CN205538510U - Can apply vertical cyclic loading device of frequency conversion of complicated load form - Google Patents

Can apply vertical cyclic loading device of frequency conversion of complicated load form Download PDF

Info

Publication number
CN205538510U
CN205538510U CN201620202897.0U CN201620202897U CN205538510U CN 205538510 U CN205538510 U CN 205538510U CN 201620202897 U CN201620202897 U CN 201620202897U CN 205538510 U CN205538510 U CN 205538510U
Authority
CN
China
Prior art keywords
wire rope
model
shift mechanism
gravity center
pulley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620202897.0U
Other languages
Chinese (zh)
Inventor
汪明元
单治钢
狄圣杰
张建经
廖蔚茗
吴金标
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Huadong Engineering Corp Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN201620202897.0U priority Critical patent/CN205538510U/en
Application granted granted Critical
Publication of CN205538510U publication Critical patent/CN205538510U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model relates to a can apply vertical cyclic loading device of frequency conversion of complicated load form. The utility model aims at providing a simple structure, the can apply vertical cyclic loading device of frequency conversion of complicated load form that the cost is lower, high pressure heater carries the number of times. The utility model provides a: the device has mold box and vertical and is fixed in the model pile in the mold box, and model pile upper end coupling torque load mechanism, moment load mechanism have the focus and change mechanism and balancing weight I, and the focus changes the mechanism and is fixed in ground through the steel bracket, and the focus changes rotatable the connecing on the steel bracket of pivot that mechanism's one end was arranged through the level, and the focus changes the mechanism and connects through wire rope I and adapter sleeve linkage model pile upper end, I string wire rope is on the focus changes the pulley I of mechanism top, and the focus changes the mechanism and still connects II strings balancing weight I, wire rope on the focus changes the pulley II of mechanism top through wire rope II, and pulley I, II is all installed on the steel bracket.

Description

The frequency conversion vertical CYCLIC LOADING device of Complicated Loads form can be applied
Technical field
This utility model relates to a kind of frequency conversion vertical CYCLIC LOADING device applying Complicated Loads form.It is suitable for Single pile model test in the vertical reciprocating CYCLIC LOADING of single-point.
Background technology
Pile foundation is one of range widest base structure form in land-based area civil engineering, and it is in ocean Engineering (such as ocean platform, oceanic winds electric field) also there are bigger utilization potentiality.With offshore wind-powered electricity generation it is Example, external widely used single pile type foundation.During fan operation, along with rotation and other seas of blade The overlaying influence of ocean environmental load, pile foundation can be acted on by vertical cyclic load.Consider the operation of 20 years Total life cycle, the vertical cyclic load magnitude that pile foundation is subject to is relatively big, has the vertical bearing capacity of base structure Very important impact.Additionally, due to vertically circulation load-bearing deformation, may be weak to the contact of stake soil and stake week The raw a certain degree of disturbance of local products, also has potential impact to the lateral bearing capacity of pile foundation.Existing research The problems referred to above are conducted a research work by the method generally using indoor scale (model) test.When carrying out model test, Generally use excitational equipment or the MTS hydraulic loading system of routine that somewhat expensive version is complicated, on There is main following defect in equipment of stating:
1. equipment making processing or lease expenses are costly, and need plant maintenance is spent more manpower Material resources;
2. it is difficult to the waveform requirements meeting indoor model test to loading amplitude.As homemade excitational equipment is difficult to protect That demonstrate,proves Loaded contact analysis stablizes loading that is controlled and that realize Complicated Loads form.Conventional MTS generally loads magnitude Relatively big, and indoor model test required load amplitude applied after similar reduction is less, thus use MTS It is difficult to meet the demand of test;
3. test is loaded number of times and has certain restriction, it is difficult to realize the cyclic loading test of relatively large level.From Excitational equipment processed is generally difficult to ensure to load stablizing of number of times relatively big rear load waveform, and conventional MTS is then difficult to Realize the CYCLIC LOADING of relatively large level;
The most existing loading equipemtn is generally directed to the horizontal cyclic of pile foundation and loads, it is difficult to be directly used in the vertical of pile foundation Cyclic loading test.
Summary of the invention
The technical problems to be solved in the utility model is: for the problem of above-mentioned existence, it is provided that a kind of structure letter Singly, the frequency conversion vertical CYCLIC LOADING device of the applied Complicated Loads form of cost loading number of times relatively low, high.
This utility model be the technical scheme is that a kind of frequency conversion applying Complicated Loads form vertically follows Ring charger, has model casing and the Model Pile being vertically fixed in model casing, it is characterised in that: described Model Pile upper end coupling torque load maintainer, described moment load maintainer has gravity center shift mechanism and balancing weight I, ground is fixed on through steel bracket in gravity center shift mechanism, and gravity center shift mechanism one end turns through horizontally disposed Axle is rotatably connected on steel bracket, and described gravity center shift mechanism is through steel wire rope I and connects the collar described mould of connection Type stake upper end, steel wire rope I is hung on the pulley I above gravity center shift mechanism, and gravity center shift mechanism is also through steel Cord II connects balancing weight I, and steel wire rope II is hung on the pulley II above gravity center shift mechanism, pulley I, II is mounted on steel bracket.
Described gravity center shift mechanism includes connecting platform, motor, rotating disk and balancing weight II, wherein connecting platform One end is rotatably connected on described steel bracket through described rotating shaft, and motor is fixed on connecting platform, this motor Fix rotating disk in rotating shaft, rotating disk deviates rotating shaft position balancing weight II is set.
The beneficial effects of the utility model are: 1, this utility model is based on principle of moment balance, utilize center of gravity to become The gravity center shift changing mechanism applies cyclic load to Model Pile, can adjust vertically following of output according to test demand Ring power.2, this utility model simple in construction, be easily maintained, there is preferable economy and reliability, output Load stability preferably and precision is higher.3, can be according to test demand (such as model casing size, Model Pile chi Very little etc.) parts are carried out Customization Module.
Accompanying drawing explanation
Fig. 1 is the structural representation of embodiment.
Fig. 2 is the schematic diagram of moment load maintainer in embodiment.
Fig. 3 is the structural representation connecting the collar in embodiment.
Detailed description of the invention
As it is shown in figure 1, the present embodiment is a kind of frequency conversion vertical CYCLIC LOADING dress applying Complicated Loads form Putting, have model casing 1 and the Model Pile 2 being vertically fixed in model casing, the upper end of Model Pile 2 connects it Apply the moment load maintainer of vertical load.
As in figure 2 it is shown, moment load maintainer has gravity center shift mechanism and balancing weight I 13, center of gravity in this example Changeable mechanism includes connecting platform 3, motor 4, rotating disk 5 and balancing weight II 6, and wherein connecting platform 3 is through steel Support 14 is fixed on ground, realizes turning through horizontally disposed rotating shaft 7 between connecting platform 3 and steel bracket 14 Dynamic connected, the other end of connecting platform 3 installs motor 4, the vertical connecting platform of rotating shaft 3 of this motor, motor It is fixed with rotating disk 5 in the rotating shaft of 4, balancing weight II 6 is set in the deviation machine shaft position of rotating disk 5.Connect The medium position of platform 3 is through steel wire rope I 8 and the upper end of the connection collar 12 (Fig. 3) link model stake 2, steel Cord I 8 is hung on pulley I 10 and pulley III 15 successively, and pulley I 10 is positioned at above connecting platform 3, sliding Taking turns III 15 and be positioned at above Model Pile 2, pulley I 10 and pulley III 15 are installed on steel bracket 14.Connect flat The medium position of platform 3 connects balancing weight I 13 through steel wire rope II 9, and steel wire rope II 9 is hung on above connecting platform 3 Pulley II 11, pulley II 11 is installed on steel bracket 14.
The operation principle of the present embodiment is as follows: the present embodiment charger mainly utilizes the equalising torque in mechanics Principle realizes the gravity of balancing weight II 6 and motor 4 is converted into vertical force, and concrete principle is as follows:
Along with motor 4 operates, the rotating disk 5 below drive rotates, the position between balancing weight II 6 and rotating shaft 7 Relation is continually changing, and causes the connecting platform 3 external force resultant moment at rotating shaft 7 to change, connecting platform 3 7 rotating around the shaft, realize Model Pile 2 under the cooperation of balancing weight I 13 and steel wire rope I, II is vertical Load.
As shown in Figure 2, it is assumed that when balancing weight II 6 is in L1 position, connecting platform 3 be in level its Equalising torque, now has:
∑MO=0=Fm2×L1+Frotor×L0-Fload×L3-Fm1×L4
When motor runs, and mass turns to, when O point L2 distance, now to be had:
∑MO=Fm2×L2+Frotor×L0-FLoad×L3-Fm1×L4
Then the load suffered by pile body is:
F L o a d = F m 2 × L 2 + F r o t o r × L 0 - F m 1 × L 4 L 3
Wherein Fm2Gravity for balancing weight II 6;FrotorGravity for motor 4;Fm1For balancing weight I 13 Gravity;FLoadActive force for I 8 pairs of Model Pile 2 of steel wire rope.
Along with motor runs, rotatable platform produces and rotates, and balancing weight II 6 moves in L1 and L2 position Dynamic, it is 0 to F that pile body receives amplitudeLoadHorizontal force action.When the weight of regulation balancing weight I, II, When the rotation amplitude of guarantee connecting platform 3 is less, moment charger can export stable sinusoidal wave form lotus Carry;Further, by adjusting the weight of balancing weight I, II and hanging extra at loading on the connection collar 12 Mass, can realize Loaded contact analysis such as part eccentric, fully eccentric and full symmetric.

Claims (2)

1. can apply a frequency conversion vertical CYCLIC LOADING device for Complicated Loads form, there is model casing (1) The Model Pile (2) being vertically fixed in model casing, it is characterised in that: described Model Pile (2) upper end connects Moment load maintainer, described moment load maintainer has gravity center shift mechanism and balancing weight I (13), and center of gravity becomes Change mechanism and be fixed on ground through steel bracket (14), and gravity center shift mechanism one end is through horizontally disposed rotating shaft (7) Rotatably being connected on steel bracket (14), described gravity center shift mechanism is through steel wire rope I (8) and connects the collar (12) Connecting described Model Pile (2) upper end, steel wire rope I (8) is hung on the pulley I (10) above gravity center shift mechanism On, gravity center shift mechanism also connects balancing weight I (13) through steel wire rope II (9), and steel wire rope II (9) is hung on On pulley II (11) above gravity center shift mechanism, pulley I (10), II (11) is mounted on steel bracket (14) On.
The frequency conversion vertical CYCLIC LOADING device applying Complicated Loads form the most according to claim 1, It is characterized in that: described gravity center shift mechanism includes connecting platform (3), motor (4), rotating disk (5) and joins Pouring weight II (6), wherein connecting platform (3) one end is rotatably connected to described steel bracket through described rotating shaft (7) (14) on, motor (4) is fixed on connecting platform (3), and the rotating shaft of this motor is fixed rotating disk (5), In rotating disk (5) upper deviation machine shaft position, balancing weight II (6) is set.
CN201620202897.0U 2016-03-16 2016-03-16 Can apply vertical cyclic loading device of frequency conversion of complicated load form Withdrawn - After Issue CN205538510U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620202897.0U CN205538510U (en) 2016-03-16 2016-03-16 Can apply vertical cyclic loading device of frequency conversion of complicated load form

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620202897.0U CN205538510U (en) 2016-03-16 2016-03-16 Can apply vertical cyclic loading device of frequency conversion of complicated load form

Publications (1)

Publication Number Publication Date
CN205538510U true CN205538510U (en) 2016-08-31

Family

ID=56781806

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620202897.0U Withdrawn - After Issue CN205538510U (en) 2016-03-16 2016-03-16 Can apply vertical cyclic loading device of frequency conversion of complicated load form

Country Status (1)

Country Link
CN (1) CN205538510U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105588771A (en) * 2016-03-16 2016-05-18 中国电建集团华东勘测设计研究院有限公司 Variable-frequency vertical cyclic loading device capable of applying complicated loading mode
CN110552381A (en) * 2019-09-12 2019-12-10 中国石油大学(华东) mechanical transmission control's frequency conversion cyclic load loading test device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105588771A (en) * 2016-03-16 2016-05-18 中国电建集团华东勘测设计研究院有限公司 Variable-frequency vertical cyclic loading device capable of applying complicated loading mode
CN110552381A (en) * 2019-09-12 2019-12-10 中国石油大学(华东) mechanical transmission control's frequency conversion cyclic load loading test device
CN110552381B (en) * 2019-09-12 2020-12-25 中国石油大学(华东) Mechanical transmission control's frequency conversion cyclic load loading test device

Similar Documents

Publication Publication Date Title
CN201408112Y (en) Loading test device for fan blade of wind generating set
Akimoto et al. Floating axis wind turbines for offshore power generation—a conceptual study
CN106245691B (en) Calcareous sand sound load Multifunctional pile base model test apparatus
CN105588771A (en) Variable-frequency vertical cyclic loading device capable of applying complicated loading mode
CN106368891A (en) Wind energy and ocean energy integrated generating set
JP2010533264A (en) Power generation station that converts gravity into electric power
EP2080899A1 (en) An offshore wind turbine with a rotor integrated with a floating and rotating foundation
CN111851605A (en) Pile foundation model loading device for vertical/horizontal cyclic loading
CN205538510U (en) Can apply vertical cyclic loading device of frequency conversion of complicated load form
CN103597207A (en) Hybrid water pressure energy accumulating wind turbine and method
CN204783496U (en) Pendulum model lever power generation facility
CN208456780U (en) A kind of wind power generation plant
Achard et al. Floating vertical axis wind turbine—OWLWIND project
CN102828894A (en) Tidal energy generating device and method
CN206801790U (en) Large-scale vertical shaft type wind generator system
CN112682260A (en) Blade separation technology of wind power generation motor
CN103147904B (en) Double-oblique-arm rotating mechanism used for tidal current power generation
CN102226444A (en) Track sliding-rotating bearing and framework hollow shaft
CN105041573B (en) A kind of vertical-shaft wind/hydroelectric installation
CN205841100U (en) A kind of self-regulated sail formula flow generator
CN108374756A (en) Real-time pitch-adjusting wind wheel and vertical axis aerogenerator
CN103147911A (en) Vertical shaft lever hopper type overlaying wind energy power source
CN207499007U (en) Horizontal bidirectional cyclic load loading device based on model casing
CN101614189A (en) A kind of high-altitude orbit sailboard wind driven generator
CN106286138B (en) A kind of liftable air pressure energy-storage wind power generator group and its electricity-generating method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20160831

Effective date of abandoning: 20180522

AV01 Patent right actively abandoned

Granted publication date: 20160831

Effective date of abandoning: 20180522

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned