nailing and soil The problem that between Ceng, frictional force is less.
For achieving the above object, this utility model following technical scheme of offer: a kind of foundation pit construction soil nailing, Including tail pipe, fixture, middle pipe and head tube, threaded between described tail pipe and described middle pipe, described Middle pipe is minimum is set to one, is threaded connection, described middle tube side between described middle pipe and described head tube Wall is provided with perforate and locating part, is interconnected between described perforate and described locating part, described locating part Inside is fixed with elastic component, and described elastic component is internally provided with extension, described fixture and described stretch Go out portion's tail end to be slidably connected.
Preferably, described extension includes that newel post, foundation and base, described newel post and described foundation are one Body structure, is enclosed with end shield outside described newel post, described end shield bottom outside is fixed with projection, described Base and the fixing connection of described foundation, described base bottom is fixed with protective layer.
Preferably, described end shield is plastic construction, and described base end is set to trapezoidal, described protective layer For ganoid rich chromium cast iron wearing layer.
Preferably, described fixture end is set to taper.
Technique effect of the present utility model and advantage: this foundation pit construction soil nailing, by installing varying number Middle pipe can control the length of soil nailing, and be attached by screw thread between middle pipe and middle pipe, permissible Easily dismantle, the soil nailing of different length can be installed according to different situations, and by stretching out Portion can increase the frictional force between soil nailing and soil layer, such that it is able to reduce the consumption of soil nailing, reduces engineering Amount, work when, is driven into fixture inside middle pipe, because fixture end is through tail pipe Taper, it is possible to use extension is fixed on the position of work by fixture, needs are dismantled when, can To be extracted by fixture, the end shield in fixture can be stuck in outside, and other portions due to the projection of bottom Position can rely on the elasticity of elastic component to be retracted into predetermined position, and due to the existence of end shield, newel post retracts Time, frictional force will not be produced with soil layer, thereby may be ensured that newel post can retract well, from And can the most easily soil nailing be extracted.Therefore, this utility model is reasonable in design, it is ensured that soil nailing And between soil layer, there is bigger frictional force, it is possible to reduce the consumption of soil nailing, and profit again can be reclaimed With, economize on resources, very environmental protection.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is extension structural representation of the present utility model.
In figure: 1. tail pipe, 2. fixture, 3. extension, 31. newel posts, 32. end shields, 33. protruding, 34. Foundation, 35. bases, 36. protective layers, 4. elastic component, 5. perforate, 6. in manage, 7. head tube, the most spacing Part.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, to the technology in this utility model embodiment Scheme is clearly and completely described, it is clear that described embodiment is only this utility model one Divide embodiment rather than whole embodiments.Based on the embodiment in this utility model, this area is common The every other embodiment that technical staff is obtained under not making creative work premise, broadly falls into this The scope of utility model protection.
This utility model provides a kind of foundation pit construction soil nailing as depicted in figs. 1 and 2, including tail pipe 1, Fixture 2, middle pipe 6 and head tube 7, threaded between described tail pipe 1 and described middle pipe 6, described in Pipe 6 is minimum is set to one, is threaded connection between described middle pipe 6 and described head tube 7, described in Pipe 6 sidewall is provided with perforate 5 and locating part 8, is interconnected between described perforate 5 and described locating part 8, Described locating part 8 is internal is fixed with elastic component 4, and described elastic component 4 is internally provided with extension 3, institute State fixture 2 and described extension 3 tail end is slidably connected.
Further, described extension 3 includes newel post 31, foundation 34 and base 35, described newel post 31 It is structure as a whole with described foundation 34, outside described newel post 31, is enclosed with end shield 32, described end shield 32 end Protruding 33 it are fixed with, described base 35 and the fixing connection of described foundation 34, described base 35 outside portion Bottom is fixed with protective layer 36, and protective layer 36 can be that base 35 provides protection, extends it and uses the longevity Life.
Further, described end shield 32 is plastic construction, and described base 35 end is set to trapezoidal, institute Stating protective layer 36 is ganoid rich chromium cast iron wearing layer, and plastic construction has stronger corrosion resistance, Can protect newel post 31, rich chromium cast iron has the strongest wearability, after this multiple use will not Produce bigger abrasion, base 35 can be made to have longer service life.
Further, described fixture 2 end is set to taper, the shape of the base 35 that can coincide well Shape, such that it is able to be fixed the position of base 35 well.
This foundation pit construction soil nailing, can control the length of soil nailing by installing the middle pipe 6 of varying number, And it is attached by screw thread between middle pipe 6 and middle pipe 6, can easily dismantle, Ke Yigen The soil nailing of different length is installed according to different situations, and soil nailing and soil layer can be increased by extension 3 Between frictional force, such that it is able to reduce soil nailing consumption, reduce quantities, work when, will It is internal that fixture 2 is driven into middle pipe 6 through tail pipe 1, because fixture 2 end is taper, and can be in order to With fixture 2, extension 3 is fixed on the position of work, needs are dismantled when, can be by fixing Part 2 is extracted, the end shield 32 in fixture 2 due to the projection 33 of bottom can be stuck in outside, and other Position can rely on the elasticity of elastic component 4 to be retracted into predetermined position, due to the existence of end shield 32, newel post The when of 31 retraction, frictional force will not be produced with soil layer, thereby may be ensured that newel post 31 can enter well Row is retracted, such that it is able to the most easily extracted by soil nailing.Therefore, this utility model is reasonable in design, can To ensure to there is bigger frictional force between soil nailing and soil layer, it is possible to reduce the consumption of soil nailing and permissible Reclaim again with, economize on resources, very environmental protection.
Last it is noted that the foregoing is only preferred embodiment of the present utility model, and need not In limiting this utility model, although this utility model being described in detail with reference to previous embodiment, For a person skilled in the art, it still can be to the technical scheme described in foregoing embodiments Modify, or wherein portion of techniques feature carried out equivalent, all in spirit of the present utility model and Within principle, any modification, equivalent substitution and improvement etc. made, should be included in of the present utility model Within protection domain.

Claims (4)

1. a foundation pit construction soil nailing, including tail pipe (1), fixture (2), middle pipe (6) and head Pipe (7), it is characterised in that: threaded between described tail pipe (1) and described middle pipe (6), described Middle pipe (6) is minimum is set to one, between described middle pipe (6) and described head tube (7) by screw thread even Connecing, described middle pipe (6) sidewall is provided with perforate (5) and locating part (8), described perforate (5) and institute Stating and be interconnected between locating part (8), described locating part (8) is internal is fixed with elastic component (4), Described elastic component (4) is internally provided with extension (3), described fixture (2) and described extension (3) Tail end is slidably connected.
A kind of foundation pit construction soil nailing the most according to claim 1, it is characterised in that stretch out described in: Portion (3) includes newel post (31), foundation (34) and base (35), described newel post (31) and the described end Post (34) is structure as a whole, and described newel post (31) outside is enclosed with end shield (32), described end shield (32) Bottom outside is fixed with the fixing connection of projection (33), described base (35) and described foundation (34), Described base (35) bottom is fixed with protective layer (36).
A kind of foundation pit construction soil nailing the most according to claim 2, it is characterised in that: described end shield (32) being plastic construction, described base (35) end is set to trapezoidal, and described protective layer (36) is Ganoid rich chromium cast iron wearing layer.
A kind of foundation pit construction soil nailing the most according to claim 1, it is characterised in that: described fixing Part (2) end is set to taper.
CN201620533941.6U 2016-05-30 2016-05-30 Soil nail is used in foundation ditch construction Expired - Fee Related CN205653787U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620533941.6U CN205653787U (en) 2016-05-30 2016-05-30 Soil nail is used in foundation ditch construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620533941.6U CN205653787U (en) 2016-05-30 2016-05-30 Soil nail is used in foundation ditch construction

Publications (1)

Publication Number Publication Date
CN205653787U true CN205653787U (en) 2016-10-19

Family

ID=57405661

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620533941.6U Expired - Fee Related CN205653787U (en) 2016-05-30 2016-05-30 Soil nail is used in foundation ditch construction

Country Status (1)

Country Link
CN (1) CN205653787U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109853541A (en) * 2019-01-09 2019-06-07 安徽金联地矿科技有限公司 For preventing the anchor of Landslide Hazards
CN110206573A (en) * 2019-04-10 2019-09-06 广东工业大学 A kind of multifunctional expanded formula recoverable anchor rod
CN110374085A (en) * 2019-07-18 2019-10-25 三峡大学 A kind of Double-layer threaded steel-pipe pile and construction method for coral sand ground

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109853541A (en) * 2019-01-09 2019-06-07 安徽金联地矿科技有限公司 For preventing the anchor of Landslide Hazards
CN109853541B (en) * 2019-01-09 2020-11-20 安徽金联地矿科技有限公司 Anchoring device for preventing landslide geological disasters
CN110206573A (en) * 2019-04-10 2019-09-06 广东工业大学 A kind of multifunctional expanded formula recoverable anchor rod
CN110374085A (en) * 2019-07-18 2019-10-25 三峡大学 A kind of Double-layer threaded steel-pipe pile and construction method for coral sand ground

Similar Documents

Publication Publication Date Title
CN205653787U (en) Soil nail is used in foundation ditch construction
CN104074529B (en) A kind of cave continuous bivalve, lane, deep reinforcement means
CN106013171B (en) A kind of semi-rigid supporting construction semi-flexible and method of deep-foundation side wall
CN201891116U (en) Wall supporting system comprising flexible surface layer and soil nails
CN103953366B (en) Mid-board top former lining cutting cavity backfill construction method when single hole tunnel changes arcading into
CN109457709A (en) A kind of supporting construction and construction method of double-row pile combination wide-angle anchor cable
CN202208928U (en) Splicing type soil nailing wall slope protecting panel convenient to dismount and made of fiber composite materials
CN106480889A (en) A kind of Pile of Deep Foundation Pit method of reinforcement design
CN113832905A (en) Flood control wall structure capable of comprehensively lifting
CN205857173U (en) A kind of Novel steel casing sheath applying bored concrete pile on the water
CN103422499B (en) Casing construction method inside and outside a kind of permafrost region pile foundation
CN211899791U (en) Prefabricated floor preformed hole adopts and wears steel pull rod to consolidate masonry structure
CN102767187A (en) Reverse construction method for pebble foundation swirling well
CN209892260U (en) Anchor rod construction device for constructional engineering
CN209508742U (en) A kind of interim detachable roads plate of architectural design
CN110158424B (en) Concrete pouring template
CN208920979U (en) A kind of concrete walling explosion dual-protection structure
CN205502023U (en) Native protector between foundation ditch stake
CN206220104U (en) A kind of Frozen Soil Cylinder Foundation Supported with Composite Soil Nailing system
CN205857220U (en) Blinding layer structure under level of ground water
CN204326072U (en) A kind of anti-float anchor rod node
CN211899790U (en) Masonry structure reinforced by longitudinal drilling steel-penetrating pull rod and end plate
CN205012333U (en) Recoverable FRP stock with enlarged footing
CN103924616B (en) The pre-buried shearing groove of ultra-deep underground continuous wall makes, construction method of installation
CN204326061U (en) A kind of pile tube be drawn out easily

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161019

Termination date: 20170530

CF01 Termination of patent right due to non-payment of annual fee