CN205591961U - Newly -built high blow mine in mountain area is worn layer and is taken out in advance and speedy drivage system - Google Patents

Newly -built high blow mine in mountain area is worn layer and is taken out in advance and speedy drivage system Download PDF

Info

Publication number
CN205591961U
CN205591961U CN201620281438.6U CN201620281438U CN205591961U CN 205591961 U CN205591961 U CN 205591961U CN 201620281438 U CN201620281438 U CN 201620281438U CN 205591961 U CN205591961 U CN 205591961U
Authority
CN
China
Prior art keywords
lane
base plate
gas
advance
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620281438.6U
Other languages
Chinese (zh)
Inventor
艾德春
谢小平
刘建刚
李健
岳虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liupanshui Normal University
Original Assignee
Liupanshui Normal University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liupanshui Normal University filed Critical Liupanshui Normal University
Priority to CN201620281438.6U priority Critical patent/CN205591961U/en
Application granted granted Critical
Publication of CN205591961U publication Critical patent/CN205591961U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a newly -built high blow mine in mountain area is worn layer and is taken out in advance and speedy drivage system, this system are mainly dug tunnel, high -pressure water conservancy slot in advance, are worn the layer by the coal seam and take out drilling in advance, take out drilling yard, bottom plate gas drainage crossdrift, bottom plate central drainage lane, bottom plate gas drainage lane in advance and form, characterized by: arrange bottom plate gas drainage crossdrift, bottom plate central drainage lane, bottom plate gas drainage lane, the end at the coal seam group bottom plate and take out the connection roadway, help to arrange gas drainage drilling yard in bottom plate gas drainage crossdrift and bottom plate gas drainage lane two, arrange a layer gas drainage drilling in drilling yard, it is anti -reflection through the release of high -pressure spray slot to annotate filling material to pressing in the drilling slot. Its advantage: it is anti -reflection that this system passes through coal seam slot release, improves coal seam group gas drainage and rate, reduces the gas discharge volume of digging the tunnel in advance in the coal seam, and the while pressure is annotated filling material and is favorable to the maintenance in the coal road tunneling process to realize quick safe mesh of digging the lane.

Description

The newly-built high gas and outburst mine in a kind of mountain area is worn layer and is taken out in advance and speedy drivage system
Technical field
This utility model relates to a kind of heading Quick Driving Technology field, the specifically newly-built high gas and outburst mine in a kind of mountain area Wear layer to take out in advance and speedy drivage system.
Background technology
Coal and gas prominent is a kind of special dynamic phenomenon of underground coal mine, is one of bigger disaster of colliery harm, for a long time, The gas explosion of China's coal-mine enterprise, coal and gas prominent disaster accident occur again and again, to coal mining enterprise and the lives and properties of worker Cause massive losses.According to statistics, China's State owned coal mine high methane and projecting mine proportion are 45.97%, due to watt The number of this death by accident accounts for the 32.03% of total death toll, and wherein coal and gas prominent accident accounts for more than 60% and occurs heading driver Make face.Along with the transformation of China's Economic Development Mode, China's coal-mine industry realizes safe and efficient extremely urgent, safe and efficient realization One of important means be exactly that face propulsion speed is fast, it is necessary to tunnel speedy drivage for ensureing.But, highlight at high methane Carrying out tunnelling in coal seam, gas emission is big, and coal and gas prominent is dangerous big, has had a strong impact on mine and has realized high yield height The paces of effect.The problems such as slow for mountain area newly-built high gas and outburst mine heading driving speed in outburst hazard is big, it is impossible to During exploitation protective layer, it is little to there is single hole gas pumping effective range in conventional gas pumping method, and extraction rate is low, it is impossible to efficient solution The harm that certainly in heading tunneling process, gas pours out, to this end, should from the discussion high methane coal of many aspects system with watt The problem of this projecting mine heading speedy drivage.
Utility model content
Technical problem: the newly-built high gas and outburst mine in a kind of mountain area of offer is worn layer and taken out in advance and speedy drivage system by this utility model, This system is anti-reflection by coal seam cutting release, improves coal seam group gas pumping rate, reduces the gas emission in pre-tunnel laneway road, coal seam, Maintenance during pressure injection filler is conducive to coal roadway tunneling simultaneously, thus it is quick to realize newly-built high gas and outburst mine coal seam group Safety digs the purpose in lane.
Technical scheme: the purpose of this utility model is achieved through the following technical solutions:
1, the newly-built high gas and outburst mine in a kind of mountain area is worn layer and is taken out in advance and speedy drivage system, it is characterised in that have the following steps: main Will by coal seam group (1), pre-tunnel laneway road, coal seam (2), high-pressure hydraulic slot (3), wear layer Gas pre-drainage boring (4), take out watt in advance Connection is taken out at this drill site (5), base plate gas pumping crossdrift (6), base plate central drainage lane (7), base plate gas pumping lane (8), the end Network lane (9), floor rail main haulage roadway (10), connection roadway (11), base plate adhesive tape main haulage roadway (12), return air connection roadway (13), Total big lane of return air (14) composition.
2, described high methane projecting coal bed group (1) backplane base plate gas pumping crossdrift (6), base plate central drainage lane (7), connection roadway (9), floor rail main haulage roadway (10), connection roadway (11), the end, taken out in base plate gas pumping lane (8), the end The big lane of plate Belt transport (12), return air connection roadway (13), the big lane of total return air (14);At base plate gas pumping crossdrift (6) and Base plate gas pumping lane (8) two is helped to arrange gas pumping gas treatment technique (5), arranges that wearing layer gas pumping bores in drill site (5) Hole (4), anti-reflection by high-pressure spray slot (3) release, and pressure injection filler in boring slot (3).
3, described base plate gas pumping lane (8) slope section inclination angle a is 6 °~10 °, and the end takes out connection roadway slope section angle of inclination beta and is 18 °~22 °;Roadway's sides Gas pre-drainage drill site (5) spacing is 8~20m;Each drill site (5) is arranged and is worn a layer pre-draining borehole (4) It it is 6~8.
Beneficial effect: owing to have employed such scheme, this utility model advantage compared with conventional art is as follows:
This utility model relates to a kind of tunnel speedy drivage systems technology field, the specifically newly-built high gas and outburst mine in a kind of mountain area Wear layer to take out in advance and speedy drivage system.Slow and the outburst hazard for mountain area newly-built high gas and outburst mine heading driving speed The problem such as big, it is impossible to during exploitation protective layer, it is little that traditional gas pumping method exists single hole gas pumping effective range, extraction rate Low, it is impossible to effectively to solve the harm that in heading tunneling process, gas pours out.This system is by wearing a layer pre-draining borehole, coal Layer slot release is anti-reflection, improves coal seam group gas pumping rate, reduces the gas emission in pre-tunnel laneway road, coal seam, pressure injection filling simultaneously Material is conducive to the maintenance during coal roadway tunneling, thus realizes high gas and outburst mine coal seam group and fast and safely dig the purpose in lane.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the A-A generalized section of this utility model Fig. 1.
Marginal data: 1, coal seam group;2, coal seam pre-tunnel laneway road;3, high-pressure hydraulic slot;4, a layer Gas pre-drainage boring is worn;5、 Gas pre-drainage drill site;6, base plate gas pumping crossdrift;7, base plate central drainage lane;8, base plate gas pumping lane;9, the end, takes out Connection roadway;10, floor rail main haulage roadway;11, connection roadway;12, base plate adhesive tape main haulage roadway;13, return air connection roadway; 14, the big lane of total return air;A, slope section inclination angle, base plate gas pumping lane;Connection roadway slope section inclination angle is taken out at β, the end.
Detailed description of the invention
By further illustrating the technological means and effect that this utility model taked by reaching predetermined goal of the invention, below in conjunction with attached Figure and preferably implement example, takes out and quickly in advance to wearing layer according to the newly-built high gas and outburst mine in a kind of mountain area that the utility model proposes Its detailed description of the invention of driving system and effect thereof are described as follows:
1, refer to shown in Fig. 1, Fig. 2, structure described in the utility model main by coal seam group (1), pre-tunnel laneway road, coal seam (2), High-pressure hydraulic slot (3), wear layer Gas pre-drainage boring (4), a Gas pre-drainage drill site (5), base plate gas pumping crossdrift (6), Connection roadway (9), floor rail main haulage roadway (10), connection are taken out in base plate central drainage lane (7), base plate gas pumping lane (8), the end Network lane (11), base plate adhesive tape main haulage roadway (12), return air connection roadway (13), the big lane of total return air (14) composition.
2, refer to shown in Fig. 1, Fig. 2, described high methane projecting coal bed group (1) backplane base plate gas pumping stone Connection roadway (9), floor rail main haulage roadway are taken out in door (6), base plate central drainage lane (7), base plate gas pumping lane (8), the end (10), connection roadway (11), base plate adhesive tape main haulage roadway (12), return air connection roadway (13), the big lane of total return air (14);The end of at Plate gas pumping crossdrift (6) and base plate gas pumping lane (8) two are helped to arrange gas pumping gas treatment technique (5), in drill site (5) Interior layout wears a layer mash gas pumping drilling (4), anti-reflection by high-pressure spray slot (3) release, and intrinsic pressure to boring slot (3) Note filler.
3, referring to shown in Fig. 1, Fig. 2, described base plate gas pumping lane (8) slope section inclination angle a is 6 °~10 °, and the end takes out Connection roadway slope section angle of inclination beta is 18 °~22 °;Roadway's sides Gas pre-drainage drill site (5) spacing is 8~20m;Each drill site (5) It is 6~8 that layout wears a layer pre-draining borehole (4).
During use, first compose deposit according to the actual geologic information of mine, coal-bed gas parameter, coal and gas prominent qualification, coal seam group Situation hydrological geological conditions, determines base plate gas pumping crossdrift (6), the size of base plate gas pumping lane (8) interior drill site (5) With boring number, and layer-through drilling (4) length, whole pitch of holes, and carry out in advance construction pre-treatment water damage, crack, tomography, The prediction scheme technical measures of the risk factors such as Gas Outburst.Layer pre-draining borehole (4) 30~40m is worn when digging heading (2) positional distance in advance During position, should stop taking out in advance.Construct complete wear a layer pre-draining borehole (4) after, by water under high pressure to coal seam cutting (3), and pass through Pressure injection stock pump is to boring slot (3) pressure injection filler, it is achieved coal seam pressure relief, raising coal strength, when tunneling heading, A large amount of heading gas emissions that reduce, and the maintenance of favourable heading.

Claims (2)

1. the newly-built high gas and outburst mine in mountain area is worn layer and is taken out in advance and speedy drivage system, it is characterized in that: main by coal seam group (1), pre-tunnel laneway road, coal seam (2), high-pressure hydraulic slot (3), wear layer Gas pre-drainage boring (4), Gas pre-drainage drill site (5), base plate gas pumping crossdrift (6), base plate central drainage lane (7), base plate gas pumping lane (8), connection roadway (9) is taken out at the end, floor rail main haulage roadway (10), connection roadway (11), base plate adhesive tape main haulage roadway (12), return air connection roadway (13), total big lane of return air (14) composition;It is characterized in that: connection roadway (9), floor rail main haulage roadway (10), connection roadway (11), base plate adhesive tape main haulage roadway (12), return air connection roadway (13), the big lane of total return air (14) are taken out in described high methane projecting coal bed group (1) backplane base plate gas pumping crossdrift (6), base plate central drainage lane (7), base plate gas pumping lane (8), the end;Help to arrange gas pumping gas treatment technique (5) at base plate gas pumping crossdrift (6) and base plate gas pumping lane (8) two, arrange in drill site (5) and wear a layer mash gas pumping drilling (4), anti-reflection by high-pressure spray slot (3) release, and pressure injection filler in boring slot (3).
The newly-built high gas and outburst mine in a kind of mountain area the most according to claim 1 is worn layer and is taken out in advance and speedy drivage system, it is further characterized in that: described base plate gas pumping lane (8) slope section inclination angle a is 6 °~10 °, and it is 18 °~22 ° that connection roadway slope section angle of inclination beta is taken out at the end;Roadway's sides Gas pre-drainage drill site (5) spacing is 8~20m;Each drill site (5) arranges that wearing a layer pre-draining borehole (4) is 6~8.
CN201620281438.6U 2016-03-30 2016-03-30 Newly -built high blow mine in mountain area is worn layer and is taken out in advance and speedy drivage system Expired - Fee Related CN205591961U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620281438.6U CN205591961U (en) 2016-03-30 2016-03-30 Newly -built high blow mine in mountain area is worn layer and is taken out in advance and speedy drivage system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620281438.6U CN205591961U (en) 2016-03-30 2016-03-30 Newly -built high blow mine in mountain area is worn layer and is taken out in advance and speedy drivage system

Publications (1)

Publication Number Publication Date
CN205591961U true CN205591961U (en) 2016-09-21

Family

ID=56922714

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620281438.6U Expired - Fee Related CN205591961U (en) 2016-03-30 2016-03-30 Newly -built high blow mine in mountain area is worn layer and is taken out in advance and speedy drivage system

Country Status (1)

Country Link
CN (1) CN205591961U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106812551A (en) * 2016-03-30 2017-06-09 六盘水师范学院 A kind of newly-built high gas and outburst mine in mountain area is worn layer and is taken out and speedy drivage system in advance
CN113006867A (en) * 2021-04-27 2021-06-22 中国矿业大学 Combined prevention and control method for multiple disasters before coal mining on high-gas low-lying island working face

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106812551A (en) * 2016-03-30 2017-06-09 六盘水师范学院 A kind of newly-built high gas and outburst mine in mountain area is worn layer and is taken out and speedy drivage system in advance
CN113006867A (en) * 2021-04-27 2021-06-22 中国矿业大学 Combined prevention and control method for multiple disasters before coal mining on high-gas low-lying island working face
CN113006867B (en) * 2021-04-27 2021-12-21 中国矿业大学 Combined prevention and control method for multiple disasters before coal mining on high-gas low-lying island working face

Similar Documents

Publication Publication Date Title
CN103670496B (en) Single low permeability outburst coal seam gob side entry retaining with take out section coal-bed gas method in advance
CN103016053B (en) Method of local filling to control surface subsidence in gob
CN107387084B (en) The construction method of top depth is cut in a kind of gob side entry retaining reduction
CN101302931B (en) Method for extracting rim angle coal and re-extracting after warehouse coal extracting
CN102352769A (en) Integrated mining method for commonly mining coal and gas of high mine
CN101725352A (en) Method for filling solid and fully mechanizing and recovering room type coal pillar
CN104481578B (en) A kind of high gas layer large-mining-height working surface mash gas harnessing method
CN111828007B (en) Stoping method for residual studs in underground mine goaf
CN103104260B (en) Under complex geological condition, comprehensive-machine is to hand-pulled noodles coal-mining method
CN102900460A (en) Method for performing through-going seam cutting, pressure relief, permeability enhancement and quick tunneling on soft and high-outburst coal seam
CN101240715A (en) One well three-purpose mash gas harnessing method for ground well drilling and ground well drilling
CN108397227A (en) A kind of progressive extinction roadway layout method of tendency
CN104912557A (en) High-efficiency thin coal seam complete-set coal mining equipment and coal mining method
CN109869150B (en) Mine resource subsection full-mining local-charging mining method
CN104806285A (en) Coal mine goaf gas control method based on ground horizontal well
CN105464700A (en) Method for determining length of filling segment of fully mechanized mining and filling mixed mining working face
CN102418525B (en) Soft coal seam long-wall high-mining-height comprehensive mechanized coal mining end mining method
CN107559008A (en) A kind of method combined second mining super high seam and stop adopting line coal column
CN107339105A (en) A kind of method for being layered the residual exploiting field of paste body filling second mining super high seam and stopping adopting line coal column
CN109630112A (en) A kind of N00 mining codes for cutting top filling
CN103147759B (en) Prospecting and short-hole shrinkage mining method of small inclined ore body
CN102877848A (en) Method for performing coal mining and gangue cementation stripe filling simultaneously
CN114294046B (en) Coal mine area full-coverage underground three-dimensional extraction method
CN108505999A (en) A kind of high prominent more lane method for arranging of working face of coal seam
CN205591961U (en) Newly -built high blow mine in mountain area is worn layer and is taken out in advance and speedy drivage system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant