CN103216094B - A kind of adjustable arc-shaped beam cylindrical node assembling clamp construction method - Google Patents

A kind of adjustable arc-shaped beam cylindrical node assembling clamp construction method Download PDF

Info

Publication number
CN103216094B
CN103216094B CN201310165269.0A CN201310165269A CN103216094B CN 103216094 B CN103216094 B CN 103216094B CN 201310165269 A CN201310165269 A CN 201310165269A CN 103216094 B CN103216094 B CN 103216094B
Authority
CN
China
Prior art keywords
concrete
node
fixture
steel plate
spacing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310165269.0A
Other languages
Chinese (zh)
Other versions
CN103216094A (en
Inventor
郅栓明
乔在雄
张小军
皮志军
张元龙
马政
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xingtai Construction Group Co., Ltd
Original Assignee
INNER MONGOLIA XINGTAI CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by INNER MONGOLIA XINGTAI CONSTRUCTION CO Ltd filed Critical INNER MONGOLIA XINGTAI CONSTRUCTION CO Ltd
Priority to CN201310165269.0A priority Critical patent/CN103216094B/en
Publication of CN103216094A publication Critical patent/CN103216094A/en
Application granted granted Critical
Publication of CN103216094B publication Critical patent/CN103216094B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The present invention relates to a kind of adjustable arc-shaped beam cylindrical node assembling clamp and construction method thereof, described fixture is fabricated to arc after using two pieces of 4mm thickness 100mm width steel plate overlap half, lap can regulate the width of beam section at bean column node, and fixture lap uses the screw rod of ¢ 12 to fix;200mm width steel plate side is fixed with node template, and side Screw arbor with nut at both-ends is fixed, and the bilateral symmetry of beam is arranged, and along length direction perforating hole on 200mm width steel plate;Outside two row's macropores are arranged according to spacing 100mm according to angle 45 ° setting, spacing 50mm, inner side one row's aperture, and outside macropore arranges and is connected with node at the bottom of the beam being because having along depth of beam direction the discrepancy in elevation, and fixture can arbitrarily adjust spacing on the macropore of outside.

Description

A kind of adjustable arc-shaped beam cylindrical node assembling clamp construction method
Technical field
The present invention relates to construction and decoration field.
Background technology
Flourish along with modern architecture thing, large public building moulding is increasingly abundant, novel and diversified.Cause This, in building engineering construction, the structure node difficulty of construction such as Curved beam cylinder becomes increasingly complex;Along with people are to engineering matter Amount, the requirement of construction benefit improve constantly, and discuss research for Curved beam beam-cylinder joint difficulty of construction in irregular building: biography System construction method takes fillet flat-die to make full fold-line-shaped spelling group along circular arc, then contains position with outside reinforcing bar annular anchor ear.Result goes out Circle is lost in current situation portion, and outward appearance undulate, Forming Quality is poor.And make set shaped steel formwork specially, description can be caused many, complete I.e. lose turnover after work to be worth and scrap, the most uneconomical." adjustable arc-shaped beam cylindrical node assembling clamp " construction makes By movable fixture stationary nodes template, the number of turnover is many, and technical economic benefit is notable, node quality beautiful appearance.
Summary of the invention
It is an object of the present invention to provide a kind of adjustable arc-shaped beam cylindrical node assembling clamp construction method, should Method includes step:
(1) preparation of construction: according to confiding a technological secret of site technology administrative staff, carries out the examination of adjustable assembling fixture scene Spell;
(2) set Curved beam bed die, colligation Curved beam reinforcing bar, then install Curved beam two side template and assemble adjustable card Tool;Technical staff's on-the-spot guidance checks that fixture screw rod is fixed, and carries out self-inspection through Quality Inspector, and the management of qualified rear tissue is checked and accepted, detection At node, template clamping is firmly and the requirement such as perpendicularity, all checks complete after-pouring concrete;
(3) by node quality examination, sum up construction experience and lesson, improve arrangement and method for construction, and workman's every day Before leaving offices, site operation person, Quality Inspector class monitor and group leader is led to check the node quality constructed the same day, carry out evaluating, analyze, Learn from other's strong points to offset one's weaknesses, improve constantly operative skill, improve construction technology further;
(4) conscientiously construct by job specfication, job specfication is accomplished, and staff is a, strengthen the quality responsibility heart to workman and teach Educate.Organizational technology director gives some short-term training to operating personnel, is then passed through examination on the spot, defective not appoints, and passes through After above-mentioned measure, modal displacement, swollen mould, spillage phenomenon have been resolved;
(5) strengthen vibrating with small-sized plug-in type vibrating rod for the core space that Curved beam beam-cylinder joint reinforcing bar is intensive, stop Leak the dead angle that shakes, it is ensured that the density of joint cores concrete and design strength;
(6) in order to ensure the quality of node area concrete, before Curved beam beam-cylinder joint concrete initial set, carry out secondary shake Smash, i.e. vibrate again once before concrete initial set, the density of concrete at Curved beam beam-cylinder joint, reduces and shrinks, it is ensured that matter Amount;
(7) concrete after pouring, should carry out covering and water seasoning in 12h, water foster after pouring shaping The shortest time protected is 7d, irrigation amount number, concrete should be able to be kept to be in moisture state and to be advisable, use plastic sheeting maintenance Concrete, its exposed surface should all cover tightly, and has condensation water in should keeping plastic sheeting;
(8) striking time and form removal method are controlled, it is ensured that the corner angle of concrete, surface are complete.Must not arrive striking time pine The accessories such as moving platen bolt, in order to avoid affecting concrete quality and the integrality of surface corner angle, forbid during form removal firmly to pound, hard sledge;
(9) concrete curing is carried out at bean column node in time with plastic sheeting parcel after concrete form removal.
Another object of the present invention is to provide a kind of adjustable arc-shaped beam cylindrical node assembling clamp, it uses two Being fabricated to arc after block 4mm thickness 100mm width steel plate overlap half, lap can regulate the width of beam section at bean column node Degree, fixture lap uses the screw rod of ¢ 12 to fix;200mm width steel plate side is fixed with node template, and side is with to drawing spiral shell Bar is fixed, and the bilateral symmetry of beam is arranged, and along length direction perforating hole on 200mm width steel plate;Outside two row's macropores are according to angle 45 ° of settings, spacing 50mm, inner side one row's aperture is arranged according to spacing 100mm, and it is because having along depth of beam direction that outside macropore is arranged Being connected with node at the bottom of the beam of the discrepancy in elevation, fixture can arbitrarily adjust spacing on the macropore of outside.
It is an advantage of the current invention that: at Curved beam beam-cylinder joint, use " adjustable arc-shaped beam cylindrical node assembling clamp " Construction is compared with common templates assembling construction process, and position of joints apparent size and quality are guaranteed, and decrease coagulation The swollen mould of Tu Jiedianchu, displacement, improve work efficiency and construction quality;This engineering method has certain operability, wound property and is suitable for Property, extensively can apply at complicated round building structure Curved beam beam-cylinder joint core space.
The construction at present invention bean column node position be applicable to large public building circular configuration or arcuate structure.
Accompanying drawing explanation
Fig. 1 shows a kind of concrete technology flow process of the inventive method.
Fig. 2 shows that the on-the-spot examination of a kind of fixture model of the present invention is spelled.
Fixture 1, Screw arbor with nut at both-ends 2.
Detailed description of the invention
Embodiment 1: material and equipment
1.1 material
1.1.1 use customization set shaped steel formwork.
1.1.2 even with roller brush brush during use releasing agent, must not trickle, forbid to pollute reinforcing bar.
1.1.3 construction material planning is shown in Table 1.
Material planning table is used in table 1 construction
Note: in table, unreceipted unit is millimeter: mm
1.2 plant equipment
The electric saw of requirement of engineering, handsaw, hand hammer, spanner, horizon rule, steel tape, line pendant, etc. must intact, problematic and Shi Weixiu, it is ensured that requirement of engineering.
Embodiment 2: quality control
2.1 preparative work before constructions are the most ready, and plant equipment does not has hidden danger on inspection, can normally work.
Commercial Concrete used by 2.2 has product certificate and former material test report list, the strength grade of concrete and other performance to meet Design requires and job specfication regulation.
During 2.3 casting concrete, contaminated reinforcing bar should process in time, and the reinforcing bar of displacement to arrange reset in time, waters top Operation packway is taken in advance, it is ensured that operator safety is constructed during plate concrete.
2.4 forbid to add water in concrete, must not add ground remaining concrete in new poured concrete.
2.5 clothes are uniform, limit blanking height.Formwork edge joint is tight, it is necessary to has enough rigidity, intensity and stablizes Property.
2.6 concrete test blocks samplings, proofread, make, maintenance and test to meet " concrete strength check evaluation criterion "
(GBJ107-87) regulation.
2.7 Permission deviation items are shown in Table 2:
Table 2, cast-in-place structural permissible variation in dimension and the method for inspection
Embodiment 3: safety measure
Before 3.1 concretings, reply vibrator carries out test running, and vibrator operating personnel should wear rubber boot, wear insulation Gloves;Vibrator can not hang on reinforcing bar, and wet hand can not contact power switch.
3.2 when pouring Curved beam, cylinder concrete, should set up operating desk, operating personnel must not stand directly on template or Operate in support, in order to avoid stepping on sliding or stepping on disconnected support and fall.
3.3 all operations personnel should wear a safety helmet;Work high above the ground should be fastened the safety belt, and night work to have enough illuminations. Job site temporary electricity is in strict accordance with the relevant specification regulation of " job site temporary electricity technical specification of security) " JGJ46-88 Perform.
Embodiment 4: environmental practice
4.1 scenes, when carrying out steel bar meter and shaping, will control the noise of various machinery.Machinery is placed in flatness On higher platform, underlay plank.And make regular check on various parts, as found, parts have loosening a, abrasion, in time fastening or Change, to reduce noise.Do not vibrate reinforcing bar during casting concrete, reduce noise emission intensity.
4.2 in order to when reducing rust cleaning dust fly upward, scene tarpaulin to be arranged blocks, and rust bits cleaning is got up in time, unites One clears the rubbish of regulation intensively.
4.3 for alleviating the atmosphere pollution caused due to welding, and splice uses taper thread and cold extrusion to connect Head.
4.4 when propping up form removal, it is necessary to handles with care, and upper and lower, left and right has people to transmit.When the dismounting of template and repairing, prohibit Sledgehammer is only used to beat template to reduce noise.
4.5 template topcoating brush high-quality releasing agents, forbid to use used oil, prevent contaminated land.The plastics of dress releasing agent Bucket is arranged in special warehouse.
After 4.6 form removables, understanding the such as concrete of the adhesive in template etc., collection to be cleared up in time in scene, is deposited in Fixing stacking place, transports to rubbish and concentrates stacking field.
Embodiment 5: performance analysis
Facts have proved that this construction method flow process is reasonable, be effectively guaranteed Curved beam beam-cylinder joint position apparent size and sight Sense quality, node quality beautiful appearance, and it is many to assemble the fixture number of turnover, has good Social benefit and economic benefit, joint About human and material resources, financial resources, have received obvious effect, its common quality defect have been obtained effectively preventing.Obtained management and The commendation of construction unit, by the favorable comment of relevant expert.

Claims (2)

1. an adjustable arc-shaped beam cylindrical node assembling clamp, after it uses two pieces of 4mm thickness 100mm width steel plate overlap half Being fabricated to arc, lap can regulate the width of beam section at bean column node, and fixture lap uses the screw rod of Φ 12 Fixing;200mm width steel plate side is fixed with node template, and side Screw arbor with nut at both-ends is fixed, and the bilateral symmetry of beam is arranged, and Along length direction perforating hole on 200mm width steel plate;Outside two row's macropores are according to angle 45 ° setting, spacing 50mm, inner side one row's aperture Arranging according to spacing 100mm, it is to be connected with node because having along depth of beam direction at the bottom of the beam of the discrepancy in elevation that outside macropore is arranged, and fixture is permissible Outside macropore arbitrarily adjusts spacing.
2. employ a construction method for adjustable arc-shaped beam cylindrical node assembling clamp described in claim 1, its feature It is to specifically include step:
(1) preparation of construction: according to confiding a technological secret of site technology administrative staff, carries out the examination of adjustable assembling fixture scene and spells;
(2) install beam bottom board, reinforcing bar binding is checked and accepted:
(3) install beam two side template, assemble template at fixture connection node;
(4) tie down screw, stationary nodes fixture;
(5) check;
(6) Curved beam concrete is poured;
(7) concrete at Curved beam beam-cylinder joint is poured: the core space intensive for Curved beam beam-cylinder joint reinforcing bar is inserted with small-sized Enter formula vibrating head to strengthen vibrating, stop leakage and shake dead angle, it is ensured that the density of joint cores concrete and design strength;
(8) secondary vibration is carried out before bean column node concrete initial set: vibrate once before concrete initial set, Curved beam cylindrical knots again The density of concrete at Dian, reduces and shrinks, it is ensured that quality;
(9) concrete curing;Carrying out covering and water seasoning in 12h, after pouring shaping, the shortest time of water seasoning is 7d, Irrigation amount can keep elder brother to coagulate soil being in moisture state and be advisable, use the concrete of plastic sheeting maintenance, and its exposed surface should be complete Portion covers tight, and has condensation water in keeping plastic sheeting;
(10) form removable;
(11) finished product protection;Concrete curing is carried out at bean column node in time with plastic sheeting parcel after concrete form removal.
CN201310165269.0A 2013-05-08 2013-05-08 A kind of adjustable arc-shaped beam cylindrical node assembling clamp construction method Active CN103216094B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310165269.0A CN103216094B (en) 2013-05-08 2013-05-08 A kind of adjustable arc-shaped beam cylindrical node assembling clamp construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310165269.0A CN103216094B (en) 2013-05-08 2013-05-08 A kind of adjustable arc-shaped beam cylindrical node assembling clamp construction method

Publications (2)

Publication Number Publication Date
CN103216094A CN103216094A (en) 2013-07-24
CN103216094B true CN103216094B (en) 2016-08-24

Family

ID=48814214

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310165269.0A Active CN103216094B (en) 2013-05-08 2013-05-08 A kind of adjustable arc-shaped beam cylindrical node assembling clamp construction method

Country Status (1)

Country Link
CN (1) CN103216094B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107977781A (en) * 2017-11-21 2018-05-01 上海筑想信息科技股份有限公司 Residence development project decoration construction quality inspection man-machine interactive system based on mobile terminal

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1502756A (en) * 2002-11-22 2004-06-09 钟肇鸿 Beam column node structure for building frame and construction method
CN1644827A (en) * 2005-01-04 2005-07-27 华南理工大学 Node structure for combined beam and concrete column and construction thereof
CN101302776A (en) * 2008-06-24 2008-11-12 沈阳建筑大学 Cellular combined steel and concrete column and reinforced concrete beam frame node
CN101487291A (en) * 2009-02-09 2009-07-22 刘馨裕 Assembly node and construction method of prefabricated hollow beam and column
CN102383496A (en) * 2011-08-26 2012-03-21 章雪峰 Prefabricated steel hoop barrel of reinforced concrete beam column joint and construction method
CN102677784A (en) * 2012-05-21 2012-09-19 天津大学 Prefabricated concrete pipe column and reinforced concrete beam node structure and construction method thereof
CN102704575A (en) * 2012-05-21 2012-10-03 天津大学 Node structure of precast concrete tubular column steel rib concrete beam and construction method of node structure
CN102864842A (en) * 2012-10-26 2013-01-09 上海中锦建设集团股份有限公司 Core anchoring barrel type node system of reinforced concrete frame structure and application of core anchoring barrel type node system
CN102926773A (en) * 2012-10-30 2013-02-13 福州市第三建筑工程公司 Assembled type concrete block pressing rod beam and using method, production die and production method thereof
CN103088915A (en) * 2012-08-16 2013-05-08 杨众 Cast-in-site column with column cap and construction method

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1502756A (en) * 2002-11-22 2004-06-09 钟肇鸿 Beam column node structure for building frame and construction method
CN1644827A (en) * 2005-01-04 2005-07-27 华南理工大学 Node structure for combined beam and concrete column and construction thereof
CN101302776A (en) * 2008-06-24 2008-11-12 沈阳建筑大学 Cellular combined steel and concrete column and reinforced concrete beam frame node
CN101487291A (en) * 2009-02-09 2009-07-22 刘馨裕 Assembly node and construction method of prefabricated hollow beam and column
CN102383496A (en) * 2011-08-26 2012-03-21 章雪峰 Prefabricated steel hoop barrel of reinforced concrete beam column joint and construction method
CN102677784A (en) * 2012-05-21 2012-09-19 天津大学 Prefabricated concrete pipe column and reinforced concrete beam node structure and construction method thereof
CN102704575A (en) * 2012-05-21 2012-10-03 天津大学 Node structure of precast concrete tubular column steel rib concrete beam and construction method of node structure
CN103088915A (en) * 2012-08-16 2013-05-08 杨众 Cast-in-site column with column cap and construction method
CN102864842A (en) * 2012-10-26 2013-01-09 上海中锦建设集团股份有限公司 Core anchoring barrel type node system of reinforced concrete frame structure and application of core anchoring barrel type node system
CN102926773A (en) * 2012-10-30 2013-02-13 福州市第三建筑工程公司 Assembled type concrete block pressing rod beam and using method, production die and production method thereof

Also Published As

Publication number Publication date
CN103216094A (en) 2013-07-24

Similar Documents

Publication Publication Date Title
CN104846744B (en) Construction method for pouring and forming urban viaduct curve type pier stud in one-off mode
CN204781624U (en) Floor elevation and roughness controlling means
CN106013750A (en) Disc buckle direct insertion type support frame capable of being rapidly assembled and disassembled and construction method thereof
CN206428970U (en) A kind of constructional column top tool formula steel form
CN103758348A (en) Profile steel framework structure concrete floor slab suspension mould pouring construction method
CN108708481A (en) Constructional column exempts from formwork construction method
CN105696800A (en) Temporary fixed sleeve frame for preventing relative displacement generated during construction of steel-structured anchor bolts
CN105089184B (en) Multi-curved concrete hollow modelling wall construction method and rhombic hollow structure formwork
CN103216094B (en) A kind of adjustable arc-shaped beam cylindrical node assembling clamp construction method
CN205370110U (en) Constructon site fence
CN115162594A (en) Construction method based on BIM floor support plate process deepening
CN210032629U (en) Concrete form slab staggering trimming tool
CN205591073U (en) Novel assembled skating rink
CN103243912A (en) Multilayer no-board frame structure constructing method
CN104499715A (en) Template overhanging construction method for floor system with composite structure by utilizing profiled steel beams
US8813447B2 (en) Apparatus and method for feed through construction
CN106141366B (en) A kind of strength plate stress hole cutting implement and application method
CN205476573U (en) Civil engineering uses interim guardrail
CN207999065U (en) A kind of 3.5 meters of height internal shear force wall form composite structures
CN203878605U (en) Spliced tower crane foundation
CN207362706U (en) Load carrying type hanging basket operating platform
CN205100253U (en) Bottom plate template post -cast strip department structure with and in protector thereof
CN205296988U (en) Material covers quick assembly disassembly device
CN105256996B (en) Tilting cone tube-in-tube structure Bark mark manages exposed concrete construction method
CN206815190U (en) Carry the bridge square pier construction formwork of corbel type support safety fence operation platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20161018

Address after: 017010 the Inner Mongolia Autonomous Region Ordos Ulan New District of Kangbashi City, the South Bank of the Mulun River Xingtai Business Plaza (CBD) T4 tower room 2207

Patentee after: INNER MONGOLIA XINGTAI CONSTRUCTION GROUP CO., LTD.

Address before: The Inner Mongolia Autonomous Region city Dongsheng District 017000 Erdos ejinhuro Street No. 7 Room 308

Patentee before: Inner Mongolia Xingtai Construction Co., Ltd.

CP03 Change of name, title or address

Address after: The Inner Mongolia Autonomous Region city Dongsheng District 017000 Ordos ejinhuro Street No. 7

Patentee after: Xingtai Construction Group Co., Ltd

Address before: 017010 the Inner Mongolia Autonomous Region Ordos Ulan New District of Kangbashi City, the South Bank of the Mulun River Xingtai Business Plaza (CBD) T4 tower room 2207

Patentee before: INNER MONGOLIA XINGTAI CONSTRUCTION GROUP Co.,Ltd.

CP03 Change of name, title or address