CN103147572A - Complete water-stopping screw rod and mounting method - Google Patents

Complete water-stopping screw rod and mounting method Download PDF

Info

Publication number
CN103147572A
CN103147572A CN201310070842XA CN201310070842A CN103147572A CN 103147572 A CN103147572 A CN 103147572A CN 201310070842X A CN201310070842X A CN 201310070842XA CN 201310070842 A CN201310070842 A CN 201310070842A CN 103147572 A CN103147572 A CN 103147572A
Authority
CN
China
Prior art keywords
fixed bar
pullover
sleeve
plug
sealing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310070842XA
Other languages
Chinese (zh)
Inventor
林光明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHAOXING COUNTY MINGHUANG BUILDING MATERIALS TECHNOLOGY Co Ltd
Original Assignee
SHAOXING COUNTY MINGHUANG BUILDING MATERIALS TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHAOXING COUNTY MINGHUANG BUILDING MATERIALS TECHNOLOGY Co Ltd filed Critical SHAOXING COUNTY MINGHUANG BUILDING MATERIALS TECHNOLOGY Co Ltd
Priority to CN201310070842XA priority Critical patent/CN103147572A/en
Publication of CN103147572A publication Critical patent/CN103147572A/en
Pending legal-status Critical Current

Links

Abstract

The invention belongs to the technical field of building members, and particularly relates to a complete water-stopping screw rod and a mounting method. The complete water-stopping screw rod comprises three water-stopping sheets with holes, a sleeve, sleeve heads, fixing rods and iron pins, wherein the three water-stopping sheets are tightly connected in series to two end parts and a center end of the sleeve; an axial hole is formed at one end of each sleeve head, and a plug is arranged at the other end of each sleeve head; the axial holes of the sleeve heads are sleeved at two ends of the sleeve in a matching way, and the end surfaces of the sleeve heads are clung to the water-stopping sheets; the fixing rods and the iron pins are in threaded connection with the plug ends; external threads are arranged at the plug ends and matched with internal threads at one ends of the fixing rods; fixing grooves penetrating through the fixing rods vertically are formed in the outer circumferential surfaces of the fixing rods, and a plurality of fixing holes arranged at intervals are formed in two sides of the fixing grooves. According to the invention, reinforcement is convenient and firm, disassembly is simple, and a great amount of manpower can be saved; and the traditional reinforcement concept of adopting screw plugs is changed, and the construction progress can be accelerated.

Description

A kind of complete sealing up screw and mounting method
Technical field
The invention belongs to the building unit technical field, be specifically related to a kind of complete sealing up screw and mounting method.
Background technology
underground shear wall formwork construction, there is the member of waterproof requirement usually to adopt complete sealing up screw, (patent No. is sealing up screw as disclosed in Chinese patent: 201010158798.4), it comprises three sealing pieces all with holes, a sleeve pipe, three sealing pieces closely are connected in respectively both ends and the center-side of sleeve pipe, also comprise an end establish axial aperture and the other end establish axial macropore and communicate pullover, and one end be provided with externally threaded plug, all be provided with the internal thread that the external screw thread with plug is complementary in the two ends of sleeve pipe, the plug of this patent is when fixing sealing up screw, use supporting breakdown instrument to tighten or breakdown, this installation mode consumes a large amount of man power and materials in the shear wall formwork work progress, construction period is elongated, construction cost rises.
In view of this, the inventor invents a kind of complete sealing up screw that can fix fast and dismantle, and this case produces thus.
Summary of the invention
The object of the present invention is to provide a kind of complete sealing up screw and mounting method, sealing up screw is reinforced convenient, firm, dismounting is simple, can save a large amount of artificial; Changed the theory that the conventional screw plug is reinforced, construction speed is accelerated.
For reaching above-mentioned purpose, technical scheme of the present invention is: a kind of complete sealing up screw, comprise three sealing pieces all with holes, a sleeve pipe, described three sealing pieces are series at both ends and the center-side of sleeve pipe closely, comprise that also an end is provided with the axial hole other end and is provided with the pullover of plug, this pullover axial hole cooperation is placed in the two ends of sleeve pipe and this pullover end face is close to mutually with sealing piece, it is characterized in that: also comprise the fixed bar and the iron pin that are threadedly connected to the plug end, described plug end is provided with the internal thread coupling of external screw thread and fixed bar one end; Described fixed bar outer circumference surface is provided with the holddown groove that vertically runs through fixed bar, and the both sides of this holddown groove are provided with the fixing hole that some intervals arrange, and is positioned at the fixing hole steady pin of planting, and this steady pin can butt be positioned at the iron pin of holddown groove.
Further, 6 ~ 12 of described fixing holes, the distance of adjacent fixing hole is 4 ~ 8cm.
Further, described iron pin is up big and down small contract type shape, and the upper surface width is 3 ~ 10cm, and the lower surface width is 0.5 ~ 1cm.
Further, described pullover and quantity fixed bar is two, and this pullover and fixed bar are symmetricly set in described sleeve pipe two ends.
Further, described fixed bar and steady pin adopt metal material to make.
Further, described pullover be circular platform type or column type.
A kind of mounting method of complete sealing up screw: (1) is with the reinforcing bar binding of shear wall; (2) sleeve pipe that assembly unit is good, three sealing pieces and pulloverly be embedded in advance in shear wall; (3) offer porose mounted split pattern and erected splicing; (4) lumps of wood is fixed in outside template; (5) fixed bar is connected in pullover plug, sheathed mountain type card blocks steel pipe on fixed bar, plugs steady pin in fixing hole, fills in holddown groove with contract sections pin at last and fixes, and beat with hammer, makes contract sections pin card real.
The present invention has the following advantages: one, the present invention uses fixed bar replacing traditional plug, and the present invention as long as filling in holddown groove with contract sections pin fixes, and beats with hammer fixedly the time, and contract sections pin card reality is got final product, and installing/dismounting is simple and convenient.Two, the present invention both sides of being positioned at holddown groove are provided with the fixing hole that some intervals arrange and are fixed pin and use, and the present invention can adapt to the construction of the underground shear wall of different size.
Below in conjunction with drawings and the specific embodiments, invention is described in further detail.
Description of drawings
Fig. 1 is structural representation of the present invention;
Fig. 2 is the sectional view that shear wall is fixed in the present invention.
Specific embodiment
as shown in Figure 1, what the present invention disclosed is a kind of complete sealing up screw and mounting method, a kind of complete sealing up screw, comprise three sealing pieces all with holes 1, a sleeve pipe 2, described three sealing pieces 1 are series at both ends and the center-side of sleeve pipe 2 closely, comprise that also an end is provided with axial hole 32 other ends and is provided with pullover 3 of plug 31, these axial hole of pullover 3 32 cooperations are placed in the two ends of sleeve pipe 2 and this end face of pullover 3 is close to mutually with sealing piece 1, also comprise the fixed bar 4 and the iron pin 10 that are threadedly connected to plug 31 ends, described plug 31 ends are provided with the internal thread coupling of external screw thread and fixed bar 4 one ends, described fixed bar 4 outer circumference surfaces are provided with the holddown groove 41 that vertically runs through fixed bar 4, the both sides of this holddown groove 41 are provided with the fixing hole 42 that some intervals arrange, be positioned at fixing hole 42 steady pin 43 of planting, this steady pin 43 can butts be positioned at the iron pin 10 of holddown groove 41.
Further, described fixing hole 42 is 6 ~ 12, and the distance of adjacent fixing hole 42 is 4 ~ 8cm.Further, described iron pin 10 is up big and down small contract type shape, and the upper surface width is 3 ~ 10cm, and the lower surface width is 0.5 ~ 1cm.Further, described pullover 3 and the quantity of fixed bar 4 be two, this pullover 3 is symmetricly set in described sleeve pipe 2 two ends with fixed bar 4.Further, described fixed bar 4 and steady pin 43 adopt metal material to make.Further, described pullover 3 is circular platform type or column type.
In conjunction with shown in Figure 2, a kind of mounting method of complete sealing up screw: (1) is with the reinforcing bar binding of shear wall 6; (2) sleeve pipe 2 that assembly unit is good, three sealing pieces 1 and pullover 3 are embedded in shear wall 6 in advance; (3) offer porose mounted split pattern 7 and erected splicing; (4) lumps of wood is fixed in outside template; (5) fixed bar 4 is connected in pullover 3 plug 31, sheathed mountain type card 8 blocks steel pipe 9 on fixed bar 4, plugs steady pin 43 in fixing hole 42, fills in holddown groove 41 with contract sections pin 10 at last fixing, and beats with hammer, makes contract sections pin 10 cards real.
Wherein, the present invention's operating frequency in shear wall 6 constructions is up to steady pin 43 in close first fixing hole 42 of template, and other fixing hole 42 can adapt to the shear wall construction of different size.
The present invention has following beneficial effect: one, the present invention uses fixed bar replacing traditional plug, and the present invention as long as filling in holddown groove with contract type stopper fixes, and beats with hammer fixedly the time, and contract type stopper consolidation is got final product, and installing/dismounting is simple and convenient.Two, the present invention both sides of being positioned at holddown groove are provided with the fixing hole that some intervals arrange and are fixed pin and use, and the present invention can adapt to the construction of the shear wall of different size.
Above-described embodiment and graphic and non-limiting product form of the present invention and style, any person of an ordinary skill in the technical field all should be considered as not breaking away from patent category of the present invention to its suitable variation or modification of doing.

Claims (7)

1. complete sealing up screw, comprise three sealing pieces all with holes, a sleeve pipe, described three sealing pieces are series at both ends and the center-side of sleeve pipe closely, comprise that also an end is provided with the axial hole other end and is provided with the pullover of plug, this pullover axial hole cooperation is placed in the two ends of sleeve pipe and this pullover end face is close to mutually with sealing piece, it is characterized in that: also comprise the fixed bar and the iron pin that are threadedly connected to the plug end, described plug end is provided with the internal thread coupling of external screw thread and fixed bar one end; Described fixed bar outer circumference surface is provided with the holddown groove that vertically runs through fixed bar, and the both sides of this holddown groove are provided with the fixing hole that some intervals arrange, and is positioned at the fixing hole steady pin of planting, and this steady pin can butt be positioned at the iron pin of holddown groove.
2. complete sealing up screw according to claim 1, it is characterized in that: 6 ~ 12 of described fixing holes, the distance of adjacent fixing hole are 4 ~ 8cm.
3. complete sealing up screw according to claim 1, it is characterized in that: described iron pin is up big and down small contract type shape, and the upper surface width is 3 ~ 10cm, and the lower surface width is 0.5 ~ 1cm.
4. complete sealing up screw according to claim 1 is characterized in that: described pullover and quantity fixed bar is two, and this pullover and fixed bar are symmetricly set in described sleeve pipe two ends.
5. complete sealing up screw according to claim 1 is characterized in that: described fixed bar and steady pin adopt metal material to make.
6. complete sealing up screw according to claim 1, is characterized in that: described pullover be circular platform type or column type.
7. the mounting method of a complete sealing up screw, it is characterized in that: (1) is with the reinforcing bar binding of shear wall; (2) sleeve pipe that assembly unit is good, three sealing pieces and pulloverly be embedded in advance in shear wall; (3) offer porose mounted split pattern and erected splicing; (4) lumps of wood is fixed in outside template; (5) fixed bar is connected in pullover plug, sheathed mountain type card blocks steel pipe on fixed bar, plugs steady pin in fixing hole, fills in holddown groove with contract sections pin at last and fixes, and beat with hammer, makes contract sections pin card real.
CN201310070842XA 2013-03-06 2013-03-06 Complete water-stopping screw rod and mounting method Pending CN103147572A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310070842XA CN103147572A (en) 2013-03-06 2013-03-06 Complete water-stopping screw rod and mounting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310070842XA CN103147572A (en) 2013-03-06 2013-03-06 Complete water-stopping screw rod and mounting method

Publications (1)

Publication Number Publication Date
CN103147572A true CN103147572A (en) 2013-06-12

Family

ID=48545863

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310070842XA Pending CN103147572A (en) 2013-03-06 2013-03-06 Complete water-stopping screw rod and mounting method

Country Status (1)

Country Link
CN (1) CN103147572A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108149719A (en) * 2018-01-17 2018-06-12 温州正康建设有限公司 A kind of anti-corrosion sealing up screw and its construction technology
CN108678361A (en) * 2018-06-29 2018-10-19 五冶集团上海有限公司 A kind of the wall-connecting piece built-in fitting and its setting method of construction exterior rack
CN108756217A (en) * 2018-07-26 2018-11-06 广东快建模架科技有限公司 A kind of clamp device and its application method of shear wall casting mold
CN109898852A (en) * 2019-03-20 2019-06-18 伍祥文 A kind of building template clamp device and fastening method
CN110374327A (en) * 2019-07-20 2019-10-25 廖德全 A kind of rod assembly and concrete cast-in-situ mold for concrete cast-in-situ mold

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000017837A (en) * 1998-07-02 2000-01-18 Koji Otsubo Tightening construction for concrete form
CN201162352Y (en) * 2008-03-07 2008-12-10 长业建设集团有限公司 Water stop screw
CN101832025A (en) * 2010-04-24 2010-09-15 林光明 Sealing up screw
CN202248891U (en) * 2011-08-05 2012-05-30 山东三箭建设工程管理有限公司 Side moldboard reinforcing tool with bowl openings
CN203213602U (en) * 2013-03-06 2013-09-25 绍兴县明煌建材科技有限公司 Sealing screw set

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000017837A (en) * 1998-07-02 2000-01-18 Koji Otsubo Tightening construction for concrete form
CN201162352Y (en) * 2008-03-07 2008-12-10 长业建设集团有限公司 Water stop screw
CN101832025A (en) * 2010-04-24 2010-09-15 林光明 Sealing up screw
CN202248891U (en) * 2011-08-05 2012-05-30 山东三箭建设工程管理有限公司 Side moldboard reinforcing tool with bowl openings
CN203213602U (en) * 2013-03-06 2013-09-25 绍兴县明煌建材科技有限公司 Sealing screw set

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108149719A (en) * 2018-01-17 2018-06-12 温州正康建设有限公司 A kind of anti-corrosion sealing up screw and its construction technology
CN108678361A (en) * 2018-06-29 2018-10-19 五冶集团上海有限公司 A kind of the wall-connecting piece built-in fitting and its setting method of construction exterior rack
CN108756217A (en) * 2018-07-26 2018-11-06 广东快建模架科技有限公司 A kind of clamp device and its application method of shear wall casting mold
CN109898852A (en) * 2019-03-20 2019-06-18 伍祥文 A kind of building template clamp device and fastening method
CN110374327A (en) * 2019-07-20 2019-10-25 廖德全 A kind of rod assembly and concrete cast-in-situ mold for concrete cast-in-situ mold

Similar Documents

Publication Publication Date Title
CN103147572A (en) Complete water-stopping screw rod and mounting method
CN204492190U (en) Aluminum alloy mould plate back cord fastening devices
CN105569211B (en) A kind of assembled wall, wallboard and construction method
CN205206324U (en) Precast concrete wallboard and wall form setting node
CN203846523U (en) Combined tower crane foundation
CN203213602U (en) Sealing screw set
CN101832025A (en) Sealing up screw
CN204139622U (en) Adjustable segmented column steel bar positioning fixture
CN203499017U (en) Wall tie bar pre-embedded positioning device
CN203926599U (en) Screw pull rod
CN205314289U (en) Assembled wall body, assembled wallboard and assembled wall body subassembly
CN203924718U (en) A kind of formwork reinforcement combination tool
CN204645582U (en) Girder steel assembly is chosen outside one is complete
CN204551857U (en) Long nut component is used in furred ceiling suspention
CN104343382B (en) Pedestrain raise solar steel design and construction method
CN209211934U (en) A kind of reinforced steel concrete framed floor structure
CN203476355U (en) Hollow pipe concrete support
CN206952875U (en) A kind of hydraulic means for being used to take out steady pin
CN201671338U (en) Water-stop screw rod
CN204899034U (en) Prefabricated wall post
CN204311326U (en) The simple and easy template of a kind of pavement concrete
CN206385709U (en) A kind of mud insulating brick
CN204252589U (en) Polygon movable pond
CN203572477U (en) Assembled settlement observation point
CN104533020A (en) Connector for lengthening prestressed steel bars and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130612