CN205476573U - Civil engineering uses interim guardrail - Google Patents
Civil engineering uses interim guardrail Download PDFInfo
- Publication number
- CN205476573U CN205476573U CN201620310321.6U CN201620310321U CN205476573U CN 205476573 U CN205476573 U CN 205476573U CN 201620310321 U CN201620310321 U CN 201620310321U CN 205476573 U CN205476573 U CN 205476573U
- Authority
- CN
- China
- Prior art keywords
- rod
- civil engineering
- guardrail
- utility
- model
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model discloses a civil engineering uses interim guardrail, include two at least bodies of rod and locate the rope that protects between the body of rod, the body of rod side of being pipe steel structure, upper end are equipped with at least a set ofly perforates with protecting the rope complex, and the lower extreme is equipped with the spout that is used for installing fixed establishment, fixed establishment comprises body, conical head and bearing plate, the body cooperatees with the hole of the body of rod, the bottom of body is located to the conical head, the both sides of body upper end are located to the bearing plate symmetry, and the width is greater than the width of spout. The utility model discloses interim guardrail is through setting up fixed establishment, and is fixed reliable with ground on the one hand, has ensured the safety of executing industrial area ground staff, on the other hand and ground break away from shi buhui leads to the fact the guardrail and damages, and the reuse of the guardrail of being convenient for satisfies the demand of the interim construction of civil engineering.
Description
Technical field
This utility model relates to field of civil engineering, particularly relates to a kind of civil engineering temporary guard rail.
Background technology
Carrying out civil engineering work when, especially the when of building constructure, construction field
Typically require and use the safety guarantee that guardrail works as workman, building constructure when, by
Complicated in place, it is impossible to using regular large-scale guardrail, therefore guardrail is the most all to build temporarily
, safety is the highest, and its length and the most also cannot regulating, some guardrail integralizations design,
Specification limit is fixed, and may be only available for single place scene, it is impossible to many places use on a large scale,
And the guardrail built needs dismounting to carry carrying after architectural engineering finishes temporarily, traditional guardrail is removed
Fortune dismounting and installation are the most cumbersome.
Utility model content
The purpose of this utility model is to overcome the above-mentioned problems in the prior art, it is provided that a kind of soil
Wood engineering temporary guard rail.
For realizing above-mentioned technical purpose, reaching above-mentioned technique effect, this utility model passes through techniques below
Scheme realizes:
A kind of civil engineering temporary guard rail, including at least two body of rod and be located between the body of rod protect rope,
The described body of rod is square hollow section steel structure, and upper end is provided with least one set and protects the perforation that rope coordinates, and lower end is provided with
For installing the chute of fixed mechanism, described fixed mechanism is made up of body, conehead and bearing plate, institute
Stating body to match with the endoporus of the body of rod, described conehead is located at the bottom of body, and described bearing plate is symmetrical
Being located at the both sides of body upper end, width is more than the width of described chute.
Further, the upper end of the body of rod be provided with two groups with protect the perforation that coordinates of rope.
Further, in fixed mechanism body and conehead length and equal to the length of chute.
Further, conehead is provided with at least one tip.
Further, it is provided with reinforcing plate between the lower end of bearing plate and body.
The beneficial effects of the utility model are:
1, temporary guard rail is by arranging fixed mechanism, on the one hand fixing with ground reliable, has ensured construction
The safety of field officer;Guardrail will not be caused breaking-up when on the other hand departing from ground, it is simple to
The recycling of guardrail, meets the demand of civil engineering temporary construction.
2, fixed mechanism is reasonable in design, and conehead and bearing plate cooperate, it is simple to guardrail is consolidated with ground
Determine and depart from.
Certainly, implement arbitrary product of the present utility model to it is not absolutely required to reach above-described simultaneously
All advantages.
Accompanying drawing explanation
In order to be illustrated more clearly that the technical scheme of this utility model embodiment, embodiment will be retouched below
The accompanying drawing stating required use is briefly described, it should be apparent that, the accompanying drawing in describing below is only
It is embodiments more of the present utility model, for those of ordinary skill in the art, is not paying wound
On the premise of the property made work, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is structural representation during civil engineering temporary guard rail described in the utility model use;
Fig. 2 is the use view of civil engineering temporary guard rail described in the utility model;
Fig. 3 is the STRUCTURE DECOMPOSITION schematic diagram of civil engineering temporary guard rail described in the utility model;
Fig. 4 is the structural representation of fixed mechanism in civil engineering temporary guard rail described in the utility model;
Fig. 5 is that in civil engineering temporary guard rail described in the utility model, the structure of looking up of fixed mechanism is shown
It is intended to;
In accompanying drawing, the list of parts representated by each label is as follows:
The 1-body of rod, 101-bores a hole, and 102-chute, 2-protects rope, 3-fixed mechanism, 301-body, 302-
Conehead, 303-bearing plate, 304-reinforcing plate.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, to the skill in this utility model embodiment
Art scheme is clearly and completely described, it is clear that described embodiment is only this utility model
A part of embodiment rather than whole embodiments.Based on the embodiment in this utility model, ability
All other embodiments that territory those of ordinary skill is obtained under not making creative work premise,
Broadly fall into the scope of this utility model protection.
In description of the present utility model, it is to be understood that term " perforate ", " on ", D score,
" thickness ", " top ", " in ", " length ", " interior ", the indicating position such as " surrounding " or
Position relationship, is for only for ease of description this utility model and simplifies description rather than instruction or hint
The assembly of indication or element must have specific orientation, with specific azimuth configuration and operation, therefore
It is not intended that to restriction of the present utility model.
Referring to shown in Fig. 1-5, this utility model is a kind of civil engineering temporary guard rail, including at least
Two bodies of rod 1 and the rope that protects being located between the body of rod 2, the body of rod 1 is square hollow section steel structure, and upper end is provided with at least
One group with protect the perforation 101 that coordinate of rope 2, lower end is provided with the chute 102 for installing fixed mechanism 3,
Fixed mechanism 3 is made up of body 301, conehead 302 and bearing plate 303, body and the endoporus of the body of rod 1
Matching, conehead is located at the bottom of body, and bearing plate is symmetrically set in the both sides of body upper end, and width is big
Width in described chute 102.
Wherein, the upper end of the body of rod 1 be provided with two groups with protect the perforation 101 that coordinate of rope 2.
Wherein, in fixed mechanism 3 body 301 and conehead 302 length and equal to the length of chute 102
Degree.
Wherein, conehead 302 is provided with at least one tip.
Wherein, it is provided with reinforcing plate 304 between the lower end of bearing plate 303 and body 301.
One of the present embodiment has particular application as: the bottom of the body of rod 1 arranges fixed mechanism 3, during use to
The bearing plate 303 of fixed mechanism 3 sidepiece presses, and bearing plate 303 moves downward along chute 102, band
Conehead 302 bottom dynamic body 301 and body 301 moves downward, and conehead 302 inserts construction
In the ground in place, it is achieved the body of rod 1 is fixing with ground.In this way so that the body of rod 1 is not
Easily knocked over, ensured the safety of construction site staff.When end of constructing needs to remove guardrail,
Upwards tap bearing plate 303 by instruments such as hammers, the body of rod 1 can be made to depart from ground, operation side
Just, it is simple to the recycling of guardrail.
In the description of this specification, reference term " embodiment ", " example ", " concrete
Example " etc. the specific features that description means to combine this embodiment or example describes, structure, material mistake
The feature of wearing is contained at least one embodiment of the present utility model or example.In this manual, right
The schematic representation of above-mentioned term is not necessarily referring to identical embodiment or example.And, description
Specific features, structure, material or feature can be in any one or more embodiments or example
Combine in an appropriate manner.
This utility model preferred embodiment disclosed above is only intended to help to illustrate this utility model.Excellent
Select embodiment not have all of details of detailed descriptionthe, be also not intended to the tool that this utility model is only described
Body embodiment.Obviously, according to the content of this specification, can make many modifications and variations.This theory
These embodiments are chosen and specifically described to bright book, be in order to preferably explain principle of the present utility model and
Actual application, so that skilled artisan can be best understood by and utilize this utility model.
This utility model is only limited by claims and four corner thereof and equivalent.
Claims (5)
1. a civil engineering temporary guard rail, including at least two body of rod (1) be located at the body of rod (2)
Between protect rope, it is characterised in that: the described body of rod (1) is square hollow section steel structure, and upper end is provided with least one set
With protect the perforation (101) that rope (2) coordinates, lower end is provided with the chute for installing fixed mechanism (3)
(102), described fixed mechanism (3) is by body (301), conehead (302) and bearing plate (303)
Composition, described body matches with the endoporus of the body of rod (1), and described conehead is located at the bottom of body, institute
Stating bearing plate and be symmetrically set in the both sides of body upper end, width is more than the width of described chute (102).
A kind of civil engineering temporary guard rail the most according to claim 1, it is characterised in that: institute
State the upper end of the body of rod (1) be provided with two groups with protect the perforation (101) that rope (2) coordinates.
A kind of civil engineering temporary guard rail the most according to claim 1, it is characterised in that: institute
State the length of body (301) and conehead (302) in fixed mechanism (3) and equal to chute (102)
Length.
A kind of civil engineering temporary guard rail the most according to claim 1, it is characterised in that: institute
State conehead (302) and be provided with at least one tip.
A kind of civil engineering temporary guard rail the most according to claim 1, it is characterised in that: institute
State and between the lower end of bearing plate (303) and body (301), be provided with reinforcing plate (304).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620310321.6U CN205476573U (en) | 2016-04-07 | 2016-04-07 | Civil engineering uses interim guardrail |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620310321.6U CN205476573U (en) | 2016-04-07 | 2016-04-07 | Civil engineering uses interim guardrail |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205476573U true CN205476573U (en) | 2016-08-17 |
Family
ID=56640298
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620310321.6U Expired - Fee Related CN205476573U (en) | 2016-04-07 | 2016-04-07 | Civil engineering uses interim guardrail |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205476573U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109779258A (en) * | 2019-01-23 | 2019-05-21 | 温州鸿达建设有限公司 | A kind of building construction protective fence |
-
2016
- 2016-04-07 CN CN201620310321.6U patent/CN205476573U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109779258A (en) * | 2019-01-23 | 2019-05-21 | 温州鸿达建设有限公司 | A kind of building construction protective fence |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20190380282A1 (en) | Ground Stake Kit | |
CN205476573U (en) | Civil engineering uses interim guardrail | |
CN204781970U (en) | Template fixing device with adjustable | |
CN105040973B (en) | Construction method of outer decorating layer formwork for conical columns of comprehensive gym | |
CN103321438B (en) | A kind of modular protection marguise of large cantilever being applicable to high-building construction | |
CN204080793U (en) | Hoisting device for reinforcement cage | |
CN209556416U (en) | A kind of hole protective device and building complete set of equipments | |
CN106437150A (en) | Fixing device for preventing flotation of reinforcing steel bars in reinforced concrete | |
CN103147572A (en) | Complete water-stopping screw rod and mounting method | |
CN206616876U (en) | One kind is encorbelmented protective platform system | |
CN107044204B (en) | Facilitate the pre-buried ring of cutting | |
CN205654063U (en) | Tower crane concrete cap's safety protection platform is demolishd in high altitude | |
CN204850251U (en) | Vertical rebar positioning device of shear force wall | |
CN205012621U (en) | Template is pour to outside decorative layer of conical column | |
CN206554529U (en) | One kind faces side opening protective device | |
CN203213631U (en) | Protective handrail close to edge | |
CN208415925U (en) | A kind of PVC column-form | |
CN207215095U (en) | A kind of mold plate verticality survey tool | |
CN206208167U (en) | It is a kind of for beam, post, wall steel reinforced concrete protective layer pre-detection instrument | |
CN201992195U (en) | Cable fastener for scaffolding | |
CN205918128U (en) | Shear force wall outer wall template bracket | |
CN205445132U (en) | Curtain wall penel | |
CN202055550U (en) | Span adjusting device | |
CN103216094B (en) | A kind of adjustable arc-shaped beam cylindrical node assembling clamp construction method | |
CN211172103U (en) | Composite sandwich board deformation joint for bearing plate construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160817 Termination date: 20170407 |