CN205653787U - Soil nail is used in foundation ditch construction - Google Patents
Soil nail is used in foundation ditch construction Download PDFInfo
- Publication number
- CN205653787U CN205653787U CN201620533941.6U CN201620533941U CN205653787U CN 205653787 U CN205653787 U CN 205653787U CN 201620533941 U CN201620533941 U CN 201620533941U CN 205653787 U CN205653787 U CN 205653787U
- Authority
- CN
- China
- Prior art keywords
- pipe
- soil nailing
- locating part
- middle pipe
- foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model discloses a soil nail is used in foundation ditch construction, including tail pipe, mounting, well pipe and head pipe, the tail pipe with threaded connection between the well pipe, well pipe sets up to one at least, well pipe with pass through threaded connection between the head pipe, be equipped with trompil and locating part on the well tub of lateral wall, the trompil with communicate each other between the locating part, the inside fixed elastic component that is equipped with of locating part, the inside extension that is provided with of elastic component, the mounting with extension tail end sliding connection. The utility model relates to a rationally, can guarantee to have great frictional force between soil nail and the soil layer, can reduce soil nail's quantity to can retrieve reuse, resources are saved, very environmental protection.
Description
Technical field
This utility model belongs to virtue and society's course teaching aid technical field, is specifically related to a kind of foundation ditch and executes
Work soil nailing.
Background technology
Base pit engineering mainly includes foundation pit supporting system design and construction and earth excavation, be one comprehensive
The strongest system engineering, it requires Geotechnical Engineering and Structural Engineering technical staff's close fit, pattern foundation pit supporting structure
System is temporary structure, is no longer needed for after underground engineering construction completes, little in the excavation of foundation pit degree of depth
In the case of (such as soft clay area, typically to when putting slope condition in 5m, at 4m during without putting slope condition
In), using soil nail wall or composite soil nailing wall is a kind of both economical supporting side as the support system of foundation ditch
Case.
At present, soil nailing wall structure of the prior art, the many employings of its soil nailing with injected hole steel pipe (or
Reinforcing bar), by (or in boring) slip casting in pipe, it is achieved the reinforcing to the foundation ditch surrounding soil body, foundation ditch slope
Face uses and hangs bar-mat reinforcement and spray concrete, makes the soil being reinforced and forms the compound soil body by the soil nailing of slip-crack surface,
Be equivalent to gravity retaining wall, thus reach the purpose of supporting foundation pit, but, this utilize steel pipe or reinforcing bar to make
For the soil nailing of material, because it is outside relatively smooth, and the frictional force produced between soil layer is less, therefore exists
During construction, its demand is relatively big, the quantities of this construction being increased by.
Utility model content
The purpose of this utility model is to provide a kind of foundation pit construction soil nailing, to solve common soil nailing and soil
The problem that between Ceng, frictional force is less.
For achieving the above object, this utility model following technical scheme of offer: a kind of foundation pit construction soil nailing,
Including tail pipe, fixture, middle pipe and head tube, threaded between described tail pipe and described middle pipe, described
Middle pipe is minimum is set to one, is threaded connection, described middle tube side between described middle pipe and described head tube
Wall is provided with perforate and locating part, is interconnected between described perforate and described locating part, described locating part
Inside is fixed with elastic component, and described elastic component is internally provided with extension, described fixture and described stretch
Go out portion's tail end to be slidably connected.
Preferably, described extension includes that newel post, foundation and base, described newel post and described foundation are one
Body structure, is enclosed with end shield outside described newel post, described end shield bottom outside is fixed with projection, described
Base and the fixing connection of described foundation, described base bottom is fixed with protective layer.
Preferably, described end shield is plastic construction, and described base end is set to trapezoidal, described protective layer
For ganoid rich chromium cast iron wearing layer.
Preferably, described fixture end is set to taper.
Technique effect of the present utility model and advantage: this foundation pit construction soil nailing, by installing varying number
Middle pipe can control the length of soil nailing, and be attached by screw thread between middle pipe and middle pipe, permissible
Easily dismantle, the soil nailing of different length can be installed according to different situations, and by stretching out
Portion can increase the frictional force between soil nailing and soil layer, such that it is able to reduce the consumption of soil nailing, reduces engineering
Amount, work when, is driven into fixture inside middle pipe, because fixture end is through tail pipe
Taper, it is possible to use extension is fixed on the position of work by fixture, needs are dismantled when, can
To be extracted by fixture, the end shield in fixture can be stuck in outside, and other portions due to the projection of bottom
Position can rely on the elasticity of elastic component to be retracted into predetermined position, and due to the existence of end shield, newel post retracts
Time, frictional force will not be produced with soil layer, thereby may be ensured that newel post can retract well, from
And can the most easily soil nailing be extracted.Therefore, this utility model is reasonable in design, it is ensured that soil nailing
And between soil layer, there is bigger frictional force, it is possible to reduce the consumption of soil nailing, and profit again can be reclaimed
With, economize on resources, very environmental protection.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is extension structural representation of the present utility model.
In figure: 1. tail pipe, 2. fixture, 3. extension, 31. newel posts, 32. end shields, 33. protruding, 34.
Foundation, 35. bases, 36. protective layers, 4. elastic component, 5. perforate, 6. in manage, 7. head tube, the most spacing
Part.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, to the technology in this utility model embodiment
Scheme is clearly and completely described, it is clear that described embodiment is only this utility model one
Divide embodiment rather than whole embodiments.Based on the embodiment in this utility model, this area is common
The every other embodiment that technical staff is obtained under not making creative work premise, broadly falls into this
The scope of utility model protection.
This utility model provides a kind of foundation pit construction soil nailing as depicted in figs. 1 and 2, including tail pipe 1,
Fixture 2, middle pipe 6 and head tube 7, threaded between described tail pipe 1 and described middle pipe 6, described in
Pipe 6 is minimum is set to one, is threaded connection between described middle pipe 6 and described head tube 7, described in
Pipe 6 sidewall is provided with perforate 5 and locating part 8, is interconnected between described perforate 5 and described locating part 8,
Described locating part 8 is internal is fixed with elastic component 4, and described elastic component 4 is internally provided with extension 3, institute
State fixture 2 and described extension 3 tail end is slidably connected.
Further, described extension 3 includes newel post 31, foundation 34 and base 35, described newel post 31
It is structure as a whole with described foundation 34, outside described newel post 31, is enclosed with end shield 32, described end shield 32 end
Protruding 33 it are fixed with, described base 35 and the fixing connection of described foundation 34, described base 35 outside portion
Bottom is fixed with protective layer 36, and protective layer 36 can be that base 35 provides protection, extends it and uses the longevity
Life.
Further, described end shield 32 is plastic construction, and described base 35 end is set to trapezoidal, institute
Stating protective layer 36 is ganoid rich chromium cast iron wearing layer, and plastic construction has stronger corrosion resistance,
Can protect newel post 31, rich chromium cast iron has the strongest wearability, after this multiple use will not
Produce bigger abrasion, base 35 can be made to have longer service life.
Further, described fixture 2 end is set to taper, the shape of the base 35 that can coincide well
Shape, such that it is able to be fixed the position of base 35 well.
This foundation pit construction soil nailing, can control the length of soil nailing by installing the middle pipe 6 of varying number,
And it is attached by screw thread between middle pipe 6 and middle pipe 6, can easily dismantle, Ke Yigen
The soil nailing of different length is installed according to different situations, and soil nailing and soil layer can be increased by extension 3
Between frictional force, such that it is able to reduce soil nailing consumption, reduce quantities, work when, will
It is internal that fixture 2 is driven into middle pipe 6 through tail pipe 1, because fixture 2 end is taper, and can be in order to
With fixture 2, extension 3 is fixed on the position of work, needs are dismantled when, can be by fixing
Part 2 is extracted, the end shield 32 in fixture 2 due to the projection 33 of bottom can be stuck in outside, and other
Position can rely on the elasticity of elastic component 4 to be retracted into predetermined position, due to the existence of end shield 32, newel post
The when of 31 retraction, frictional force will not be produced with soil layer, thereby may be ensured that newel post 31 can enter well
Row is retracted, such that it is able to the most easily extracted by soil nailing.Therefore, this utility model is reasonable in design, can
To ensure to there is bigger frictional force between soil nailing and soil layer, it is possible to reduce the consumption of soil nailing and permissible
Reclaim again with, economize on resources, very environmental protection.
Last it is noted that the foregoing is only preferred embodiment of the present utility model, and need not
In limiting this utility model, although this utility model being described in detail with reference to previous embodiment,
For a person skilled in the art, it still can be to the technical scheme described in foregoing embodiments
Modify, or wherein portion of techniques feature carried out equivalent, all in spirit of the present utility model and
Within principle, any modification, equivalent substitution and improvement etc. made, should be included in of the present utility model
Within protection domain.
Claims (4)
1. a foundation pit construction soil nailing, including tail pipe (1), fixture (2), middle pipe (6) and head
Pipe (7), it is characterised in that: threaded between described tail pipe (1) and described middle pipe (6), described
Middle pipe (6) is minimum is set to one, between described middle pipe (6) and described head tube (7) by screw thread even
Connecing, described middle pipe (6) sidewall is provided with perforate (5) and locating part (8), described perforate (5) and institute
Stating and be interconnected between locating part (8), described locating part (8) is internal is fixed with elastic component (4),
Described elastic component (4) is internally provided with extension (3), described fixture (2) and described extension (3)
Tail end is slidably connected.
A kind of foundation pit construction soil nailing the most according to claim 1, it is characterised in that stretch out described in:
Portion (3) includes newel post (31), foundation (34) and base (35), described newel post (31) and the described end
Post (34) is structure as a whole, and described newel post (31) outside is enclosed with end shield (32), described end shield (32)
Bottom outside is fixed with the fixing connection of projection (33), described base (35) and described foundation (34),
Described base (35) bottom is fixed with protective layer (36).
A kind of foundation pit construction soil nailing the most according to claim 2, it is characterised in that: described end shield
(32) being plastic construction, described base (35) end is set to trapezoidal, and described protective layer (36) is
Ganoid rich chromium cast iron wearing layer.
A kind of foundation pit construction soil nailing the most according to claim 1, it is characterised in that: described fixing
Part (2) end is set to taper.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620533941.6U CN205653787U (en) | 2016-05-30 | 2016-05-30 | Soil nail is used in foundation ditch construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620533941.6U CN205653787U (en) | 2016-05-30 | 2016-05-30 | Soil nail is used in foundation ditch construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205653787U true CN205653787U (en) | 2016-10-19 |
Family
ID=57405661
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620533941.6U Expired - Fee Related CN205653787U (en) | 2016-05-30 | 2016-05-30 | Soil nail is used in foundation ditch construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205653787U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109853541A (en) * | 2019-01-09 | 2019-06-07 | 安徽金联地矿科技有限公司 | For preventing the anchor of Landslide Hazards |
CN110206573A (en) * | 2019-04-10 | 2019-09-06 | 广东工业大学 | A kind of multifunctional expanded formula recoverable anchor rod |
CN110374085A (en) * | 2019-07-18 | 2019-10-25 | 三峡大学 | A kind of Double-layer threaded steel-pipe pile and construction method for coral sand ground |
-
2016
- 2016-05-30 CN CN201620533941.6U patent/CN205653787U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109853541A (en) * | 2019-01-09 | 2019-06-07 | 安徽金联地矿科技有限公司 | For preventing the anchor of Landslide Hazards |
CN109853541B (en) * | 2019-01-09 | 2020-11-20 | 安徽金联地矿科技有限公司 | Anchoring device for preventing landslide geological disasters |
CN110206573A (en) * | 2019-04-10 | 2019-09-06 | 广东工业大学 | A kind of multifunctional expanded formula recoverable anchor rod |
CN110374085A (en) * | 2019-07-18 | 2019-10-25 | 三峡大学 | A kind of Double-layer threaded steel-pipe pile and construction method for coral sand ground |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205653787U (en) | Soil nail is used in foundation ditch construction | |
CN104074529B (en) | A kind of cave continuous bivalve, lane, deep reinforcement means | |
CN106013171B (en) | A kind of semi-rigid supporting construction semi-flexible and method of deep-foundation side wall | |
CN201891116U (en) | Wall supporting system comprising flexible surface layer and soil nails | |
CN103953366B (en) | Mid-board top former lining cutting cavity backfill construction method when single hole tunnel changes arcading into | |
CN109457709A (en) | A kind of supporting construction and construction method of double-row pile combination wide-angle anchor cable | |
CN202208928U (en) | Splicing type soil nailing wall slope protecting panel convenient to dismount and made of fiber composite materials | |
CN106480889A (en) | A kind of Pile of Deep Foundation Pit method of reinforcement design | |
CN113832905A (en) | Flood control wall structure capable of comprehensively lifting | |
CN205857173U (en) | A kind of Novel steel casing sheath applying bored concrete pile on the water | |
CN103422499B (en) | Casing construction method inside and outside a kind of permafrost region pile foundation | |
CN211899791U (en) | Prefabricated floor preformed hole adopts and wears steel pull rod to consolidate masonry structure | |
CN102767187A (en) | Reverse construction method for pebble foundation swirling well | |
CN209892260U (en) | Anchor rod construction device for constructional engineering | |
CN209508742U (en) | A kind of interim detachable roads plate of architectural design | |
CN110158424B (en) | Concrete pouring template | |
CN208920979U (en) | A kind of concrete walling explosion dual-protection structure | |
CN205502023U (en) | Native protector between foundation ditch stake | |
CN206220104U (en) | A kind of Frozen Soil Cylinder Foundation Supported with Composite Soil Nailing system | |
CN205857220U (en) | Blinding layer structure under level of ground water | |
CN204326072U (en) | A kind of anti-float anchor rod node | |
CN211899790U (en) | Masonry structure reinforced by longitudinal drilling steel-penetrating pull rod and end plate | |
CN205012333U (en) | Recoverable FRP stock with enlarged footing | |
CN103924616B (en) | The pre-buried shearing groove of ultra-deep underground continuous wall makes, construction method of installation | |
CN204326061U (en) | A kind of pile tube be drawn out easily |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161019 Termination date: 20170530 |
|
CF01 | Termination of patent right due to non-payment of annual fee |