CN205577214U - Roof below pipeline suspension structure - Google Patents
Roof below pipeline suspension structure Download PDFInfo
- Publication number
- CN205577214U CN205577214U CN201520821502.0U CN201520821502U CN205577214U CN 205577214 U CN205577214 U CN 205577214U CN 201520821502 U CN201520821502 U CN 201520821502U CN 205577214 U CN205577214 U CN 205577214U
- Authority
- CN
- China
- Prior art keywords
- top board
- connecting piece
- utility
- model
- roof
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Installation Of Indoor Wiring (AREA)
Abstract
The utility model discloses a roof below pipeline suspension structure, it includes: the roof, the single wire erection and extension device comprises a connecting piece, the connecting piece pass through expansion bolts fixed mounting in the lower surface of roof, vertical jib, the top of vertical jib connect in the connecting piece. Adopt expansion bolts to connect between connecting piece and the roof, can avoid using at the construction field (site) the electric welding operation of getting angry. Adopt the elevation error of bolted connection, the vertical jib bottom of this kind of connected mode effective control in addition between connecting piece and the vertical jib to the feasible elevations such as water pipe tuber pipe that suspend in midair below vertical jib are unanimous, and the atress is even.
Description
Technical field
This utility model relates to a kind of construction structure, particularly relates to conduit wiring suspension structure below a kind of top board.
Background technology
In prior art, need to lay various pipeline at interior of building.In order to save the space of interior of building, pipeline is generally laid in the lower section of building top board.Various pipelines are suspended to the lower section of top board by furred ceiling support.In prior art, the top of furred ceiling support is generally connected to the pre-embedded steel slab of top board lower surface by the way of welding.But the mode using welding easily produces bigger scale error so that the absolute altitude of furred ceiling bottom is wayward.In addition the mode using welding needs the eminence at building to carry out weld job, easily causes potential safety hazard.
Summary of the invention
In order to solve above-mentioned technical problem, this utility model provides conduit wiring suspension structure below a kind of top board, and below top board of the present utility model, conduit wiring suspension structure can solve problems of the prior art.
The technical solution of the utility model provides conduit wiring suspension structure below a kind of top board, comprising:
Top board;
Connector, described connector is fixedly installed in the lower surface of described top board by expansion bolt;
Vertical suspension rod, the top of described vertical suspension rod is connected to described connector.
Further improvement is that of conduit wiring suspension structure below top board of the present utility model: described connector includes the first connecting plate and second connecting plate of orthogonal connection, and described first connecting plate offers bolt hole;Described expansion bolt passes described bolt hole, and described connector is fixedly installed in the lower surface of described top board;The top of described vertical suspension rod is fixedly connected on described second connecting plate.
Further improvement is that of conduit wiring suspension structure below top board of the present utility model: be bolted between top and described second connecting plate of described vertical suspension rod.
Further improvement is that of conduit wiring suspension structure below top board of the present utility model: the number of the bolt hole of described first connecting plate is two.
Further improvement is that of conduit wiring suspension structure below top board of the present utility model: described top board is concrete floor.
Below top board of the present utility model, the Advantageous Effects of conduit wiring suspension structure is: uses expansion bolt to be attached between connector and top board, can avoid using electric welding machine fire operation at the construction field (site).Between this outer connector and vertical suspension rod with bolts, this connected mode effectively controls the absolute altitude error of vertical suspension rod bottom so that it is consistent to be suspended to the absolute altitudes such as the water pipe airduct below vertical suspension rod, uniform force.
Accompanying drawing explanation
Fig. 1 is the vertical suspension rod in this utility model and the three-dimensional view of connector;
Fig. 2 is the side view of conduit wiring suspension structure below top board of the present utility model.
Detailed description of the invention
Below by way of specific instantiation, embodiment of the present utility model being described, those skilled in the art can be understood other advantages of the present utility model and effect easily by the content disclosed by this specification.This utility model can also be carried out by the most different detailed description of the invention or apply, and the every details in this specification can also carry out various modification or change based on different viewpoints and application under without departing from spirit of the present utility model.
Below in conjunction with the accompanying drawings conduit wiring suspension structure below top board of the present utility model is introduced:
As depicted in figs. 1 and 2, below top board of the present utility model, conduit wiring suspension structure includes: top board 10, connector 11 and vertical suspension rod 12.Top board 10 is concrete floor, and connector 11 is fixedly installed in the lower surface of top board 10 by expansion bolt 13.Vertical suspension rod 12 is L-shaped structure, and the top of vertical suspension rod 12 is connected to connector.
Connector 11 includes the first connecting plate 14 and the second connecting plate 15 of orthogonal connection.Connector 11 is made up of angle steel in the present embodiment.First connecting plate 14 offers bolt hole 16, and in the present embodiment, the first connecting plate 14 offers two bolts hole 16.Connector 11, through bolt hole 16, is fixedly installed in the lower surface of top board 10 by expansion bolt 13.The top of vertical suspension rod 12 is fixedly connected on the second connecting plate 15 by two bolts 17.
During vertical suspension rod 12 is installed, first by expansion bolt 13, connector 11 is installed on the lower surface of top board 10.Use bolt 17 that vertical suspension rod 12 is installed on connector 11 subsequently.Can be by various conduit wiring suspensions in the lower section of vertical suspension rod 12 after vertical suspension rod 12 installation.
Below top board of the present utility model, the Advantageous Effects of conduit wiring suspension structure is: uses expansion bolt 13 to be attached between connector 11 and top board 10, can avoid using electric welding machine fire operation at the construction field (site).Using bolt 17 to connect between this outer connector 11 and vertical suspension rod 12, this connected mode effectively controls the absolute altitude error of vertical suspension rod 12 bottom, so that it is consistent to be suspended to the absolute altitudes such as the water pipe airduct below vertical suspension rod 12, and uniform force.
The above is only preferred embodiment of the present utility model, not this utility model is done any pro forma restriction, although this utility model is disclosed above with preferred embodiment, but it is not limited to this utility model, any those skilled in the art, in the range of without departing from technical solutions of the utility model, when the technology contents of available the disclosure above makes a little change or is modified to the Equivalent embodiments of equivalent variations, in every case it is the content without departing from technical solutions of the utility model, any simple modification above example made according to technical spirit of the present utility model, equivalent variations and modification, all still fall within the range of technical solutions of the utility model.
Claims (3)
1. conduit wiring suspension structure below a top board, it is characterised in that including:
Top board;
Connector, described connector is fixedly installed in the lower surface of described top board by expansion bolt, and described connector includes the first connecting plate and second connecting plate of orthogonal connection, and described first connecting plate offers bolt hole;Described expansion bolt passes described bolt hole, and described connector is fixedly installed in the lower surface of described top board;
Vertical suspension rod, described vertical suspension rod is L-shaped structure, and the top of described vertical suspension rod is connected to described connector, is bolted between top and described second connecting plate of described vertical suspension rod.
2. conduit wiring suspension structure below top board as claimed in claim 1, it is characterised in that: the number of the bolt hole of described first connecting plate is two.
3. conduit wiring suspension structure below top board as claimed in claim 1, it is characterised in that: described top board is concrete floor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520821502.0U CN205577214U (en) | 2015-10-22 | 2015-10-22 | Roof below pipeline suspension structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520821502.0U CN205577214U (en) | 2015-10-22 | 2015-10-22 | Roof below pipeline suspension structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205577214U true CN205577214U (en) | 2016-09-14 |
Family
ID=56882044
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520821502.0U Expired - Fee Related CN205577214U (en) | 2015-10-22 | 2015-10-22 | Roof below pipeline suspension structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205577214U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109680860A (en) * | 2019-01-22 | 2019-04-26 | 杭州柏晗装饰设计工程有限公司 | A kind of calcium silicate board with microporous furred ceiling |
CN109680859A (en) * | 2019-01-22 | 2019-04-26 | 杭州柏晗装饰设计工程有限公司 | A kind of aluminum-pinch furred ceiling |
-
2015
- 2015-10-22 CN CN201520821502.0U patent/CN205577214U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109680860A (en) * | 2019-01-22 | 2019-04-26 | 杭州柏晗装饰设计工程有限公司 | A kind of calcium silicate board with microporous furred ceiling |
CN109680859A (en) * | 2019-01-22 | 2019-04-26 | 杭州柏晗装饰设计工程有限公司 | A kind of aluminum-pinch furred ceiling |
CN109680859B (en) * | 2019-01-22 | 2023-09-05 | 佛山市镁鑫金属制品科技有限公司 | Aluminum pinch plate suspended ceiling |
CN109680860B (en) * | 2019-01-22 | 2024-04-05 | 杭州柏晗装饰设计工程有限公司 | Silicon-calcium plate suspended ceiling |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104806822B (en) | The modularity installation method of integral riser | |
CN104453197B (en) | High Large Cantilever concrete structural steel shape supports platform | |
CN207830730U (en) | A kind of combined type installation suspension and support | |
CN205577214U (en) | Roof below pipeline suspension structure | |
JP6404583B2 (en) | Ceiling hanging bolt, ceiling material mounting device and universal joint | |
CN205116524U (en) | Adjustable jib | |
CN204434116U (en) | A kind of hanging device for interior courtyard lifting pipeline | |
CN204284665U (en) | A kind of diagonal-bracing type suspension and support of rationally arranging for line classification | |
CN203963265U (en) | Pipeline layout support | |
CN204879075U (en) | Installation device of sack tuber pipe | |
CN204590344U (en) | Sheet material curtain wall antidetonation connects Combined hanger | |
CN106185642A (en) | Tower crane Upon Flexible Adhesion steel wire rope pre-tightening device | |
CN204230807U (en) | A kind of power cable crane span structure supporting structure being easy to regulate | |
CN104627849B (en) | Hoisting equipment and hoisting method for hoisting inner courtyard pipeline | |
CN204676757U (en) | Suspended-ceiling suspension device | |
CN104480959A (en) | General tower crane supporting base | |
CN204040213U (en) | A kind of sphere nodes exempts from soldered connection device | |
CN205689912U (en) | A kind of multi-pipeline fixing device | |
CN206053276U (en) | Steel construction high altitude operation platform | |
CN204609092U (en) | A kind of combined type conversion layer connector | |
CN203856117U (en) | Reverse supporting installation structure | |
CN210118615U (en) | Hoisting structure for high-level logistics equipment | |
JP2014156969A (en) | Air-conditioning unit and construction method of the same | |
CN205206124U (en) | No jib formula furred ceiling | |
CN201406782Y (en) | Baking paint keel hung ceiling system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160914 Termination date: 20201022 |