CN205476513U - A vibration device for steel -pipe column concrete placement - Google Patents
A vibration device for steel -pipe column concrete placement Download PDFInfo
- Publication number
- CN205476513U CN205476513U CN201620167786.0U CN201620167786U CN205476513U CN 205476513 U CN205476513 U CN 205476513U CN 201620167786 U CN201620167786 U CN 201620167786U CN 205476513 U CN205476513 U CN 205476513U
- Authority
- CN
- China
- Prior art keywords
- pipe column
- steel pipe
- vibrates
- vibrating spear
- lifting device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a vibration device for steel -pipe column concrete placement, including erectting in the operation platform on steel -pipe column top, installing the travelling hoisting device on operation platform to and the integration that lies in travelling hoisting device below and lie in the steel -pipe column stick that vibrates, wherein, travelling hoisting device and the integrated stick that vibrates are connected in order promoting the integrated stick that vibrates, the last winding reel of installing of operation platform, on this winding reel the winding have with the integration excellent electric cable of being connected that vibrates, travelling hoisting device can walk on operation platform. The utility model provides a vibration device for steel -pipe column concrete placement has satisfied and has carried out the demand of vibrating to steel -pipe column concrete placement, and because of travelling hoisting device can walk on operation platform, consequently the scope of vibrating does not have the dead angle.
Description
Technical field
This utility model relates to construction implement technical field, particularly relates to a kind of tamping equipment for steel pipe column concreting.
Background technology
The construction of current domestic concrete core cylinder+steel frame frame structure form Super High uses the most contour synchronization to rise construction technology, Core Walls Structure construction leading housing 6 ~ 8 layers, 3 ~ 6 layers of housing steel column leading housing floor, therefore housing floor concrete casting is led in the concreting of housing steel column, but it is limited to the impact pouring the scope of operation, steel column concreting is extremely difficult, and it is longer that monolayer pours the cycle, affects frame structure overall progress.The most emerging technique is perforate on steel column, and concrete is poured in steel column from hole, it is achieved housing steel column and floorslab concrete synchronize to pour.But because of concreting position away from steel pipe column top aspect ratio farther out, cause concrete vibrating operating difficulties, inefficiency, it is possible that concreting leakiness phenomenon.
Utility model content
Main purpose of the present utility model is to provide a kind of tamping equipment for steel pipe column concreting, it is intended to conveniently vibrate steel pipe column concreting.
For achieving the above object, this utility model provides a kind of tamping equipment for steel pipe column concreting, including the operating platform being set up in steel pipe column top, the travelling lifting device being installed on described operating platform, and it is positioned at below described travelling lifting device and is positioned at the integrated vibrating spear of steel pipe column, wherein, described travelling lifting device is connected with described integrated vibrating spear to promote integrated vibrating spear, on described operating platform, spool is installed, the cable electrically connected with integrated vibrating spear it is wound with on this spool, described travelling lifting device can be walked on the operational platform.
Preferably, the spool support base that described operating platform includes two parallel walking tracks, is installed on described parallel walking track, and connect the connecting rod of two described parallel walking tracks, wherein, described travelling lifting device is installed on parallel walking track and can roll walking on parallel walking track.
Preferably, it is provided with the U-type groove for being sticked on steel pipe column below described parallel walking track.
Preferably, described travelling lifting device includes driving vehicle frame, is positioned at described driving vehicle frame bottom and is installed on the vehicle wheel on described parallel walking track, is installed on the rope drum that the driving means of described driving vehicle frame is connected with described driving means, and it is wound in the rope on described rope drum, wherein, described rope is connected with integrated vibrating spear, and the work of described driving means drives rope drum to rotate to promote integrated vibrating spear.
Preferably, described driving means is motor.
Preferably, described integrated vibrating spear include vibrating holder, be installed on the flexible pipe that vibrates that the motor that vibrates vibrating in holder is connected with the described motor that vibrates, and be positioned at the vibrating spear below the flexible pipe that vibrates, described in the cable that motor one end stretches out that vibrates be wound on described spool.
Preferably, described in the holder that vibrates be provided with suspension ring, the lower section of described rope is fixed with suspension hook, and this suspension hook catches on described suspension ring to promote integrated vibrating spear.
The tamping equipment for steel pipe column concreting that the utility model proposes, by arrange operating platform, travelling lifting device and integrated vibrating spear with the use of, by operating platform, travelling lifting device is set up in above steel pipe column, can realize promoting integrated vibrating spear by travelling lifting device simultaneously, thus meet the demand that steel pipe column concreting is vibrated, because travelling lifting device can be walked on the operational platform, travelling lifting device can move up and down integrated vibrating spear, therefore scope of vibrating, without dead angle, improves vibrating effect.It addition, the three of this tamping equipment parts are separate, can split, convenient transfer.Meanwhile, this tamping equipment also has simple in construction, the advantage easily realized.
Accompanying drawing explanation
Fig. 1 is this utility model structural representation for the tamping equipment preferred embodiment of steel pipe column concreting;
Fig. 2 is the plan structure schematic diagram of the tamping equipment for steel pipe column concreting shown in Fig. 1;
Fig. 3 is this utility model structural representation of operating platform in the tamping equipment of steel pipe column concreting;
Fig. 4 is this utility model structural representation of travelling lifting device in the tamping equipment of steel pipe column concreting;
Fig. 5 is the side-looking structural representation of the travelling lifting device shown in Fig. 4;
Fig. 6 this utility model is the structural representation of integrated vibrating spear in the tamping equipment of steel pipe column concreting.
In figure, 1-operating platform, 2-travelling lifting device, the integrated vibrating spear of 3-, 4-parallel walking track, 5-connecting rod, 6-U type groove, 7-spool support base, 8-spool, 9-driving vehicle frame, 10-vehicle wheel, 11-motor, 12-rope drum, 13-rope, 14-suspension hook, 15-vibrate holder, 16-vibrates motor, 17-vibrates flexible pipe, 18-vibrating spear, 19-cable, 20-steel pipe column.
The realization of this utility model purpose, functional characteristics and advantage will in conjunction with the embodiments, are described further referring to the drawings.
Detailed description of the invention
Should be appreciated that specific embodiment described herein, only in order to explain this utility model, is not used to limit this utility model.
It should be noted that, in description of the present utility model, term " laterally ", " longitudinally ", on " ", D score, " front ", " afterwards ", " left ", " right ", " vertically ", " level ", " push up ", " end ", " interior ", orientation or the position relationship of the instruction such as " outward " are based on orientation shown in the drawings or position relationship, it is for only for ease of description this utility model and simplifies description, it is not to indicate or imply that the device of indication or element must have specific orientation, with specific azimuth configuration and operation, therefore it is not intended that to restriction of the present utility model.
Referring to figs. 1 through Fig. 6, tamping equipment for steel pipe column concreting, including the operating platform 1 being set up in steel pipe column 20 top, the travelling lifting device 2 that is installed on operating platform 1, and it is positioned at below travelling lifting device 2 and is positioned at the integrated vibrating spear 3 of steel pipe column 20, wherein, travelling lifting device 2 is connected to promote integrated vibrating spear 3 with integrated vibrating spear 3, spool 8 is installed on operating platform 1, being wound with the cable 19 electrically connected with integrated vibrating spear 3 on this spool 8, travelling lifting device 2 can be walked on operating platform 1.It is between operating platform 1, travelling lifting device 2 and integrated vibrating spear 3 and removably connects.
Specifically, the spool support base 7 that operating platform 1 includes two parallel walking tracks 4, is installed on parallel walking track 4, and the connecting rod 5(connecting two parallel walking tracks 4 can arrange two), wherein, travelling lifting device 2 is installed on parallel walking track 4 and can roll walking on parallel walking track 4.Parallel walking track 4 and connecting rod 5 all can use square tube to make.Spool 8 is installed on spool support base 7 and rotatable relative to it.Spool supports base 7 and is fixed on parallel walking track 4.
Further, it is provided with below parallel walking track 4 for being sticked in the U-lag on steel pipe column 20, thus realizes stably being installed on steel pipe column 20 parallel walking track 4.Specifically, U-type groove 6 can be formed at parallel walking track 4 Plate Welding.U-type groove 6 is provided with four, and the distance between four U-type groove 6 is determined by the diameter of steel pipe column 20.
Specifically, travelling lifting device 2 includes driving vehicle frame 9, is positioned at driving vehicle frame 9 bottom and is installed on the vehicle wheel 10 on parallel walking track 4, is installed on the rope drum 12 that the driving means of driving vehicle frame 9 is connected with driving means, and the rope 13 being wound on rope drum 12, wherein, rope 13 is connected with integrated vibrating spear 3, rope drum 12 is driven to rotate, to promote integrated vibrating spear 3 during driving means work.In the present embodiment, driving means is motor 11.Vehicle wheel 10 is provided with four, lays respectively at the bottom at four angles of vehicle wheel 10.
Integrated vibrating spear 3 include vibrating holder 15, be installed on the flexible pipe 17 that vibrates vibrating motor 16 and being connected with the motor 16 that vibrates vibrating in holder 15, and it being positioned at the vibrating spear 18 below the flexible pipe 17 that vibrates, the cable 19 that motor 16 one end of vibrating is stretched out is wound on spool 8.Because of concrete discharging mouth from concreting face close to 8m, therefore need the flexible pipe 17 that vibrates is added long process, prevent Concrete contamination from vibrating motor 16.The weight of operating platform 1, travelling lifting device 2 and integrated vibrating spear 3 all must not exceed 25kg, to facilitate it to shift.
It addition, vibrate, holder 15 is provided with suspension ring, and the lower section of rope 13 is fixed with suspension hook 14, and this suspension hook 14 catches on suspension ring to promote integrated vibrating spear 3.
As it is shown in figure 1, before Shi Gong, successively operating platform 1, travelling lifting device 2 and integrated vibrating spear 3 are arranged on the top of steel pipe column 20;During construction, workmen is manipulated by driving vehicle frame 9 and moves before and after parallel walking track 4, and motor 11 work controls the position of vibrating of vibrating spear 18;After having constructed, remove integrated vibrating spear 3, travelling lifting device 2, operating platform 1 successively, and be transported to next root steel pipe column 20, and the above operation of repetition is constructed.
The tamping equipment for steel pipe column concreting that the present embodiment proposes, by arranging operating platform 1, travelling lifting device 2 and integrated vibrating spear 3 with the use of, by operating platform 1, travelling lifting device 2 is set up in the top of steel pipe column 20, can realize promoting integrated vibrating spear 3 by travelling lifting device 2 simultaneously, thus meet the demand that steel pipe column concreting is vibrated, because travelling lifting device 2 can be walked on operating platform 1, travelling lifting device 2 can move up and down integrated vibrating spear 3, therefore scope of vibrating is without dead angle, improve vibrating effect.It addition, the three of this tamping equipment parts are separate, can split, convenient transfer.Meanwhile, this tamping equipment also has simple in construction, the advantage easily realized.
These are only preferred embodiment of the present utility model; not thereby the scope of the claims of the present utility model is limited; every equivalent structure transformation utilizing this utility model description and accompanying drawing content to be made; or directly or indirectly it is used in other relevant technical fields, the most in like manner it is included in scope of patent protection of the present utility model.
Claims (7)
1. the tamping equipment for steel pipe column concreting, it is characterized in that, including the operating platform being set up in steel pipe column top, the travelling lifting device that is installed on described operating platform, and it is positioned at below described travelling lifting device and is positioned at the integrated vibrating spear of steel pipe column, wherein, described travelling lifting device is connected with described integrated vibrating spear to promote integrated vibrating spear, on described operating platform, spool is installed, being wound with the cable electrically connected with integrated vibrating spear on this spool, described travelling lifting device can be walked on the operational platform.
2. the tamping equipment for steel pipe column concreting as claimed in claim 1, it is characterized in that, the spool support base that described operating platform includes two parallel walking tracks, is installed on described parallel walking track, and connect the connecting rod of two described parallel walking tracks, wherein, described travelling lifting device is installed on parallel walking track and can roll walking on parallel walking track.
3. the tamping equipment for steel pipe column concreting as claimed in claim 2, it is characterised in that be provided with the U-type groove for being sticked on steel pipe column below described parallel walking track.
4. the tamping equipment for steel pipe column concreting as claimed in claim 2, it is characterized in that, described travelling lifting device includes driving vehicle frame, is positioned at described driving vehicle frame bottom and is installed on the vehicle wheel on described parallel walking track, is installed on the rope drum that the driving means of described driving vehicle frame is connected with described driving means, and it is wound in the rope on described rope drum, wherein, described rope is connected with integrated vibrating spear, and the work of described driving means drives rope drum to rotate to promote integrated vibrating spear.
5. the tamping equipment for steel pipe column concreting as claimed in claim 4, it is characterised in that described driving means is motor.
6. the tamping equipment for steel pipe column concreting as described in claim 4 or 5, it is characterized in that, described integrated vibrating spear include vibrating holder, be installed on the flexible pipe that vibrates that the motor that vibrates vibrating in holder is connected with the described motor that vibrates, and be positioned at the vibrating spear below the flexible pipe that vibrates, described in the cable that motor one end stretches out that vibrates be wound on described spool.
7. the tamping equipment for steel pipe column concreting as claimed in claim 6, it is characterised in that described in the holder that vibrates be provided with suspension ring, the lower section of described rope is fixed with suspension hook, and this suspension hook catches on described suspension ring and promotes integrated vibrating spear.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620167786.0U CN205476513U (en) | 2016-03-04 | 2016-03-04 | A vibration device for steel -pipe column concrete placement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620167786.0U CN205476513U (en) | 2016-03-04 | 2016-03-04 | A vibration device for steel -pipe column concrete placement |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205476513U true CN205476513U (en) | 2016-08-17 |
Family
ID=56659579
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620167786.0U Active CN205476513U (en) | 2016-03-04 | 2016-03-04 | A vibration device for steel -pipe column concrete placement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205476513U (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107227689A (en) * | 2017-07-11 | 2017-10-03 | 中国铁建大桥工程局集团有限公司 | Plate bridge pier column concrete vibrating equipment |
CN108861892A (en) * | 2018-08-14 | 2018-11-23 | 蔚来汽车有限公司 | Automatic takeup system and charging pile |
CN110173119A (en) * | 2019-06-27 | 2019-08-27 | 中核华辰建筑工程有限公司 | A kind of pumping of concrete construction is vibrated integrated equipment |
CN110644374A (en) * | 2019-10-14 | 2020-01-03 | 中交武汉港湾工程设计研究院有限公司 | Multifunctional construction platform for concrete inner cavity and construction method thereof |
CN111113628A (en) * | 2019-12-03 | 2020-05-08 | 湖北省路桥集团有限公司 | Construction method for spraying prefabricated T-shaped beam |
CN111764731A (en) * | 2020-07-10 | 2020-10-13 | 郭顺合 | Tower installation and reinforcement construction method based on 5G communication line |
CN112160600A (en) * | 2020-09-30 | 2021-01-01 | 重庆建工集团股份有限公司 | Concrete pouring device |
CN113106855A (en) * | 2021-04-20 | 2021-07-13 | 樊涛 | Bridge support building and pouring forming equipment and method |
CN113152439A (en) * | 2021-04-06 | 2021-07-23 | 中交第二航务工程局有限公司 | Pile body concrete vibrating rod lifting device and construction method thereof |
CN113186928A (en) * | 2021-05-24 | 2021-07-30 | 合肥工业大学 | Mechanical intelligent vibration device of multidirectional regulation of tractive formula |
-
2016
- 2016-03-04 CN CN201620167786.0U patent/CN205476513U/en active Active
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107227689A (en) * | 2017-07-11 | 2017-10-03 | 中国铁建大桥工程局集团有限公司 | Plate bridge pier column concrete vibrating equipment |
CN108861892A (en) * | 2018-08-14 | 2018-11-23 | 蔚来汽车有限公司 | Automatic takeup system and charging pile |
CN110173119A (en) * | 2019-06-27 | 2019-08-27 | 中核华辰建筑工程有限公司 | A kind of pumping of concrete construction is vibrated integrated equipment |
CN110173119B (en) * | 2019-06-27 | 2024-04-05 | 中核华辰建筑工程有限公司 | Pumping and vibrating integrated equipment for concrete construction |
CN110644374B (en) * | 2019-10-14 | 2021-07-06 | 中交武汉港湾工程设计研究院有限公司 | Multifunctional construction platform for concrete inner cavity and construction method thereof |
CN110644374A (en) * | 2019-10-14 | 2020-01-03 | 中交武汉港湾工程设计研究院有限公司 | Multifunctional construction platform for concrete inner cavity and construction method thereof |
CN111113628A (en) * | 2019-12-03 | 2020-05-08 | 湖北省路桥集团有限公司 | Construction method for spraying prefabricated T-shaped beam |
CN111113628B (en) * | 2019-12-03 | 2021-05-28 | 湖北省路桥集团有限公司 | Construction method for spraying prefabricated T-shaped beam |
CN111764731B (en) * | 2020-07-10 | 2021-07-09 | 北京华光浩阳科技有限公司 | Tower installation and reinforcement construction method based on 5G communication line |
CN111764731A (en) * | 2020-07-10 | 2020-10-13 | 郭顺合 | Tower installation and reinforcement construction method based on 5G communication line |
CN112160600A (en) * | 2020-09-30 | 2021-01-01 | 重庆建工集团股份有限公司 | Concrete pouring device |
CN113152439A (en) * | 2021-04-06 | 2021-07-23 | 中交第二航务工程局有限公司 | Pile body concrete vibrating rod lifting device and construction method thereof |
CN113152439B (en) * | 2021-04-06 | 2022-04-26 | 中交第二航务工程局有限公司 | Pile body concrete vibrating rod lifting device and construction method thereof |
CN113106855A (en) * | 2021-04-20 | 2021-07-13 | 樊涛 | Bridge support building and pouring forming equipment and method |
CN113106855B (en) * | 2021-04-20 | 2022-12-30 | 唐山市华运铁路交通器材有限公司 | Bridge support building and pouring forming equipment and method |
CN113186928A (en) * | 2021-05-24 | 2021-07-30 | 合肥工业大学 | Mechanical intelligent vibration device of multidirectional regulation of tractive formula |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205476513U (en) | A vibration device for steel -pipe column concrete placement | |
CN205325920U (en) | Vibrating device | |
CN113152439B (en) | Pile body concrete vibrating rod lifting device and construction method thereof | |
CN106012717B (en) | One kind is vibrated apparatus for leveling | |
CN113187242A (en) | Multi-connection concrete vibrating device and using method | |
CN110424224A (en) | The construction method of kerbstone | |
CN206337827U (en) | A kind of slim-lined construction post automatic vibrating device | |
CN205189422U (en) | Concrete casting apparatus | |
CN205638491U (en) | Multi -functional platform truck | |
CN208870380U (en) | Mobile device and removable wall form for wall form | |
CN102352628A (en) | Filling pile concrete guide pipe assembling and disassembling device and construction method thereof | |
CN208379441U (en) | Moving die plate | |
CN208831042U (en) | Construction trolley | |
CN109653769A (en) | The tamping agency and method of side wall concrete during a kind of Tunnel Second Lining mould is built | |
CN101705748B (en) | Formwork for placing concrete on slope surface | |
CN202910964U (en) | Prefabricated box web adhering type concrete vibrorammer | |
CN101942804A (en) | Bridge surface construction vehicle for high-speed railway | |
CN113309000B (en) | Vibration system applied to bridge main tower construction | |
CN206298805U (en) | Road vibration beam | |
CN209162590U (en) | A kind of municipal road engineering concrete vibrating device | |
CN208686102U (en) | A kind of concrete leakproof shake device | |
CN208413687U (en) | The anti-pollution automatic feeding apparatus of Portable oil pipe | |
CN208034949U (en) | A kind of dedicated concrete slab of Construction of Civil Engineering pours device | |
CN206157583U (en) | Platform truck is used in construction of high -speed railway case roof beam straight wall | |
CN220030663U (en) | Prefabricating device for solid tubular pile head |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210622 Address after: 19 / F, Sanqi square, 146 Minzu Avenue, Qingxiu District, Nanning City, Guangxi Zhuang Autonomous Region Patentee after: GUANGXI BRANCH OF THE FIRST CONSTRUCTION ENGINEERING LIMITED COMPANY OF CHINA CONSTRUCTION THIRD ENGINEERING BUREAU Address before: 430040, No. 1, Soochow Road, Dongxihu District, Hubei, Wuhan Patentee before: NO. 1 CONSTRUCTION ENGINEERING CO., LTD. OF CHINA CONSTRUCTION THIRD ENGINEERING BUREAU Co.,Ltd. |
|
TR01 | Transfer of patent right |