CN106480889A - A kind of Pile of Deep Foundation Pit method of reinforcement design - Google Patents

A kind of Pile of Deep Foundation Pit method of reinforcement design Download PDF

Info

Publication number
CN106480889A
CN106480889A CN201611023795.3A CN201611023795A CN106480889A CN 106480889 A CN106480889 A CN 106480889A CN 201611023795 A CN201611023795 A CN 201611023795A CN 106480889 A CN106480889 A CN 106480889A
Authority
CN
China
Prior art keywords
pile
construction
support pile
complement
foundation pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611023795.3A
Other languages
Chinese (zh)
Inventor
顾国荣
徐枫
董月英
樊向阳
张开普
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Geotechnical Investigations and Design Institute Co Ltd
Original Assignee
Shanghai Geotechnical Investigations and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Geotechnical Investigations and Design Institute Co Ltd filed Critical Shanghai Geotechnical Investigations and Design Institute Co Ltd
Priority to CN201611023795.3A priority Critical patent/CN106480889A/en
Publication of CN106480889A publication Critical patent/CN106480889A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D37/00Repair of damaged foundations or foundation structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Foundations (AREA)

Abstract

The present invention relates to a kind of Pile of Deep Foundation Pit method of reinforcement design, comprise the following steps:S1, the support pile in construction and plan to build between outer wall of basement setting complement support pile;High-pressure rotary jet grouting pile is fixedly installed between the support pile of S2, construction and complement support pile;S3, it is fixedly installed, in the stake top of new complement support pile, the reinforced concrete circle beam being connected with the support pile of construction;S4, construction outer wall of basement.The present invention makes full use of the support pile of construction, low engineering cost, short time limit, has good Social benefit and economic benefit;Prop need not take extra construction site.Newly-increased prop makes full use of the space between construction supporting body and outer wall of basement, is mainly distributed on existing prop and plans to build between outer wall of basement;The method has higher practicality and economic worth in the more nervous project of construction land tenure.

Description

A kind of Pile of Deep Foundation Pit method of reinforcement design
Technical field
The present invention relates to a kind of Pile of Deep Foundation Pit method of reinforcement design, belong to pattern foundation pit supporting structure and the ground in Geotechnical Engineering field Lower field of engineering technology.
Background technology
In order to meet the needs of urban construction, a lot of project development progresses are very fast, and building function and the basement number of plies are sometimes Can adjust in construction.Some projects have foundation pit supporting pile has constructed and has finished, but the feelings that the basement number of plies will increase etc. Condition, the more original design depth of depth of foundation ditch has and increases considerably, the stake of the support pile completing of having constructed is long and stake footpath etc. often The stress needs of the base pit engineering after depth increases can not be met.For guaranteeing the safety of base pit engineering and surrounding enviroment it is necessary to right Former foundation pit system carries out Design of Reinforcement.The general support pile completing that considers to have been constructed of Design Method of Reinforcing commonly used at present Cancel, outside former support pile, again need to carry out the design and construction of support pile, the method overall cost by the depth of foundation ditch Height, can cause the significant wastage of social resources, and also ratio is larger for the space occupied by another aspect prop, and the construction period is relatively Long.
Content of the invention
The technical problem to be solved in the invention is:Existing Pile of Deep Foundation Pit Strengthening Design, general consideration has been applied The support pile that work completes cancels, and again needs to carry out the design and construction of support pile by the depth of foundation ditch outside former support pile, The method overall cost is high, can cause the significant wastage of social resources, also ratio is larger for the space occupied by another aspect prop, And the construction period is longer.
The present invention takes technical scheme below:
A kind of Pile of Deep Foundation Pit method of reinforcement design is it is characterised in that comprise the following steps:S1, propping up in construction Fender pile and plan to build between outer wall of basement 8 setting complement support pile;Fixing between the support pile of S2, construction and complement support pile Setting high-pressure rotary jet grouting pile;S3, it is fixedly installed, in the stake top of new complement support pile, the reinforced concrete being connected with the support pile of construction Pedosphere beam 5;S4, construction outer wall of basement 8.
Further, described complement props up stanchion is cast-in-situ bored pile 3, and the support pile of described construction is to go along with sb. to guard him bored concrete pile 2.
Further, described high-pressure rotary jet grouting pile is sealing high-pressure rotary jet grouting pile 4, for the boring of construction supporting stake and complement The inter-pile soil body of bored concrete pile is reinforced, and is used for water-seal pile reinforcement.
Further, in step S3:Construction supporting stake is laterally fixedly connected with reinforced concrete circle beam 5 by U-shaped muscle, Mend support pile to be connected with reinforced concrete circle beam by stake top cage bar, stake top cage bar anchors into reinforced concrete circle beam.
Further, step S3 includes:Cut and go along with sb. to guard him bored concrete pile 2 cage bar protective layer, U-shaped muscle 7 is installed, pours coagulation Soil, has been constructed and has gone along with sb. to guard him bored concrete pile 2, newly-increased cast-in-situ bored pile 3 and reinforced concrete circle beam and be connected as an entirety, stage excavation To hole bottom absolute altitude.
Further, described complement support pile and the support pile of construction correspond, each complement support pile with corresponding The support pile of construction between horizontal spacing identical.
Further, it is fixedly connected between adjacent sealing high-pressure rotary jet grouting pile 4 mutually embeddedly.
The beneficial effects of the present invention is:
1) make full use of the support pile of construction, Strengthening Design theory, low engineering cost, duration are adopted to existing support pile Short, there is good Social benefit and economic benefit;
2) prop need not take extra construction site.Newly-increased prop makes full use of construction supporting body and basement Space between exterior wall, is mainly distributed on existing prop and plans to build between outer wall of basement.
3) the method has higher practicality and economic worth in the more nervous project of construction land tenure.
4) sealing high-pressure rotary jet grouting pile is used for the inter-pile soil body reinforcing of construction supporting stake and the cast-in-situ bored pile of complement, dual-purpose In water-seal pile reinforcement, kill two birds with one stone, design is ingenious.
Brief description
Fig. 1 is the top view in the present invention for Pile of Deep Foundation Pit Strengthening Design;
Fig. 2 is the side view in the present invention for Pile of Deep Foundation Pit Strengthening Design;
Fig. 3 is the connection detail drawing of construction supporting stake, the cast-in-situ bored pile of complement and reinforced concrete circle beam in the present invention.
Specific embodiment
The present invention is further described with specific embodiment below in conjunction with the accompanying drawings.
Referring to Fig. 1-Fig. 3, a kind of Pile of Deep Foundation Pit method of reinforcement design, comprise the following steps:S1, propping up in construction Fender pile and plan to build between outer wall of basement 8 setting complement support pile;Fixing between the support pile of S2, construction and complement support pile Setting high-pressure rotary jet grouting pile;S3, it is fixedly installed, in the stake top of new complement support pile, the reinforced concrete being connected with the support pile of construction Pedosphere beam 5;S4, construction outer wall of basement 8.
Referring to Fig. 2, it is cast-in-situ bored pile 3 that described complement props up stanchion, and the support pile of described construction is to go along with sb. to guard him bored concrete pile 2.
Referring to Fig. 1-2, described high-pressure rotary jet grouting pile is sealing high-pressure rotary jet grouting pile 4, for the brill of construction supporting stake and complement The inter-pile soil body of hole pouring pile is reinforced, and is used for water-seal pile reinforcement.
Referring to Fig. 2-3, in step S3:Construction supporting stake passes through U-shaped muscle laterally and reinforced concrete circle beam 5 is fixing even Connect, mend support pile and be connected with reinforced concrete circle beam by stake top cage bar, stake top cage bar anchors into reinforced concrete circle beam.
Referring to Fig. 2-3, step S3 includes:Cut and go along with sb. to guard him bored concrete pile 2 cage bar protective layer, the U-shaped muscle 7 of installation, casting concrete, Constructed and gone along with sb. to guard him bored concrete pile 2, newly-increased cast-in-situ bored pile 3 and reinforced concrete circle beam and be connected as an entirety, stage excavation is extremely Hole bottom absolute altitude.
Referring to Fig. 1, described complement support pile is corresponded with the support pile of construction, each complement support pile with corresponding Horizontal spacing between the support pile of construction is identical.
Referring to Fig. 1, it is fixedly connected between adjacent sealing high-pressure rotary jet grouting pile 4 mutually embeddedly.
During Specific construction, referring to Fig. 1-3, install first and constructed water-seal pile 1 and gone along with sb. to guard him bored concrete pile 2, Ran Houan The newly-increased bored concrete pile 3 of dress and sealing high-pressure rotary jet grouting pile 4, stage excavation to reinforced concrete circle beam 5 bottom surface absolute altitude, newly-increased boring is filled The internal cage bar 6 of note stake 3 cuts to designed elevation, cuts and goes along with sb. to guard him bored concrete pile 2 cage bar protective layer, the U-shaped muscle 7 of installation, casting concrete, Constructed and gone along with sb. to guard him bored concrete pile 2, newly-increased cast-in-situ bored pile 3 and reinforced concrete circle beam and be connected as an entirety, stage excavation is extremely Hole bottom absolute altitude, construction outer wall of basement 8 in time.
It is more than the preferred embodiments of the present invention, on this basis, the present invention can also have various changes and modifications, not On the premise of departing from the total design of the present invention, these changes and improvements still fall within the protection domain of application claims.

Claims (7)

1. a kind of Pile of Deep Foundation Pit method of reinforcement design is it is characterised in that comprise the following steps:
S1, the support pile in construction and plan to build between outer wall of basement (8) setting complement support pile;
High-pressure rotary jet grouting pile is fixedly installed between the support pile of S2, construction and complement support pile;
S3, it is fixedly installed, in the stake top of new complement support pile, the reinforced concrete circle beam (5) being connected with the support pile of construction;
S4, construction outer wall of basement (8).
2. Pile of Deep Foundation Pit method of reinforcement design as claimed in claim 1 it is characterised in that:It is to bore that described complement props up stanchion Hole pouring pile (3), the support pile of described construction is to go along with sb. to guard him bored concrete pile (2).
3. Pile of Deep Foundation Pit method of reinforcement design as claimed in claim 1 it is characterised in that:Till described high-pressure rotary jet grouting pile Water high-pressure rotary jet grouting pile (4), the inter-pile soil body for construction supporting stake and the cast-in-situ bored pile of complement is reinforced, and is used for water-seal pile Reinforcement.
4. Pile of Deep Foundation Pit method of reinforcement design as claimed in claim 1 it is characterised in that:In step S3:Construct and propped up Fender pile is laterally fixedly connected with reinforced concrete circle beam (5) by U-shaped muscle, mends support pile and passes through stake top cage bar and armored concrete Collar tie beam connects, and stake top cage bar anchors into reinforced concrete circle beam.
5. Pile of Deep Foundation Pit method of reinforcement design as claimed in claim 1 it is characterised in that:Step S3 includes:Cut and enclose Shield bored concrete pile (2) cage bar protective layer, installs U-shaped muscle (7), casting concrete, has been constructed and has gone along with sb. to guard him bored concrete pile (2), newly-increased boring Bored concrete pile (3) and reinforced concrete circle beam are connected as an entirety, and stage excavation is to hole bottom absolute altitude.
6. Pile of Deep Foundation Pit method of reinforcement design as claimed in claim 1 it is characterised in that:Described complement support pile with The support pile of construction corresponds, and the horizontal spacing between each complement support pile and the support pile of corresponding construction is identical.
7. Pile of Deep Foundation Pit method of reinforcement design as claimed in claim 1 it is characterised in that:Adjacent sealing high-pressure rotary-spray It is fixedly connected between stake (4) mutually embeddedly.
CN201611023795.3A 2016-11-14 2016-11-14 A kind of Pile of Deep Foundation Pit method of reinforcement design Pending CN106480889A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611023795.3A CN106480889A (en) 2016-11-14 2016-11-14 A kind of Pile of Deep Foundation Pit method of reinforcement design

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611023795.3A CN106480889A (en) 2016-11-14 2016-11-14 A kind of Pile of Deep Foundation Pit method of reinforcement design

Publications (1)

Publication Number Publication Date
CN106480889A true CN106480889A (en) 2017-03-08

Family

ID=58272773

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611023795.3A Pending CN106480889A (en) 2016-11-14 2016-11-14 A kind of Pile of Deep Foundation Pit method of reinforcement design

Country Status (1)

Country Link
CN (1) CN106480889A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107761742A (en) * 2017-10-23 2018-03-06 上海市城市建设设计研究总院(集团)有限公司 Along depth direction is multi-form, variable cross-section supporting construction and its construction method
CN108951640A (en) * 2018-07-02 2018-12-07 上海建工集团股份有限公司 A kind of Extra-Deep Foundation Pit construction method
CN110093926A (en) * 2018-01-31 2019-08-06 中国二十冶集团有限公司 Newly, the old foundation pit system combined and its construction method
CN113006109A (en) * 2021-03-02 2021-06-22 北京住总第一开发建设有限公司 Construction method of foundation pit waterproof curtain of strongly permeable stratum area
CN113106981A (en) * 2021-03-31 2021-07-13 河南省远基岩土工程有限公司 Foundation pit deepening reinforcement support body

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100376590B1 (en) * 1999-10-30 2003-03-17 삼성중공업 주식회사 Multi-phased underground construction method for wide excavation using permanent structural members as temporary struts
CN203256751U (en) * 2013-05-22 2013-10-30 中国建筑第八工程局有限公司 Deep foundation pit supporting structure for soft soil foundation
CN103806449A (en) * 2014-02-17 2014-05-21 中交公路规划设计院有限公司 Supporting structure of foundation pit

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100376590B1 (en) * 1999-10-30 2003-03-17 삼성중공업 주식회사 Multi-phased underground construction method for wide excavation using permanent structural members as temporary struts
CN203256751U (en) * 2013-05-22 2013-10-30 中国建筑第八工程局有限公司 Deep foundation pit supporting structure for soft soil foundation
CN103806449A (en) * 2014-02-17 2014-05-21 中交公路规划设计院有限公司 Supporting structure of foundation pit

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈加核: ""基坑施工阶段加深后复合支护的设计与应用"", 《地下空间与工程学报》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107761742A (en) * 2017-10-23 2018-03-06 上海市城市建设设计研究总院(集团)有限公司 Along depth direction is multi-form, variable cross-section supporting construction and its construction method
CN110093926A (en) * 2018-01-31 2019-08-06 中国二十冶集团有限公司 Newly, the old foundation pit system combined and its construction method
CN108951640A (en) * 2018-07-02 2018-12-07 上海建工集团股份有限公司 A kind of Extra-Deep Foundation Pit construction method
CN113006109A (en) * 2021-03-02 2021-06-22 北京住总第一开发建设有限公司 Construction method of foundation pit waterproof curtain of strongly permeable stratum area
CN113006109B (en) * 2021-03-02 2022-09-09 北京住总第一开发建设有限公司 Construction method of waterproof curtain of foundation pit of highly permeable stratum area
CN113106981A (en) * 2021-03-31 2021-07-13 河南省远基岩土工程有限公司 Foundation pit deepening reinforcement support body

Similar Documents

Publication Publication Date Title
CN106480889A (en) A kind of Pile of Deep Foundation Pit method of reinforcement design
CN102966108B (en) Construction method of deep foundation pit close to building and adopting underground structure as internal support
CN202969392U (en) Complex geology deep excavation pit combined support
CN205776249U (en) A kind of combined inner supporting structure
CN106013171B (en) A kind of semi-rigid supporting construction semi-flexible and method of deep-foundation side wall
CN107083771B (en) A kind of drilling construction method of artificial digging pile
KR101545307B1 (en) Construction method of complex temporary facility with bottom grouting for weak ground
CN101560764B (en) Method for calking exploratory hole by intermittent high-pressure rotary jet grouting
CN107542108A (en) A kind of reverse construction method of building basement structure
CN103195076A (en) Method for constructing silt deep foundation pit tower crane foundation
CN102660955B (en) Quick construction method for foundation pit slope support
CN114233385B (en) Treatment method for mud-bursting water of inclined shaft
CN108797620A (en) A kind of OPT construction method of interlocking pile
CN109778869A (en) Foundation ditch construction method
CN108643191A (en) A kind of supporting construction and its construction method of ultra-deep piping lane foundation pit
CN105569051A (en) Foundation pit support system of sandy pebble boulder geological stratification and construction method
CN106065628B (en) Based on the major diameter running water pipe security protection construction method faced forever with reference to theory
CN110284885A (en) Shield inspection-pit construction method
CN104532714B (en) Roadbed structure for treating deep soft soil karst foundation
CN103572764A (en) Watertight structure for retaining wall of ultra-deep manually excavated pile and construction method thereof
CN107100206A (en) A kind of prevention and controls of basement leakage
CN107237332A (en) A kind of foundation pit stope support containing drifting sand layer method of use composite soil-nailed retaining wall
CN106567365B (en) Earth and rockfill dam longitudinal reinforcement construction method
JP2019015100A (en) Removing method of earth retaining wall
CN107268635A (en) Deep foundation pit supporting structure and construction method of the karst area adjacent to existing structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170308