CN203006799U - Standard knot coupling sleeve stop device of tower crane - Google Patents
Standard knot coupling sleeve stop device of tower crane Download PDFInfo
- Publication number
- CN203006799U CN203006799U CN 201320001857 CN201320001857U CN203006799U CN 203006799 U CN203006799 U CN 203006799U CN 201320001857 CN201320001857 CN 201320001857 CN 201320001857 U CN201320001857 U CN 201320001857U CN 203006799 U CN203006799 U CN 203006799U
- Authority
- CN
- China
- Prior art keywords
- coupling sleeve
- bolt
- tower crane
- standard knot
- stop device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Jib Cranes (AREA)
Abstract
The utility model discloses a standard knot coupling sleeve stop device of a tower crane, and relates to the technical field of construction machinery. Main branches of standard knots are provided with an upper coupling sleeve and a lower coupling sleeve; two adjacent standard knots are connected by a bolt through the upper coupling sleeve and the lower coupling sleeve; and a boss is arranged at the upper end of the lower coupling sleeve. The bolt is inserted into the upper coupling sleeve when the standard knots of the tower crane are arranged; a rotating high-strength hexagon bolt is baffled by the boss on the upper coupling sleeve when a person screws the nut by a spanner, so as to play a stopping role. The bolt is dismantled by the same method in a dismantling process. The high-strength bolt can be rapidly arranged without other tools and manpower; and the standard knot coupling sleeve stop device of the tower crane is simple in structure, applicable, safe and reliable.
Description
Technical field
The utility model relates to the vehicle for construction technical field, is specifically to play the parts of connection function on a kind of tower crane by bolt the coupling sleeve stop motion mechanism that the process of especially installing, dismantling at bolt plays the role of stopper.
Background technology
Tower crane is widely used in each big-and-middle-sized building ground as the machinery of the transportation of middle and high layer housing construction and equipment installation.Its tower body is partly to be formed by connecting by the high strength bolt that is contained in coupling sleeve by base section, reinforcement joint, standard knot, and the installation and removal of bolt are very important links.In prior art, the installation and removal process of bolt generally has two installation personnels to go up tower crane simultaneously to operate, and the human spanner nut that puts bolt that is fixedly connected prevents its rotation, and another people is at coupling sleeve lower end spanner clamp nut, otherwise nut can't be tightened.So not only increase labour cost, return erection work and bring certain potential safety hazard.
Summary of the invention
For overcoming the deficiencies in the prior art, goal of the invention of the present utility model is to provide a kind of tower crane mark
Accurate joint coupling sleeve stop motion mechanism is to realize the purpose of single independent installation or removal.
For achieving the above object, the master of standard knot of the present utility model props up and is provided with first line of a couplet female connector and second line of a couplet female connector, and adjacent two standard knots are connected bolt and are connected with lower link by first line of a couplet female connector, and it is characterized in that: the upper end of lower joint sleeve is provided with boss.
When column crane mast section was installed, bolt inserted second line of a couplet female connector, and during a human spanner fastening nut, the high strength hexagonal bar iron that thereupon rotates is kept out by the stop ledge that lower link puts, thereby played the effect of stop.During dismounting, disassemble bolt by same method and get final product.
The utility model compared with prior art, can Fast Installation high strength bolt, and need to be by other instrument, manpower, simple in structure applicable, safe and reliable.
Description of drawings
Fig. 1 is standard knot integral installation schematic diagram of the present utility model.
Fig. 2 is the I-I enlarged drawing of Fig. 1.
Fig. 3 is that the A of Fig. 2 is to view.
Fig. 4 is the B-B cutaway view of Fig. 3.
The specific embodiment
As shown in Figure 1, tower body is to be assembled by several standard knots 1, all adopts 8 10.9 grades, the high strength bolt of M30 to connect between every two standard knots 1 and tightens up, and sequence number 2 is propped up for the master of standard knot 1.
As shown in Figure 2, Figure 3, Figure 4, Fig. 2 is the I-I enlarged drawing of Fig. 1.The master of standard knot props up and is provided with first line of a couplet female connector 4 and second line of a couplet female connector 3, and adjacent two standard knots 1 are connected with second line of a couplet female connector with bolt 5 connections by first line of a couplet female connector 4, and the upper end of lower joint sleeve 3 is provided with boss 6.
When column crane mast section was installed, high strength bolt 5 inserted second line of a couplet female connectors 3, and boss 6 is wherein parallel on one side with high strength hexagonal bar iron 5, also can guarantee certain gap during bolt 5 and boss 6 nearest, can not interfere.When installation, dismounting, a human spanner fastening nut, the hexagonal bar iron 5 that thereupon rotates is kept out by the boss 6 on second line of a couplet female connector 3, thereby reaches the purpose of stop.
Claims (1)
1. column crane mast section coupling sleeve stop motion mechanism, the master of standard knot (1) props up (2) and is provided with first line of a couplet female connector (4) and second line of a couplet female connector (3), adjacent two standard knots (1) are connected 3 by first line of a couplet female connector (4) with second line of a couplet female connector) connect with bolt (5), it is characterized in that: the upper end of lower joint sleeve (3) is provided with boss (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320001857 CN203006799U (en) | 2013-01-04 | 2013-01-04 | Standard knot coupling sleeve stop device of tower crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320001857 CN203006799U (en) | 2013-01-04 | 2013-01-04 | Standard knot coupling sleeve stop device of tower crane |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203006799U true CN203006799U (en) | 2013-06-19 |
Family
ID=48598414
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320001857 Expired - Fee Related CN203006799U (en) | 2013-01-04 | 2013-01-04 | Standard knot coupling sleeve stop device of tower crane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203006799U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103303815A (en) * | 2013-07-01 | 2013-09-18 | 张家港市天运建筑机械有限公司 | Tower crane standard knot |
CN110723663A (en) * | 2019-10-21 | 2020-01-24 | 徐州瑞益晟机械有限公司 | Standard knot bolt fastening device of tower crane |
-
2013
- 2013-01-04 CN CN 201320001857 patent/CN203006799U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103303815A (en) * | 2013-07-01 | 2013-09-18 | 张家港市天运建筑机械有限公司 | Tower crane standard knot |
CN110723663A (en) * | 2019-10-21 | 2020-01-24 | 徐州瑞益晟机械有限公司 | Standard knot bolt fastening device of tower crane |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203604916U (en) | Anti-knock connecting base | |
CN203006799U (en) | Standard knot coupling sleeve stop device of tower crane | |
CN202559713U (en) | Steel pipe connecting device | |
CN203390893U (en) | Sliding weight for pulling pin | |
CN201428238Y (en) | Expansion sleeve type scaffold connecting part | |
CN203347322U (en) | Electric pole stay wire clamping apparatus | |
CN202867496U (en) | Platform fixing device | |
CN204492327U (en) | A kind of Assembled safety enclosing railings | |
CN205100529U (en) | Concatenation guide rail | |
CN110820944B (en) | Steel structure fastening equipment | |
CN205637644U (en) | Entrance to a cave protective structure | |
CN203161966U (en) | Regulating and locking device for rope end of steel wire rope | |
CN206393519U (en) | A kind of modified ratchet spanner header structure | |
CN204725381U (en) | Electric power pylon bolt fixture | |
CN2835437Y (en) | Falsework fastening fastener | |
CN203961088U (en) | For the scaffolding steel pipe linkage of multistory building | |
CN202812478U (en) | Pipe clamp structure | |
CN204441820U (en) | A kind of cable walk away safety spacer assembly | |
CN203553771U (en) | Pulley fixing plate applied to overhead line stringing | |
CN204349332U (en) | A kind of suspension clamp for electric line fastened tools with moment Presentation Function | |
CN203487768U (en) | Modified scaffold rotary fastener | |
CN204386031U (en) | The crossbeam of bar and triangle gusset taken by a kind of band | |
CN202866383U (en) | Edge protection device | |
CN203009361U (en) | Locking device of feed water pump thrust disc | |
CN203296370U (en) | U-shaped bolt fastener for platform beam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C53 | Correction of patent for invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Mei Ling Inventor after: Ma Zhao Inventor after: Chen Xiaowei Inventor before: Mei Ling |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: MEI LING TO: MEI LING MA ZHAO CHEN XIAOWEI |
|
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130619 Termination date: 20160104 |