CN108978485A - A kind of steel construction cable-stayed bridge anchor tie plate field installation process - Google Patents

A kind of steel construction cable-stayed bridge anchor tie plate field installation process Download PDF

Info

Publication number
CN108978485A
CN108978485A CN201810974616.7A CN201810974616A CN108978485A CN 108978485 A CN108978485 A CN 108978485A CN 201810974616 A CN201810974616 A CN 201810974616A CN 108978485 A CN108978485 A CN 108978485A
Authority
CN
China
Prior art keywords
tie plate
girder
anchor tie
steel box
anchor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810974616.7A
Other languages
Chinese (zh)
Other versions
CN108978485B (en
Inventor
阎王虎
陈红江
李川
渠凯
朱丹丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge International Co Ltd
China Communications Road and Bridge North China Engineering Co Ltd
Original Assignee
Road and Bridge International Co Ltd
China Communications Road and Bridge North China Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge International Co Ltd, China Communications Road and Bridge North China Engineering Co Ltd filed Critical Road and Bridge International Co Ltd
Priority to CN201810974616.7A priority Critical patent/CN108978485B/en
Publication of CN108978485A publication Critical patent/CN108978485A/en
Application granted granted Critical
Publication of CN108978485B publication Critical patent/CN108978485B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D11/00Suspension or cable-stayed bridges
    • E01D11/04Cable-stayed bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention provides a kind of steel construction cable-stayed bridge anchor tie plate field installation process, by steel box-girder and anchor tie plate split production, when steel box-girder is pre-splicing, installation control point and the position baseline of anchor tie plate are marked on steel box-girder, after steel box-girder is installed, setting angle is designed according to suspension cable, control point is installed to anchor tie plates all on steel box-girder and position baseline carries out repetition measurement, when in-site installation anchor tie plate, it is overlapped anchor tie plate base plate center line with the position baseline on steel box-girder, the axis extended line of anchor tie plate cable guide pipe is overlapped with the intersection point of steel box-girder top surface with installation control point;The plumb line that setting intersects vertically with cable guide pipe axis orthographic projection line in anchor tie plate upper end, adjusts anchor tie plate angle, until plumb line is directed toward the position baseline of steel box-girder top surface, realizes anchor tie plate positioning, while anchor tie plate bottom plate and steel box-girder top surface being welded and fixed.

Description

A kind of steel construction cable-stayed bridge anchor tie plate field installation process
Technical field
The present invention relates to municipal steel construction CONSTRUCTION OF CABLE-STAYED BRIDGE technical fields, and in particular to the installation of cable-stayed bridge anchor tie plate Control method.
Background technique
Cable-stayed bridge anchor tie plate is connect in steel girder top surface with Main Girder Welding, is the pass of stay cable of cable-stayed bridge and the transmitting of beam body power Key component, positioning accuracy request are very high.Since position of the anchor tie plate on girder is relatively fixed, to guarantee its installation accuracy, with And it saves subsequent installation process and is integrally machined anchor tie plate and girder usually when processing steel girder beam.But one is also brought in this way Determine problem, since girder is in the unified processing of processing space, the girder overall height for having installed anchor tie plate is higher, past from processing space When girder is transported in erecting bed, the municipal cable-stayed bridge in urban district is located to construction location, the total height of girder steel haulage vehicle is frequent It is limited by limit for height an outpost of the tax office or limit for height channel bridge, can not be successfully passage;Since anchor tie plate is fixed in advance with girder, in installation steel If there is deviation when girder, the position deviation of anchor tie plate is also resulted in, influences the positioning accuracy of anchor tie plate.
Summary of the invention
The object of the present invention is to provide a kind of steel construction cable-stayed bridge anchor tie plate field installation process, by steel girder and anchor Pulling plate separately transports, and to reduce the height of transport vehicle, avoids in the current limited and risk in transit in urban district, while installing anchor at the scene Anchor tie plate installation site can be checked when pulling plate, improve its positioning accuracy.
Technical scheme is as follows:
A kind of steel construction cable-stayed bridge anchor tie plate field installation process, it is characterised in that the following steps are included:
(1) all steel box-girders of cable-stayed bridge processing space after processing is completed, carry out steel box-girder it is pre-splicing, when steel box-girder is pre-splicing according to Design installation site of the anchor tie plate on steel box-girder carries out anchor tie plate prepackage, and the installation control of anchor tie plate is marked on steel box-girder System point and position baseline, the installation control point are the axis of anchor tie plate cable guide pipe and the intersection point of steel box-girder top surface, described fixed Position reference line is orthographic projection line of the anchor rope conduit axis on steel box-girder;
(2) steel box-girder and anchor tie plate are transported to construction site respectively;After steel box-girder is installed, full-bridge closes up, according to oblique Cable setting angle installs control point to anchor tie plates all on steel box-girder and position baseline carries out repetition measurement, and according to multiple Survey installation control point and position baseline that result redefines anchor tie plate;
(3) anchor tie plate component is transported on steel box-girder, it is mobile with jack pushing tow anchor tie plate, make anchor tie plate base plate center line It is overlapped with the position baseline on steel box-girder, the axis extended line of anchor tie plate cable guide pipe and the intersection point of steel box-girder top surface and installation are controlled System point is overlapped;
(4) plumb line that setting intersects vertically with cable guide pipe axis orthographic projection line in anchor tie plate upper end, uses flower basket bolt Or chain block adjusts anchor tie plate angle, until plumb line is directed toward the position baseline of steel box-girder top surface, realizes anchor tie plate Positioning;
(5) the above-mentioned positioning states of anchor tie plate are kept, while anchor tie plate bottom plate and steel box-girder top surface being welded and fixed, are completed Anchor tie plate in-site installation.
The present invention is by anchor tie plate and steel girder split production and transport, it is possible to reduce the height of anchor tie plate beam section makes steel master Whole height reduces when beam transports in urban district, avoids beam section transport superelevation, transfinites;After the completion of steel erection of main beam, scene Carry out anchor tie plate measurement and positioning and installation, it can be ensured that the positioning accuracy of anchor tie plate.
Detailed description of the invention
Fig. 1 is construction process figure of the invention;
Fig. 2 is anchor tie plate along bridge to mounting structure schematic diagram.
Specific embodiment
Construction process of the invention is as shown in Figure 1, detailed process is as follows:
All steel box-girders of cable-stayed bridge processing space after processing is completed, carry out steel box-girder it is pre-splicing, according to anchor when steel box-girder is pre-splicing Design installation site of the pulling plate on steel box-girder carries out anchor tie plate prepackage, and the installation control of anchor tie plate is marked on steel box-girder Point and position baseline, the installation control point are the axis of anchor tie plate cable guide pipe and the intersection point of steel box-girder top surface, the positioning Reference line is orthographic projection extended line of the anchor rope conduit axis on steel box-girder.
Steel box-girder and anchor tie plate component are transported to construction site respectively.After steel box-girder is installed, full-bridge closes up, according to rope The design setting angle of the anchor point of suspension cable and suspension cable on tower installs control point and positioning to anchor tie plates all on steel box-girder Reference line carries out repetition measurement, and installation control and the position baseline of anchor tie plate are redefined according to repetition measurement result.
As shown in Fig. 2, anchor tie plate 1 is transported on steel box-girder 2, it is mobile with jack pushing tow anchor tie plate, make anchor tie plate bottom plate 3 Center line be overlapped with the position baseline on steel box-girder, the friendship of axis 5 extended line and steel box-girder top surface of anchor tie plate cable guide pipe 4 Point is overlapped with installation control point 6.
The plumb line 7 that setting intersects vertically with 5 orthographic projection line of cable guide pipe axis in 1 upper end of anchor tie plate, uses flower basket bolt Or chain block adjusts anchor tie plate angle, until plumb line is directed toward the position baseline of steel box-girder top surface, realizes anchor tie plate Positioning.
The above-mentioned positioning states of anchor tie plate are kept, while anchor tie plate bottom plate and steel box-girder top surface being welded and fixed, complete anchor Pulling plate in-site installation.

Claims (1)

1. a kind of steel construction cable-stayed bridge anchor tie plate field installation process, it is characterised in that the following steps are included:
(1) all steel box-girders of cable-stayed bridge processing space after processing is completed, carry out steel box-girder it is pre-splicing, drawn when steel box-girder is pre-splicing according to anchor Design installation site of the plate on steel box-girder carries out anchor tie plate prepackage, and the installation control point of anchor tie plate is marked on steel box-girder And position baseline, the installation control point is the axis of anchor tie plate cable guide pipe and the intersection point of steel box-girder top surface, the positioning base Directrix is orthographic projection line of the anchor rope conduit axis on steel box-girder;
(2) steel box-girder and anchor tie plate are transported to construction site respectively;After steel box-girder is installed, full-bridge closes up, according to suspension cable Setting angle is designed, control point is installed to anchor tie plates all on steel box-girder and position baseline carries out repetition measurement, and according to repetition measurement knot Fruit redefines installation control point and the position baseline of anchor tie plate;
(3) anchor tie plate component is transported on steel box-girder, it is mobile with jack pushing tow anchor tie plate, make anchor tie plate base plate center line and steel Position baseline in box beam is overlapped, the axis extended line of anchor tie plate cable guide pipe and the intersection point of steel box-girder top surface and installation control point It is overlapped;
(4) plumb line that setting intersects vertically with cable guide pipe axis orthographic projection line in anchor tie plate upper end, uses flower basket bolt or hand It draws cucurbit to adjust anchor tie plate angle, until plumb line is directed toward the position baseline of steel box-girder top surface, realizes anchor tie plate positioning;
(5) the above-mentioned positioning states of anchor tie plate are kept, while anchor tie plate bottom plate and steel box-girder top surface being welded and fixed, anchor is completed and draws Plate in-site installation.
CN201810974616.7A 2018-08-24 2018-08-24 Method for on-site installation of anchor plate of steel structure cable-stayed bridge Active CN108978485B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810974616.7A CN108978485B (en) 2018-08-24 2018-08-24 Method for on-site installation of anchor plate of steel structure cable-stayed bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810974616.7A CN108978485B (en) 2018-08-24 2018-08-24 Method for on-site installation of anchor plate of steel structure cable-stayed bridge

Publications (2)

Publication Number Publication Date
CN108978485A true CN108978485A (en) 2018-12-11
CN108978485B CN108978485B (en) 2020-02-14

Family

ID=64546607

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810974616.7A Active CN108978485B (en) 2018-08-24 2018-08-24 Method for on-site installation of anchor plate of steel structure cable-stayed bridge

Country Status (1)

Country Link
CN (1) CN108978485B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111058384A (en) * 2020-01-13 2020-04-24 中铁九桥工程有限公司 Method for mounting anchor plate on steel box girder
CN114250715A (en) * 2022-02-15 2022-03-29 中铁二局集团有限公司 Method and device for positioning space special-shaped steel arch bridge inhaul cable
CN114398692A (en) * 2021-12-31 2022-04-26 中铁宝桥集团有限公司 Method for determining spatial position of special-shaped anchor plate on top surface of steel box girder

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130083410A (en) * 2012-01-12 2013-07-22 (주)태영이씨엠 Slab-type box girder of a varying longitudinal section made by prestressed precast concrete and method constructing the bridge therewith
CN205653703U (en) * 2016-04-27 2016-10-19 中国电建集团昆明勘测设计研究院有限公司 Suspension bridge anchorage anchor
CN106592441A (en) * 2017-01-16 2017-04-26 中交路桥华南工程有限公司 Mounting method of stayed cable of cable-stayed bridge
CN106948263A (en) * 2017-05-10 2017-07-14 安徽省交通控股集团有限公司 A kind of cable-stayed bridge concrete pylon anchor tie plate
CN107268421A (en) * 2017-08-11 2017-10-20 湖南省交通规划勘察设计院有限公司 Spatial Cable face steel truss girder cable-stayed bridge cable beam anchoring component and Spatial Cable face steel truss girder cable-stayed bridge

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130083410A (en) * 2012-01-12 2013-07-22 (주)태영이씨엠 Slab-type box girder of a varying longitudinal section made by prestressed precast concrete and method constructing the bridge therewith
CN205653703U (en) * 2016-04-27 2016-10-19 中国电建集团昆明勘测设计研究院有限公司 Suspension bridge anchorage anchor
CN106592441A (en) * 2017-01-16 2017-04-26 中交路桥华南工程有限公司 Mounting method of stayed cable of cable-stayed bridge
CN106948263A (en) * 2017-05-10 2017-07-14 安徽省交通控股集团有限公司 A kind of cable-stayed bridge concrete pylon anchor tie plate
CN107268421A (en) * 2017-08-11 2017-10-20 湖南省交通规划勘察设计院有限公司 Spatial Cable face steel truss girder cable-stayed bridge cable beam anchoring component and Spatial Cable face steel truss girder cable-stayed bridge

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111058384A (en) * 2020-01-13 2020-04-24 中铁九桥工程有限公司 Method for mounting anchor plate on steel box girder
CN111058384B (en) * 2020-01-13 2021-12-07 中铁九桥工程有限公司 Method for mounting anchor plate on steel box girder
CN114398692A (en) * 2021-12-31 2022-04-26 中铁宝桥集团有限公司 Method for determining spatial position of special-shaped anchor plate on top surface of steel box girder
CN114398692B (en) * 2021-12-31 2024-06-21 中铁宝桥集团有限公司 Method for determining spatial position of special-shaped anchor plate on top surface of steel box girder
CN114250715A (en) * 2022-02-15 2022-03-29 中铁二局集团有限公司 Method and device for positioning space special-shaped steel arch bridge inhaul cable
CN114250715B (en) * 2022-02-15 2024-04-26 中铁二局集团有限公司 Positioning method and positioning device for space special-shaped steel arch bridge inhaul cable

Also Published As

Publication number Publication date
CN108978485B (en) 2020-02-14

Similar Documents

Publication Publication Date Title
CN108978485A (en) A kind of steel construction cable-stayed bridge anchor tie plate field installation process
CN207048069U (en) A kind of pipe gallery segmental timbering
CN107740350B (en) The bridge pier column construction method and its passing method of full precast bridge Bridge Erector
CN108374296A (en) The construction method of straddle type monorail rail tracks installation
US10544014B2 (en) Method for hoisting and transporting assemblies in underground nuclear power plant
CN105507155A (en) Construction process for installation of small-segment steel box girder
CN102720137B (en) Prefabrication construction method for trough girder sections of track traffic high-level bridge
CN109878380B (en) Subway vehicle section flexible contact net track-free construction method
CN103047478B (en) In-hole sectioning installation method for penstocks with overlarge diameters
CN103696374A (en) Straddle method of cantilever of long-span simply supported steel truss beam of horizontal curve section
CN103669227A (en) Bridge reinforced concrete combination section steel box girder slipping locating method
CN107288157A (en) Prefabricated box culvert installs car
CN106836829B (en) A kind of mounting structure and its installation method of ring crane corbel
CN104314009B (en) Big sections hoisting mechanism and using method
CN105926672A (en) Mined metro station steel pipe column construction method
CN104018426A (en) Steel truss installation method
CN107255188A (en) A kind of lifting pipeline method suitable at pipe gallery intersection node
CN103669218B (en) Novel toughened internal stress steel box-girder module and spelling method thereof
CN103088843B (en) Pipe gallery embedded iron parts construction method of installation
CN105196414A (en) Prefabricated T-beam web plate rebar jig frame and prestressed T-beam construction method
CN104032676B (en) A kind of horizontal drawing cable bridge steel wire rope self-anchored type bridge abutment structure
CN108203981B (en) System and method for installing steel support in cover and excavation method
CN201605110U (en) Device for hoisting waveform steel webs at the front end of truss in cantilever construction
CN204955097U (en) Prefabricated T web reinforcing bar bed -jig
CN112728209A (en) Construction method for communicating new pipe and old pipe in non-excavation mode

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant