KR100376590B1 - Multi-phased underground construction method for wide excavation using permanent structural members as temporary struts - Google Patents

Multi-phased underground construction method for wide excavation using permanent structural members as temporary struts Download PDF

Info

Publication number
KR100376590B1
KR100376590B1 KR10-1999-0047839A KR19990047839A KR100376590B1 KR 100376590 B1 KR100376590 B1 KR 100376590B1 KR 19990047839 A KR19990047839 A KR 19990047839A KR 100376590 B1 KR100376590 B1 KR 100376590B1
Authority
KR
South Korea
Prior art keywords
building
construction method
retaining wall
center
construction
Prior art date
Application number
KR10-1999-0047839A
Other languages
Korean (ko)
Other versions
KR20000058239A (en
Inventor
홍원기
윤광섭
Original Assignee
삼성중공업 주식회사
홍원기
윤광섭
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 삼성중공업 주식회사, 홍원기, 윤광섭 filed Critical 삼성중공업 주식회사
Priority to KR10-1999-0047839A priority Critical patent/KR100376590B1/en
Priority to AU2000230800A priority patent/AU2000230800A1/en
Priority to US09/646,225 priority patent/US6536181B1/en
Priority to PCT/KR2000/000017 priority patent/WO2000042263A2/en
Publication of KR20000058239A publication Critical patent/KR20000058239A/en
Priority to US10/135,581 priority patent/US20030005650A1/en
Application granted granted Critical
Publication of KR100376590B1 publication Critical patent/KR100376590B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2220/00Temporary installations or constructions
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork

Abstract

본 발명은 지하 구조물 공사에서 대형 건축물인 경우 기초를 설치하기 위한 터파기를 구획을 나누어 공사하는 방법에 관한 것이다.The present invention relates to a method for dividing the construction of the trench for installing the foundation in the case of a large building in the underground structure construction.

본 발명은 건물이 서게 될 곳의 대지를 중앙부('가')와 외곽부('나')로 구획하고; 상기 외곽부는, 건축물의 기둥이 설치될 곳에 센터 파일(3)을 박고; 건축물이 설치될 곳의 경계선에 내부 옹벽(22)을 설치하고; 상기 내부 옹벽(22)과 상기 센터 파일(3) 상단이 일체가 되도록 지상 1층의 철골 또는 철근콘크리트 보(4)를 설치하고; 제1단계 굴착하고; 다음 층 바닥의 철골 또는 철근콘크리트 보(4)를 상기 내부 옹벽(22)과 상기 센터 파일(3)과 접합하여 설치하고; 다시 제2단계 굴착하는 단계를 반복하여 최하부층까지 굴착하고; 기초를 설치하고; 그리고 최하부 층 바닥 콘크리트를 타설하여 상부를 향해 공사해 올라오는 단계로 공사하고; 그리고 상기 중앙부는 상기 외곽부에 설치한 구조물로 지탱하여 별도의 가시설물 없이 공사하는 단계로 구성된 것을 특징으로 하는 영구 구조물의 일부를 토공사용 버팀대로 활용하는 공사방법을 이용한 구획식 공사방법 및 그 변형 방법이다.The present invention divides the site where the building will stand into a central part ('ga') and an outer part ('b'); The outer part, the center pile (3) in the place where the pillar of the building is to be installed; An inner retaining wall 22 is installed at the boundary of where the building is to be installed; Install steel frame or reinforced concrete beam (4) on the ground floor so that the inner retaining wall (22) and the top of the center pile (3) are integrated; Excavating the first stage; A steel frame or reinforced concrete beam 4 at the bottom of the next layer is attached to the inner retaining wall 22 and the center pile 3; Repeating the second step of digging again to excavate to the lowest layer; Install the foundation; And the bottom floor concrete is poured into the upper part; And the central part is supported by a structure installed in the outer part of the construction of the partition-type construction method using a construction method utilizing a part of the permanent structure as a prop for earthwork, characterized in that the construction without a separate provisions Way.

본 발명으로 넓은 지역을 터파기해야 하는 대형 건축물에서 영구 구조물의 일부를 임시 시설물로 활용하는 공사방법을 이용하여 넓은 지역을 구획하여 공사하는 구획식 공사함으로서 효율적으로 지하공사를 할 수 있다.In the present invention, by using a construction method that utilizes a part of a permanent structure as a temporary facility in a large building that needs to dig a large area, it is possible to efficiently perform underground construction by dividing a large area by constructing a compartment.

Description

영구 구조물의 일부를 토공사용 버팀대로 활용하는 공사방법을 이용한 구획식 공사방법{Multi-phased underground construction method for wide excavation using permanent structural members as temporary struts}Multi-phased underground construction method for wide excavation using permanent structural members as temporary struts}

본 발명은 지하 구조물 공사방법에 관한 것이다. 더욱 구체적으로는 대형 건축물인 경우 기초를 설치하기 위한 터파기를 구획을 나누어 공사하는 방법에 관한 것이다.The present invention relates to a method for constructing underground structures. More specifically, it relates to a method for dividing the construction of the trench for installing the foundation in the case of large buildings.

도심지와 같이 땅값이 비싼 지역에서는 토지 이용효율을 높이기 위하여 지하 깊이 땅을 파고 구조물을 설치한다. 지하에 구조물을 설치하기 위하여 통상 가설 흙막이 벽을 설치하고, 가설 흙막이 벽에 걸리는 하중을 버팀대로 지탱하면서 지하 맨 아래쪽부터 구축해 상부로 올라가는 방법을 통상 채택한다. 대형 건축물일 경우 터파기할 지역이 넓어 한꺼번에 흙막이 공사를 하기 어렵다. 따라서 구획을 나누어 먼저 부지의 중앙부에 건축물의 기초나 지지체를 형성하여 이에 지지하면서 터파기하는 이른바 아일랜드 공법이 있다.In areas with high land prices, such as urban areas, digging deep underground and installing structures to increase land use efficiency. In order to install the structure in the basement, it is usually adopted to install the temporary barrier wall, and to build up from the bottom of the basement to the upper part while supporting the load on the temporary barrier wall as a brace. In the case of large buildings, it is difficult to construct a wall at once because of the large area to dig. Therefore, there is a so-called Irish construction method that divides and divides and forms a foundation or support of a building at the center of the site and supports it.

종래 아일랜드 공법을 수행하는 방법은 부지의 중앙부에 먼저 1차 흙막이하고 굴토하여 고층부용 구조체를 시공하고, 상기 고층부용 구조체에 지지하여 외곽부에 2차 흙막이 벽을 설치하여 외곽부 터파기하여 외곽부 구조체를 시공한다.Conventionally, the method of performing the Irish construction method constructs a structure for a high-rise part by first piling and gulting at a central part of the site, and supporting a structure for the high-level part by installing a second retaining wall on the periphery to break the periphery. Construct it.

종래의 시공법은 1차 흙막이용 임시시설물을 1차 터파기가 끝나면 해체해야 하고 중앙부에 구조체를 설치하고 난 다음 외곽부에 다시 버팀대(strut)나 어스앵커로 지지하면서 2차 터파기를 해야 한다. 즉 본체 구조물과 별도로 토공사용 임시 시설물을 설치해야 했다. 만약 본 구조체를 임시 시설물로 사용할 수 있다면 공사비와 공사기간을 대폭 절감할 수 있을 것이다.The conventional construction method is to dismantle the primary temporary temporary facilities after the first dig, and to install the structure in the center and then the second dig while supporting the back with a strut or earth anchor in the outer part. In other words, a temporary facility for earthwork was to be installed separately from the main structure. If the structure can be used as a temporary facility, the construction cost and construction period can be greatly reduced.

발명자가 특허출원 제1999-639호로 이미 출원한 내용에는 '건축물의 기둥이 설치될 곳에 센터 파일(3, center pile)을 박고; 건축물이 설치될 곳의 경계선에 맞춰 지하연속벽(slurry wall)을 설치하고; 제1단계 굴토작업을 실시하고; 상기 지하연속벽에 고정판(6, embedded plate)으로 영구 구조물의 일부로 사용될 거더(4)를 설치하여 상기 센터 파일(3)에 거치시키고; 제2단계 굴토작업을 실시하여 상기 제1단계 이후의 단계를 반복하여 건축물의 최하부까지 굴착하고; 그리고 상기 센터 파일(3)과 상기 거더(4)를 내화피복 또는 콘크리트 타설하고 슬래브를 설치하는 단계로 이루어지는 구조물 구축방법 등'이 개시되어 있다. 이는 토공사용 흙막이 벽용 버팀대를 설치하는 대신에 영구 구조물인 철골보를 버팀대로서 활용하는 공사방법이다.The contents already filed by the inventor in the patent application No. 1999-639 include the following: 'Place a center pile (3, pile) where the pillar of the building will be installed; Install a slurry wall in accordance with the boundary of the place where the building is to be installed; Performing a first step excavation work; Installing a girder (4) to be used as part of a permanent structure by a fixed plate (6, embedded plate) on the base continuous wall and mounting it on the center pile (3); Performing a second step of excavation and repeating the steps after the first step to excavate to the bottom of the building; And the center pile (3) and the girder (4) is a structure construction method comprising a step of installing fire-resistant coating or concrete and installing a slab is disclosed. This is a construction method that utilizes Cheolgolbo, which is a permanent structure, as a brace instead of installing a brace for earthwork wall.

또한 발명자는 영구구조 부재의 일부를 토공사용 버팀대로 활용하는 지하 구조물 구축방법을 개발하여 본 출원과 같은 날짜로 출원한다. 같은 날 출원하는 기술내용은 '건축물의 기둥이 설치될 곳에 센터 파일(3)을 박고; 건축물이 설치될 곳의 경계선에 내부 옹벽(22)을 설치하고; 제1단계 굴토작업을 실시하고; 상기 흙막이용 벽에 띠장(31)을 설치하고; 상기 띠장(31)과 상기 센터 파일(3)을 연결하는 영구 구조물의 일부로 사용될 거더(4)를 설치하고; 제2단계 굴토작업을 실시하여 상기 제1단계 이후의 단계를 반복하여 건축물의 최하부까지 굴착하여 진행하는 단계로 공사하는 방법'과 '건축물의 기둥이 설치될 곳에 센터 파일(3)을 박고; 건축물이 설치될 곳의 경계선에 내부 옹벽(22)을 설치하고; 상기 내부 옹벽(22)과 상기센터 파일(3) 상단이 일체가 되도록 지상 1층의 콘크리트 보(4)를 타설하고; 제1단계 굴착하고; 다음 층 바닥의 철근콘크리트 보(4)를 상기 내부 옹벽(22)과 상기 센터 파일(3)과 접합하여 설치하고; 다시 제2단계 굴착하는 단계를 반복하여 최하부층까지 굴착하고; 기초를 설치하고; 그리고 최하부 층 바닥 콘크리트를 타설하여 상부를 향해 공사해 올라오는 단계로 이루어지는 공사방법'이다.In addition, the inventor develops a method for constructing an underground structure that utilizes a part of a permanent structural member as a brace for earthworks, and files it on the same date as the present application. The same application filed on the same day puts the center pile 3 where the pillars of the building will be installed; An inner retaining wall 22 is installed at the boundary of where the building is to be installed; Performing a first step excavation work; Installing a strip 31 on the wall for the earthen board; Installing a girder (4) to be used as part of the permanent structure connecting the belt strip (31) and the center pile (3); Performing a second step of excavation and repeating the steps after the first step to excavate and proceed to the bottom of the building 'and' put the center pile 3 where the pillars of the building will be installed; An inner retaining wall 22 is installed at the boundary of where the building is to be installed; Placing a concrete beam (4) on the ground level so that the inner retaining wall (22) and the top of the center pile (3) are integrated; Excavating the first stage; A reinforced concrete beam (4) of the next floor is bonded to the inner retaining wall (22) and the center pile (3); Repeating the second step of digging again to excavate to the lowest layer; Install the foundation; And the construction method consists of pouring the bottom floor concrete to the upper part.

본 발명은 발명자가 이미 개발한 영구 구조물의 일부를 토공사용 버팀대로 사용하는 구조물 구축방법과 아일랜드공법을 결합하여 넓은 지역을 터파기해야 하는 경우에 적용하기 위한 구획식 공사방법을 개발하였다.The present invention has been developed a partitioned construction method for applying in the case of having to dig a large area by combining the structure construction method and the island construction method using a part of the permanent structure already developed by the inventor as a earthwork brace.

본 발명의 목적은 넓은 지역을 터파기해야 하는 대형 건축물에서 영구 구조물의 일부를 임시 시설물로 활용하는 공사방법을 이용하여 넓은 지역을 구획하여 공사하는 구획식 공사방법을 제공하는 것이다.An object of the present invention is to provide a partitioned construction method for partitioning a large area by using a construction method that utilizes a part of the permanent structure as a temporary facility in a large building that must break a large area.

제1도는 본 발명에서 채택하는 영구 구조물의 일부를 토공사용 버팀대로 활용하는 방법을 보인 구체예의 단면도이다.1 is a cross-sectional view showing a method of utilizing a part of the permanent structure adopted in the present invention as a earthwork brace.

제2a도와 제2b도는 본 발명의 구체예의 평면도와 그 단면도이고, 제2c도는 제2a도의 변형예이다.2A and 2B are a plan view and a sectional view of a specific example of the present invention, and FIG. 2C is a modification of FIG. 2A.

제3a, 3b, 3c도는 제2도의 변형예이다.3A, 3B, and 3C are modifications of FIG.

제4a, 4b, 4c도는 다른 구체예이다.4a, 4b, 4c are other embodiments.

제5도는 또 다른 구체예로서, 제5a도는 평면도, 제5b도와 제5c도는 공사진행과정을 나타내는 단면도이다.5 is another embodiment, and FIG. 5A is a plan view, and FIG. 5B and FIG. 5C are cross-sectional views showing a process of photographing.

* 도면의 주요부호에 대한 설명 *Explanation of the main symbols in the drawings

3: 센터 파일 4: 철골 또는 철근콘크리트 보3: center file 4: steel or reinforced concrete beam

21: 흙막이용 H형강 22: 내부 옹벽21: H-beam for retaining wall 22: Internal retaining wall

가: 중앙부 나: 외곽부A: Central B: Outer

첨부한 구체예의 도면을 참조하며 본 발명을 상세히 설명한다.The present invention will be described in detail with reference to the accompanying drawings of embodiments.

제1도는 본 발명에서 채택하는 영구 구조물의 일부를 토공사용 버팀대로 활용하는 방법을 보인 구체예의 단면도이다.1 is a cross-sectional view showing a method of utilizing a part of the permanent structure adopted in the present invention as a earthwork brace.

이 발명은 동일자로 특허출원하는 내용으로 '건축물의 기둥이 설치될 곳에 센터 파일(3)을 박고; 건축물이 설치될 곳의 경계선에 내부 옹벽(22)을 설치하고;제1단계 굴토작업을 실시하고; 상기 흙막이용 벽에 띠장(31)을 설치하고; 상기 띠장(31)과 상기 센터 파일(3)을 연결하는 영구 구조물의 일부로 사용될 거더(4)를 설치하고; 제2단계 굴토작업을 실시하여 상기 제1단계 이후의 단계를 반복하여 건축물의 최하부까지 굴착하여 진행하는 단계로 공사하는 방법'과 따로 도면을 첨부하지 않았지만 '건축물의 기둥이 설치될 곳에 센터 파일(3)을 박고; 건축물이 설치될 곳의 경계선에 내부 옹벽(22)을 설치하고; 상기 내부 옹벽(22)과 상기 센터 파일(3) 상단이 일체가 되도록 지상 1층의 콘크리트 보(4)를 타설하고; 제1단계 굴착하고; 다음 층 바닥의 철근콘크리트 보(4)를 상기 내부 옹벽(22)과 상기 센터 파일(3)과 접합하여 설치하고; 다시 제2단계 굴착하고 단계를 반복하여 최하부층까지 굴착하고; 기초를 설치하고; 그리고 최하부 층 바닥 콘크리트를 타설하여 상부를 향해 공사해 올라오는 단계로 이루어지는 공사방법'이다. 두 발명 모두 영구 구조물의 일부를 토공사용 버팀대로 활용하는 방법(실무에서는 이 공법을 지칭하기 위하여 SPS공법이란 용어를 사용한다. 따라서 도면 중에 'SPS보'라는 표현은 영구 구조물인 보를 가설 버팀대 용도로 사용하는 보라는 의미이다)에 관한 것이다. 본 발명은 영구 구조물의 일부를 토공사용 버팀대로 사용하는 방법을 활용하여 넓은 지역을 굴토해야 하는 경우에 적용하는 방법이다.This invention is a patent application of the same as' put the center pile (3) where the pillar of the building will be installed; Installing the inner retaining wall 22 at the boundary of the place where the building is to be installed; Installing a strip 31 on the wall for the earthen board; Installing a girder (4) to be used as part of the permanent structure connecting the belt strip (31) and the center pile (3); The second step of excavation work is carried out by repeating the steps after the first step and excavating to the bottom of the building and proceeding with the construction.'However, the drawings are not attached to the center file (where the pillars of the building will be installed) 3) put; An inner retaining wall 22 is installed at the boundary of where the building is to be installed; Placing a concrete beam (4) on the ground floor so that the inner retaining wall (22) and the top of the center pile (3) are integrated; Excavating the first stage; A reinforced concrete beam (4) of the next floor is bonded to the inner retaining wall (22) and the center pile (3); Digging the second step again and repeating the steps to excavate to the lowest layer; Install the foundation; And the construction method consists of pouring the bottom floor concrete to the upper part. Both inventions utilize a part of the permanent structure as a prop for earthwork (in practice, the term SPS method is used to refer to this method. Therefore, the expression 'SPS beam' in the drawing refers to the use of a temporary structure as a temporary prop. Means to use). The present invention is a method applied to the case of excavating a large area using a method of using a portion of the permanent structure as a earthwork brace.

제2a도와 제2b도는 본 발명의 구체예의 평면도와 그 단면도이고, 제2c도는 제2a도의 변형예이다.2A and 2B are a plan view and a sectional view of a specific example of the present invention, and FIG. 2C is a modification of FIG. 2A.

대형 건축물이 자리 잡을 경우 터파기하는 면적이 넓어 한꺼번에 처리하기 힘들다. 따라서 구역을 나누어 중앙지역을 선시공하고 선시공한 구조체에 지지하면서 터파기하는 방법이 아일랜드공법이다.When large buildings are located, the area for digging is large, making it difficult to handle them all at once. Therefore, Irish construction method is to divide the area and construct the central area and dig it while supporting the structure.

본 발명은 대형 건축물이 들어서는 지역을 중앙부('가')와 외곽부('나')로 나누어 외곽부는 영구 구조물을 가시설물로 이용하는 방법으로 구축한다. 외곽부에 구축된 구조물이 흙막이 벽의 역할을 하면서 중앙부에는 별다른 가시설물이 없어도 토공사를 수행할 수 있다.The present invention is divided into a central portion ('ga') and the outer portion ('na') is divided into an area in which a large building is built, the outer portion is constructed by using a permanent structure as a temporary facility. As the structure built on the outer part acts as a wall of earth, the earthwork can be performed even if there is no special provision in the center part.

제2c도는 중앙부가 넓거나 토압이 커서 외곽부의 토공사용으로 먼저 설치한 영구 구조물의 내력이 부족한 경우 중앙부의 귀 부분을 가새 보로서 보강한 것이다. 더욱 보강하기 위하여 또는 지상 1층 바닥을 작업공간으로 활용하기 위하여 지상 1층 바닥 콘크리트를 선 타설할 수 있음은 당연하다.Figure 2c is a reinforcement of the ear portion of the center portion as a brace when the center portion is wide or the earth pressure is large, and the strength of the permanent structure installed first by the earthwork use of the outer portion is insufficient. It is obvious that concrete can be pre-grounded for further reinforcement or to utilize ground floors as a work space.

제3a, 3b, 3c도는 제2도의 변형예이다.3A, 3B, and 3C are modifications of FIG.

중앙부가 넓이가 더욱 커지면 외곽부의 본 구조물만으로 토압에 견디지 못할 수 있다. 이 경우 중앙부를 십자형으로 가로질러 본 구조물을 더 시공하면 안전성이 보장된다.If the central part is larger in area, the outer structure alone may not be able to withstand earth pressure. In this case, further construction of the structure across the center crosswise ensures safety.

제4a, 4b, 4c도는 다른 구체예이다.4a, 4b, 4c are other embodiments.

모퉁이 부분은 어스앵커로 흙막이하고 나머지 부분은 본 구조물을 토공사용 임시 시설물로 활용하여 지지할 수 있다. 흙막이 벽으로 둘러싸인 중앙부에 일자 혹은 십자형으로 본 구조물을 선시공하면서 토공사를 하는 방법이다.Corners are earthed with earth anchors and the rest can be supported by using the structure as a temporary facility for earthwork. It is a method of earthwork while pre-installing the structure in a straight or cross shape in the center surrounded by the wall of soil.

제5도는 다른 구체예이다. 제5a도는 평면도, 제5b도와 제5c도는 공사진행과정을 나타내는 단면도이다.5 is another embodiment. FIG. 5A is a plan view, and FIG. 5B and FIG. 5C are cross-sectional views showing the process of coplanarity.

본 구체예는 중앙부('가')를 선시공하기 위해 중앙부를 둘러싸는 흙막이 벽과 어스앵커를 시공하고 중앙부를 먼저 터파기한다. 그리고 중앙부의 구조체를 먼저 시공한다.In this embodiment, to construct the central portion ('ga'), the earth wall and earth anchors surrounding the central portion are constructed and the central portion is first destroyed. Then, construct the central structure first.

중앙부 구조체가 시공되면 외곽부('나')에 영구 구조물을 가시설물로 이용하는 공사방법으로 외곽부 구조물을 시공한다. 이때 영구 구조물의 구조부재의 일단은 내부 옹벽(22)과 접합하고 다른 단은 중앙부의 구조체와 결합되어 버팀대의 역할을 하게 된다.When the central structure is constructed, the outer structure is constructed in the construction method using the permanent structure as a temporary facility in the outer part ('b'). At this time, one end of the structural member of the permanent structure is bonded to the inner retaining wall 22 and the other end is combined with the structure of the central portion to serve as a brace.

본 발명으로 넓은 지역을 터파기해야 하는 대형 건축물에서 영구 구조물의 일부를 임시 시설물로 활용하는 공사방법을 이용하여 넓은 지역을 구획하여 공사하는 구획식 공사함으로서 효율적으로 지하공사를 할 수 있다.In the present invention, by using a construction method that utilizes a part of a permanent structure as a temporary facility in a large building that needs to dig a large area, it is possible to efficiently perform underground construction by dividing a large area by constructing a compartment.

Claims (6)

건물이 서게 될 곳의 대지를 중앙부('가')와 외곽부('나')로 구획하고, 상기 외곽부는 건축물의 기둥이 설치될 곳에 센터 파일(3)을 박고 건축물이 설치될 곳의 경계선에 내부 옹벽(22)을 설치하고, 상기 내부 옹벽(22)과 상기 센터 파일(3) 상단이 일체가 되도록 지상 1층의 철골 또는 철근콘크리트 보(4)를 설치하고, 제1단계 굴착하고 다음 층 바닥의 철골 또는 철근콘크리트 보(4)를 상기 내부 옹벽(22)과 상기 센터 파일(3)과 접합하여 설치하고, 다시 제2단계 굴착하는 단계를 반복하여 최하부층까지 굴착하고, 기초를 설치한 후 최하부 층 바닥 콘크리트를 타설하여 상부를 향해 공사해 올라오는 단계로 공사하고, 그리고 상기 중앙부는 상기 외곽부에 설치한 구조물로 지탱하여 별도의 가시설물 없이 공사하는 단계를 포함하는 구획식 공사방법에 있어서:The site where the building will stand is divided into a central part ('ga') and an outer part ('na'), and the outer part has a center pile (3) where the pillar of the building is to be installed and the boundary line where the building is to be installed. The inner retaining wall 22 is installed in the wall, and the steel frame or reinforced concrete beam 4 of the ground floor is installed so that the upper part of the inner retaining wall 22 and the center pile 3 are integrated, and the first step is excavated and then The steel frame or reinforced concrete beam 4 at the bottom of the floor is bonded to the inner retaining wall 22 and the center pile 3, and the second step of the excavation is repeated to excavate to the lowermost layer and install the foundation. After the bottom floor floor concrete is poured into the construction to the upper step, and the central part is supported by the structure installed in the outer portion of the partition construction method comprising the step of constructing without additional provisions In: 상기 설치된 외곽부 본 구조물의 토압지지력 향상을 위해 중앙부를 가로지르는 외곽부 구조물을 설치하고;Installing an outer structure that crosses the center to improve the earth pressure bearing capacity of the installed outer main structure; 상기 외곽부 지상 1층을 작업공간으로 활용하기 위해 지상 1층 바닥 콘크리트를 타설하며;Placing the ground ground floor concrete to utilize the outer ground floor as a working space; 기 설치된 영구구조물의 내력 보강을 위해 중앙부의 모퉁이 부분에 가새 보를 더 설치하는 것을 특징으로 하는 영구 구조물의 일부를 토공사용 버팀대로 활용하는 공사방법을 이용한 구획식 공사방법.Compartmental construction method using a construction method that utilizes a part of the permanent structure as a brace for earthworks, characterized in that the brace is further installed in the corner portion of the center to reinforce the strength of the existing permanent structure. 삭제delete 삭제delete 삭제delete 건축물이 설치될 곳의 경계선을 따라 가설 흙막이 벽을 설치하고;Install temporary barrier walls along the boundary of where the building is to be installed; 상기 가설 흙막이 벽의 4 모퉁이에 어스앵커를 설치하고;Installing an earth anchor at four corners of the temporary barrier wall; 상기 경계선으로 만들어지는 부분의 중앙을 가로질러 일자 또는 십자형으로 건축물의 기둥이 설치될 곳에 센터 파일(3)을 박고;A center pile 3 is inserted at a place where the pillars of the building are installed in a straight or cross shape across the center of the boundary portion; 제1단계 굴토작업을 실시하고; 상기 가설 흙막이 벽에 영구 구조물의 일부로 사용될 보(4)를 설치하여 상기 센터 파일(3)에 거치하고;Performing a first step excavation work; Installing a beam (4) to be used as part of the permanent structure on the temporary barrier wall and mounting it on the center pile (3); 제2단계 굴토작업을 실시하고 상기 제1단계 굴토 이후의 단계를 반복하여 건축물의 최하부까지 굴착하여 구조물을 공사하고; 그리고Constructing the structure by carrying out the second step of excavation and repeating the steps after the first step of excavation to the bottom of the building; And 상기 4 모퉁이 부분은 별도의 가시설물 없이 공사하는 단계;Constructing the four corners without a separate provisional unit; 로 구성되는 것을 특징으로 하는 영구 구조물의 일부를 토공사용 버팀대로 활용하는 공사방법을 이용한 구획식 공사방법.Compartmental construction method using a construction method that utilizes a part of the permanent structure as a earthwork prop. 건물이 서게 될 곳의 대지를 중앙부('가')와 외곽부('나')로 구획하고;Divide the site where the building will stand into a central part ('ga') and an outer part ('b'); 상기 중앙부의 경계를 따라 가설 흙막이 벽을 설치하고;Installing a temporary barrier wall along a boundary of the central portion; 상기 중앙부를 굴토하고 중앙부 구조물을 구축하고;Excavating the central portion and constructing a central portion structure; 상기 외곽부는, 건축물의 기둥이 설치될 곳에 센터 파일(3)을 박고; 건축물이 설치될 곳의 경계선에 내부 옹벽(22)을 설치하고; 상기 내부 옹벽(22)과 상기 센터 파일(3) 상단이 일체가 되도록 지상 1층의 철골 또는 철근콘크리트 보(4)를 설치하고; 제1단계 굴착하고; 다음 층 바닥의 철골 또는 철근콘크리트 보(4)를 상기 내부 옹벽(22)과 상기 센터 파일(3)과 접합하여 설치하고; 다시 제2단계 굴착하는 단계를 반복하여 최하부층까지 굴착하고; 기초를 설치하고; 그리고 최하부 층 바닥 콘크리트를 타설하여 상부를 향해 공사해 올라오는 단계로 공사하고; 그리고The outer part, the center pile (3) in the place where the pillar of the building is to be installed; An inner retaining wall 22 is installed at the boundary of where the building is to be installed; Install steel frame or reinforced concrete beam (4) on the ground floor so that the inner retaining wall (22) and the top of the center pile (3) are integrated; Excavating the first stage; A steel frame or reinforced concrete beam 4 at the bottom of the next layer is attached to the inner retaining wall 22 and the center pile 3; Repeating the second step of digging again to excavate to the lowest layer; Install the foundation; And the bottom floor concrete is poured into the upper part; And 상기 중앙부는 상기 외곽부에 설치한 구조물로 지탱하여 별도의 가시설물 없이 공사하는 단계;The central portion is supported by a structure installed in the outer portion to construct without additional provisional facilities; 로 구성된 것을 특징으로 하는 영구 구조물의 일부를 토공사용 버팀대로 활용하는 공사방법을 이용한 구획식 공사방법.Compartmental construction method using a construction method that utilizes a part of the permanent structure, characterized in that consisting of earthwork braces.
KR10-1999-0047839A 1999-01-13 1999-10-30 Multi-phased underground construction method for wide excavation using permanent structural members as temporary struts KR100376590B1 (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
KR10-1999-0047839A KR100376590B1 (en) 1999-10-30 1999-10-30 Multi-phased underground construction method for wide excavation using permanent structural members as temporary struts
AU2000230800A AU2000230800A1 (en) 1999-01-13 2000-01-13 Composite retaining wall and construction method for underground structure
US09/646,225 US6536181B1 (en) 1999-01-13 2000-01-13 Composite retaining wall and construction method for underground structure
PCT/KR2000/000017 WO2000042263A2 (en) 1999-01-13 2000-01-13 Composite retaining wall and construction method for underground structure
US10/135,581 US20030005650A1 (en) 1999-01-13 2002-04-30 Composite retaining wall and construction method for underground structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-1999-0047839A KR100376590B1 (en) 1999-10-30 1999-10-30 Multi-phased underground construction method for wide excavation using permanent structural members as temporary struts

Publications (2)

Publication Number Publication Date
KR20000058239A KR20000058239A (en) 2000-10-05
KR100376590B1 true KR100376590B1 (en) 2003-03-17

Family

ID=19617922

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-1999-0047839A KR100376590B1 (en) 1999-01-13 1999-10-30 Multi-phased underground construction method for wide excavation using permanent structural members as temporary struts

Country Status (1)

Country Link
KR (1) KR100376590B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103711128A (en) * 2013-12-31 2014-04-09 上海建工七建集团有限公司 Construction method for shallow foundation structural beam slab
CN104563128A (en) * 2014-12-22 2015-04-29 上海建工集团股份有限公司 Synchronous excavation supporting system for deep and large asymmetric pit in soft soil area and implementation method of supporting system
CN106480889A (en) * 2016-11-14 2017-03-08 上海岩土工程勘察设计研究院有限公司 A kind of Pile of Deep Foundation Pit method of reinforcement design

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100383268B1 (en) * 2000-07-14 2003-05-12 조재형 method for underground construction of building by using permanent structural member as strut for support retaining wall
KR100412162B1 (en) * 2001-09-25 2003-12-24 (주)신성엔지니어링 Method of construction for excavating the ground by using trusstype support structures
CN111648245A (en) * 2020-05-21 2020-09-11 中交二公局第二工程有限公司 Ultra-large area grouting construction method for cable-stayed bridge reinforced concrete combined section
CN115094905A (en) * 2022-08-01 2022-09-23 上海建工一建集团有限公司 Construction method for large-scale foundation pit underground engineering center-to-periphery prefabricated assembly structure
CN116876529B (en) * 2023-09-08 2023-12-15 中建交通建设集团有限公司 Construction method of central type supporting system for deep and large foundation pit

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR0179708B1 (en) * 1995-02-21 1999-04-01 최훈 Working method for underground structure of a building

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR0179708B1 (en) * 1995-02-21 1999-04-01 최훈 Working method for underground structure of a building

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103711128A (en) * 2013-12-31 2014-04-09 上海建工七建集团有限公司 Construction method for shallow foundation structural beam slab
CN104563128A (en) * 2014-12-22 2015-04-29 上海建工集团股份有限公司 Synchronous excavation supporting system for deep and large asymmetric pit in soft soil area and implementation method of supporting system
CN104563128B (en) * 2014-12-22 2016-10-05 上海建工集团股份有限公司 The asymmetric deep big foundation pit in soft clay area synchronizes support system and the implementation of excavation
CN106480889A (en) * 2016-11-14 2017-03-08 上海岩土工程勘察设计研究院有限公司 A kind of Pile of Deep Foundation Pit method of reinforcement design

Also Published As

Publication number Publication date
KR20000058239A (en) 2000-10-05

Similar Documents

Publication Publication Date Title
CN1078294C (en) Integral foundation underpinning technology for building added floor
KR100313720B1 (en) Composite Underground Structure Construction Method
CN109024662A (en) Method of the anchor pile underpinning without basement building underground space increasing layer
KR100376590B1 (en) Multi-phased underground construction method for wide excavation using permanent structural members as temporary struts
JP2000008394A (en) Construction method for underground structure such as underground pit for installation of parking lot
JP2002115260A (en) Extension method for basement
JP2000352296A (en) Method o constructing passage just under underground structure
JPS62288269A (en) Method for extending underground stair of building
KR20000058238A (en) Underground construction method using permanent reinforced concrete girders as temporary struts
JP7275844B2 (en) WALL-LIKE STRUCTURE AND METHOD OF CONSTRUCTING WALL-LIKE STRUCTURE
JPH0559728A (en) Sheathing work above underground structure
KR20030086233A (en) execution method of landscape architecture for cutting ground using blasting stone and structure of landscape architecture for the same
KR200219236Y1 (en) A mold assembly for reinforced concrete girders execution
JP2003082691A (en) Execution method for underground structural skeleton
CN205557573U (en) Underground structure
JP2657671B2 (en) Reconstruction method for existing structures
JP7398609B2 (en) Concrete frame construction method and underground structure
KR102632451B1 (en) Basement Demolition Method using Established-wall
KR102420947B1 (en) Retaining wall construction method using gravity block
JP4031284B2 (en) Construction method for underground structures
JPH05331865A (en) Differential settlement reducing method of multistory building
JPH0886117A (en) Building installation method
KR100623005B1 (en) Underground outer wall construction method using temporary retaining wall
JPH02248527A (en) Constructing foundation structure
TW418274B (en) A pre-cast and site-cast combined construction method of retaining and waterproof diaphragm wall

Legal Events

Date Code Title Description
A201 Request for examination
G15R Request for early opening
N231 Notification of change of applicant
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130305

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20140305

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20150304

Year of fee payment: 13

FPAY Annual fee payment

Payment date: 20151229

Year of fee payment: 14

LAPS Lapse due to unpaid annual fee