CN205520263U - Cable support positioning and manufacturing device - Google Patents
Cable support positioning and manufacturing device Download PDFInfo
- Publication number
- CN205520263U CN205520263U CN201620352540.0U CN201620352540U CN205520263U CN 205520263 U CN205520263 U CN 205520263U CN 201620352540 U CN201620352540 U CN 201620352540U CN 205520263 U CN205520263 U CN 205520263U
- Authority
- CN
- China
- Prior art keywords
- support
- location
- base support
- channel
- cable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000004519 manufacturing process Methods 0.000 title description 2
- 229910000831 Steel Inorganic materials 0.000 claims description 32
- 239000010959 steel Substances 0.000 claims description 32
- 238000003466 welding Methods 0.000 claims description 13
- 238000005452 bending Methods 0.000 claims description 5
- 238000010276 construction Methods 0.000 abstract description 8
- 238000009434 installation Methods 0.000 abstract description 3
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000000034 method Methods 0.000 description 4
- 239000000463 material Substances 0.000 description 2
- 238000005520 cutting process Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 210000005036 nerve Anatomy 0.000 description 1
- 238000004513 sizing Methods 0.000 description 1
Landscapes
- Butt Welding And Welding Of Specific Article (AREA)
Abstract
The utility model discloses a cable support location making devices of electromechanical device installation technical field, the device include the base support, be equipped with cross arm location support on the width direction of base support, cross arm location support includes the multiunit, and follows the even interval arrangement of base support length direction, each group cross arm location support is parallel to each other and the tip aligns, be equipped with stand location support on the length direction of base support. The beneficial effects of the utility model are that, utilize this device as location preparation platform, can carry out direct location to cable support and put and weld, can guarantee that the cable support who produces with batch reaches same design quality standard to alone can operate, efficient during processing preparation, the device can lightly conveniently remove everywhere, is applicable to the indoor or on-the-spot processing preparation construction demand of various cable supports.
Description
Technical field
This utility model relates to mechanical and electric equipment installation field, particularly relates to a kind of device made for cable bearer location.
Background technology
In engineering electrical equipment is installed, cable is contact nerve between technique drive apparatus, control system, and cable is most
Lay using the mounting bracket in crane span structure, cable duct or cable tunnel as outlet openings.Generally cable testing bridge is qualified life
Produce producer to provide, but each cable bearer Que Xu unit in charge of construction is processed by design size requirement, is made.In the past, because of construction
Personnel are different, processing is inconsistent for weld interval, generally during rack making, and the cutting stock of diagonal angle Steel material, shelf layer
Between the deviation of the existence such as the sizing of spacing, support vertical degree, levelness welding production relatively big, on-the-spot support is installed entity
Quality produces directly impact, and adjusts and be difficult to put in place, making of need to doing over again, otherwise ultimately result in cable bridge horizontal degree overproof or
Cable camber is overproof, and integral installation impression quality can not meet design and code requirement.
Utility model content
For overcoming existing cable support to be difficult to hold in welding process medium-height trestle interlamellar spacing, perpendicularity, levelness, affect product matter
The deficiencies such as amount, technical problem to be solved in the utility model is: provide a kind of making that can facilitate cable bearer positioning welding to fill
Put.
This utility model solves its technical problem the technical scheme is that cable bearer location producing device, props up including base
Frame, the width of described base support is provided with cross-arm positioning support, and described cross-arm positioning support includes many groups, and along base
Stent length direction uniform intervals is arranged, described each group of cross-arm positioning support is parallel to each other and end part aligning, described base support
Length direction is provided with stud location bearing.
Further, described base support includes the channel-section steel that two parallel interval are arranged and the angle steel being connected in channel-section steel two ends, institute
State stud location bearing and be located therein the upper surface of a channel-section steel and parallel with channel-section steel length direction, described often group cross-arm positioning support
Including two locating pieces being located along the same line and lay respectively on two channel-section steels.
Further, the side of described base support channel-section steel is provided with rule, the end of described stud location bearing and rule
Zero graduation alignment.
Further, the end of described base support channel-section steel is provided with simmering and bending mouth.
Further, the angle steel of described base support is provided with the connection bolt connecting electric welding wire.
The beneficial effects of the utility model are: utilize this device as location platform for making, can simmer the material of cable bearer
Curved processing, location is put, is more directly welded, and can guarantee that the cable bearer that same batch is produced reaches same designing quality standard,
And during processing and fabricating, one people is the most operable, efficiency is high, this device lightly can be moved easily everywhere, it is adaptable to various cable beareves
Indoor or on-the-spot processing and fabricating construction demand.
Accompanying drawing explanation
Fig. 1 is this utility model structural representation.
Figure is labeled as, 1-base support, 2-cross-arm positioning support, 3-stud location bearing, 4-simmering and bending mouth, 5-wiring
Bolt, 6-cable column, 7-cross-arm, 11-channel-section steel, 12-angle steel, 13-rule.
Detailed description of the invention
Below by way of detailed description of the invention, this utility model is further described.
As it is shown in figure 1, this utility model includes that base support 1, the width of described base support 1 are provided with cross-arm location
Bearing 2, described cross-arm positioning support 2 includes many groups, and arranges along base support 1 length direction uniform intervals, described each group
Cross-arm positioning support 2 is parallel to each other and end part aligning, and the length direction of described base support 1 is provided with stud location bearing 3.
Cable bearer is typically made up of cable column 6 and cross-arm 7, and cross-arm 7 has multiple, needs uniformly, interval, parallel is welded on electricity
On cable column 6, traditional welding manner is operated by rule of thumb by workman, it is easy to error occur, affects Forming Quality.This practicality
Novel using method is: first by this device horizontal positioned, is then placed on stud location bearing 3 by cable column 6,
The end allowing cable column 6 leans against on the catch of stud location bearing 3 end, and makes the side of cable column 6 be resisted against horizontal stroke
The end of load positioning support 2, thus realize the location of cable column 6, the side at cross-arm positioning support 2 is put the most again
Cross-arm 7, and make the end of cross-arm 7 contact with cable column 6, thus complete the location of cross-arm 7, carry out cross-arm 7 the most again
Welding with cable column 6.Utilize this device can realize the quick location of cable column 6 and cross-arm 7, substantially increase
Efficiency of construction and welding quality.
Further, in order to alleviate the weight of whole device, being more convenient for making and mobile, described base support 1 is parallel by two
Spaced apart channel-section steel 11 and be connected in the angle steel 12 at channel-section steel 11 two ends and form, described stud location bearing 1 is located therein one
The upper surface of channel-section steel 11 and parallel with channel-section steel 11 length direction, described often group cross-arm positioning support 2 includes that two are positioned at the most always
Locating piece on line and laying respectively on two channel-section steels 11.Spaced apart channel-section steel 11 and two locating pieces are utilized to come cross-arm 7
The contact area of cross-arm 7 and device also can be reduced in location as far as possible, it is to avoid device deformation causes error, makes location more accurate.
The side of the channel-section steel 11 of described base support 1 is provided with rule 13, the end of described stud location bearing 3 and rule
The zero graduation alignment of 13.When making this device, it is usually and stud location bearing 3 is first set, then cross-arm positioning support 2 is set,
May be different, so it is permissible to arrange rule 13 in channel-section steel 11 side because the interlamellar spacing of cable bearer is required by each engineering
It is easy to the location of cross-arm bearing 2.
Process owing to the cross-arm 7 of cable bearer needs to make simmering and bending mostly, so, in order to improve efficiency of construction further, described
The end of base support 1 channel-section steel 11 is provided with simmering and bending mouth 4.It addition, in order to ensure the electric current when welding cable column 6 and cross-arm 7
The stability in loop, improves the welding quality of support, is provided with the connection bolt connecting electric welding wire on the angle steel 12 of base support 1
5, first at connection bolt 5, connect a bonding wire before welding.
This utility model simple in construction, makes and uses all very convenient, and can be used repeatedly, substantially increasing cable and prop up
The efficiency of construction of frame and welding quality, make the cable bearer of same batch reach standardization and concordance, have good practicality and
Application prospect.
Claims (5)
1. cable bearer location producing device, is characterized in that: include base support (1), the width of described base support (1)
Direction is provided with cross-arm positioning support (2), and described cross-arm positioning support (2) includes many groups, and along base support (1) length
Direction uniform intervals is arranged, described each group of cross-arm positioning support (2) is parallel to each other and end part aligning, described base support (1)
Length direction be provided with stud location bearing (3).
2. cable bearer location as claimed in claim 1 producing device, is characterized in that: described base support (1) includes two
Channel-section steel (11) that root parallel interval is arranged and be connected in the angle steel (12) at channel-section steel (11) two ends, described stud location bearing (3)
It is located therein the upper surface of a channel-section steel (11) and parallel with channel-section steel (11) length direction, described often group cross-arm positioning support (2)
Including two locating pieces being located along the same line and lay respectively on two channel-section steels (11).
3. cable bearer location as claimed in claim 2 producing device, is characterized in that: the channel-section steel of described base support (1)
(11) side is provided with rule (13), the end of described stud location bearing (3) and the zero graduation pair of rule (13)
Together.
4. cable bearer location as claimed in claim 2 producing device, is characterized in that: the channel-section steel of described base support (1)
(11) end is provided with simmering and bending mouth (4).
5. cable bearer location as claimed in claim 2 producing device, is characterized in that: the angle steel of described base support (1)
(12) connection bolt (5) of connection electric welding wire it is provided with.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620352540.0U CN205520263U (en) | 2016-04-25 | 2016-04-25 | Cable support positioning and manufacturing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620352540.0U CN205520263U (en) | 2016-04-25 | 2016-04-25 | Cable support positioning and manufacturing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205520263U true CN205520263U (en) | 2016-08-31 |
Family
ID=56797654
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620352540.0U Active CN205520263U (en) | 2016-04-25 | 2016-04-25 | Cable support positioning and manufacturing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205520263U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110137843A (en) * | 2019-05-17 | 2019-08-16 | 国网山东省电力公司济宁供电公司 | A kind of crimping of SSY type device clamp wire support and method |
CN111843338A (en) * | 2020-07-09 | 2020-10-30 | 中国二冶集团有限公司 | Processing device for processing cable support |
CN112475713A (en) * | 2020-11-09 | 2021-03-12 | 上海宝冶集团有限公司 | Forming die for manufacturing cable support and using method thereof |
CN112872692A (en) * | 2021-04-12 | 2021-06-01 | 徐剑 | Cable testing bridge preparation welding forming frock clamp |
-
2016
- 2016-04-25 CN CN201620352540.0U patent/CN205520263U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110137843A (en) * | 2019-05-17 | 2019-08-16 | 国网山东省电力公司济宁供电公司 | A kind of crimping of SSY type device clamp wire support and method |
CN111843338A (en) * | 2020-07-09 | 2020-10-30 | 中国二冶集团有限公司 | Processing device for processing cable support |
CN112475713A (en) * | 2020-11-09 | 2021-03-12 | 上海宝冶集团有限公司 | Forming die for manufacturing cable support and using method thereof |
CN112872692A (en) * | 2021-04-12 | 2021-06-01 | 徐剑 | Cable testing bridge preparation welding forming frock clamp |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205520263U (en) | Cable support positioning and manufacturing device | |
CN103934613B (en) | Solar components series welding machine pressure welding strip device | |
CN208246802U (en) | A kind of Horizontal Cantilever, inclined cantilever merge device | |
CN208157984U (en) | A kind of power engineering cable shear | |
CN204675785U (en) | A kind of adjustable platform | |
CN104235505A (en) | Solderless folding cable support frame | |
CN202037207U (en) | Fixture for straightening arc castings | |
CN206795202U (en) | A kind of rack top underframe crimp connection fixture | |
CN204241323U (en) | Insulation ropes test unit | |
CN204565502U (en) | A kind of device for positioning and securing assembled without code for lower box web | |
CN208528421U (en) | A kind of pairing device of wind power tower drum and flange | |
CN204339657U (en) | The assembled frock of suspension arm of lorry-mounted crane | |
CN108612915A (en) | A kind of tube support arrangement based on beam support | |
CN207052920U (en) | The controllable sliding support of ground wire press-connection machine | |
CN203690263U (en) | Device for assembling thyristor valve string | |
CN102607834A (en) | Fatigue testing device capable of synchronously loading loads in three directions for structural test piece | |
CN202498325U (en) | Welding device for main chord member and connecting pieces of tower body standard knot | |
CN203179667U (en) | Anti-bending weight-reducing structure for iron core clamp | |
CN206023086U (en) | A kind of cable mounting bracket | |
CN205497529U (en) | A device for robot overhauls | |
CN203653178U (en) | Gantry lifting device assembly | |
CN203606243U (en) | Short-circuit mechanical impact and bend test device for sleeve of electric generator | |
CN204123007U (en) | A kind of guide for automobile welding and assembling clamp | |
CN203033606U (en) | Standard knot main chord member structure | |
CN212886181U (en) | Shearing and bending equipment for metal plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |