CN108978485A - A kind of steel construction cable-stayed bridge anchor tie plate field installation process - Google Patents
A kind of steel construction cable-stayed bridge anchor tie plate field installation process Download PDFInfo
- Publication number
- CN108978485A CN108978485A CN201810974616.7A CN201810974616A CN108978485A CN 108978485 A CN108978485 A CN 108978485A CN 201810974616 A CN201810974616 A CN 201810974616A CN 108978485 A CN108978485 A CN 108978485A
- Authority
- CN
- China
- Prior art keywords
- tie plate
- girder
- anchor tie
- steel box
- anchor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 69
- 239000010959 steel Substances 0.000 title claims abstract description 69
- 238000010276 construction Methods 0.000 title claims abstract description 14
- 238000011900 installation process Methods 0.000 title claims abstract description 7
- 238000009434 installation Methods 0.000 claims abstract description 26
- 238000005259 measurement Methods 0.000 claims abstract description 7
- 239000000725 suspension Substances 0.000 claims abstract description 4
- 235000013399 edible fruits Nutrition 0.000 claims 1
- 238000004519 manufacturing process Methods 0.000 abstract description 2
- 238000000034 method Methods 0.000 description 5
- 230000032258 transport Effects 0.000 description 5
- 238000010586 diagram Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D11/00—Suspension or cable-stayed bridges
- E01D11/04—Cable-stayed bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The present invention provides a kind of steel construction cable-stayed bridge anchor tie plate field installation process, by steel box-girder and anchor tie plate split production, when steel box-girder is pre-splicing, installation control point and the position baseline of anchor tie plate are marked on steel box-girder, after steel box-girder is installed, setting angle is designed according to suspension cable, control point is installed to anchor tie plates all on steel box-girder and position baseline carries out repetition measurement, when in-site installation anchor tie plate, it is overlapped anchor tie plate base plate center line with the position baseline on steel box-girder, the axis extended line of anchor tie plate cable guide pipe is overlapped with the intersection point of steel box-girder top surface with installation control point;The plumb line that setting intersects vertically with cable guide pipe axis orthographic projection line in anchor tie plate upper end, adjusts anchor tie plate angle, until plumb line is directed toward the position baseline of steel box-girder top surface, realizes anchor tie plate positioning, while anchor tie plate bottom plate and steel box-girder top surface being welded and fixed.
Description
Technical field
The present invention relates to municipal steel construction CONSTRUCTION OF CABLE-STAYED BRIDGE technical fields, and in particular to the installation of cable-stayed bridge anchor tie plate
Control method.
Background technique
Cable-stayed bridge anchor tie plate is connect in steel girder top surface with Main Girder Welding, is the pass of stay cable of cable-stayed bridge and the transmitting of beam body power
Key component, positioning accuracy request are very high.Since position of the anchor tie plate on girder is relatively fixed, to guarantee its installation accuracy, with
And it saves subsequent installation process and is integrally machined anchor tie plate and girder usually when processing steel girder beam.But one is also brought in this way
Determine problem, since girder is in the unified processing of processing space, the girder overall height for having installed anchor tie plate is higher, past from processing space
When girder is transported in erecting bed, the municipal cable-stayed bridge in urban district is located to construction location, the total height of girder steel haulage vehicle is frequent
It is limited by limit for height an outpost of the tax office or limit for height channel bridge, can not be successfully passage;Since anchor tie plate is fixed in advance with girder, in installation steel
If there is deviation when girder, the position deviation of anchor tie plate is also resulted in, influences the positioning accuracy of anchor tie plate.
Summary of the invention
The object of the present invention is to provide a kind of steel construction cable-stayed bridge anchor tie plate field installation process, by steel girder and anchor
Pulling plate separately transports, and to reduce the height of transport vehicle, avoids in the current limited and risk in transit in urban district, while installing anchor at the scene
Anchor tie plate installation site can be checked when pulling plate, improve its positioning accuracy.
Technical scheme is as follows:
A kind of steel construction cable-stayed bridge anchor tie plate field installation process, it is characterised in that the following steps are included:
(1) all steel box-girders of cable-stayed bridge processing space after processing is completed, carry out steel box-girder it is pre-splicing, when steel box-girder is pre-splicing according to
Design installation site of the anchor tie plate on steel box-girder carries out anchor tie plate prepackage, and the installation control of anchor tie plate is marked on steel box-girder
System point and position baseline, the installation control point are the axis of anchor tie plate cable guide pipe and the intersection point of steel box-girder top surface, described fixed
Position reference line is orthographic projection line of the anchor rope conduit axis on steel box-girder;
(2) steel box-girder and anchor tie plate are transported to construction site respectively;After steel box-girder is installed, full-bridge closes up, according to oblique
Cable setting angle installs control point to anchor tie plates all on steel box-girder and position baseline carries out repetition measurement, and according to multiple
Survey installation control point and position baseline that result redefines anchor tie plate;
(3) anchor tie plate component is transported on steel box-girder, it is mobile with jack pushing tow anchor tie plate, make anchor tie plate base plate center line
It is overlapped with the position baseline on steel box-girder, the axis extended line of anchor tie plate cable guide pipe and the intersection point of steel box-girder top surface and installation are controlled
System point is overlapped;
(4) plumb line that setting intersects vertically with cable guide pipe axis orthographic projection line in anchor tie plate upper end, uses flower basket bolt
Or chain block adjusts anchor tie plate angle, until plumb line is directed toward the position baseline of steel box-girder top surface, realizes anchor tie plate
Positioning;
(5) the above-mentioned positioning states of anchor tie plate are kept, while anchor tie plate bottom plate and steel box-girder top surface being welded and fixed, are completed
Anchor tie plate in-site installation.
The present invention is by anchor tie plate and steel girder split production and transport, it is possible to reduce the height of anchor tie plate beam section makes steel master
Whole height reduces when beam transports in urban district, avoids beam section transport superelevation, transfinites;After the completion of steel erection of main beam, scene
Carry out anchor tie plate measurement and positioning and installation, it can be ensured that the positioning accuracy of anchor tie plate.
Detailed description of the invention
Fig. 1 is construction process figure of the invention;
Fig. 2 is anchor tie plate along bridge to mounting structure schematic diagram.
Specific embodiment
Construction process of the invention is as shown in Figure 1, detailed process is as follows:
All steel box-girders of cable-stayed bridge processing space after processing is completed, carry out steel box-girder it is pre-splicing, according to anchor when steel box-girder is pre-splicing
Design installation site of the pulling plate on steel box-girder carries out anchor tie plate prepackage, and the installation control of anchor tie plate is marked on steel box-girder
Point and position baseline, the installation control point are the axis of anchor tie plate cable guide pipe and the intersection point of steel box-girder top surface, the positioning
Reference line is orthographic projection extended line of the anchor rope conduit axis on steel box-girder.
Steel box-girder and anchor tie plate component are transported to construction site respectively.After steel box-girder is installed, full-bridge closes up, according to rope
The design setting angle of the anchor point of suspension cable and suspension cable on tower installs control point and positioning to anchor tie plates all on steel box-girder
Reference line carries out repetition measurement, and installation control and the position baseline of anchor tie plate are redefined according to repetition measurement result.
As shown in Fig. 2, anchor tie plate 1 is transported on steel box-girder 2, it is mobile with jack pushing tow anchor tie plate, make anchor tie plate bottom plate 3
Center line be overlapped with the position baseline on steel box-girder, the friendship of axis 5 extended line and steel box-girder top surface of anchor tie plate cable guide pipe 4
Point is overlapped with installation control point 6.
The plumb line 7 that setting intersects vertically with 5 orthographic projection line of cable guide pipe axis in 1 upper end of anchor tie plate, uses flower basket bolt
Or chain block adjusts anchor tie plate angle, until plumb line is directed toward the position baseline of steel box-girder top surface, realizes anchor tie plate
Positioning.
The above-mentioned positioning states of anchor tie plate are kept, while anchor tie plate bottom plate and steel box-girder top surface being welded and fixed, complete anchor
Pulling plate in-site installation.
Claims (1)
1. a kind of steel construction cable-stayed bridge anchor tie plate field installation process, it is characterised in that the following steps are included:
(1) all steel box-girders of cable-stayed bridge processing space after processing is completed, carry out steel box-girder it is pre-splicing, drawn when steel box-girder is pre-splicing according to anchor
Design installation site of the plate on steel box-girder carries out anchor tie plate prepackage, and the installation control point of anchor tie plate is marked on steel box-girder
And position baseline, the installation control point is the axis of anchor tie plate cable guide pipe and the intersection point of steel box-girder top surface, the positioning base
Directrix is orthographic projection line of the anchor rope conduit axis on steel box-girder;
(2) steel box-girder and anchor tie plate are transported to construction site respectively;After steel box-girder is installed, full-bridge closes up, according to suspension cable
Setting angle is designed, control point is installed to anchor tie plates all on steel box-girder and position baseline carries out repetition measurement, and according to repetition measurement knot
Fruit redefines installation control point and the position baseline of anchor tie plate;
(3) anchor tie plate component is transported on steel box-girder, it is mobile with jack pushing tow anchor tie plate, make anchor tie plate base plate center line and steel
Position baseline in box beam is overlapped, the axis extended line of anchor tie plate cable guide pipe and the intersection point of steel box-girder top surface and installation control point
It is overlapped;
(4) plumb line that setting intersects vertically with cable guide pipe axis orthographic projection line in anchor tie plate upper end, uses flower basket bolt or hand
It draws cucurbit to adjust anchor tie plate angle, until plumb line is directed toward the position baseline of steel box-girder top surface, realizes anchor tie plate positioning;
(5) the above-mentioned positioning states of anchor tie plate are kept, while anchor tie plate bottom plate and steel box-girder top surface being welded and fixed, anchor is completed and draws
Plate in-site installation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810974616.7A CN108978485B (en) | 2018-08-24 | 2018-08-24 | Method for on-site installation of anchor plate of steel structure cable-stayed bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810974616.7A CN108978485B (en) | 2018-08-24 | 2018-08-24 | Method for on-site installation of anchor plate of steel structure cable-stayed bridge |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108978485A true CN108978485A (en) | 2018-12-11 |
CN108978485B CN108978485B (en) | 2020-02-14 |
Family
ID=64546607
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810974616.7A Active CN108978485B (en) | 2018-08-24 | 2018-08-24 | Method for on-site installation of anchor plate of steel structure cable-stayed bridge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108978485B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111058384A (en) * | 2020-01-13 | 2020-04-24 | 中铁九桥工程有限公司 | Method for mounting anchor plate on steel box girder |
CN114250715A (en) * | 2022-02-15 | 2022-03-29 | 中铁二局集团有限公司 | Method and device for positioning space special-shaped steel arch bridge inhaul cable |
CN114398692A (en) * | 2021-12-31 | 2022-04-26 | 中铁宝桥集团有限公司 | Method for determining spatial position of special-shaped anchor plate on top surface of steel box girder |
CN116238662A (en) * | 2023-04-24 | 2023-06-09 | 江南造船(集团)有限责任公司 | Manufacturing method of anchor table sample box |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20130083410A (en) * | 2012-01-12 | 2013-07-22 | (주)태영이씨엠 | Slab-type box girder of a varying longitudinal section made by prestressed precast concrete and method constructing the bridge therewith |
CN205653703U (en) * | 2016-04-27 | 2016-10-19 | 中国电建集团昆明勘测设计研究院有限公司 | Suspension bridge anchorage anchoring device |
CN106592441A (en) * | 2017-01-16 | 2017-04-26 | 中交路桥华南工程有限公司 | Installation method of cable-stayed bridge |
CN106948263A (en) * | 2017-05-10 | 2017-07-14 | 安徽省交通控股集团有限公司 | A kind of cable-stayed bridge concrete pylon anchor tie plate |
CN107268421A (en) * | 2017-08-11 | 2017-10-20 | 湖南省交通规划勘察设计院有限公司 | Spatial Cable face steel truss girder cable-stayed bridge cable beam anchoring component and Spatial Cable face steel truss girder cable-stayed bridge |
-
2018
- 2018-08-24 CN CN201810974616.7A patent/CN108978485B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20130083410A (en) * | 2012-01-12 | 2013-07-22 | (주)태영이씨엠 | Slab-type box girder of a varying longitudinal section made by prestressed precast concrete and method constructing the bridge therewith |
CN205653703U (en) * | 2016-04-27 | 2016-10-19 | 中国电建集团昆明勘测设计研究院有限公司 | Suspension bridge anchorage anchoring device |
CN106592441A (en) * | 2017-01-16 | 2017-04-26 | 中交路桥华南工程有限公司 | Installation method of cable-stayed bridge |
CN106948263A (en) * | 2017-05-10 | 2017-07-14 | 安徽省交通控股集团有限公司 | A kind of cable-stayed bridge concrete pylon anchor tie plate |
CN107268421A (en) * | 2017-08-11 | 2017-10-20 | 湖南省交通规划勘察设计院有限公司 | Spatial Cable face steel truss girder cable-stayed bridge cable beam anchoring component and Spatial Cable face steel truss girder cable-stayed bridge |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111058384A (en) * | 2020-01-13 | 2020-04-24 | 中铁九桥工程有限公司 | Method for mounting anchor plate on steel box girder |
CN111058384B (en) * | 2020-01-13 | 2021-12-07 | 中铁九桥工程有限公司 | Method for mounting anchor plate on steel box girder |
CN114398692A (en) * | 2021-12-31 | 2022-04-26 | 中铁宝桥集团有限公司 | Method for determining spatial position of special-shaped anchor plate on top surface of steel box girder |
CN114398692B (en) * | 2021-12-31 | 2024-06-21 | 中铁宝桥集团有限公司 | Method for determining spatial position of special-shaped anchor plate on top surface of steel box girder |
CN114250715A (en) * | 2022-02-15 | 2022-03-29 | 中铁二局集团有限公司 | Method and device for positioning space special-shaped steel arch bridge inhaul cable |
CN114250715B (en) * | 2022-02-15 | 2024-04-26 | 中铁二局集团有限公司 | Positioning method and positioning device for space special-shaped steel arch bridge inhaul cable |
CN116238662A (en) * | 2023-04-24 | 2023-06-09 | 江南造船(集团)有限责任公司 | Manufacturing method of anchor table sample box |
Also Published As
Publication number | Publication date |
---|---|
CN108978485B (en) | 2020-02-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108978485A (en) | A kind of steel construction cable-stayed bridge anchor tie plate field installation process | |
CN100585098C (en) | High-precision intelligent vertical adjustment system for underground pre-buried columns and its installation and construction method | |
CN207048069U (en) | A kind of pipe gallery segmental timbering | |
CN107740350B (en) | The bridge pier column construction method and its passing method of full precast bridge Bridge Erector | |
CN106836829B (en) | A kind of mounting structure and its installation method of ring crane corbel | |
CN103292035A (en) | Construction method of underground pipe jacking | |
CN105507155A (en) | Construction process for installation of small-segment steel box girder | |
CN103669227B (en) | Bridge steel-concrete combined section steel box girder slippage positioning method | |
CN104032676B (en) | A kind of horizontal drawing cable bridge steel wire rope self-anchored type bridge abutment structure | |
US20180002144A1 (en) | Method for hoisting and transporting assemblies in underground nuclear power plant | |
CN104314009B (en) | Big sections hoisting mechanism and using method | |
CN102518034B (en) | Bidirectional pre-bent multi-steel-girder and concrete bridge deck combined small box girder bridge structure | |
CN102720137B (en) | Prefabrication construction method for trough girder sections of track traffic high-level bridge | |
CN103696374A (en) | Straddle method of cantilever of long-span simply supported steel truss beam of horizontal curve section | |
CN107288157A (en) | Prefabricated box culvert installs car | |
CN107255188A (en) | A kind of lifting pipeline method suitable at pipe gallery intersection node | |
CN109878380B (en) | Subway vehicle section flexible contact net track-free construction method | |
CN105926672A (en) | Mined metro station steel pipe column construction method | |
CN105196414A (en) | Prefabricated T-beam web plate rebar jig frame and prestressed T-beam construction method | |
CN104895336A (en) | Method for installing steel beam of stiff hybrid structure in place | |
CN104653222A (en) | Prefabricated evacuation platform for shield interval tunnel | |
CN102296600A (en) | Method for positioning middle pile of spread built subway station | |
CN204436457U (en) | The prefabricated evacuation platform of a kind of shield structure running tunnel | |
CN204955097U (en) | Prefabricated T web reinforcing bar bed -jig | |
CN113737951B (en) | Measurement and control method for deformation control of installation of large-span multi-joint steel structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |