CN205653703U - Suspension bridge anchorage anchor - Google Patents

Suspension bridge anchorage anchor Download PDF

Info

Publication number
CN205653703U
CN205653703U CN201620363340.5U CN201620363340U CN205653703U CN 205653703 U CN205653703 U CN 205653703U CN 201620363340 U CN201620363340 U CN 201620363340U CN 205653703 U CN205653703 U CN 205653703U
Authority
CN
China
Prior art keywords
anchor
anchorage
cable
reinforcing bar
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620363340.5U
Other languages
Chinese (zh)
Inventor
汤庆超
罗仕庭
沈良帅
张隆顺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Kunming Engineering Corp Ltd
Original Assignee
PowerChina Kunming Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Kunming Engineering Corp Ltd filed Critical PowerChina Kunming Engineering Corp Ltd
Priority to CN201620363340.5U priority Critical patent/CN205653703U/en
Application granted granted Critical
Publication of CN205653703U publication Critical patent/CN205653703U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a suspension bridge anchorage anchor, including connector pull rod, anchor rope ground tackle, prestressed anchorage cable, anchor arm -tie concrete and anchorage sealing concrete, connector pull rod, anchor rope ground tackle and prestressed anchorage cable are connected in order, the periphery of anchor rope ground tackle sets up the anchor reinforcing bar of many parallels, the tip of anchor rope ground tackle sets up reinforcing bar net piece under the multilayer anchor, the anchor reinforcing bar is followed pass in the reinforcing bar net piece under the anchor, reinforcing bar net piece embedded in under anchor rope ground tackle, anchor reinforcing bar and the anchor in anchor arm -tie concrete and the anchorage sealing concrete, pass in the reinforcing bar net piece under the connector pull rod follow anchor. Anchor simple structure, safe and reliable, construction convenience can strengthen suspension bridge anchorage safety stock, and when some prestressed anchorage of suspension bridge anchorage cable became invalid, the effect of redistributing was played to main push -towing rope internal force to the intervention effect in time of this anchor, improves the durability of suspension bridge anchorage, guarantees bridge safety.

Description

Analysis of Suspension Bridges ' Anchorage anchor
Technical field
This utility model belongs to science of bridge building field, relates to Analysis of Suspension Bridges ' Anchorage, is specifically related to improve Analysis of Suspension Bridges ' Anchorage safety A kind of anchor of property.
Background technology
Analysis of Suspension Bridges ' Anchorage structure is generally divided into bridge anchorage, gravity anchor and rock anchorage, is mainly used in resisting main push-towing rope Pulling force.
Considering for factors such as economy and construction conditions, suspension bridge rock anchor technology is used for Bridges in Mountainous Areas, and main push-towing rope load is big Some or all of is to be undertaken by anchor cable, and the effect of rock bolting directly affects the safety of bridge.
Generally prestress anchorage cable uses form to be one to one attached with main push-towing rope thread, the feature of this connected mode The transmission being power is relatively clearer and more definite, and structural form is simple, can effectively reduce anchor plate concrete amount, and shortcoming is that anchor cable entirety can The best by property.Durability is the problem needing emphasis to consider in Analysis of Suspension Bridges ' Anchorage design, and the load of main push-towing rope thread is by corresponding Prestress anchorage cable undertakes, if a certain failure of cable, then corresponding main push-towing rope thread is lost anchoring, it will affect the peace of bridge Quan Xing.
Utility model content
Technical problem to be solved in the utility model is, overcomes the above defect, it is provided that a kind of simple in construction, safety Reliably, easy construction, the anchor of Analysis of Suspension Bridges ' Anchorage safety stock can be strengthened, to solve to drop due to indivedual failure of cables The problem of low anchorage system safety coefficient.
In order to solve techniques described above problem, Analysis of Suspension Bridges ' Anchorage anchor described in the utility model, including adapter Pull bar, Anchor Cable Anchorage, prestress anchorage cable, anchor tie plate concrete and sealing off and covering anchorage concrete, described adapter pull bar, Anchor Cable Anchorage and pre- Stress anchor cable is sequentially connected with, and the periphery of described Anchor Cable Anchorage arranges a plurality of parallel anchor bar, the end of described Anchor Cable Anchorage Arranging reinforced mesh under multilamellar anchor, described anchor bar passes in reinforced mesh from described anchor, described Anchor Cable Anchorage, anchoring steel During under muscle and anchor, reinforced mesh is embedded in described anchor tie plate concrete and sealing off and covering anchorage concrete, described adapter pull bar reinforcing bar from anchor Mesh sheet passes.
As preferably, under anchor described in the utility model, reinforced mesh is set to 3 ~ 6 layers.
Further, the two ends of anchor bar described in the utility model are outwards rolled over;Described anchor bar is diameter 20 ~ 32 millimeters Reinforcing bar.
Analysis of Suspension Bridges ' Anchorage anchor described in the utility model, the periphery of its Anchor Cable Anchorage arranges a plurality of anchoring steel parallel Muscle, the end of described Anchor Cable Anchorage arranges reinforced mesh under multilamellar anchor, and under described anchor bar and anchor, reinforced mesh is embedded in anchor in advance In arm-tie concrete and sealing off and covering anchorage concrete, and surround Anchor Cable Anchorage, can be that adapter pull bar provides interim when construction Support;Under anchor, reinforced mesh dispersibles stress under anchorage, it is to avoid stress is concentrated.
The beneficial effects of the utility model: owing to employing structure described above, this utility model has simple in construction, executes The advantages such as work is easy, practical, effect is notable, when in rock anchor, certain prestress anchorage cable lost efficacy, the main push-towing rope thread of its correspondence Power be first transferred to anchor, by anchor tie plate concrete, power is disperseed to other prestress anchorage cable, it is ensured that main push-towing rope thread Anchoring, if a rock anchor failure of cable can be prevented effectively from, the situation that the main push-towing rope thread of its correspondence is the most ineffective, carry to greatest extent The durability of high Analysis of Suspension Bridges ' Anchorage, it is ensured that bridge security.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the plane graph of reinforced mesh under anchor described in the utility model;
Fig. 3 is the axonometric chart of anchor described in embodiment one;
Fig. 4 is the structural representation of anchor described in embodiment two.
Detailed description of the invention
With embodiment, this utility model is described in further detail below in conjunction with the accompanying drawings.
Analysis of Suspension Bridges ' Anchorage anchor described in the utility model, including adapter pull bar 1, Anchor Cable Anchorage 2, prestress anchorage cable 3, anchor tie plate concrete 4 and sealing off and covering anchorage concrete 5, described adapter pull bar 1, Anchor Cable Anchorage 2 and prestress anchorage cable 3 be sequentially connected with, The periphery of described Anchor Cable Anchorage 2 arranges a plurality of parallel anchor bar 6, and the end of described Anchor Cable Anchorage 2 arranges steel under multilamellar anchor Muscle mesh sheet 7, described anchor bar 6 passes in reinforced mesh 7 from described anchor, under described Anchor Cable Anchorage 2, anchor bar 6 and anchor Reinforced mesh 7 is embedded in described anchor tie plate concrete 4 and sealing off and covering anchorage concrete 5, described adapter pull bar 1 reinforced mesh from anchor Pass in 7.
As preferably, under anchor described in the utility model, reinforced mesh 7 is set to 3 ~ 6 layers.
Further, the two ends of anchor bar 6 described in the utility model are outwards rolled over;Described anchor bar 6 is diameter 20 ~ 32 milli The reinforcing bar of rice.
Embodiment one: the middle part of Anchor Cable Anchorage 2 described in the utility model arranges a macropore, each aperture in both sides, greatly Hole is prestress anchorage cable hole 10, and for the connection of prestress anchorage cable 3 with Anchor Cable Anchorage 2, aperture is adapter tie rod hole 11, is used for Adapter pull bar 1 and the connection of Anchor Cable Anchorage 2;Described anchor bar 6 is the high intensity straight steel bar of 25, bar-mat reinforcement from anchor Passing in sheet 7, described reinforced mesh 7 is set to five layers, under described anchor bar 6 and anchor reinforced mesh 7 be embedded in advance anchor tie plate mix In solidifying soil 4 and sealing off and covering anchorage concrete 5, the rectangular shape of anchor bar 6 surrounds Anchor Cable Anchorage 2 parallel, and under anchor, reinforced mesh 7 is arranged in Rock anchor anchorage 2 end, described adapter pull bar 1 passes in reinforced mesh 7 from anchor.The quantity of described anchor and main push-towing rope silk Number of share of stock amount is consistent, the corresponding main push-towing rope thread 9 of each device and a prestress anchorage cable 3, primarily serves the purpose of dispersion stress under anchorage, Stress is avoided excessively to concentrate.
Mechanical behavior of the present utility model is as follows:
(1) under the equal non-failure case of prestress anchorage cable 3, the load of main rope of suspension bridge 8 disperses to hold to main push-towing rope thread 9 Load, and transmit the force to Anchor Cable Anchorage 2 by adapter pull bar 1, final load is transferred to prestress anchorage cable by Anchor Cable Anchorage 2 3, prestress anchorage cable 3 undertake the load that main rope of suspension bridge 8 passes over;
(2) in the case of prestress anchorage cable 3 exists part failure of cable, described anchor starts to get involved, and undertakes mistake The load of effect main push-towing rope thread 9 corresponding to anchor cable, under anchor, reinforced mesh 7 plays a role and avoids stress under anchorage to concentrate, and load passes through Parallel type anchor bar 6 is transferred in anchor tie plate concrete 4, by anchor tie plate concrete 4 by main push-towing rope silk corresponding for the anchor cable that lost efficacy The load of stock 9 disperses to undertake to other prestress anchorage cable 3 not lost efficacy, it is to avoid part failure of cable and cause its correspondence The situation that main push-towing rope thread 9 also lost efficacy.
Embodiment two: described in the present embodiment, anchor bar 6 is the high intensity straight steel bar of 30, and two ends are outwards rolled over, described Reinforced mesh 7 is set to four layers, and described anchor bar 6 passes in reinforced mesh 7 from anchor, strengthens the stability of anchor, Remaining is with embodiment one.
These are only some embodiments of the present utility model, be not limitation of the utility model, this utility model is same Sample can apply to, in Tunnel-Type Anchorage of Suspension Bridge heavy stone used as an anchor and gravity anchor structure, as long as employing structure described above, all should fall into Protection domain of the present utility model.

Claims (4)

1. an Analysis of Suspension Bridges ' Anchorage anchor, draws including adapter pull bar (1), Anchor Cable Anchorage (2), prestress anchorage cable (3), anchor Board concrete (4) and sealing off and covering anchorage concrete (5), described adapter pull bar (1), Anchor Cable Anchorage (2) and prestress anchorage cable (3) sequentially connect Connect, it is characterised in that the periphery of described Anchor Cable Anchorage (2) arranges a plurality of parallel anchor bar (6), described Anchor Cable Anchorage (2) End reinforced mesh (7) under multilamellar anchor are set, described anchor bar (6) passes in reinforced mesh (7) from described anchor, described Under Anchor Cable Anchorage (2), anchor bar (6) and anchor, reinforced mesh (7) is embedded in described anchor tie plate concrete (4) and sealing off and covering anchorage concrete (5), in, described adapter pull bar (1) passes in reinforced mesh (7) from anchor.
Analysis of Suspension Bridges ' Anchorage anchor the most according to claim 1, it is characterised in that under described anchor, reinforced mesh (7) is arranged It it is 3 ~ 6 layers.
Analysis of Suspension Bridges ' Anchorage anchor the most according to claim 1 or claim 2, it is characterised in that the two ends of described anchor bar (6) Outwards folding.
Analysis of Suspension Bridges ' Anchorage anchor the most according to claim 1 or claim 2, it is characterised in that described anchor bar (6) is diameter The reinforcing bar of 20 ~ 32.
CN201620363340.5U 2016-04-27 2016-04-27 Suspension bridge anchorage anchor Withdrawn - After Issue CN205653703U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620363340.5U CN205653703U (en) 2016-04-27 2016-04-27 Suspension bridge anchorage anchor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620363340.5U CN205653703U (en) 2016-04-27 2016-04-27 Suspension bridge anchorage anchor

Publications (1)

Publication Number Publication Date
CN205653703U true CN205653703U (en) 2016-10-19

Family

ID=57401503

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620363340.5U Withdrawn - After Issue CN205653703U (en) 2016-04-27 2016-04-27 Suspension bridge anchorage anchor

Country Status (1)

Country Link
CN (1) CN205653703U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105696464A (en) * 2016-04-27 2016-06-22 中国电建集团昆明勘测设计研究院有限公司 Suspension bridge concrete anchor anchoring device
CN107724236A (en) * 2017-10-24 2018-02-23 长江水利委员会长江科学院 A kind of Tunnel-Type Anchorage of Suspension Bridge combination anchor and method of construction
CN108978485A (en) * 2018-08-24 2018-12-11 中交路桥建设有限公司 A kind of steel construction cable-stayed bridge anchor tie plate field installation process
CN111535177A (en) * 2020-05-27 2020-08-14 中国科学院武汉岩土力学研究所 Rock anchor anchorage composed of prestressed group anchor and surrounding rock and construction method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105696464A (en) * 2016-04-27 2016-06-22 中国电建集团昆明勘测设计研究院有限公司 Suspension bridge concrete anchor anchoring device
CN107724236A (en) * 2017-10-24 2018-02-23 长江水利委员会长江科学院 A kind of Tunnel-Type Anchorage of Suspension Bridge combination anchor and method of construction
CN107724236B (en) * 2017-10-24 2022-05-03 长江水利委员会长江科学院 Suspension bridge tunnel anchor combined anchorage and construction method
CN108978485A (en) * 2018-08-24 2018-12-11 中交路桥建设有限公司 A kind of steel construction cable-stayed bridge anchor tie plate field installation process
CN111535177A (en) * 2020-05-27 2020-08-14 中国科学院武汉岩土力学研究所 Rock anchor anchorage composed of prestressed group anchor and surrounding rock and construction method thereof

Similar Documents

Publication Publication Date Title
CN205653703U (en) Suspension bridge anchorage anchor
CN104947603A (en) Reinforced concrete girder bridge girder reinforcing structure and method
CN105696464B (en) Analysis of Suspension Bridges ' Anchorage anchor
CN205223867U (en) Device that falls is prevented in bridge construction
CN207485010U (en) A kind of building bracing means
CN208966124U (en) A kind of novel clamp
CN103898905B (en) Composite high-strength anchor cable
CN204589831U (en) A kind of rc beam bridge girder reinforcing construction
CN207934488U (en) A kind of Core Walls Structure bottom ruggedized construction
CN105256720A (en) Partial ground anchor balancing cable cable-stayed bridge
CN203096597U (en) Bridge suspender connecting device
CN205062830U (en) Transmission tower's basis
CN203429559U (en) Suspension bridge anchor system steel anchor rod hoisting tool
CN209397765U (en) Prefabricated panel and panel wall system
CN203006799U (en) Standard knot coupling sleeve stop device of tower crane
CN102251474B (en) Frictional anchorage device applied to fibre reinforced composite cables
CN207582981U (en) Building bar lifts auxiliary tool
CN206034498U (en) Open string beam type combination side well lid
CN206071088U (en) The system of prestress rope integrative consolidation board wall
CN205985890U (en) Insulating baffle of electric power
CN204386031U (en) The crossbeam of bar and triangle gusset taken by a kind of band
CN203256906U (en) Embedding structure of steel rib columns and foundation bolts
CN204112600U (en) New type FRP rib tape screw plug bond type anchorage
CN202107998U (en) Friction anchorage device used for fiber reinforced composite bar dragline
CN202810223U (en) Integrated safety net for buildings

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20161019

Effective date of abandoning: 20181130

AV01 Patent right actively abandoned