CN203485077U - Wrench - Google Patents

Wrench Download PDF

Info

Publication number
CN203485077U
CN203485077U CN201320452979.7U CN201320452979U CN203485077U CN 203485077 U CN203485077 U CN 203485077U CN 201320452979 U CN201320452979 U CN 201320452979U CN 203485077 U CN203485077 U CN 203485077U
Authority
CN
China
Prior art keywords
connecting rod
socket
nut
handle
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320452979.7U
Other languages
Chinese (zh)
Inventor
陈宜伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 19th Bureau Group Co Ltd
Seventh Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Original Assignee
China Railway 19th Bureau Group Co Ltd
Seventh Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 19th Bureau Group Co Ltd, Seventh Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd filed Critical China Railway 19th Bureau Group Co Ltd
Priority to CN201320452979.7U priority Critical patent/CN203485077U/en
Application granted granted Critical
Publication of CN203485077U publication Critical patent/CN203485077U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to the field of hardware and provides a wrench. The wrench includes a handle, a bending connecting rod, and a nut socket, and the handle and the nut socket are respectively connected at the two ends of the bending connecting rod. When a viaduct anti-throwing wire screen is installed, a nut to be screwed can be arranged in the nut socket in advance, one can hold the handle to penetrate the nut socket through a mesh and to align with the end of a screw rod, and then uses a common wrench to tightly screw the tail end of the screw rod to tightly lock the screw rod with the nut, so that the problems that the nut and the screw rod are difficult to install because of small mesh size when the wire screen is installed can be solved. By using such a wrench, operators don't have to conduct the operation by climbing over to the outer side of the viaduct, thereby reducing the danger of high altitude construction and improving the work efficiency.

Description

A kind of spanner
Technical field
The utility model relates to five metals field, relates in particular to a kind of spanner for tie down screw, nut when silk screen is installed.
Background technology
For guaranteeing traffic safety under overpass, prevent that accident from occurring, anti-casting need be installed in bridge railings both sides and execute, anti-throwing silk screen is wherein a kind of.Facility maintenance repair outside silk screen for convenience, silk netting and steel column often adopt with bolts, because size of mesh is little, and limbs operational difficulty, during installation, personnel can only turn over and to silk screen outside, carry out the solid operation of twisting of bolt, have strengthened the danger of work high above the ground simultaneously.
Utility model content
For above-mentioned defect, the purpose of this utility model is to provide a kind of spanner, when it has solved silk screen installation, causes nut, screw rod to be difficult to the problem of installing because size of mesh is little, has improved operating efficiency.
To achieve these goals, the utility model provides a kind of spanner, comprises handle, bending connecting rod and ut socket, and described handle and described ut socket are connected to the two ends of described bending connecting rod.
According to spanner of the present utility model, described bending connecting rod comprises the first connecting rod being connected with described ut socket and the second connecting rod being connected with described handle, and described first connecting rod is connected with described second connecting rod.
According to spanner of the present utility model, described first connecting rod comprises that two have the journal stirrup arranging in opposite directions, and described journal stirrup is provided with the first perforation;
One end that described second connecting rod is not connected with described handle is provided with the second perforation,
Described first connecting rod and described second connecting rod are by boring a hole and described biperforate bolted splice through described first.
According to spanner of the present utility model, described first connecting rod and described second connecting rod are one-body molded, and described first connecting rod and described second connecting rod arc-shaped transition.
According to spanner of the present utility model, described ut socket comprises ring body, and a side end face of described ring body is provided with the flange of inside extension, and described flange center has through hole.
According to spanner of the present utility model, the sidewall of described ring body is provided with screwed hole, and described first connecting rod is bolted in described screwed hole.
Spanner of the present utility model comprises handle, bending connecting rod and ut socket, and handle and ut socket are connected to the two ends of bending connecting rod.When the anti-throwing silk screen of overpass is installed, can in advance need be twisted to solid nut is placed in ut socket, then hand-held handle passes ut socket and aims at screw end head from mesh, then adopt common wrench to twist solid screw rod tail end, make screw rod and nut check, thereby while having solved silk screen installation, cause nut, screw rod to be difficult to the problem of installing because size of mesh is little, personnel are without turning over to outside operation, reduce the danger of work high above the ground, and improve operating efficiency.
Accompanying drawing explanation
Fig. 1 is the three-dimensional view of the utility model spanner;
Fig. 2 is the explosive view of the utility model spanner;
Fig. 3 is the three-dimensional view that the second connecting rod of the utility model spanner coordinates with handle;
Fig. 4 is the three-dimensional view of the head rod of the utility model spanner;
Fig. 5 is the three-dimensional view of the ut socket of the utility model spanner;
Fig. 6 is the three-dimensional view that the utility model spanner coordinates with nut and screw rod;
Fig. 7 is the three-dimensional view that the utility model spanner coordinates with nut and silk screen.
The specific embodiment
In order to make the purpose of this utility model, technical scheme and advantage clearer, below in conjunction with drawings and Examples, the utility model is further elaborated.Should be appreciated that specific embodiment described herein is only in order to explain the utility model, and be not used in restriction the utility model.
As shown in Fig. 1 ~ Fig. 7, a kind of spanner 100 of the utility model, comprises handle 10, bending connecting rod 20 and ut socket 30, and handle 10 and ut socket 30 are connected to the two ends of bending connecting rod 20.As shown in Figure 6 and Figure 7, when the anti-throwing silk screen 400 of overpass is installed, can in advance need be twisted to solid nut 300 is placed in ut socket 30, then hand-held handle 10 passes and aims at screw end head by ut socket 30 from mesh, then adopt common wrench to twist solid screw rod tail end, make screw rod 200 and nut 300 lockings, thereby while having solved silk screen 400 installation, because size of mesh is little, cause nut 300, screw rod 200 to be difficult to the problem of installing, personnel are without turning over to outside operation, reduce the danger of work high above the ground, and improve operating efficiency.
In embodiment as depicted in figs. 1 and 2, bending connecting rod 20 comprises the first connecting rod 21 being connected with ut socket 30 and the second connecting rod 22 being connected with handle 10, and first connecting rod 21 is connected with second connecting rod 22.As shown in Figure 2 and Figure 4, first connecting rod 21 comprises that two have the journal stirrup 211 arranging in opposite directions, and journal stirrup 211 is provided with the first perforation 212; One end that second connecting rod 22 is not connected with handle 10 is as shown in Figures 2 and 3 provided with the second perforation 221, and first connecting rod 21 passes through through the bolt 23 of the first perforation 212 and the second perforation 221 hinged with second connecting rod 22.Meanwhile, because first connecting rod 21 adopts articulated manner to be connected with second connecting rod 22, thereby first connecting rod 21 and the relative angle of second connecting rod 22 can be regulated, make this bending connecting rod 20 be more applicable for actual job.
Preferably, the first connecting rod 21 of bending connecting rod 20 can pass through arc-shaped transition with second connecting rod 22, and first connecting rod 21 is one-body molded with second connecting rod 22.Obviously, bending connecting rod 20 also can be other bending shape.
As shown in Figure 5, ut socket 30 comprises that a side end face of ring body 31,31 ring bodies is provided with the flange 32 of inside extension, and flange 32 centers have through hole 33.The sidewall of ring body 31 is provided with screwed hole 34, and first connecting rod 21 is bolted in screwed hole 34.Ut socket 30 is according to nut dimensioned, long for preventing screw rod, ut socket 30 adopts through-hole type, can from through hole 33, pass smoothly when guaranteeing that screw rod penetrates, and when assurance nut 300 is put into, unlikely spilling is advisable, and ut socket 30 is connected with first connecting rod 21 by screwed hole 34, can change different ut socket 30 according to the specification of nut.
Preferably, in the utility model, handle 10 can weld with bending connecting rod 20 or be one-body molded, and the material of handle 10, bending connecting rod 20 and ut socket 30 is preferably steel.For assurance nut, in ut socket 30, do not deviate from, ut socket 30 also can be selected magnetic material.
In sum, spanner of the present utility model comprises handle, bending connecting rod and ut socket, and handle and ut socket are connected to the two ends of bending connecting rod.When the anti-throwing silk screen of overpass is installed, can in advance need be twisted to solid nut is placed in ut socket, then hand-held handle passes ut socket and aims at screw end head from mesh, then adopt common wrench to twist solid screw rod tail end, make screw rod and nut check, thereby while having solved silk screen installation, cause nut, screw rod to be difficult to the problem of installing because size of mesh is little, personnel are without turning over to outside operation, reduce the danger of work high above the ground, and improve operating efficiency.
Certainly; the utility model also can have other various embodiments; in the situation that not deviating from the utility model spirit and essence thereof; those of ordinary skill in the art are when making various corresponding changes and distortion according to the utility model, but these corresponding changes and distortion all should belong to the protection domain of the appended claim of the utility model.

Claims (5)

1. a spanner, is characterized in that, comprises handle, bending connecting rod and ut socket, and described handle and described ut socket are connected to the two ends of described bending connecting rod; Described bending connecting rod comprises the first connecting rod being connected with described ut socket and the second connecting rod being connected with described handle, and described first connecting rod and described second connecting rod are hinged.
2. spanner according to claim 1, is characterized in that, described first connecting rod comprises that two have the journal stirrup arranging in opposite directions, and described journal stirrup is provided with the first perforation;
One end that described second connecting rod is not connected with described handle is provided with the second perforation,
Described first connecting rod and described second connecting rod are by boring a hole and described biperforate bolted splice through described first.
3. spanner according to claim 1, is characterized in that, described first connecting rod and described second connecting rod are one-body molded, and described first connecting rod and described second connecting rod arc-shaped transition.
4. spanner according to claim 1, is characterized in that, described ut socket comprises ring body, and a side end face of described ring body is provided with the flange of inside extension, and described flange center has through hole.
5. spanner according to claim 4, is characterized in that, the sidewall of described ring body is provided with screwed hole, and described first connecting rod is bolted in described screwed hole.
CN201320452979.7U 2013-07-26 2013-07-26 Wrench Expired - Fee Related CN203485077U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320452979.7U CN203485077U (en) 2013-07-26 2013-07-26 Wrench

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320452979.7U CN203485077U (en) 2013-07-26 2013-07-26 Wrench

Publications (1)

Publication Number Publication Date
CN203485077U true CN203485077U (en) 2014-03-19

Family

ID=50255935

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320452979.7U Expired - Fee Related CN203485077U (en) 2013-07-26 2013-07-26 Wrench

Country Status (1)

Country Link
CN (1) CN203485077U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104760016A (en) * 2015-03-20 2015-07-08 高灵军 Gear-shaving machine wrench
CN105058318A (en) * 2015-08-21 2015-11-18 姜超 Hardware tool bringing convenience to detachment
CN108757097A (en) * 2018-04-02 2018-11-06 广西玉柴机器股份有限公司 A kind of tooling and method unscrewed engine and put machine oil plug screw
CN109159059A (en) * 2018-10-17 2019-01-08 尹苑苑 A kind of power saving box spanner
CN109204003A (en) * 2018-11-07 2019-01-15 中车株洲电力机车有限公司 A kind of pantagraph current collector lifting boots mechanism
CN110340831A (en) * 2019-06-10 2019-10-18 射阳县恒工工具有限公司 A kind of monkey wrench
WO2020238028A1 (en) * 2019-05-31 2020-12-03 苏交科集团股份有限公司 High-strength bolt in situ fastening construction apparatus for narrow spaces

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104760016A (en) * 2015-03-20 2015-07-08 高灵军 Gear-shaving machine wrench
CN105058318A (en) * 2015-08-21 2015-11-18 姜超 Hardware tool bringing convenience to detachment
CN108757097A (en) * 2018-04-02 2018-11-06 广西玉柴机器股份有限公司 A kind of tooling and method unscrewed engine and put machine oil plug screw
CN108757097B (en) * 2018-04-02 2023-09-05 广西玉柴机器股份有限公司 Tool and method for unscrewing engine oil plug screw of engine
CN109159059A (en) * 2018-10-17 2019-01-08 尹苑苑 A kind of power saving box spanner
CN109159059B (en) * 2018-10-17 2020-11-06 玉环墨痕机电科技有限公司 Labor-saving socket wrench
CN109204003A (en) * 2018-11-07 2019-01-15 中车株洲电力机车有限公司 A kind of pantagraph current collector lifting boots mechanism
CN109204003B (en) * 2018-11-07 2020-12-11 中车株洲电力机车有限公司 Shoe lifting mechanism of current collector
WO2020238028A1 (en) * 2019-05-31 2020-12-03 苏交科集团股份有限公司 High-strength bolt in situ fastening construction apparatus for narrow spaces
CN110340831A (en) * 2019-06-10 2019-10-18 射阳县恒工工具有限公司 A kind of monkey wrench

Similar Documents

Publication Publication Date Title
CN203485077U (en) Wrench
CN203799586U (en) Signboard mounting support for power transmission line steel tube tower
CN213692941U (en) Bolt fastening tool for electrified porcelain insulator
CN104158112A (en) Multi-purpose pedaled flying vehicle
CN204437484U (en) The support of duct of large-span steel rack
CN204878186U (en) Harmless adjustable connecting device
CN203021200U (en) Windproof draw bar of port machinery
CN204851874U (en) Fix a position safe staple bolt
CN205346632U (en) Pipe truss lifting device
CN203859440U (en) 110kV tension double-string composite insulator loss prevention device
CN203859438U (en) Multipurpose pedaling type overhead carriage
CN203795936U (en) Reinforced electric transmission line angle steel tower main material structure
CN103407904A (en) Hoop type wall-attached connection piece for tower crane and construction method thereof
CN205657407U (en) Overhead earth wire prevents falling string device
CN205270359U (en) Short stress strand mill
CN201212256Y (en) Safety horizontal net for construction of shaft
CN203006799U (en) Standard knot coupling sleeve stop device of tower crane
CN203161966U (en) Regulating and locking device for rope end of steel wire rope
CN205881330U (en) Folding portable site security notice board of distribution fortune wesy
CN105958239B (en) A kind of transmission line of electricity anticreep ground wire
CN205908028U (en) Heavy load of rigidity pull rod promotes and transfers device
CN204343366U (en) A kind of hydraulic crawler excavator driver's cabin packaged type protective screening
CN204609421U (en) Electric power safety protective sleeve
CN204947102U (en) A kind of railing ground connecting device
CN204725381U (en) Electric power pylon bolt fixture

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140319

Termination date: 20170726

CF01 Termination of patent right due to non-payment of annual fee