CN205558225U - But whole pin -connected panel scaffold frame - Google Patents

But whole pin -connected panel scaffold frame Download PDF

Info

Publication number
CN205558225U
CN205558225U CN201620337238.8U CN201620337238U CN205558225U CN 205558225 U CN205558225 U CN 205558225U CN 201620337238 U CN201620337238 U CN 201620337238U CN 205558225 U CN205558225 U CN 205558225U
Authority
CN
China
Prior art keywords
steel pipe
reinforcing bar
vertical
vertical steel
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620337238.8U
Other languages
Chinese (zh)
Inventor
陈平
王景龙
李国军
徐海龙
李俊杰
罗建
柯其顺
梁攀
杨双喜
袁强
谢万明
陈存冲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 3 Engineering Group Co Ltd
Guangdong Construction Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd
Original Assignee
China Railway No 3 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 3 Engineering Group Co Ltd filed Critical China Railway No 3 Engineering Group Co Ltd
Priority to CN201620337238.8U priority Critical patent/CN205558225U/en
Application granted granted Critical
Publication of CN205558225U publication Critical patent/CN205558225U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model belongs to the technical field of building construction equipment, specifically a but whole pin -connected panel scaffold frame. It sets up scaffold frame scene temporarily and sets up to have solved fastener -style, set up and take time within a definite time, can not utilize many times, and account for the great problem of construction space, a but whole pin -connected panel scaffold frame, including the channel -section steel frame, vertical steel pipe, horizontal steel pipe, bridging, close mesh wire net and reinforcing bar stair, channel -section steel frame level sets up, be equipped with a plurality of steel pipe hole on the channel -section steel frame, the steel pipe hole interpolation has the vertical steel pipe of vertical setting, be connected with horizontal steel pipe between the vertical steel pipe, the reinforcing bar stair have been set up between vertical steel pipe and the horizontal steel pipe, reinforcing bar stair top has hung close mesh wire net, a plurality of vertical steel pipes form the support body jointly, the side of support body is equipped with bridging. The utility model discloses assemble fast, once assemble repetitious usage, labor - and time -saving.

Description

A kind of overall assemble type scaffold
Technical field
The utility model belongs to construction implement technical field, specifically a kind of overall assemble type scaffold.
Background technology
In metro depot cover body structure post is constructed; structural column is higher and sectional area must pour by merogenesis greatly; pillar reinforcing bar binding, template are set up and are both needed to use cripple with concreting, and cripple guarantees that the size in work progress is accurate, constructing operation convenient and protection operating personnel's safety.
Prior art uses fastener type to set up scaffold as construction operation platform temporarily, comes with some shortcomings;(1) it is difficult under the conditions of the bottom of foundation is irregular adjust perpendicularity and exact position;
(2) scene is set up, and sets up time-consuming, it is impossible to repeatedly utilize;
(3) construction space is accounted for bigger.
Summary of the invention
The utility model is set up scaffold scene temporarily set up to be solved fastener type, sets up time-consuming, it is impossible to repeatedly utilize, and accounts for the problem that construction space is bigger, it is provided that a kind of overall assemble type scaffold.
The utility model takes techniques below scheme: a kind of overall assemble type scaffold, including chan frame, vertical steel pipe, horizontal steel pipe, bridging, dense mesh and reinforcing bar stair, chan frame is horizontally disposed with, chan frame is provided with some steel pipe holes, vertically arranged vertical steel pipe it is inserted with in steel pipe hole, connect between vertical steel pipe and have horizontal steel pipe, it is erected with reinforcing bar stair between vertical steel pipe and laterally steel pipe, reinforcing bar stair top is hung with dense mesh, some vertical steel pipes are collectively forming support body, and the side of support body is provided with bridging.
The height of vertical steel pipe is between 4 ~ 6m, and between horizontal steel pipe, step pitch is 60cm.
Reinforcing bar stair top and bottom are welded with the U-shaped reinforcing bar that can hang on horizontal steel pipe.
Fastener is laterally used to fix between steel pipe and vertical steel pipe.
Compared with prior art, the technical solution of the utility model has the advantage that
(1) version is pin-connected panel;Quick-assembling, once assembly is used for multiple times, saving of work and time;As it has been described above, support body is played fixation by Two bors d's oeuveres channel-section steel, construction can be allocated and transported;
(2) tailor-made convenient, save material;
(3) firm being unlikely to deform, security is high;Support body periphery uses bridging to fix, and forms monolithic construction from bottom to up, uses fastener to fix and guarantee to stablize between horizontal steel pipe and vertical steel pipe.
(4) accurate, it is ensured that post template accurate positioning;
(5) reinforcing bar stair inside the employing of this scaffold, save construction space and keep support body to balance simultaneously.
Accompanying drawing explanation
Fig. 1 is the utility model front view;
Fig. 2 is Fig. 1 left view;
Fig. 3 is chan frame structural representation;
Fig. 4 is reinforcing bar staircase structure schematic diagram;
1-reinforcing bar stair in figure, 2-dense mesh, 3-chan frame, the horizontal steel pipe of 4-, 5-vertical steel pipe, 6-bridging, 7-U steel bar, 8-steel pipe hole.
Detailed description of the invention
As shown in Figure 1, 2, 3, a kind of overall assemble type scaffold, including chan frame 3, vertical steel pipe 5, horizontal steel pipe 4, bridging 6, dense mesh 2 and reinforcing bar stair 1, chan frame 3 is horizontally disposed with, chan frame 3 is provided with some steel pipe holes 8, vertically arranged vertical steel pipe 5 it is inserted with in steel pipe hole 8, connect between vertical steel pipe 5 and have horizontal steel pipe 4, it is erected with reinforcing bar stair 1 between vertical steel pipe 5 and laterally steel pipe 4, reinforcing bar stair 1 top is hung with dense mesh 1, some vertical steel pipes 5 are collectively forming support body, and the side of support body is provided with bridging 6.
The height of vertical steel pipe 5 is between 4 ~ 6m, and between horizontal steel pipe 4, step pitch is 60cm.
As shown in Figure 4, reinforcing bar stair 1 top and bottom are welded with the U-shaped reinforcing bar 7 that can hang on horizontal steel pipe 4.
Fastener is laterally used to fix between steel pipe 3 and vertical steel pipe 4.

Claims (4)

1. an overall assemble type scaffold, it is characterized in that: include chan frame (3), vertical steel pipe (5), laterally steel pipe (4), bridging (6), dense mesh (2) and reinforcing bar stair (1), chan frame (3) is horizontally disposed with, chan frame (3) is provided with some steel pipe holes (8), vertically arranged vertical steel pipe (5) it is inserted with in steel pipe hole (8), connect between vertical steel pipe (5) and have horizontal steel pipe (4), reinforcing bar stair (1) it are erected with between vertical steel pipe (5) and horizontal steel pipe (4), reinforcing bar stair (1) top is hung with dense mesh (2), some vertical steel pipes (5) are collectively forming support body, the side of support body is provided with bridging (6).
Overall assemble type scaffold the most according to claim 1, it is characterised in that: the height of vertical steel pipe (5) is between 4 ~ 6m, and between horizontal steel pipe (4), step pitch is 60cm.
Overall assemble type scaffold the most according to claim 1, it is characterised in that: reinforcing bar stair (1) top and bottom are welded with the U-shaped reinforcing bar (7) that can hang on horizontal steel pipe (4).
Overall assemble type scaffold the most according to claim 1, it is characterised in that: laterally use fastener to fix between steel pipe (3) and vertical steel pipe (4).
CN201620337238.8U 2016-04-21 2016-04-21 But whole pin -connected panel scaffold frame Active CN205558225U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620337238.8U CN205558225U (en) 2016-04-21 2016-04-21 But whole pin -connected panel scaffold frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620337238.8U CN205558225U (en) 2016-04-21 2016-04-21 But whole pin -connected panel scaffold frame

Publications (1)

Publication Number Publication Date
CN205558225U true CN205558225U (en) 2016-09-07

Family

ID=56808767

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620337238.8U Active CN205558225U (en) 2016-04-21 2016-04-21 But whole pin -connected panel scaffold frame

Country Status (1)

Country Link
CN (1) CN205558225U (en)

Similar Documents

Publication Publication Date Title
CN203487803U (en) Safety protection structure for elevator shaft construction
CN207420074U (en) A kind of detachable edge protection device of the outer cantilevered plate of Super High circular steel column
CN205558225U (en) But whole pin -connected panel scaffold frame
CN203271096U (en) Operating platform
CN205100527U (en) A cantilever construction platform for surmounting retaining wall
CN207633795U (en) A kind of foundation pit suspension lane device
CN206233544U (en) Adjustable operation platform
CN205444455U (en) Adopt environment -friendly type wall body's building window subassembly structure
CN205531268U (en) A moving platform guide rail strutting arrangement for daylighting top construction
CN208294053U (en) Attachment type raise scaffold protecting screen structure
CN204662926U (en) A kind of operating platform for steel pipe column top construction operation
CN210818054U (en) Adjustable jig frame for positioning precast beam guardrail reinforcing steel bars
CN206971735U (en) Basic platform for cantilevered structure formwork
CN203373661U (en) Movable operation platform device below cantilever arm of steel-structure bridge
CN208023608U (en) A kind of post-cast strip can have enough to meet the need steel channel formwork system
CN208215308U (en) Suspension type station
CN203066043U (en) Diversion tunnel top arch concrete lining steel formwork support
CN207277870U (en) A kind of elevator protective device with shaped
CN206737358U (en) A kind of prefabricated assembled steel reinforced concrete framework elevator shaft structure
CN204475883U (en) One can turnover type standardized construction elevator floor protection door frame
CN215561952U (en) Integrated operation platform for binding and positioning reinforcement of turnover formwork high pier
CN204531380U (en) Band post Concrete Anti wall with flues common group closes steel form device
CN202731103U (en) Height-adjustable rebar split head capable of turning around
CN203846405U (en) Bridge construction cast-in-place template
CN207686321U (en) A kind of glomeration building prefabricated construction reinforcing bar guiding tube dismounting position-limited rack

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant